Ventilation, heat insulation and waterproof roof system and method

Through the optimization of design and construction technology, the problem that the existing roofing system cannot achieve the best heat insulation, waterproofing and ventilation effect is solved, and the efficient performance and low-cost maintenance of the roofing system are achieved. It is suitable for different types of buildings and is in line with the environmental protection of modern buildings. and energy saving requirements.

CN119021428APending Publication Date: 2024-11-26ASIA PACIFIC CONSTR TECH INFORMATION RES INST CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411270536.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-11
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing ventilation, heat-insulating and waterproof roofing system has limitations in design and construction, and cannot fully meet the requirements of modern buildings for roofing systems, resulting in the insulating, waterproof and ventilation effects not reaching the best state, increasing the long-term use of the building. cost.

Method used

Adopting an optimized design and construction process, select appropriate roof substrates and materials, lay insulation layer, ventilation and waterproof layer, waterproof cushion layer and roof covering material according to the steps to ensure the sealing and performance of the roof system, including the use of corrugated cross-sectional materials and The aluminum foil waterproof cushion layer combines the construction method of hanging tile strips and tiles to carry out step-by-step quality control.

Benefits of technology

The roof system has achieved the best thermal insulation, waterproofing and ventilation performance, reduced internal temperature fluctuations of the building, reduced energy consumption, and simplified maintenance and maintenance, extended the service life of the roof system, and met environmental protection and energy-saving requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021428A_ABST
    Figure CN119021428A_ABST
Patent Text Reader

Abstract

The invention relates to the related technical field of ventilation, heat insulation and waterproof roofing, in particular to a ventilation, heat insulation and waterproof roofing system and a ventilation, heat insulation and waterproof roofing method, and provides a more efficient and reliable ventilation, heat insulation and waterproof roofing system. The heat insulation, waterproof and ventilation performance of the roof system is ensured to reach the optimal state, so that the temperature fluctuation in a building is effectively reduced, the energy consumption is reduced, the living or using comfort is improved, and by adopting advanced materials and construction technologies, the roof system is simpler and more convenient to maintain and overhaul in the later period, and the cost is reduced. The long-term use cost of the building is reduced, meanwhile, the service life of the roof system is prolonged, the roof system can be suitable for different types of buildings including flat roof and pitched roof roofs, and various building styles and use requirements are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field related to ventilated, heat-insulating and waterproof roofs, and in particular to a ventilated, heat-insulating and waterproof roof system and method. Background Art

[0002] Ventilated, heat-insulating and waterproof roof. In modern buildings, the roof system must not only withstand the test of various natural environments, but also meet the requirements of energy saving, environmental protection and comfort. Traditional roof systems often have problems such as poor thermal insulation performance, poor waterproofing effect and poor ventilation, which leads to large temperature fluctuations inside the building and increased energy consumption. In order to prevent the comprehensive consideration of ventilation, heat insulation and waterproofing performance, a ventilated, heat-insulating and waterproof roof system and method are particularly needed.

[0003] Because of the existing ventilation, heat-insulating and waterproof roofs, most ventilation, heat-insulating and waterproof roof systems and methods have certain limitations in design and construction, and cannot fully meet the requirements of modern buildings for roof systems. For example, some ventilation, heat-insulating and waterproof roof systems are not sophisticated enough in material selection and construction technology, resulting in the roof's insulation, waterproofing and ventilation effects cannot reach the optimal state. Some systems also have certain difficulties in later maintenance and overhaul, which increases the long-term use cost of the building. Summary of the invention

[0004] The purpose of the present invention is to provide a ventilated, heat-insulating and waterproof roofing system and method to solve the existing ventilated, heat-insulating and waterproof roofing problems mentioned in the above background technology. Most of the ventilated, heat-insulating and waterproof roofing systems and methods have certain limitations in design and construction and cannot fully meet the requirements of modern buildings for roofing systems. For example, some ventilated, heat-insulating and waterproof roofing systems are not sophisticated enough in material selection and construction technology, resulting in the roof's insulation, waterproofing and ventilation effects failing to achieve optimal conditions. Some systems also have certain difficulties in later maintenance and overhaul, increasing the long-term use cost of the building.

[0005] To achieve the above object, the present invention provides a ventilated, heat-insulating and waterproof roofing system, which is carried out according to the following steps:

[0006] S1. First, choose the right roofing substrate;

[0007] S2. Lay the insulation layer according to the requirements of the insulation calculation, such as extruded polystyrene board or polyurethane foam board;

[0008] S3. Lay a ventilation and waterproof layer on the roof substrate;

[0009] S4. Install a few characters on the crest of the ventilation and waterproof layer;

[0010] S5. Lay a waterproof cushion layer (aluminum foil) or waterproof roll material on the ventilation and waterproof layer;

[0011] S6. Install tile strips + tiles or other suitable roof covering materials on the aluminum foil waterproof cushion. The roof covering materials not only have the effect of aesthetics, but also protect the roof system from damage by external factors.

[0012] S7. Finally, inspect and test the entire roof system to ensure that all joints and interfaces are well sealed and there are no water leaks or poor ventilation. After passing the test, the roof system can be put into use.

[0013] Preferably, the roof substrate in S1 ensures that it has good bearing capacity and durability, and the substrate can be metal, concrete or other suitable materials.

[0014] Preferably, the ventilation and waterproof layer in S3 is usually made of a new material plate with a corrugated cross-section and a certain bearing capacity, which helps to discharge moisture under the roof, reduce the thermal bridge effect, and improve the overall performance of the roof;

[0015] Preferably, the waterproof cushion layer in S5 should be ensured to be intact and cover the entire roof area to ensure that there is no hidden danger of water leakage.

[0016] Preferably, the preferred method for constructing a ventilated, heat-insulating and waterproof roof described in S6 is carried out according to the following steps;

[0017] Q1. Acceptance of the base layer to ensure that the surface of the roof base layer is flat and has no obvious unevenness, providing a good foundation for subsequent construction;

[0018] Q2. Insulation layer construction: according to the size and shape of the roof substrate, cut the insulation materials into appropriate sizes and lay them on the substrate, ensuring that there are no gaps between the insulation materials to achieve the best insulation effect;

[0019] Q3. Construction of ventilation and waterproof layer: while laying the insulation layer, simultaneously lay the corrugated ventilation and waterproof layer;

[0020] Q4. Install a few code marks on the crest of the ventilation and waterproof layer to protect the ventilation and waterproof layer from being damaged during subsequent construction;

[0021] Q5. After the installation of the waterproof cushion layer, lay the aluminum foil waterproof cushion layer or waterproof membrane on the ventilation and waterproof layer;

[0022] Q6. Tile hanging strips are installed according to the slope of the roof and the specifications of the tiles;

[0023] Q7. Lay the roof tiles on the tile hanging strips according to the design requirements to achieve waterproof, aesthetic and protective effects.

[0024] Preferably, the waterproof layer described in Q3 and Q5, such as waterproof coating or waterproof membrane, is evenly applied or laid on the insulation layer to ensure that the waterproof layer is not damaged or missed, so as to form a continuous waterproof layer.

[0025] Preferably, the tile strips described in Q6 ensure that the tile hanging strips are firm and reliable, with uniform spacing, providing good support for the tiles.

[0026] Preferably, the tiles described in Q7 ensure that the tiles are closely connected without obvious gaps, and at the same time pay attention to the overlap length and direction of the tiles to ensure the waterproof performance and aesthetics of the roof.

[0027] Compared with the prior art, the present invention has the following beneficial effects:

[0028] 1. Provide a more efficient and reliable ventilation, heat insulation and waterproof roof system. By optimizing the design and construction process, ensure that the thermal insulation, waterproof and ventilation performance of the roof system reaches the best state, thereby effectively reducing the temperature fluctuation inside the building, reducing energy consumption, and improving living or use comfort.

[0029] 2. By adopting advanced materials and construction techniques, the roofing system of the present invention is easier to maintain and overhaul, which reduces the long-term use cost of the building and prolongs the service life of the roofing system.

[0030] 3. The ventilated, heat-insulating and waterproof roofing system of the present invention has good adaptability in design and can be applied to different types of buildings, including flat roofs and sloping roofs, to meet various architectural styles and usage requirements. During the construction process, the quality control of each step is ensured through step-by-step implementation, thereby ensuring the overall performance and reliability of the final roofing system. During the construction process, attention is paid to environmental protection and energy conservation, reducing waste and pollution during the construction process, and meeting the environmental protection requirements of modern buildings. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 This is a schematic diagram of the use steps of the ventilation, heat-insulating and waterproof roofing system of the present invention;

[0032] Figure 2 This is a schematic diagram of the steps of the ventilation, heat-insulating and waterproof roof construction method of the present invention;

[0033] Figure 3 This is a schematic diagram of the structure of the ventilation, heat insulation and waterproof roofing system of the present invention;

[0034] Figure 4 This is a schematic diagram of the three-dimensional structure of the ventilated, heat-insulating and waterproof roof of the present invention;

[0035] Figure 5 It is a schematic diagram of the three-dimensional side structure of the ventilated, heat-insulating and waterproof roof of the present invention. DETAILED DESCRIPTION

[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] See also Figure 1-3 , the present invention provides a ventilation, heat insulation and waterproof roofing system, which is carried out according to the following steps;

[0038] S1. First, choose the right roofing substrate;

[0039] S2. Lay the insulation layer according to the requirements of the insulation calculation, such as extruded polystyrene board or polyurethane foam board;

[0040] S3. Lay a ventilation and waterproof layer on the roof substrate;

[0041] S4. Install a few characters on the crest of the ventilation and waterproof layer;

[0042] S5. Lay a waterproof cushion layer (aluminum foil) or waterproof roll material on the ventilation and waterproof layer;

[0043] S6. Install tile strips + tiles or other suitable roof covering materials on the aluminum foil waterproof cushion. The roof covering materials not only have the effect of aesthetics, but also protect the roof system from damage by external factors.

[0044] S7. Finally, inspect and test the entire roof system to ensure that all joints and interfaces are well sealed and there are no water leaks or poor ventilation. After passing the test, the roof system can be put into use.

[0045] When processing the base layer, the roof facilities, embedded parts, and roof structures should have been installed. First, clean the roof base layer, remove the floating mortar and construction waste on the surface, and the roof should be dry, flat, and straight, without looseness, bulging, pits, sanding, dust and other defects; check the flatness with a 2m ruler and feeler gauge, and the error should not exceed 5mm; check the straightness of the ridge, gutter, etc. with a 2m support line, and repair the leveling layer to meet the requirements of the "Technical Specifications for Sloped Roof Engineering" GB50693-2011 before proceeding to the next process. The positive and negative corners of the leveling layer should be made into edges and corners, and arc shapes should not be used; when laying the insulation layer and waterproof board and installing the tile hanging strips, the base should be smooth and straight, and the surface should be smooth and straight. The surface should be flat and free of water, clean and dry. The insulation layer, waterproof board and tile hanging strips should be laid in place at one time and fixed with nylon anchors at the crest of the waterproof board. The anchors should be fixed in the roof structure layer with a fixing depth of ≥50mm. The large-area laying of the insulation layer and the waterproof layer should start from the eaves and be laid towards the ridge. The insulation layer should be laid in the air. The insulation materials entering the site should have quality certification documents such as test reports and certificates and meet the design requirements. They can only enter the site after passing the on-site sampling test. When laying on site, start from the eaves and lay in the air. There is no need to use mortar for bonding. The insulation layer should be laid tightly, flat and stable. The surface should be consistent with the height of the adjacent insulation layer. The gap between the plates should be ≤20mm, and there should be no gaps at the edges and corners. For larger areas, the insulation layer should be cut into small pieces for filling according to the shape of the edges and corners to ensure that the roof is fully covered with the insulation layer; when filling, it is advisable to give priority to using discarded scraps, and attention should be paid to staggered paving of large-surface insulation layers to prevent through-seam formation. The insulation boards at node locations such as the ridge need to be laid continuously. In areas such as gutters where two slopes intersect, the insulation layer should be thinned accordingly to match the curvature of the metal tiles that match the roof tiles to ensure that the high points on both sides of the gutter tiles are above the corrugated asphalt waterproofing sheet. The waterproofing sheet should cover the additional waterproofing layer and extend 2cm toward the center line to prevent water from the waterproofing sheet from draining under the gutter tiles. Open flames are strictly prohibited during the laying of the insulation layer, and smoking is prohibited at the construction site. After the construction of the roof insulation layer is completed, the construction unit Self-inspection should be carried out, and the parts of the insulation board that are warped, missing, or missed should be reworked and repaired; after passing the self-inspection, report to the supervision unit, and the supervision unit will organize the process acceptance. According to the acceptance opinion of the supervision engineer, repairs should be made again. Only after the supervision acceptance is qualified can the next process be entered. The corrugated asphalt waterproof board, which is a material for ventilation and waterproofing, should be laid along with the thermal insulation layer. The corrugated asphalt waterproof board should be laid in one sheet to ensure that the front and back sides are laid correctly. The laying order is to start from the eaves, from left to right for the first row, and from right to left and from bottom to top for the second row in a zigzag order; the first row of corrugated asphalt waterproof boards should be laid according to the control line drawn in advance, and the upper end of the waterproof board should coincide with the first horizontal control line;The overlap range of corrugated asphalt waterproof sheet is: 1 to 2 waves overlapped on the left and right, ≥100mm overlapped on the top and bottom. At the same time, it should be noted that the longitudinal joints of the upper and lower rows of waterproof sheets cannot be on the same straight line, and should be staggered by 1 / 3 to 1 / 2 of the width of the waterproof sheet. The installation height of the corrugated asphalt waterproof sheet at the ridge should be flush with the insulation layer on the top of the ridge. When the corrugated asphalt waterproof sheet is laid and encounters structures such as gutters, hanging hills (hard hills), and dormer windows, an electric cutting machine should be used for cutting, and the straightness of the cut section should be ≤4mm / m. When encountering pipes or other small-sized protruding components on the roof, the waterproof sheet should be cut (dug), and the cutting size should not be greater than 20mm outside the component size. When laying the waterproof sheet, installing the fixed code, laying the aluminum foil waterproof cushion layer and the tile hanging strip, the straightness of the tile hanging strip It should be ≤4mm, and the flatness should be within ±4mm. Use a special φ10 nylon anchor bolt (nail rod diameter 6mm) to pass through the tile hanging strips, waterproof cushion layer, waterproof board crest, and insulation board to fix the system on the roof base. The anchor bolt extends into the base ≥50mm. The tile hanging strips should be nailed flat and firm, the upper edges should be in a straight line, and the joints of the upper and lower rows of tile hanging strips should be staggered. The length of the nail rod of the nylon anchor bolt is the sum of the thickness of the tile hanging strips, aluminum foil waterproof cushion layer, corrugated asphalt waterproof board, and insulation board plus 50mm into the structural layer; if an impact drill is used to drill holes, the drill bit should be perpendicular to the roof to ensure that the nylon anchor bolt will not cause the tile hanging strips to move after construction. When drilling, a limit mark should be made at the drill bit according to the length of the nail rod of the nylon anchor bolt to ensure the same depth of the drilling hole, such as If the nail hole is off-center, be sure to pull it out and then re-drill on the adjacent wave crest, and seal the off-center nail hole tightly with waterproof material to ensure that there is no leakage. When positioning the spacing of the tile strips, wooden spacers can be used to determine the accurate spacing between the two tile strips, or a waterproof tile strip punching locator can be used to solve the problems of difficulty in leveling and straightening the tile strips and difficulty in drilling and locating holes. The waterproof tile strip punching locator is a patented product. It uses a punch caliper and a precise positioning system, and uses an impact drill to drill holes in the corrugated waterproof board through a positioning sleeve to ensure that the spacing between each hole fixing point is consistent and on the same axis, thereby achieving rapid and precise positioning and installation of the tile strips. The key operating points of the waterproof tile strip punching locator are: after installation, hold the positioning plate below the locator against the installed The upper positioning plate can accurately define the upper surface of the tile strip to be installed; the hammer head passes through the positioning hole on the positioning device card head to accurately punch holes, ensuring that the hole position is accurately on the crest of the waterproof board, ensuring the accuracy of the installation of the tile strip, eliminating the risk of leakage caused by the deviation of the bolt hole, and greatly improving the installation efficiency of the roof system. When hanging tiles, ① draw lines. After the tile strips are installed and fixed, a longitudinal straight line should be drawn before laying tiles. The method is as follows: reserve 50mm on the eaves on the left and right sides of the tile strips to draw lines at right angles to the eaves line; align the longitudinal straight line with the edge reinforcement position of the two tiles pre-laid from the eaves and the ridge, or calculate according to the width of the two tiles to determine the vertical straight line; align the lines when laying tiles to achieve horizontal tile surface, vertical tile seams, and diagonal alignment in three directions;② Pre-tiling. During the pre-tiling process, especially for large-area double-slope roofs, the effective width of the main tile is apportioned with the horizontal length of the roof. The 4mm adjustment distance of the left and right overlapping edges of the main tile can be fully utilized, and the terminal should be adjusted to the width of a whole tile or half a tile as much as possible; ③ Formal tiling. Starting from the lower right corner of the eaves, from right to left and from bottom to top, first lay the drainage ditch, then lay the main tile, and finally lay the ridge tile from bottom to top, and finally lay the ridge tile. The claws of each main tile must be tightly fastened to the tile hanging strips, and the corrugated tiles should be aligned with the tile seams or staggered according to the requirements of Party A; ④ Node processing. When ridges and diagonal grooves appear in the roof, if the main tile needs to be cut, 20mm should be retained parallel to the ridge line. When the claws of some main tiles are cut off and cannot be hung, they can be fixed by cutting nail holes; ⑤ Tile fixing After all the roof tiles are installed, the elastic flashing roll is used for closing and finishing. Note that the flashing roll should be sealed to avoid leakage at the closing. After the finished product protection strips and tile hanging strips are fixed, do not step directly on the wooden strips before laying tiles to prevent the wooden strips from breaking under stress. On the tiled roof, construction and maintenance personnel should try to walk in the middle of the tiles instead of stepping on the weaker tile joints. When cutting tiles, mark the tiles with numbers and try to do it under the roof to prevent the powder from getting wet and contaminating the roof. Further, the roof substrate described in S1 ensures that it has good bearing capacity and durability. The substrate can be metal, concrete or other suitable materials. ;

[0046] Furthermore, the ventilation and waterproof layer and the waterproof cushion layer in S3 and S5 should be ensured to be intact and cover the entire roof area.

[0047] Furthermore, the ventilation and waterproof layer in S3 usually uses a corrugated asphalt waterproof sheet, which helps to discharge moisture under the roof, reduce the thermal bridge effect, and improve the overall performance of the roof.

[0048] Further, a ventilation, heat-insulating and waterproof roof construction method is carried out according to the following steps;

[0049] Q1. Acceptance of the base layer to ensure that the surface of the roof base layer is flat and has no obvious unevenness, providing a good foundation for subsequent construction;

[0050] Q2. Insulation layer construction: according to the size and shape of the roof substrate, cut the insulation materials into appropriate sizes and lay them on the substrate, ensuring that there are no gaps between the insulation materials to achieve the best insulation effect;

[0051] Q3. Construction of ventilation and waterproof layer: while laying the insulation layer, simultaneously lay the corrugated ventilation and waterproof layer;

[0052] Q4. Install a few code marks on the crest of the ventilation and waterproof layer to protect the ventilation and waterproof layer from being damaged during subsequent construction;

[0053] Q5. After the installation of the waterproof cushion layer, lay the aluminum foil waterproof cushion layer or waterproof membrane on the ventilation and waterproof layer;

[0054] Q6. Tile hanging strips are installed according to the slope of the roof and the specifications of the tiles;

[0055] Q7. Lay the roof tiles on the tile hanging strips according to the design requirements to achieve waterproof, aesthetic and protective effects.

[0056] 1. Process flow

[0057] Acceptance of roof leveling layer → laying of insulation layer, ventilation and waterproof layer, code, waterproof cushion layer and tile hanging strips → interlaced node construction → inclined gutter construction → installation of main tiles → installation of inclined ridges → closing;

[0058] 2. Construction points

[0059] ① Acceptance of roof leveling layer

[0060] The roof leveling layer is a general contracting construction item. When the slope roof project enters the construction site, the leveling layer should be inspected and accepted. The acceptance standards are: the leveling layer should be firm and solid, with no bumps, sand or bulging on the surface. If there is snow, residual frost, debris, etc., it should be cleaned up, and the flatness error is required to be within 5mm; before laying the roof waterproof layer, the leveling layer should be clean and dry. The method for testing the degree of dryness is to lay 1m2 of coiled material flat on the leveling layer, leave it for 3 to 4 hours, then open it for inspection. If there is no watermark on the part covered by the leveling layer and the coiled material, the waterproof layer can be laid; the connection between the leveling layer and the protruding roof structure such as the parapet, vertical wall, skylight wall, expansion joint, chimney, and the corners of the leveling layer (water outlet, eaves, gutter, eaves, ridge, etc.) should be made into arcs. If the leveling layer does not meet the requirements, it needs to be repaired or reworked by the general contractor. Only after meeting the requirements can the roof project enter the construction site.

[0061] ② Lay the insulation layer, ventilation and waterproof layer, code, waterproof cushion layer and tile hanging strips

[0062] The insulation layer should be laid in an empty space with staggered joints. No mortar is required. The joints should be tight and the paving should be dense. If the flatness of the base layer does not meet the requirements, polymer mortar can be used to paste the insulation board to facilitate leveling.

[0063] The corrugated asphalt waterproof sheet used as ventilation and insulation layer should be laid together with the insulation layer. The waterproof sheet should overlap 1 to 2 waves on the left and right, and the overlap distance between the top and bottom should be ≥100mm.

[0064] The code should be fixed on the crest of the corrugated asphalt waterproof sheet;

[0065] The aluminum foil waterproof cushion layer should be laid continuously and not damaged to ensure its waterproof effect;

[0066] The tile hanging strips should be installed along with the insulation board, waterproof board and waterproof cushion layer. Use special φ10 nylon anchor bolts to pass through the tile hanging strips, waterproof cushion layer, waterproof board crest, and insulation board to fix the system on the base layer. The anchor bolts extend into the roof base layer by 50mm. It should be noted that the tile hanging strips should be arranged according to the size of the roof tiles. The anchor bolts are always located at the crest of the waterproof board. If the anchor bolts are crooked or hit wrong, they should be pulled out and re-drilled and fixed. The original wrong holes should be tightly sealed with waterproof membranes to avoid leakage hazards.

[0067] ③Interlaced processing of node parts

[0068] SBS membranes can be used for waterproofing at most nodes. The construction sequence must be from bottom to top. Therefore, when encountering nodes such as smoke and air ducts and roof pipes during the waterproofing board laying, the sequence of bottom to top should be followed, and the waterproofing structure of the node should be interlaced layer by layer.

[0069] ④Start with the installation of tile strips

[0070] The eaves tile hanging strip determines the appearance of the eaves tiles and the installation level of all tiles in the future, so accurate positioning is very important. This project uses the physical method to determine the position of the starting tile strip, that is, the actual main tile is placed on site to determine the installation position of the starting tile strip. In actual operation, hang two physical tiles on both ends of the tile strip, so that the tile claws tightly hang on the tile strip, adjust the two tiles to protrude 50-70mm from the final live surface of the eaves, and then fix one end of the tile strip first, check the installation size again, and then fix the other end of the tile strip. It should be noted that the tile strip must not be misplaced or moved during the fixing process.

[0071] ⑤Aluminum inclined gutter installation

[0072] Before installing the inclined gutter, a positioning line should be placed according to the contour line (i.e. the center line) of the inclined gutter. The area between the two positioning lines is the installation area of ​​the inclined gutter. The longitudinal tile hanging strips are installed according to the position of the positioning lines. Then, the aluminum inclined gutter tiles are processed into a V shape or a specified shape on site, and fixed to the longitudinal tile hanging strips with 50mm screws; the upper and lower overlap dimensions of the aluminum gutter should not be less than 100mm. After the main tile above the gutter is installed, the overlap gap between the main tile and the aluminum inclined gutter is filled with building structure sealant.

[0073] ⑥Main tile installation

[0074] For roofs with sloping gutters, the main tiles should be laid starting from the sloping gutters to ensure that the first starting tile does not need to be cut. If the main tile lap groove is on the left, the main tiles should be laid from right to left. If the main tiles at the sloping gutters have cut tiles that cannot be fixed with tile nails, grooves can be cut on both sides of the cut tiles and then fixed with tile nails. The tiles should be measured, cut and installed as they are laid. It is not advisable to cut them uniformly after the roof tiles are laid. To prevent the roof tiles from being contaminated, the roof tiles should be cut at a fixed location and effective dust prevention measures should be taken. The main tiles at the ridge need to be cut into cut tiles (triangular tiles) and laid as they are cut.

[0075] First install the main tiles on both sides of the ridge or ridge tiles, no need to fix them; then temporarily place the supporting wood brackets, ridge tile supporting strips and ridge tiles, so that the ridge tiles just press the main tiles. When placing them, bend the legs of the supporting wood brackets to a suitable height, then remove the ridge tiles, determine the installation height of the supporting wood brackets, remove the main tiles on both sides of the ridge, fix the corresponding ridge or the entire ridge tile hanging strips on the supporting wood brackets with a spacing of 500mm, and install the supporting wood brackets connected to the ridge tile hanging strips on the additional hanging strips on the ridge, with the height being the same as when placed.

[0076] Then lay the main tiles. The cut main tiles need to be fixed after installing the tile buckles. Before installing the tile buckles, the hidden parts between the additional tile hanging strips and the tile cuttings, and the overlapped edges of the tile cuttings and the lower tiles should be reinforced with building structure sealant. Then install a screw on the additional tile hanging strips at a position close to the tile buckle, wrap the tile cutting wire around the screw, and tighten the bolt.

[0077] Then lay the ridge roll material. The overlap size of the ridge ventilation roll material on the left and right should be the same. The overlap between the roll material and the tile should be compacted and flattened with a roller.

[0078] Finally, install the ridge tiles and ridge tile buckles, with one buckle for each ridge tile; lay the ridge tiles from the eaves upwards, pre-apply building structure sealant between the ridge tiles or ridge tile heads at the eaves and the ridge tile hanging strips to reinforce the starting ridge tiles or ridge tile heads; install the ridge tile buckles while fixing the ridge tiles.

[0079] ⑦ Closing

[0080] The vertical wall is finished with node flashing. The flashing pressure line is fixed on the vertical wall with steel nails at a spacing of 300mm. Then the elastic flashing facade isolation paper is removed. The facade is laid first, and then the isolation paper on the other side is removed. The tile surface is laid, and the bonding point with the tile surface should be compacted and adhered with a pressure roller. Finally, the flashing pressure strip is fixed with cement nails, and the fixing point spacing is 300mm.

[0081] Furthermore, the waterproof layer described in Q4, such as waterproof paint or waterproof membrane, is evenly applied or laid on the insulation layer to ensure that the waterproof layer is not damaged or missed, so as to form a continuous waterproof layer.

[0082] Furthermore, the tile strips described in Q5 ensure that the tile hanging strips are firm and reliable, with uniform spacing, providing good support for the tiles.

[0083] Furthermore, the tiles described in Q6 ensure that the tiles are closely connected without obvious gaps, and pay attention to the overlap length and direction of the tiles to ensure the waterproof performance and aesthetics of the roof.

[0084] Working principle: The roof waterproofing system ensures the waterproof performance and durability of the roof through multi-level protection measures. First of all, the construction quality of the leveling layer directly affects the laying effect of the subsequent waterproof layer. Therefore, it is necessary to ensure that the leveling layer is flat, crack-free, and hollow-free. After the leveling layer meets the requirements, the insulation board and waterproof board are laid. The staggered laying and mortar-free pasting method of the insulation board can effectively reduce the thermal bridge effect and improve the insulation effect. The overlap and fixing method of the corrugated asphalt waterproof board ensures the continuity and stability of the waterproof layer. The installation of the tile hanging strip is a key link in the laying of roof tiles. The accuracy of its position directly affects the beauty and service life of the roof tiles. The hanging tiles are fixed with special nylon anchors. The strips are fixed to the base layer, ensuring the firmness and stability of the tile hanging strips. The installation of the aluminum inclined gutters requires precise positioning and fixing to ensure smooth drainage and no leakage risks. The installation order and method of the main tiles are also crucial. The main tiles are laid from the inclined gutters to ensure that the first starting tile does not need to be cut, thereby improving construction efficiency and aesthetics. The main tile lap grooves, the treatment of the cut tiles and the installation of the ridge tiles must all follow certain process requirements to ensure the overall waterproof performance and aesthetics of the roof. Finally, the treatment of the roof closing is a key step in ensuring the integrity of the roof waterproofing system. The installation of node flashing and flashing strips can effectively prevent rainwater from seeping into the roof and ensure the waterproof performance of the roof.

[0085] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the implementation rules without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A ventilated, heat-insulating and waterproof roofing system is carried out according to the following steps; S1. First, choose the right roofing substrate; S2. Lay the insulation layer according to the requirements of the insulation calculation, such as extruded polystyrene board or polyurethane foam board; S3. Lay a ventilation and waterproof layer on the roof substrate; S4. Install a few characters on the crest of the ventilation and waterproof layer; S5. Lay a waterproof cushion layer (aluminum foil) or waterproof roll material on the ventilation and waterproof layer; S6. Install tile strips + tiles or other suitable roof covering materials on the aluminum foil waterproof cushion. The roof covering materials not only have the effect of aesthetics, but also protect the roof system from damage by external factors. S7. Finally, inspect and test the entire roof system to ensure that all joints and interfaces are well sealed and there are no water leaks or poor ventilation. After passing the test, the roof system can be put into use.

2. A ventilated, heat-insulating and waterproof roofing system according to claim 1, characterized in that: The roof substrate in S1 ensures good bearing capacity and durability, and the substrate can be metal, concrete or other suitable materials.

3. A ventilated, heat-insulating and waterproof roofing system according to claim 1, characterized in that: The waterproof membrane in S2 ensures that it is intact and covers the entire roof area.

4. A ventilated, heat-insulating and waterproof roofing system according to claim 1, characterized in that: The ventilation layer in S4 is usually made of a metal plate or a plastic plate with ventilation holes, which helps to discharge moisture under the roof, reduce the thermal bridge effect, and improve the overall performance of the roof.

5. A method for constructing a ventilated, heat-insulating and waterproof roof, comprising the following steps: Q1. Acceptance of the base layer to ensure that the surface of the roof base layer is flat and has no obvious unevenness, providing a good foundation for subsequent construction; Q2. Insulation layer construction: according to the size and shape of the roof substrate, cut the insulation materials into appropriate sizes and lay them on the substrate, ensuring that there are no gaps between the insulation materials to achieve the best insulation effect; Q3. Construction of ventilation and waterproof layer: while laying the insulation layer, simultaneously lay the corrugated ventilation and waterproof layer; Q4. Install a few code marks on the crest of the ventilation and waterproof layer to protect the ventilation and waterproof layer from being damaged during subsequent construction; Q5. After the installation of the waterproof cushion layer, lay the aluminum foil waterproof cushion layer or waterproof membrane on the ventilation and waterproof layer; Q6. Tile hanging strips are installed according to the slope of the roof and the specifications of the tiles; Q7. Lay the roof tiles on the tile hanging strips according to the design requirements to achieve waterproof, aesthetic and protective effects.

6. A ventilation, heat-insulating and waterproof roof construction method according to claim 5, characterized in that: The ventilation and waterproof layer described in Q3 is laid on the thermal insulation layer to ensure that the waterproof layer is not damaged, so as to form a continuous waterproof layer.

7. A ventilation, heat-insulating and waterproof roof construction method according to claim 5, characterized in that: The ventilation and waterproof layer and waterproof cushion layer described in Q3 and Q5 are laid without any gaps and have good overlaps to ensure the waterproof effect; the ventilation and waterproof layer should be fixed at the crest, and the several code layouts should be evenly and firmly arranged to ensure good ventilation and waterproof effects.

8. A ventilation, heat-insulating and waterproof roof construction method according to claim 5, characterized in that: The tile roof described in Q7 ensures that the roof system is firm and reliable, and the tiles are closely connected to each other, providing good support for the full play of the roof insulation and heat insulation effects to ensure the waterproof performance and aesthetics of the roof.