Stone crushing device for highway engineering construction
By designing and controlling the linkage mechanism between the cutting board and the partition in the gravel device, we ensure that the stones are evenly discharged and efficiently crushed, the problem of low gravel efficiency caused by stone accumulation in the existing technology is solved, and the overall Gravel effect and collection efficiency.
Patent Information
- Application Number
- CN202411101558.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-29
AI Technical Summary
During the stone gravel process, existing gravel devices are prone to pile up due to inconvenient cutting of stones, which affects the efficiency and effect of gravel and is inefficient in working efficiency.
A crushing device for highway engineering construction was designed, including processing boxes, inclined conveyor belts, partitions, inclined plates, cutting blades and crushing rollers. By controlling the linkage between the cutting plate and the partition, the stones are ensured to be evenly lowered. The material is efficiently crushed, increasing the linkage of the device, and using electric push rods to improve collection efficiency.
It effectively solves the problem of reduced crushing efficiency caused by stone accumulation, improves the efficiency and effect of gravel, and greatly improves the efficiency of stone collection and transportation.
Smart Images

Figure CN119034854A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of stone crushing devices, in particular to a stone crushing device used in highway engineering construction. Background Art
[0002] Highway engineering refers to the survey, measurement, design, construction, maintenance, and management of highway structures. Highway engineering structures include: roadbed, pavement, bridges, culverts, tunnels, drainage systems, safety protection facilities, greening and traffic monitoring facilities, as well as houses, workshops and other service facilities used for construction, maintenance and monitoring;
[0003] At present, when crushing stones, it is first necessary to move the required crushed stones into the stone crushing device before the stone crushing operation can be carried out. First of all, the workload is large and the efficiency is slow during such operation. Moreover, when crushing by the crushing roller, it is inconvenient to control the material discharge in the stone crushing device, which causes the stones to pile up easily, thus affecting the overall efficiency during stone crushing and not being able to fully exert the efficiency, resulting in poor work efficiency and also affecting the overall stone crushing effect, and failing to meet the requirements.
[0004] In view of the above problems, the inventor proposes a stone crushing device for highway engineering construction to solve the above problems. Summary of the invention
[0005] In order to solve the above problems, the object of the present invention is to provide a stone crushing device for highway engineering construction.
[0006] In order to solve the above technical problems, the present invention adopts the following technical scheme: a stone crushing device for highway engineering construction, comprising a processing box, an inclined conveyor belt is provided above the outer wall of the processing box, a plurality of equally spaced partitions are provided on the conveyor belt, a feed port is provided on the top of the processing box, the feed port is located directly below one end of the top of the conveyor belt, a first inclined plate is provided at the top of the processing box directly below the feed port, a discharge plate is provided at the top of the processing box that is opposite to the first inclined plate and is inclined, an empty slot for discharge is formed between the discharge plate and the bottom of the first inclined plate, the top of the discharge plate is rotatably arranged on the inner wall of the processing box, and the back of the discharge plate is at the same A control component is provided between the processing boxes, and two symmetrically distributed first rotating rods are rotatably provided at the middle end inside the processing box, and cutting blades distributed at intervals are fixedly provided on the two first rotating rods. Two symmetrically distributed second rotating rods are rotatably provided below the two first rotating rods in the processing box, and crushing rollers are fixedly provided on the two second rotating rods. Two adjacent first rotating rods and second rotating rods are respectively connected by meshing driving gears, and a second belt is provided for transmission connection between one of the first rotating rods and the second rotating rod, and a second motor is provided for driving connection at the end of one of the first rotating rods, and two symmetrically distributed partitions are installed inside the processing box between the cutting blades and the crushing rollers.
[0007] The top of described supporting sprocket wheel is equipped with a toothed wheel, and the bottom of described toothed wheel is equipped with a toothed wheel, and the toothed wheel is equipped with a toothed wheel on the bottom of described toothed wheel.
[0008] Preferably, a horizontally arranged mounting plate is installed near the outer wall of the processing box between the two partitions, and a first gear is rotatably arranged inside the mounting plate, and two diagonally distributed tooth plates are meshed on the first gear, and the two ends of the tooth plates away from the first gear are fixed on the two partitions respectively; two symmetrically distributed connecting rods are fixedly arranged at the end of the movable plate away from the long rod, and the end of the connecting rod away from the movable plate passes through the processing box, and the two connecting rods are fixedly connected to the partitions at the same end through an L-shaped connecting plate; inclined concentrating plates are fixedly arranged on the upper and lower surfaces of the partitions on opposite sides of the interior of the processing box.
[0009] Preferably, a U-shaped fixed frame is fixedly provided at the bottom of the processing box, and a movable frame is slidably provided at the bottom of the fixed frame, the movable frame is located directly below the processing box, and the upper and lower side surfaces of the movable frame are penetrated, and two symmetrically distributed electric push rods are installed on one side of the fixed frame, and the output ends of the electric push rods are fixed on the outer wall of the movable frame; a second inclined plate is fixedly provided on the side of the bottom of the fixed frame opposite to the side where the electric push rod is located; a horizontally arranged baffle is fixedly provided on the top of the movable frame close to the electric push rod, and the upper surface of the baffle is parallel to and abuts against the bottom of the processing box.
[0010] The conveyor belt is provided with a plurality of partitions which are distributed at equal intervals.
[0011] Compared with the prior art, the present invention has the following beneficial effects:
[0012] 1. The unloading plate and the partition provided in the present invention can fully control the unloading of stones, so that the stones falling onto the crushing roller each time are certain, so that the crushing roller itself can fully and effectively crush the stones efficiently, solving the problem that the crushing efficiency of the crushing roller is reduced due to the accumulation of stones;
[0013] 2. The blanking plate and the partition provided in the present invention are connected by a connecting plate and a connecting rod, so that the movable plate can drive the partition to move together when moving, thereby increasing the integrated linkage of the device and ensuring the stability of the operation;
[0014] 3. In the present invention, the electric push rod will push one end of the movable frame out of the fixed plate. At this time, the collected stones will roll down from the bottom with the second inclined plate. The staff can set a collection frame at the bottom of the second inclined plate to directly complete the collection and subsequent direct transportation, which can greatly improve the collection efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 It is a schematic diagram of the overall structure of the present invention.
[0017] Figure 2 It is a schematic diagram of the fixed frame structure of the present invention.
[0018] Figure 3 This is a schematic diagram of the internal structure of the processing box of the present invention.
[0019] Figure 4 It is a schematic diagram of the structure of the movable plate of the present invention.
[0020] Figure 5 For the present invention Figure 4 Enlarged structural diagram at A in the middle.
[0021] Figure 6 It is a schematic diagram of the partition structure of the present invention.
[0022] In the figure: 1. processing box; 11. conveyor belt; 12. feed port; 13. partition bar; 14. first inclined plate; 15. unloading plate; 151. cross plate; 16. rotating shaft; 17. swing plate; 171. push block; 18. moving plate; 19. movable groove; 2. long rod; 21. support frame; 22. first connecting shaft; 23. second connecting shaft; 24. half-face gear; 25. full gear; 26. first motor; 27. first belt; 3. first rotating rod; 31. cutting blade; 32. second rotating rod; 33. crushing roller; 34. driving gear; 35. second belt; 36. second motor; 37. concentrating plate; 4. partition; 41. mounting plate; 42. first gear; 43. tooth plate; 44. connecting plate; 45. connecting rod; 5. fixed plate; 51. moving frame; 52. baffle; 53. second inclined plate; 54. electric push rod. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] like Figure 1-6As shown, the present invention provides a stone crushing device for highway engineering construction, including a processing box 1, an inclined conveyor belt 11 is arranged above the outer wall of the processing box 1, a feeding port 12 is opened on the top of the processing box 1, and the feeding port 12 is located directly below one end of the top of the conveyor belt 11, and a first inclined plate 14 is arranged at the top of the processing box 1 directly below the feeding port 12, and a material discharge plate 15 is arranged at the top of the processing box 1, which is opposite to the first inclined plate 14 and inclined, and an empty groove for material discharge is formed between the material discharge plate 15 and the bottom of the first inclined plate 14, and the top of the material discharge plate 15 is rotatably arranged on the inner wall of the processing box 1, and a control component is arranged between the back of the material discharge plate 15 and the processing box 1, and two symmetrically distributed first rotating rods 3 are rotatably arranged at the middle end of the processing box 1, and the two first rotating rods 3 are fixedly provided with spaced distributions. A cutting blade 31, two symmetrically distributed second rotating rods 32 are rotatably provided below the two first rotating rods 3 in the processing box 1, and crushing rollers 33 are fixed on the two second rotating rods 32. The two adjacent first rotating rods 3 and the second rotating rods 32 are connected by meshing driving gears 34 respectively, and a second belt 35 is provided for transmission connection between one of the first rotating rods 3 and the second rotating rod 32, and a second motor 36 is provided for driving connection at the end of one of the first rotating rods 3. The second motor 36 is matched with the meshing driving gear 34 and the second belt 35 to make the first rotating rod 3 and the second rotating rod 32 rotate synchronously, so that the cutting blade 31 and the crushing roller 33 can rotate to perform their own work, and two symmetrically distributed partitions 4 are installed between the cutting blade 31 and the crushing roller 33 inside the processing box 1.
[0025] The control component includes a transverse plate 151, which is fixedly arranged at one end of the interior of the processing box 1 away from the first inclined plate 14. A vertically arranged rotating shaft 16 is rotatably provided on the transverse plate 151, and a swing plate 17 is fixedly arranged at the bottom of the rotating shaft 16. A push block 171 is fixedly arranged at the end of the swing plate 17 away from the rotating shaft 16. A movable plate 18 is provided below the transverse plate 151, and movable grooves 19 are commonly penetrated at both ends of the movable plate 18. The bottom of the push block 171 is movably inserted in the movable groove 19. Two symmetrically distributed long rods 2 are fixedly arranged at one end of the movable plate 18 close to the unloading plate 15, and the end of the long rod 2 away from the movable plate 18 is hingedly arranged on the unloading plate 15.
[0026] By adopting the above technical solution, when the rotating shaft 16 rotates, the swing plate 17 will drive the push block 171 to make the movable plate 18 move repeatedly, thereby controlling the unloading plate 15 to intermittently and continuously move away from and close to the first inclined plate 14, so that the empty groove between the first inclined plate 14 and the unloading plate 15 is opened or maintains the minimum diameter, completing the control of the material and preventing the accumulation of stones from falling and affecting the stone crushing effect.
[0027] A U-shaped support frame 21 is fixedly provided on the outside of the processing box 1 near the horizontal plate 151. A first connecting shaft 22 and a second connecting shaft 23 are rotatably provided at one end of the bottom of the support frame 21. A half-gear 24 is fixedly provided on the first connecting shaft 22, and a full gear 25 meshing with the half-gear 24 is fixedly provided on the second connecting shaft 23. The bottom of the second connecting shaft 23 is connected to the rotating shaft 16 through a first belt 27. A first motor 26 is installed on the top of the support frame 21, and the output end of the first motor 26 is coaxially fixed on the first connecting shaft 22.
[0028] By adopting the above technical solution, the first motor 26 is provided in combination with the half-gear 24 and the full gear 25 to eventually drive the rotating shaft 16 to rotate intermittently, thereby ensuring the frequency of the rotating shaft 16 in the subsequent control of the swing of the blanking plate 15.
[0029] A horizontally arranged mounting plate 41 is installed on the outer wall of the processing box 1 near the two partitions 4, and a first gear 42 is rotatably arranged inside the mounting plate 41. Two diagonally distributed tooth plates 43 are meshed on the first gear 42, and the ends of the two tooth plates 43 away from the first gear 42 are fixedly arranged on the two partitions 4 respectively.
[0030] By adopting the above technical solution, the first gear 42 is set with two tooth plates 43 to connect the two partitions 4, so that when one partition 4 moves toward the inside of the processing box 1, the other partition 4 will move towards it at the same time, and when one partition 4 moves away from the processing box 1, the other partition 4 will move away from it together.
[0031] Two symmetrically distributed connecting rods 45 are fixedly provided at one end of the movable plate 18 away from the long rod 2. The end of the connecting rod 45 away from the movable plate 18 passes through the processing box 1. The two connecting rods 45 are fixedly connected to the partition 4 at the same end through an L-shaped connecting plate 44.
[0032] By adopting the above technical solution, the connecting plate 44 and the connecting rod 45 can enable the movable plate 18 to drive the partition plate 4 to move together when moving, thereby increasing the integrated linkage of the device and ensuring stable operation.
[0033] Inclined concentrating plates 37 are fixedly disposed on the upper and lower surfaces of the partition plate 4 at opposite sides of the interior of the processing box 1 .
[0034] By adopting the above technical solution, the centralized plate 37 can make the stones passing through the cutting blades 31 fall between the two crushing rollers 32 below to be fully crushed.
[0035] A U-shaped fixed frame 5 is fixedly provided at the bottom of the processing box 1, and a movable frame 51 is slidably provided at the bottom of the fixed frame 5. The movable frame 51 is located directly below the processing box 1, and the upper and lower sides of the movable frame 51 are penetrated. Two symmetrically distributed electric push rods 54 are installed on one side of the fixed frame 5, and the output end of the electric push rod 54 is fixedly set on the outer wall of the movable frame 51.
[0036] By adopting the above technical solution, the electric push rod 54 will push one end of the movable frame 51 out of the fixed plate 5. At this time, the collected stones will roll down from the bottom in conjunction with the second inclined plate 53. The staff can set a collection frame at the bottom of the second inclined plate 53 to directly complete the collection and subsequent direct transportation, which can greatly improve the collection efficiency.
[0037] A second inclined plate 53 is fixedly disposed at a side of the bottom of the fixed frame 5 opposite to the side where the electric push rod 54 is located.
[0038] By adopting the above technical solution, the second inclined plate 53 can facilitate the stones to roll down and be better collected.
[0039] A horizontally arranged baffle plate 52 is fixedly provided on one side of the top of the moving frame 51 close to the electric push rod 54 , and the upper surface of the baffle plate 52 is parallel to and abuts against the bottom of the processing box 1 .
[0040] By adopting the above technical solution, the baffle 52 can prevent the stones above it from falling when the moving frame 51 moves.
[0041] The conveyor belt 11 is provided with a plurality of spacers 13 which are distributed at equal intervals.
[0042] By adopting the above technical solution, the partition bar 13 is arranged to prevent the stones that move up obliquely from falling to the bottom. It is worth noting that the partition bar 13 is flexibly connected to the conveyor belt 11 and can bend together with the conveyor belt 11.
[0043] Working principle: When in use, the staff can put the required crushed stones into the bottom of the conveyor belt 11, and put the required crushed stones into the processing box 1 through the feed port 12 through the conveyor belt 11 and the partition bar 13. This operation can reduce the steps for the staff to carry the stones to the top of the processing box 1, and reduce the workload. The stones put into the processing box 1 will be accumulated between the first inclined plate 14 and the unloading plate 151. At this time, the first motor 26 can be driven. The first motor 26 is set to intermittently drive the full gear 25 to rotate through the half-face gear 24 on the first connecting shaft 22, so that the full gear 25 intermittently drives the rotating shaft 16 to rotate through the second connecting shaft 23 and the first belt 27. When the rotating shaft 16 rotates, it will drive the swing plate 17 and the push block 171 to rotate. At this time, the push block 171 will continuously move from one end of the movable groove 19 to the other end under the drive of the rotating shaft 16, so that the moving plate 18 is affected by the push block 1 The drive of 71 will continuously translate back and forth repeatedly under the horizontal plate 151, so that the moving plate 18 continuously drives the unloading plate 15 to swing through the long rod 2. The unloading plate 15 is driven by the moving plate 18 to intermittently and continuously move away from and approach the first inclined plate 14, so that the empty slot between the first inclined plate 14 and the unloading plate 15 is opened or maintains the minimum diameter. When the minimum diameter is maintained between the first inclined plate 14 and the unloading plate 15, the stones smaller than the diameter accumulated below will fall directly, indicating that the stone is small, and pass through the cutting blade 31 to be directly crushed by the crushing roller 33 for stone crushing. Some larger stones will wait for the first inclined plate 14 and the unloading plate 15 to open, so that the larger stones fall and contact with the cutting blade 31. At this time, under the drive of the second motor 36, the cutting blade 31 will cut the larger stones to reduce their volume, facilitate the crushing by the crushing roller 33, and improve the crushing effect.
[0044] When the movable plate 18 moves repeatedly, the movable plate 18 drives one of the partitions 4 to move through the connecting rod 45 and the connecting plate 44. The two partitions 4 are connected by the first gear 42 arranged in meshing with the two tooth plates 43, so that when one partition 4 moves toward the inside of the processing box 1, the other partition 4 will move toward it at the same time, and when one partition 4 moves away from the processing box 1, the other partition 4 will move back together. Through the above operation, when the first motor 26 works, the two partitions 4 will be intermittently opened or closed together with the movable plate 18, so that the stones after passing through the cutting blade 31 can intermittently fall onto the crushing roller 33 below. Through the above operation, the stones falling onto the crushing roller 33 each time are certain, so that the crushing roller 33 itself can fully and effectively crush the stones efficiently, solving the problem that the crushing efficiency of the crushing roller 33 is reduced due to the accumulation of stones.
[0045] After passing through the crushing roller 33, the crushed stones will directly fall into the moving frame 51 at the bottom. After waiting to be filled to a certain amount, the electric push rod 54 will push one end of the moving frame 51 to move out of the fixed plate 5. At this time, the collected stones will roll down from the bottom with the second inclined plate 53. The staff can set a collection frame at the bottom of the second inclined plate 53 to directly complete the collection and subsequent direct transportation, which can greatly improve the collection efficiency.
[0046] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A stone crushing device for highway engineering construction, comprising a processing box (1), characterized in that: A conveyor belt (11) is arranged in an inclined manner above the outer wall of the processing box (1), a feed port (12) is provided at the top of the processing box (1), and the feed port (12) is located directly below one end of the top of the conveyor belt (11), a first inclined plate (14) is arranged in an inclined manner at the top of the processing box (1) and located directly below the feed port (12), a discharge plate (15) is arranged in an inclined manner opposite to the first inclined plate (14) at the top of the processing box (1), a discharge slot is formed between the discharge plate (15) and the bottom of the first inclined plate (14), the top of the discharge plate (15) is rotatably arranged on the inner wall of the processing box (1), a control component is arranged between the back of the discharge plate (15) and the processing box (1), and two symmetrically distributed first control components are rotatably arranged at the middle end of the processing box (1). A rotating rod (3), two of the first rotating rods (3) are fixedly provided with cutting blades (31) distributed at intervals, two symmetrically distributed second rotating rods (32) are rotatably provided below the two first rotating rods (3) in the processing box (1), two of the second rotating rods (32) are fixedly provided with crushing rollers (33), two adjacent first rotating rods (3) and second rotating rods (32) are connected by meshing driving gears (34), one of the first rotating rods (3) is connected to the second rotating rod (32) by a second belt (35), one of the ends of the first rotating rods (3) is connected to a second motor (36), and two symmetrically distributed partitions (4) are installed inside the processing box (1) between the cutting blades (31) and the crushing rollers (33).
2. A stone crushing device for highway engineering construction as claimed in claim 1, characterized in that: The control assembly comprises a transverse plate (151), wherein the transverse plate (151) is fixedly arranged at one end of the interior of the processing box (1) away from the first inclined plate (14), a vertically arranged rotating shaft (16) is rotatably arranged on the transverse plate (151), a swing plate (17) is fixedly arranged at the bottom of the rotating shaft (16), a push block (171) is fixedly arranged at one end of the swing plate (17) away from the rotating shaft (16), a movable plate (18) is arranged below the transverse plate (151), both ends of the movable plate (18) are penetrated by a movable groove (19), the bottom of the push block (171) is movably inserted in the movable groove (19), and two symmetrically distributed long rods (2) are fixedly arranged at one end of the movable plate (18) close to the unloading plate (15), and one end of the long rod (2) away from the movable plate (18) is hingedly arranged on the unloading plate (15).
3. A stone crushing device for highway engineering construction as claimed in claim 2, characterized in that: A U-shaped support frame (21) is fixedly provided on the outside of the processing box (1) near the side of the horizontal plate (151); a first connecting shaft (22) and a second connecting shaft (23) are rotatably provided at one end of the bottom of the support frame (21); a half-gear (24) is fixedly provided on the first connecting shaft (22); a full gear (25) meshing with the half-gear (24) is fixedly provided on the second connecting shaft (23); the bottom of the second connecting shaft (23) is connected to the rotating shaft (16) through a first belt (27); a first motor (26) is installed on the top of the support frame (21); and the output end of the first motor (26) is coaxially fixedly provided on the first connecting shaft (22).
4. A stone crushing device for highway engineering construction as claimed in claim 1, characterized in that: A horizontally arranged mounting plate (41) is installed on the outer wall of the processing box (1) near the two partitions (4); a first gear (42) is rotatably arranged inside the mounting plate (41); two diagonally distributed tooth plates (43) are meshed on the first gear (42); and the ends of the two tooth plates (43) away from the first gear (42) are fixedly arranged on the two partitions (4) respectively.
5. A stone crushing device for highway engineering construction as claimed in claim 4, characterized in that: Two symmetrically distributed connecting rods (45) are fixedly provided at one end of the movable plate (18) away from the long rod (2); one end of the connecting rod (45) away from the movable plate (18) passes through the processing box (1); the two connecting rods (45) are fixedly connected to the partition plate (4) at the same end via an L-shaped connecting plate (44).
6. A stone crushing device for highway engineering construction as claimed in claim 4, characterized in that: Concentrating plates (37) are fixedly provided in an inclined manner on the upper and lower surfaces of the partition plate (4) on opposite sides of the interior of the processing box (1).
7. A stone crushing device for highway engineering construction as claimed in claim 1, characterized in that: A U-shaped fixed frame (5) is fixedly provided at the bottom of the processing box (1); a movable frame (51) is slidably provided at the bottom of the fixed frame (5); the movable frame (51) is located directly below the processing box (1); the upper and lower sides of the movable frame (51) are penetrated; one side of the fixed frame (5) is provided with two symmetrically distributed electric push rods (54); the output ends of the electric push rods (54) are fixedly provided on the outer wall of the movable frame (51).
8. A stone crushing device for highway engineering construction as claimed in claim 7, characterized in that: A second inclined plate (53) is fixedly disposed in an inclined manner on the side of the bottom of the fixed frame (5) opposite to the side where the electric push rod (54) is located.
9. A stone crushing device for highway engineering construction as claimed in claim 7, characterized in that: A horizontally arranged baffle plate (52) is fixedly provided on one side of the top of the movable frame (51) close to the electric push rod (54), and the upper surface of the baffle plate (52) is parallel to and abuts against the bottom of the processing box (1).
10. A stone crushing device for highway engineering construction as claimed in claim 1, characterized in that: The conveyor belt (11) is provided with a plurality of spacers (13) distributed at equal intervals.
Citation Information
Cited By
Raw material crushing device for concrete production
CN120038011A
Plastic tray regeneration processing equipment
CN121372576A
