Modular intelligent monitoring system supporting multi-source data

Through the time area division, data collection and analysis of the modular intelligent monitoring system, the problem of insufficient multi-source data processing capabilities in the existing technology is solved, and the fine monitoring and in-depth analysis of industrial production is realized, and the efficiency of production management is improved. Security.

CN118966882APending Publication Date: 2024-11-15HENGRUITONG FUJIAN INFORMATION TECH CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411011498.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing production monitoring system has a single data source, limited data processing capabilities and lacks intelligent analysis methods when processing multi-source data, which is difficult to meet the needs of real-time monitoring and in-depth analysis in industrial production, which limits the efficiency and effectiveness of production management.

Method used

A modular intelligent monitoring system supporting multi-source data was designed, including time area division module, production data acquisition module, production data analysis module, comprehensive analysis module and early warning module. By dividing production time into sub-time areas, the production time is collected and Analyze production environment, energy consumption, production equipment and product quality data, calculate the comprehensive abnormality index and issue early warning signals.

Benefits of technology

It realizes fine analysis and comprehensive data collection of the production process, identify abnormal situations, improves the efficiency and effectiveness of production management, responds to production problems in a timely manner, reduces production losses, and improves production safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118966882A_ABST
    Figure CN118966882A_ABST
Patent Text Reader

Abstract

The invention discloses a modular intelligent monitoring system supporting multi-source data, particularly relates to the field of intelligent monitoring, and comprises a time region division module, a production data acquisition module, a production data analysis module, a comprehensive analysis module and an early warning module. According to the invention, fine management of production time is realized through the time region division module, the production data acquisition module comprehensively collects various data in the production process and ensures the integrity and accuracy of the data, and the production data analysis module deeply analyzes the various data and provides a scientific basis for production management. The comprehensive analysis module integrates results of all the analysis units and calculates a comprehensive abnormal index, a reliable basis is provided for early warning, and the early warning module sends out an early warning signal in time to help to quickly respond to production problems. In addition, the flexibility and the expandability of the system are improved through the modular design, and the comprehensiveness and the accuracy of monitoring are enhanced through multi-source data support.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of intelligent monitoring technology, and more specifically, to a modular intelligent monitoring system supporting multi-source data. Background Art

[0002] In the current industrial field, production monitoring systems are an important means to ensure efficient and stable operation of the production process. Traditional production monitoring systems are mostly designed for a single data source and lack the ability to comprehensively process and analyze different types of data. With the continuous expansion of industrial production scale and the improvement of intelligence level, the requirements for production monitoring systems are also increasing. Not only do they need to be able to monitor various data in the production process in real time, but they also need to have the ability to conduct in-depth mining and comprehensive analysis of these data in order to promptly discover problems in the production process and take corresponding countermeasures.

[0003] However, existing production monitoring systems often have the following shortcomings when processing multi-source data: first, the data source is single, which makes it difficult to fully reflect the production status; second, the data processing capacity is limited and cannot meet the real-time monitoring needs in the big data environment; third, there is a lack of intelligent analysis methods, making it difficult to extract valuable information from massive data. These problems limit the application effect of the production monitoring system and affect the efficiency and effectiveness of production management. Summary of the invention

[0004] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a modular intelligent monitoring system supporting multi-source data, and solves the problems raised in the above-mentioned background technology through the following scheme.

[0005] To achieve the above object, the present invention provides the following technical solution: a modular intelligent monitoring system supporting multi-source data, comprising:

[0006] Time zone division module: used to determine the production time of the target factory as the target time zone, divide the target time zone into sub-time zones by equal time division, and mark them as 1, 2...n in sequence;

[0007] Production data collection module: used to collect production environment data, energy consumption data, production equipment data, and product quality data of each sub-time zone, and transmit the collected data to the production data analysis module;

[0008] Production data analysis module: including production environment data analysis unit, energy consumption data analysis unit, production equipment data analysis unit, and product quality data analysis unit, used to analyze the data transmitted by the production data acquisition module and transmit the analysis results to the comprehensive analysis module;

[0009] Comprehensive analysis module: used to establish a comprehensive analysis model, import the data transmitted by the production data analysis module into the comprehensive analysis model, calculate the comprehensive abnormal index of the target time area, and transmit it to the early warning module;

[0010] Early warning module: used to establish a preset value of the comprehensive abnormality index, judge the comprehensive abnormality index of the target data area through the preset value of the comprehensive abnormality index, and issue an early warning signal based on the judgment result.

[0011] Preferably, the production environment data include workshop temperature, air cleanliness, noise level, and light intensity, which are marked as Rt, Ra, Rc, and Ro, respectively; the energy consumption data include electricity consumption, water resource consumption, CO2 emissions, and waste generation, which are marked as Ce, Cw, Co, and Cf, respectively; the production equipment data include equipment vibration frequency, equipment temperature, production rate, and equipment downtime, which are marked as Pf, Pt, Pv, and Ps, respectively; the product quality data include product defective rate, raw material consumption rate, production cycle time, and employee production efficiency, which are marked as Qs, Ql, Qt, and Qv, respectively.

[0012] Preferably, the production environment data analysis unit is used to establish a production environment data analysis model, import the production environment data transmitted by the production data acquisition module into the production environment data analysis model, and calculate the production environment characteristic value of each sub-time zone, which is specifically expressed as: ER i represents the production environment characteristic value of the ith sub-time zone, Rt i represents the workshop temperature in the ith sub-time zone, Ra i Represents the air cleanliness of the ith sub-time zone, Rc i represents the noise level of the ith sub-time region, Ro i represents the light intensity of the i-th sub-time zone, and μ1 represents other influencing factors of the production environment characteristic value.

[0013] Preferably, the energy consumption data analysis unit is used to establish an energy consumption data analysis model, import the energy consumption data transmitted by the production data acquisition module into the energy consumption data analysis model, and calculate the energy consumption characteristic value of each sub-time zone, which is specifically expressed as: EC i represents the energy consumption characteristic value of the i-th sub-time zone, Ce i represents the power consumption of the ith sub-time zone, Cw i represents the water resource consumption in the ith sub-time zone, Co i represents the CO2 emissions in the ith sub-time zone, Cf irepresents the amount of waste generated in the i-th sub-time zone, and μ2 represents other influencing factors of the energy consumption characteristic value.

[0014] Preferably, the production equipment data analysis unit is used to establish a production equipment data analysis model, import the production equipment data transmitted by the production data acquisition module into the production equipment data analysis model, and calculate the production equipment characteristic value of each sub-time zone, which is specifically expressed as: EP i represents the characteristic value of the production equipment in the ith sub-time zone, Pf i Indicates the vibration frequency of the device in the ith sub-time zone, Pt i represents the device temperature in the ith sub-time zone, Pv i represents the production rate of the ith sub-time zone, Ps i represents the equipment downtime in the i-th sub-time zone, and μ3 represents other influencing factors of the characteristic value of the production equipment.

[0015] Preferably, the production equipment data analysis unit is used to establish a production equipment data analysis model, import the production equipment data transmitted by the production data acquisition module into the production equipment data analysis model, and calculate the production equipment characteristic value of each sub-time zone, which is specifically expressed as: EQ i represents the characteristic value of the production equipment in the ith sub-time zone, Qs i represents the product defect rate in the ith sub-time zone, Ql i represents the raw material consumption rate in the ith sub-time zone, Qt i represents the production cycle time of the ith sub-time zone, Qv i represents the employee production efficiency in the i-th sub-time zone, and μ4 represents other influencing factors of the characteristic value of production equipment.

[0016] Preferably, the comprehensive analysis model is specifically expressed as: η represents the comprehensive abnormality index of the target time zone, ER i represents the production environment characteristic value of the ith sub-time zone, EC i represents the energy consumption characteristic value of the i-th sub-time zone, EP i represents the characteristic value of the production equipment in the ith sub-time zone, EQ i represents the characteristic value of the production equipment in the i-th sub-time zone, and λ represents other influencing factors of the comprehensive abnormality index.

[0017] Preferably, the preset value of the comprehensive abnormality index is marked as η Def , when η Def >η, it means that the comprehensive abnormality index of the target data area is less than the preset value of the comprehensive abnormality index, indicating that the production quality of the target factory is good.Def When <η, it means that the comprehensive abnormality index of the target data area is greater than the preset value of the comprehensive abnormality index, indicating that the production quality of the target factory is poor, and an early warning signal is sent to the management terminal.

[0018] Technical effects and advantages of the present invention:

[0019] The present invention divides the production time of the target factory into multiple sub-time areas by equal time division through the time area division module, so that the system can analyze the production status of different time periods more finely, which is helpful to find potential production problems or optimize the production process; the production environment data, energy consumption data, production equipment data, and product quality data of each sub-time area are comprehensively collected through the production data acquisition module, providing a rich data source for subsequent data analysis, ensuring the comprehensiveness and accuracy of the analysis; the production environment, energy consumption, production equipment, product quality and other data are analyzed in depth through the production data analysis module, and the relevant characteristic values ​​of each sub-time area are calculated, which is helpful for the system to identify abnormal conditions and potential problems in production; a comprehensive analysis model is established through the comprehensive analysis module, the results of multiple analysis units are integrated, and the comprehensive abnormal index of the target time area is calculated, which provides a scientific basis for the early warning function of the system, and the module helps to evaluate the production status as a whole and improve the efficiency and effect of production management; the comprehensive abnormal index preset value is set through the early warning module, the comprehensive abnormal index of the target data area is judged, and an early warning signal is issued in time when an abnormality is found. This function helps to quickly respond to problems in production, reduce production losses, and improve production safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the overall structure of the present invention. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0022] refer to Figure 1 A modular intelligent monitoring system supporting multi-source data is shown, including a time zone division module, a production data acquisition module, a production data analysis module, a comprehensive analysis module, and an early warning module.

[0023] The time zone division module is used to determine the production time of the target factory as the target time zone, divide the target time zone into various sub-time zones by equal time division, and mark them as 1, 2...n in sequence.

[0024] The production data acquisition module is used to collect production environment data, energy consumption data, production equipment data, and product quality data in each sub-time zone, and transmit the collected data to the production data analysis module.

[0025] The production environment data include workshop temperature, air cleanliness, noise level, and light intensity, which are marked as Rt, Ra, Rc, and Ro respectively; the energy consumption data include electricity consumption, water consumption, CO2 emissions, and waste generation, which are marked as Ce, Cw, Co, and Cf respectively; the production equipment data include equipment vibration frequency, equipment temperature, production rate, and equipment downtime, which are marked as Pf, Pt, Pv, and Ps respectively; the product quality data include product defective rate, raw material consumption rate, production cycle time, and employee production efficiency, which are marked as Qs, Ql, Qt, and Qv respectively.

[0026] The production data analysis module includes a production environment data analysis unit, an energy consumption data analysis unit, a production equipment data analysis unit, and a product quality data analysis unit, which are used to analyze the data transmitted by the production data acquisition module and transmit the analysis results to the comprehensive analysis module.

[0027] The production environment data analysis unit is used to establish a production environment data analysis model, import the production environment data transmitted by the production data acquisition module into the production environment data analysis model, and calculate the production environment characteristic value of each sub-time zone, which is specifically expressed as: ER i represents the production environment characteristic value of the ith sub-time zone, Rt i represents the workshop temperature in the ith sub-time zone, Ra i Represents the air cleanliness of the ith sub-time zone, Rc i represents the noise level of the ith sub-time region, Ro i represents the light intensity of the i-th sub-time zone, and μ1 represents other influencing factors of the production environment characteristic value.

[0028] The energy consumption data analysis unit is used to establish an energy consumption data analysis model, import the energy consumption data transmitted by the production data acquisition module into the energy consumption data analysis model, and calculate the energy consumption characteristic value of each sub-time zone, which is specifically expressed as: EC i represents the energy consumption characteristic value of the i-th sub-time zone, Ce irepresents the power consumption of the ith sub-time zone, Cw i represents the water resource consumption in the ith sub-time zone, Co i represents the CO2 emissions in the ith sub-time zone, Cf i represents the amount of waste generated in the i-th sub-time zone, and μ2 represents other influencing factors of the energy consumption characteristic value.

[0029] The production equipment data analysis unit is used to establish a production equipment data analysis model, import the production equipment data transmitted by the production data acquisition module into the production equipment data analysis model, and calculate the production equipment characteristic value of each sub-time zone, which is specifically expressed as: represents the characteristic value of the production equipment in the ith sub-time zone, Pf i Indicates the vibration frequency of the device in the ith sub-time zone, Pt i represents the device temperature in the ith sub-time zone, Pv i represents the production rate of the ith sub-time zone, Ps i represents the equipment downtime in the i-th sub-time zone, and μ3 represents other influencing factors of the characteristic value of the production equipment.

[0030] The production equipment data analysis unit is used to establish a production equipment data analysis model, import the production equipment data transmitted by the production data acquisition module into the production equipment data analysis model, and calculate the production equipment characteristic value of each sub-time zone, which is specifically expressed as: EQ i represents the characteristic value of the production equipment in the ith sub-time zone, Qs i represents the product defect rate in the ith sub-time zone, Ql i represents the raw material consumption rate in the ith sub-time zone, Qt i represents the production cycle time of the ith sub-time zone, Qv i represents the employee production efficiency in the i-th sub-time zone, and μ4 represents other influencing factors of the characteristic value of production equipment.

[0031] The comprehensive analysis module is used to establish a comprehensive analysis model, import the data transmitted by the production data analysis module into the comprehensive analysis model, calculate the comprehensive abnormality index of the target time area, and transmit it to the early warning module.

[0032] The comprehensive analysis model is specifically expressed as: η represents the comprehensive abnormality index of the target time zone, ER i represents the production environment characteristic value of the ith sub-time zone, EC i represents the energy consumption characteristic value of the i-th sub-time zone, EP i represents the characteristic value of the production equipment in the ith sub-time zone, EQi represents the characteristic value of the production equipment in the i-th sub-time zone, and λ represents other influencing factors of the comprehensive abnormality index.

[0033] The early warning module is used to establish a preset value of the comprehensive abnormality index, judge the comprehensive abnormality index of the target data area through the preset value of the comprehensive abnormality index, and issue an early warning signal according to the judgment result.

[0034] The preset value of the comprehensive abnormality index is marked as η Def , when η Def >η, it means that the comprehensive abnormality index of the target data area is less than the preset value of the comprehensive abnormality index, indicating that the production quality of the target factory is good. Def When <η, it means that the comprehensive abnormality index of the target data area is greater than the preset value of the comprehensive abnormality index, indicating that the production quality of the target factory is poor, and an early warning signal is sent to the management terminal.

[0035] The present invention divides the production time of the target factory into multiple sub-time areas by equal time division through the time area division module, so that the system can analyze the production status of different time periods more finely, which is helpful to find potential production problems or optimize the production process; the production environment data, energy consumption data, production equipment data, and product quality data of each sub-time area are comprehensively collected through the production data acquisition module, providing a rich data source for subsequent data analysis, ensuring the comprehensiveness and accuracy of the analysis; the production environment, energy consumption, production equipment, product quality and other data are analyzed in depth through the production data analysis module, and the relevant characteristic values ​​of each sub-time area are calculated, which is helpful for the system to identify abnormal conditions and potential problems in production; a comprehensive analysis model is established through the comprehensive analysis module, the results of multiple analysis units are integrated, and the comprehensive abnormal index of the target time area is calculated, which provides a scientific basis for the early warning function of the system, and the module helps to evaluate the production status as a whole and improve the efficiency and effect of production management; the comprehensive abnormal index preset value is set through the early warning module, the comprehensive abnormal index of the target data area is judged, and an early warning signal is issued in time when an abnormality is found. This function helps to quickly respond to problems in production, reduce production losses, and improve production safety.

[0036] Secondly: In the drawings of the embodiments disclosed in the present invention, only the structures related to the embodiments disclosed in the present invention are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present invention can be combined with each other;

[0037] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A modular intelligent monitoring system supporting multi-source data, characterized in that: include: Time zone division module: used to determine the production time of the target factory as the target time zone, divide the target time zone into sub-time zones by equal time division, and mark them as 1, 2...n in sequence; Production data collection module: used to collect production environment data, energy consumption data, production equipment data, and product quality data of each sub-time zone, and transmit the collected data to the production data analysis module; Production data analysis module: including production environment data analysis unit, energy consumption data analysis unit, production equipment data analysis unit, and product quality data analysis unit, used to analyze the data transmitted by the production data acquisition module and transmit the analysis results to the comprehensive analysis module; Comprehensive analysis module: used to establish a comprehensive analysis model, import the data transmitted by the production data analysis module into the comprehensive analysis model, calculate the comprehensive abnormal index of the target time area, and transmit it to the early warning module; Early warning module: used to establish a preset value of the comprehensive abnormality index, judge the comprehensive abnormality index of the target data area through the preset value of the comprehensive abnormality index, and issue an early warning signal based on the judgment result.

2. A modular intelligent monitoring system supporting multi-source data according to claim 1, characterized in that: The production environment data include workshop temperature, air cleanliness, noise level, and light intensity, which are marked as Rt, Ra, Rc, and Ro respectively; the energy consumption data include electricity consumption, water consumption, CO2 emissions, and waste generation, which are marked as Ce, Cw, Co, and Cf respectively; the production equipment data include equipment vibration frequency, equipment temperature, production rate, and equipment downtime, which are marked as Pf, Pt, Pv, and Ps respectively; the product quality data include product defective rate, raw material consumption rate, production cycle time, and employee production efficiency, which are marked as Qs, Ql, Qt, and Qv respectively.

3. The modular intelligent monitoring system supporting multi-source data according to claim 1, characterized in that: The production environment data analysis unit is used to establish a production environment data analysis model, import the production environment data transmitted by the production data acquisition module into the production environment data analysis model, and calculate the production environment characteristic value of each sub-time zone, which is specifically expressed as: ER i represents the production environment characteristic value of the ith sub-time zone, Rt i represents the workshop temperature in the ith sub-time zone, Ra i Represents the air cleanliness of the ith sub-time zone, Rc i represents the noise level of the ith sub-time region, Ro i represents the light intensity of the i-th sub-time zone, and μ1 represents other influencing factors of the production environment characteristic value.

4. The modular intelligent monitoring system supporting multi-source data according to claim 1, characterized in that: The energy consumption data analysis unit is used to establish an energy consumption data analysis model, import the energy consumption data transmitted by the production data acquisition module into the energy consumption data analysis model, and calculate the energy consumption characteristic value of each sub-time zone, which is specifically expressed as: EC i represents the energy consumption characteristic value of the i-th sub-time zone, Ce i represents the power consumption of the ith sub-time zone, Cw i represents the water resource consumption in the ith sub-time zone, Co i represents the CO2 emissions in the ith sub-time zone, Cf i represents the amount of waste generated in the i-th sub-time zone, and μ2 represents other influencing factors of the energy consumption characteristic value.

5. The modular intelligent monitoring system supporting multi-source data according to claim 1, characterized in that: The production equipment data analysis unit is used to establish a production equipment data analysis model, import the production equipment data transmitted by the production data acquisition module into the production equipment data analysis model, and calculate the production equipment characteristic value of each sub-time zone, which is specifically expressed as: EP i represents the characteristic value of the production equipment in the ith sub-time zone, Pf i Indicates the vibration frequency of the device in the ith sub-time zone, Pt i Indicates the device temperature in the ith sub-time zone, Pv i represents the production rate of the ith sub-time zone, Ps i represents the equipment downtime in the i-th sub-time zone, and μ3 represents other influencing factors of the characteristic value of the production equipment.

6. The modular intelligent monitoring system supporting multi-source data according to claim 1, characterized in that: The production equipment data analysis unit is used to establish a production equipment data analysis model, import the production equipment data transmitted by the production data acquisition module into the production equipment data analysis model, and calculate the production equipment characteristic value of each sub-time zone, which is specifically expressed as: EQ i represents the characteristic value of the production equipment in the ith sub-time zone, Qs i represents the product defect rate in the ith sub-time zone, Ql i represents the raw material consumption rate in the ith sub-time zone, Qt i represents the production cycle time of the ith sub-time zone, Qv i represents the employee production efficiency in the i-th sub-time zone, and μ4 represents other influencing factors of the characteristic value of production equipment.

7. The modular intelligent monitoring system supporting multi-source data according to claim 1, characterized in that: The comprehensive analysis model is specifically expressed as: η represents the comprehensive abnormality index of the target time zone, ER i represents the production environment characteristic value of the ith sub-time zone, EC i represents the energy consumption characteristic value of the i-th sub-time zone, EP i represents the characteristic value of the production equipment in the ith sub-time zone, EQ i represents the characteristic value of the production equipment in the i-th sub-time zone, and λ represents other influencing factors of the comprehensive abnormality index.

8. The modular intelligent monitoring system supporting multi-source data according to claim 1, characterized in that: The preset value of the comprehensive abnormality index is marked as η Def , when η Def >η, it means that the comprehensive abnormality index of the target data area is less than the preset value of the comprehensive abnormality index, indicating that the production quality of the target factory is good. Def When <η, it means that the comprehensive abnormality index of the target data area is greater than the preset value of the comprehensive abnormality index, indicating that the production quality of the target factory is poor, and an early warning signal is sent to the management terminal.

Citation Information

Cited By

  • Business system development management system based on big data analysis

    CN119201056A

  • Port multi-energy fusion management system and method based on multi-source data analysis

    CN119250762A