Shallow layer solidification multi-mode construction device and construction method thereof

By designing multi-mode construction devices, using sensors and automatic planning technology, the problems of inconsistent construction quality, operator shortage and health risks in the existing technology are solved, and efficient and safe shallow solidification construction is achieved.

CN119041390AInactive Publication Date: 2024-11-29浙江坤德创新岩土工程有限公司

Patent Information

Application Number
CN202411047515.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-11-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing shallow soft-base reinforcement construction equipment and methods rely on operator skills, resulting in inconsistent construction quality and high operator shortages and health risks in large-scale projects, especially in toxic and harmful environments.

Method used

Design a shallow curing multi-mode construction device, including construction equipment, controllers, sensor modules, security monitoring modules, local databases, cloud servers and human-computer interactive screen display modules, with manual, semi-automatic and fully automatic construction modes , collect data through sensors and automatically plan construction paths to reduce operator participation in dangerous environments.

Benefits of technology

Improve construction accuracy, reduce operator experience requirements, avoid construction quality problems and health risks, achieve safe construction in toxic environments, and improve construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041390A_ABST
    Figure CN119041390A_ABST
Patent Text Reader

Abstract

The invention relates to a shallow solidification multi-mode construction device and a construction method thereof. The shallow solidification multi-mode construction device is composed of construction equipment, a controller, a sensor module, a safety monitoring module, a local database and a cloud server. The equipment has three modes of manual control, semi-automatic remote construction and full-automatic autonomous construction so as to adapt to different construction requirements and environmental conditions. In the full-automatic autonomous construction mode, the construction equipment achieves automatic construction route planning and execution, stirring head action route planning and execution and soft soil solidification stirring quality control through the route planning module and the action operation module by means of data of the sensor module and the site grid module. The equipment can be suitable for various construction sites and environmental conditions, corresponding control and path planning strategies are automatically generated, automatic and accurate construction is achieved, the construction efficiency is improved, the construction reliability and quality are improved, the construction period is shortened, the construction cost is reduced, and meanwhile exposure of operators in a high-risk or toxic environment can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of shallow soft foundation reinforcement treatment, and in particular to a shallow solidification multi-mode construction device and a construction method thereof. Background Art

[0002] Shallow solidification construction equipment improves the bearing capacity and stability of soft soil by injecting and mixing specific solidification materials into the soil. This technology is usually used for the reinforcement of soft soil foundations to reduce foundation settlement and improve the safety of buildings. With the improvement of construction quality requirements in the construction industry, the need to reduce construction costs, and the shortage of high-quality construction equipment operators, there are not enough operators to operate the construction equipment in the face of large-scale shallow solidification construction projects, and the operators' operating levels of shallow solidification construction equipment are uneven, which is not enough to meet the requirements for quality and progress.

[0003] The construction equipment and construction method of shallow soft foundation treatment in the prior art have the following defects:

[0004] 1) Existing construction equipment and technical methods often rely on the skills and experience of the operator, resulting in inconsistent construction quality, construction depth deviation, missing reinforcement volume or repeated construction.

[0005] 2) In large-scale projects, higher experience is required for operators, otherwise it is easy to cause construction quality problems and extend the construction period.

[0006] 3) With the development of urbanization, the original land of chemical plants, pesticide plants, metal smelters and waste treatment plants is reused. Operators of shallow solidification construction equipment may face health risks, including acute and chronic occupational health injuries, due to long-term construction in toxic and harmful working environments. Summary of the invention

[0007] The technical problem to be solved by the present invention is how to reduce the experience requirement for operators, improve the accuracy of shallow layer solidification construction, have a fully automatic construction function, and prevent operators from entering toxic and harmful environments.

[0008] The present invention provides a shallow solidification multi-mode construction device, comprising construction equipment, a controller, a sensor module, a safety monitoring module, a local database, a cloud server and a human-computer interaction screen display module, wherein the controller is connected to the construction equipment, the sensor module and the safety monitoring module are respectively arranged on the construction equipment, the sensor module is used to collect operating parameters of the construction equipment, the safety monitoring module is used to monitor the construction safety of the construction equipment, the sensor module, the safety monitoring module, the human-computer interaction screen display module and the local database are respectively connected to the controller, and the local database is connected to the cloud server through a communication unit; the construction equipment comprises a mixing device and a feeding device, the mixing device It includes an operating terminal in the cockpit, a remote control terminal outside the cockpit, a hydraulic system and multiple actuators driven by the hydraulic system. The remote control terminal and the operating terminal are both connected to a controller. The hydraulic system includes a solenoid valve group for driving multiple actuators. The controller has three modes: manual construction mode, semi-automatic remote control guided construction mode and full-automatic construction mode. In the manual construction mode, the operator controls the hydraulic system to drive the actuator through the controller from the operating terminal; in the semi-automatic remote control guided construction mode, the operator controls the hydraulic system to drive the actuator by looking at the controller from the remote control terminal; in the full-automatic construction mode, the controller autonomously generates a control signal to control the hydraulic system to drive the actuator.

[0009] The controller includes a control module, a site grid generation module, an equipment digital mapping module, a path planning module, an action calculation module, an action execution module and a solenoid valve monitoring module;

[0010] The site grid generation module is used to establish a digital site model that maps the construction site;

[0011] The equipment digital mapping module is used to establish a digital equipment model that maps the construction equipment;

[0012] The path planning module is used to automatically plan the construction area of ​​each construction period based on the construction period;

[0013] The action calculation module is used to calculate the electronic signal of the solenoid valve group in the hydraulic system;

[0014] The action execution module is used to convert the electronic signal into a voltage and current signal so as to make the hydraulic system operation control actuator work;

[0015] The solenoid valve monitoring module is used to monitor and record the action program of the action calculation module and the action execution module for constructing the three-dimensional grid body, and the solenoid valve monitoring module is connected to the local database to store the action program;

[0016] The control module is respectively connected with the local database, the equipment digital mapping module, the path planning module, the action execution module and the solenoid valve monitoring module.

[0017] Compared with the prior art, the shallow solidification construction equipment of the present invention has the following advantages: by planning the construction area of ​​each construction cycle, corresponding control and path planning strategies can be generated for various construction site changes, and can be remotely controlled by an operator, or fully automatically constructed, thereby avoiding construction quality problems caused by a shortage of operators or insufficient operator experience, and also avoiding operators from working for long periods of time in high-risk sites and toxic and harmful workplaces, thereby protecting the health of the operators.

[0018] In a possible embodiment, the actuator includes a robotic arm, a mixing head and a walking mechanism, and the sensor module includes a satellite positioning sensor provided on the mixing equipment, multiple inclination sensors provided on the robotic arm, a satellite positioning sensor provided on the mixing head, a rotary encoder, a hydraulic flow sensor, a hydraulic oil pressure sensor, a hydraulic oil temperature sensor, a mixing head speed sensor, a feed pipe pressure sensor provided on the feed pipe, a feed pipe flow sensor and a background weighing sensor provided on the feeding equipment.

[0019] In one possible implementation, the hydraulic system includes a hydraulic oil pump, a hydraulic oil tank, a solenoid valve group and an electronically controlled reversing valve. The solenoid valve group includes a hydraulic oil main pipeline, a hydraulic oil return main pipeline and a plurality of electronically controlled proportional solenoid valves. The hydraulic oil main pipeline and the hydraulic oil return main pipeline are connected to the hydraulic oil tank through the hydraulic oil pump respectively. The plurality of electronically controlled proportional solenoid valves are divided into a forward oil supply electronically controlled proportional valve and a reverse oil return electronically controlled proportional valve. A forward oil supply electronically controlled proportional valve and a reverse oil return electronically controlled proportional valve form a group. The forward oil supply electronically controlled proportional valve is connected to the hydraulic oil main pipeline, and the reverse oil return electronically controlled proportional valve is connected to the hydraulic oil return main pipeline. Each of the electronically controlled proportional valves is connected to the hydraulic oil main pipeline. The electric-controlled reversing valve has an A port, a B port, a T port, a P port and an S port. The two ends of each of the actuators are connected to the A port and the B port of the electric-controlled reversing valve through pipelines. The T port and the P port of the electric-controlled reversing valve are respectively connected to the valve port channels of the forward oil supply electric-controlled proportional valve and the reverse oil return electric-controlled proportional valve of the same group through pipelines. The S port of the electric-controlled reversing valve is a signal port. The action execution module is electrically connected to the hydraulic oil pump, the electric-controlled proportional solenoid valve and the S port of the electric-controlled reversing valve respectively to receive the control signal sent by the action execution module. The sensor module is arranged on the actuator to collect data of the actuator.

[0020] In a possible implementation, the shallow solidification construction equipment also includes a quality evaluation module, which is connected to the site grid generation module and is used to calculate the construction progress and construction quality of each three-dimensional grid body. The controller plans the construction strategy for the next three-dimensional grid body based on the construction progress and construction quality of the current three-dimensional grid body and the real-time construction data of the construction equipment.

[0021] A construction method, based on the above-mentioned shallow layer solidification multi-mode construction device, comprises:

[0022] S1. Establishing a digital site model that maps the construction site based on the characteristic information of the construction site, and at the same time, establishing a digital equipment model that maps the construction equipment based on the construction equipment; the characteristic information includes boundary characteristics, coordinate characteristics and address characteristics of the construction site; and establishing an association between the digital site model and the digital equipment model based on the coordinate characteristics and the coordinate information of the construction equipment collected by the sensor module;

[0023] S2. Inputting construction parameter information in the human-computer interaction screen display module according to the geological characteristics of the construction site, the construction parameter information includes the coordinates of the construction site, the construction depth, the plane side length of the three-dimensional grid body, the depth of the three-dimensional grid body, the set curing material dosage of the three-dimensional grid body and the set stirring times of the three-dimensional grid body; the geological characteristics include soil strength and soil bearing capacity;

[0024] S3. Divide the digital site model into m×n×l three-dimensional grids according to the plane side length and depth of the three-dimensional grid, and number each construction unit in the form of (i, p, o), where i represents the number of rows on the construction surface, p represents the number of columns on the construction surface, and o represents the sequence number in the construction depth direction; calculate the coordinates of each vertex and center coordinate of each three-dimensional grid;

[0025] S4. The operator selects the manual construction mode, the semi-automatic remote control guided construction mode or the fully automatic construction mode according to the needs, wherein the manual control construction mode enters S5; the semi-automatic remote control guided mode enters S6; and the fully automatic construction mode enters S7;

[0026] S5. The operator enters the cockpit of the construction equipment and controls the operation of each actuator through the hydraulic system through the control console in the cockpit to perform shallow solidification construction on the three-dimensional grid body; then enters S9, and the local database stores and records the execution actions of each actuator and the control signals of the hydraulic system corresponding to the execution actions;

[0027] S6. The operator remotely controls the hydraulic system to control the operation of each actuator. When the actuator reaches the three-dimensional grid, shallow solidification construction will be carried out. At the same time, the sensor module collects the operating conditions of each actuator in real time, updates the posture and position of the digital device model on the digital site model in real time, and displays it to the operator through the human-computer interaction screen display module; then enters S9, and the local database stores and records the execution actions of each actuator and the control signals of the hydraulic system corresponding to the execution actions;

[0028] S7. The cloud server calls the local database to store and record the execution actions of each actuator and the control signals of the hydraulic system corresponding to the execution actions, uses the reinforcement learning method to train the control signals marked as qualified construction quality and generate a control module in the fully automatic autonomous construction mode, and transmits the control parameters of the control module back to the local database;

[0029] S8. Automatically generate the construction area of ​​each construction cycle according to the construction starting point, construction end point, geological characteristics of the three-dimensional grid body and the construction area of ​​the construction equipment; determine the construction route according to the construction area of ​​each construction cycle; then the controller module generates the execution action of each actuator and the control signal of the hydraulic system corresponding to the execution action according to the control module generated in S7; perform shallow solidification construction on each three-dimensional grid body, and then enter S9;

[0030] S9. Evaluate the construction quality of each three-dimensional grid body in the construction grid group according to the set curing material dosage and cumulative curing material injection volume of the three-dimensional grid body, as well as the set stirring times and cumulative stirring times. When entering the next construction cycle, synchronously update the geological characteristics of each three-dimensional grid body in the digital site model, and return to S8 until the shallow curing construction of the entire construction site is completed.

[0031] In a possible implementation manner, the operator remotely controls the hydraulic system in S6 to control the operation of each actuator, and the operation to the three-dimensional grid body to perform shallow solidification construction specifically includes:

[0032] S601. The sensor module collects the coordinate position of the construction equipment in real time, and by associating and matching with the coordinate position on the digital site model, the operator understands the precise position of the construction equipment on the construction site through the human-computer interactive screen display module;

[0033] S602. Obtain (i,p,1), (i,p,2)…(i,p,o)…(i,p,l) of the three-dimensional grid body to be constructed in the depth direction as a construction grid group; the operator controls the construction equipment to move to the three-dimensional grid body (i,p,1);

[0034] S603. The operator controls and adjusts the robotic arm to move the mixing head to the center coordinates of the three-dimensional grid body to be constructed, and then performs solidification material injection and mixing on each three-dimensional grid body of the three-dimensional construction grid group according to the construction parameter information; in the three-dimensional construction grid group, p=1,2,…n, i=1,2,…m; after the construction of each three-dimensional grid body is completed, enter S9.

[0035] In a possible implementation, the control signal of the hydraulic system corresponding to the execution action in S6 specifically includes the opening and closing state and amplitude, opening and closing duration, and opening and closing sequence of each channel of the solenoid valve group. In S8, the controller module uses the control module in the local database to generate a control signal specifically including the opening and closing state and amplitude, opening and closing duration, and opening and closing sequence of each channel of the solenoid valve group.

[0036] In a possible implementation manner, the automatic generation of the construction area for each construction period in S8 according to the construction starting point, the construction end point, the geological characteristics of the three-dimensional grid body and the construction area of ​​the construction equipment specifically includes:

[0037] S8A1. Determine the construction starting point according to the occupied area of ​​the construction equipment and the construction area of ​​the construction equipment; construction period T = 1;

[0038] S8A2. At the initial point of construction, shallow solidification construction is carried out with the area occupied by the construction equipment as the construction area; after the construction is completed and the corresponding curing age has passed, the construction area is marked as an area that can be advanced;

[0039] S8A3.T=T+1, control the construction equipment to move to the advanceable area of ​​the construction period T, and perform shallow solidification construction on the non-advanceable area outside the advanceable area of ​​the construction period T with the construction equipment's construction area as the center; after the construction is completed, it is marked as the advanceable area; repeat A3 until the construction equipment reaches the construction end point;

[0040] In S8, the construction route is determined according to the construction area of ​​each construction cycle, specifically moving along the edge of the advanceable area and shallow layer solidification construction.

[0041] In a possible implementation manner, the evaluation of the construction quality of each three-dimensional grid body of the construction grid group according to the set curing material dosage and the cumulative injection amount of the curing material and the set stirring times and the cumulative stirring times of the three-dimensional grid body in S9 specifically includes:

[0042] The quality score coefficient R of the three-dimensional mesh is:

[0043] R=R1 0.7 ×R2 2.3

[0044] R1 is the cumulative stirring times of the stirring head, when N ≥ 350, R1 = 1; when 350 > N ≥ 300, R1 = 0.8; when 300 > N ≥ 250, R1 = 0.6; when 250 > N ≥ 200, R1 = 0.5;

[0045] R2 is the achieved value of the cumulative injection volume PV of the solidifying material and the set solidifying material dosage SV:

[0046] R2=PV / SV

[0047] By marking each three-dimensional grid body in the construction site, those with R exceeding 0.6 are qualified, and the grid construction quality evaluation is marked in green, and those with R below 0.6 are unqualified, and the grid construction quality evaluation is marked in red;

[0048] The calculation formula for the cumulative number of stirring times is:

[0049] N=ΣM×n×(1 / V d +1 / V u )

[0050] The stirring times are N, ΣM is the number of blades on the stirring head, V d 、V u are the descending and ascending speeds of the mixing head respectively, and n is the number of mixing times. The flow data of the same coordinates are integrated to obtain the cumulative injection amount of the solidified material of the three-dimensional construction grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 This is a schematic diagram of the structure of a stirring device according to a specific embodiment 1 of the present invention;

[0052] Figure 2 These are three working modes of the shallow layer solidification multi-mode construction equipment controller of the present invention;

[0053] Figure 3 It is a framework diagram of the system block diagram in the specific embodiment 1 of the present invention;

[0054] Figure 4 It is a schematic diagram of the hydraulic system and the actuator in the specific embodiment 1 of the present invention;

[0055] Figure 5 It is a schematic diagram of the solenoid valve group in the construction equipment in the specific embodiment 1 of the present invention;

[0056] Figure 6 is the control signal of each valve port channel in the solenoid valve group in the specific embodiment 1 of the present invention;

[0057] Figure 7 It is a schematic diagram of the trajectory and quality evaluation of the mixing head in soft soil in the specific embodiment 2 of the present invention;

[0058] Figure 8 It is a schematic diagram of the division of construction areas for each construction period in the specific embodiment 2 of the present invention.

[0059] Description of reference numerals:

[0060] 101. Satellite positioning sensor; 102. Tilt sensor; 103. Hydraulic flow sensor and hydraulic oil pressure sensor; 104. Communication unit; 105. Solenoid valve group; 106. Mechanical arm; 107. Walking mechanism; 108. Mixing head; 109. Construction site; 401. Action execution module; 402. Hydraulic oil tank; 403. Actuator; 404. Hydraulic oil pump; 405. Solenoid valve monitoring module; 406. Electric control reversing valve; 501. Hydraulic oil delivery main pipe 502, hydraulic oil return main pipeline; 503, electronically controlled proportional solenoid valve; 503A, electronically controlled proportional valve for forward oil delivery; 503B, electronically controlled proportional valve for reverse oil return; 504, valve port channel; 801, area that can be advanced in d days of site construction; 802, area that can be advanced in d+1 days of mid-term construction; 803, area that can be advanced in d+2 days of construction; 804, area that can be advanced in d+3 days of construction; 900, operation construction track; 901, treatment completion area; 903, quality evaluation display. DETAILED DESCRIPTION

[0061] First, those skilled in the art should understand that these implementations are only used to explain the technical principles of the embodiments of the present application, and are not intended to limit the protection scope of the embodiments of the present application. Those skilled in the art can make adjustments to them as needed to adapt to specific application scenarios.

[0062] In the description of the embodiments of the present application, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the embodiments of the present application can be understood according to specific circumstances.

[0063] In the embodiments of the present application, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0064] The present application is further described in detail below with reference to the accompanying drawings and specific embodiments. Specific embodiment 1

[0066] See also Figure 1 to Figure 6 As shown, an embodiment of the present application discloses a shallow solidification multi-mode construction device, including construction equipment, a controller, a sensor module, a safety monitoring module, a local database, a cloud server and a human-computer interaction screen display module, the controller is connected to the construction equipment, the sensor module and the safety monitoring module are respectively arranged on the construction equipment, the sensor module is used to collect the operating parameters of the construction equipment, the safety monitoring module is used to monitor the construction safety of the construction equipment, the sensor module, the safety monitoring module, the human-computer interaction screen display module and the local database are respectively connected to the controller, and the local database is connected to the cloud server through a communication unit 104; the construction equipment includes a mixing device and a feeding device, the mixing equipment includes an operating terminal in a cockpit, a remote control terminal outside the cockpit, a hydraulic system and a plurality of actuators 403 driven by the hydraulic system, and the plurality of actuators 403 in this specific embodiment are respectively The mixing device is a mixing head 108, a mechanical arm 106, a walking mechanism 107 and a feeding device. The remote control end and the operating end are connected to the controller. The hydraulic system includes a solenoid valve group 105 for driving multiple actuators 403. The controller has three modes: manual construction mode, semi-automatic remote control guided construction mode and full-automatic construction mode. In the manual construction mode, the operator controls the hydraulic system to drive the actuator 403 through the controller from the operating end; in the semi-automatic remote control guided construction mode, the operator controls the hydraulic system to drive the actuator 403 by looking at the controller from the remote control end; in the full-automatic construction mode, the controller autonomously generates a control signal to control the hydraulic system to drive the actuator 403; the controller includes a control module, a site grid generation module, an equipment digital mapping module, a path planning module, an action calculation module, an action execution module 401 and a solenoid valve monitoring module 405;

[0067] The site grid generation module is used to establish a digital site model that maps the construction site 109;

[0068] The equipment digital mapping module is used to establish a digital equipment model that maps the construction equipment;

[0069] The path planning module is used to automatically plan the construction area of ​​each construction period based on the construction period;

[0070] The action calculation module is used to calculate the electronic signal of the solenoid valve group 105 in the hydraulic system;

[0071] The action execution module 401 is used to convert the electronic signal into a voltage and current signal to enable the hydraulic system operation control actuator 403 to work;

[0072] The solenoid valve monitoring module 405 is used to monitor and record the action program of the action calculation module and the action execution module 401 for constructing the three-dimensional grid body. The solenoid valve monitoring module 405 is connected to the local database to store the action program;

[0073] The control module is connected to the local database, the equipment digital mapping module, the path planning module, the action execution module 401 and the solenoid valve monitoring module 405 respectively.

[0074] In this specific embodiment, the sensor module includes a satellite positioning sensor 101 arranged on the mixing equipment, multiple inclination sensors 102 arranged on the robotic arm 106, a satellite positioning sensor 101 arranged on the mixing head 108, a rotary encoder, a hydraulic flow sensor and a hydraulic oil pressure sensor 103, a hydraulic oil temperature sensor, a mixing head 108 speed sensor, a feed pipe pressure sensor and a feed pipe flow sensor arranged on the feed pipe, and a background weighing sensor arranged on the feeding equipment; wherein the satellite positioning sensor 101 is used to collect and process satellite signals, determine the coordinates of the construction equipment in the construction environment and the orientation of the construction equipment; wherein the construction equipment is equipped with multiple inclination sensors 102 to measure the horizontal inclination of each segment of the robotic arm 106 and the pitch and left and right swing angles of the construction equipment, and determine the relative elevation relationship and elevation coordinates of each reference point of the robotic arm 106 and the construction equipment. The rotary encoder, hydraulic flow sensor, hydraulic oil pressure sensor, and hydraulic oil temperature sensor are used to monitor the flow, pressure, and temperature of the hydraulic oil input to the mixing head 108, and to measure the rotation speed and output power of the mixing head 108. Through this information, the working efficiency of the mixing head 108 and its mixing capacity for the soil layer of the construction site 109 are determined. Each unit of the sensor module provides basic real-time data for the operation of the shallow layer solidification mixing equipment, which is used to adjust the actions of each mechanism of the equipment and thus ensure the overall construction quality.

[0075] The feeding device is used to supply curing materials. The feeding device in this specific embodiment is a wet spray slurry or dry spray powder mode. The feeding device includes automatic weighing, automatic material preparation, and feeding functions, and communicates with the controller of the construction equipment through the communication unit 104. The controller can obtain the internal pressure and flow information of the feeding pipeline by mutual communication, so as to determine the supply amount of curing agent of each three-dimensional grid body, and compare it with the preset supply amount parameters, and adjust the supply amount of each three-dimensional grid body in real time. Different feeding methods can meet the requirements of different construction processes. The feeding background is uniformly regulated by the controller. When the construction quality does not meet the design requirements, the feeding speed and feeding pressure of the background can be adjusted to achieve the stability of the feeding amount and ensure that the construction quality of each three-dimensional grid body meets the standards. After the construction is completed, the construction quality of each three-dimensional grid body is evaluated by the quality evaluation module.

[0076] The hydraulic system includes a combination of the present invention Figure 4 and Figure 5As shown, the relationship between the action execution module 401 and the hydraulic actuator 403 of the present invention is specifically described. The actuator 403 includes a hydraulic motor for driving the stirring head 108 to rotate, an oil cylinder for driving the mechanical arm 106 to extend and retract, and a hydraulic motor for driving the crawler to travel and rotate, etc. The hydraulic system includes a hydraulic oil pump 404, a hydraulic oil tank 402, a solenoid valve group 105 and an electrically controlled reversing valve 406. The solenoid valve group 105 includes a hydraulic oil delivery main pipeline 501, a hydraulic oil return main pipeline 502 and a plurality of electrically controlled proportional solenoid valves 503. The hydraulic oil delivery main pipeline 501 is a hydraulic oil return main pipeline 502. 01 and the hydraulic oil return main pipeline 502 are connected to the hydraulic oil tank 402 through the hydraulic oil pump 404 respectively, and multiple electronically controlled proportional solenoid valves 503 are divided into a forward oil delivery electronically controlled proportional valve 503A and a reverse oil return electronically controlled proportional valve 503B. A forward oil delivery electronically controlled proportional valve 503A and a reverse oil return electronically controlled proportional valve 503B form a group. The forward oil delivery electronically controlled proportional valve 503A is connected to the hydraulic oil delivery main pipeline 501, and the reverse oil return electronically controlled proportional valve 503B is connected to the hydraulic oil delivery main pipeline 501. It is connected to the hydraulic oil return main pipeline 502, each of the electrically controlled reversing valves 406 has an A port, a B port, a T port, a P port and an S port, and both ends of each of the actuators 403 are connected to the A port and the B port of the electrically controlled reversing valve 406 through pipelines. The T port and the P port of the electrically controlled reversing valve 406 are respectively connected to the valve port channel 504 of the forward oil supply electrically controlled proportional valve 503A and the reverse oil return electrically controlled proportional valve 503B of the same group through pipelines. The S port of the electrically controlled reversing valve 406 is a signal port, and the action execution module 401 is electrically connected to the hydraulic oil pump 404, the electrically controlled proportional solenoid valve 503 and the S port of the electrically controlled reversing valve 406 respectively to receive the control signal sent by the action execution module 401. The sensor module is arranged on the actuator 403 to collect data of the actuator 403, at least one hydraulic oil pump 404 on the shallow solidification construction equipment carrier, and the electrically controlled reversing valve 406. The action execution module 401 sends a control signal to the electronically controlled reversing valve 406 to switch the left and right hydraulic oil circuits, thereby controlling the movement direction of the actuator 403; when applied to the mixing head 108, it completes the control of the rotation direction of the mixing head 108 blades, and when applied to the oil cylinder of the robotic arm 106, it completes the lifting or lowering of the robotic arm 106.

[0077] The hydraulic oil pump 404 in the hydraulic system is the main power source and provides power for all actuators 403 of the shallow layer solidification equipment. The power output of the power pump 404 is adjusted by the action execution module 401. Figure 5 The hydraulic oil delivery main pipeline 501 and the hydraulic oil return main pipeline 502 are connected to the hydraulic oil pump 404 to form a loop. A plurality of electronically controlled proportional solenoid valves 503 are connected in parallel to form a solenoid valve group 105. Each hydraulic mechanism has a proportional single valve on its oil delivery branch pipeline and oil return branch pipeline.

[0078] The electronically controlled proportional solenoid valve 503 is electrically connected to the action execution module 401, and the action execution module 401 outputs control signals of different amplitudes and durations to adjust the return oil and inlet hydraulic oil flow of the actuator 403, thereby controlling the movement speed of the actuator 403; the control signal of the execution module is as follows: Figure 6 As shown, each actuator 403 is independently controlled. When applied to the mixing head 108, the rotation speed of the mixing head 108 blades is controlled. When the mixing head 108 encounters a soil layer of uneven hardness and softness, causing the rotation speed of the mixing head 108 to be lower than the set minimum speed, the action execution unit increases the opening of the electromagnetic valve and increases the flow of hydraulic oil so that the rotation speed of the mixing head 108 reaches the set speed. When the rotation speed of the mixing head 108 is lower than the set minimum speed and the hydraulic pressure reaches the upper limit safety value, the hydraulic oil pressure sensor in the sensor module will sound an alarm. After receiving the feedback, the controller adjusts the speed of the hydraulic oil pump 404 according to the control parameters in the controller, thereby avoiding overloading of the mixing head 108 hydraulic system. Furthermore, by reducing the lifting speed of the mixing head 108, it is ensured that the equipment completes the set number of mixing times in a safe load in accordance with the established construction quality requirements.

[0079] Furthermore, when the mixing head 108 encounters an uneven hard soil layer in the deep soft soil and the mixing head 108 cannot be selected normally, the shallow solidification mixing equipment escape mode is triggered, and the action execution module 401 completes the continuous reversing control of the electric control reversing valve 406, so that the rotation direction of the mixing head 108 changes, and it repeatedly rotates forward and reverse, thereby achieving the purpose of crushing the hard soil.

[0080] The mixing device in this specific embodiment is a large hydraulically driven device, which uses a powerful mixing head 108 to strongly mix the in-situ soil and the curing agent in the soft soil foundation, so that the treated site stratum obtains a higher bearing capacity. Figure 1 A carrier form of shallow solidification mixing equipment is shown, which is a crawler equipment weighing 25 tons to 40 tons. The walking mechanism 107 of the mixing equipment can also be other forms, such as walking equipment or other forms of carrier; Figure 1The shallow layer solidification mixing head 108 is connected to the vehicle equipment, and the hydraulic system equipped by the vehicle equipment provides power for the mixing head 108. The shallow layer solidification construction equipment is controlled by a controller and can autonomously perform the task of soft foundation solidification treatment. The controller has a manual control mode, a semi-automatic remote mode and a fully automatic autonomous construction mode; wherein the manual control mode is operated by the operator in the cockpit of the shallow layer solidification mixing equipment using a handle to operate the construction equipment, and the operator relies on the judgment and experience of the operator to operate the various actuators 403 of the construction equipment. In the semi-automatic remote operation mode, the operator uses a multi-channel remote control to remotely control the joint operation of the mixing head 108, the walking mechanism 107 and the mechanical arm 106 of the construction equipment outside the cockpit, thereby achieving the control of the construction trajectory of the mixing head 108 of the construction equipment and the speed and output power of the mixing head 108. The fully automatic autonomous construction mode utilizes the data sent back by the sensor module and the site grid module of the construction equipment, and utilizes the path planning module and the motion operation module to jointly realize the automatic construction route planning and execution, as well as the planning and execution of the running path of the mixing head 108, and realizes the control of the solidification quality of the soft soil layer. When necessary, the operator can remotely stop or bypass the fully automatic autonomous construction mode to enter the semi-automatic operation mode.

[0081] The grid construction quality evaluation module is connected to the controller and is used to calculate the construction progress and construction quality indicators of each three-dimensional grid body. The controller plans the construction strategy of the next grid according to the construction progress and construction quality indicators of the three-dimensional grid body of the current grid and the real-time construction data of the construction equipment. The construction quality evaluation module can evaluate in real time whether the amount of curing agent added in a single operation, the number of stirring times of the stirring head 108 and the stirring energy meet the construction requirements during the construction process. When the requirements are not met, a prompt is issued and a secondary operation is performed through the controller. At the same time, after the construction of each three-dimensional grid body is completed, the quality evaluation module will analyze the construction record of the grid and adjust the parameters or actions of the operation of the next three-dimensional grid body to ensure that the construction quality of each three-dimensional grid body meets the requirements.

[0082] The local database and the cloud server can achieve real-time data synchronization. The cloud server can support access and synchronization of multiple shallow layer curing construction equipment, and coordinate the construction and safely dispatch multiple unmanned shallow layer curing construction equipment.

[0083] The shallow layer solidification construction equipment of the present invention can realize the simultaneous operation of multiple machines through the cloud server. Multiple shallow layer solidification construction equipment can work in different areas at the same time. Each construction equipment uses an independent construction path plan to keep the construction progress within a certain difference range. At the same time, the shallow layer solidification construction equipment is installed with a safety monitoring module. Through image processing, infrared scanning or laser radar and other means, collisions between multiple machines can be avoided during the construction process, and alarms can be issued for abnormal situations in the operation area and timely avoidance can be made.

[0084] The communication unit 104 uses a wired or wireless method to transmit data with each unit of the sensor module. The operator's multi-channel remote control uses the wireless LAN protocol to communicate with the communication unit 104 over long distances, and transmits the signals of each channel of the remote control to the controller, thereby remotely controlling each corresponding channel of the solenoid valve group 105. The communication unit 104 can transmit the data generated by each module to the controller in real time, and at the same time pass the various instructions issued by the controller to each execution unit, and enter the local database and cloud server, so that the entire system forms a whole. In this specific embodiment, the satellite positioning unit of the shallow curing sensor module includes a posture sensing unit, a stirring head 108 power monitoring unit, and the solenoid valve group 105 unit and the communication unit 104 use a wired CAN bus protocol or a wireless connection. For wireless connection, the data protocol is a low-power Bluetooth (BTLE) wireless transmitter or a connection based on the 802.11 protocol. The transmission distance of BTLE meets data transmission within 10 meters, and the 802.11 protocol meets signal transmission within a distance of 500-1000 meters. Each unit of the sensor module automatically transmits data after establishing a connection, and the data of the sensor module is used by the controller to analyze, generate and execute the tasks of shallow curing construction. In the semi-automatic remote control mode, the human operator uses a multi-channel remote control outside the cockpit to communicate with the communication unit 104 over long distances, and transmits the signals of each channel on the remote control to the action controller, thereby remotely controlling each corresponding channel of the solenoid valve group 105. The operator connects to the controller through the remote control outside the cockpit, and the controller uses the communication unit 104 and the feeding background of the shallow curing mixing equipment to achieve fully automatic material preparation and feeding functions, and at the same time matches the feeding speed required for the construction of the mixing head 108 to ensure that the amount of curing agent supplied during construction reaches the design target value.

[0085] In addition, this specific embodiment also includes a safety monitoring module:

[0086] Among the three working modes of shallow curing construction equipment, the safety module, including cameras and human sensors, is set as the highest priority to ensure the safety of personnel during construction. The camera and human sensor monitor the image and movement status of the human body within the construction radius of the shallow curing construction equipment. During the real-time monitoring process of the safety monitoring module, once it detects that a person enters a dangerous area or the equipment encounters a possible risk, the controller will take measures, such as slowing down or stopping the equipment, to prevent accidents.

[0087] At the same time, the following physical safety management measures are adopted in the shallow solidification construction equipment site to ensure personnel safety:

[0088] 1. Physical isolation and warning signs: By setting up physical barriers, ensure that construction workers and equipment maintain a safe distance to avoid direct contact, and set up obvious safety warning signs to remind all personnel of safety rules and potential risks.

[0089] 2. Electronic fence: Use advanced electronic monitoring systems to create a virtual safety boundary. When people approach the equipment, the system will automatically issue a warning and take corresponding measures to maintain a safe distance.

[0090] 3. Lights and warning sounds: When the equipment is in operation, it reminds people around it to pay attention to safety through flashing warning lights and continuous warning sounds.

[0091] 4. Emergency stop button of equipment: A conspicuous emergency stop button is set on the equipment. Once an emergency occurs, the construction personnel can quickly press the button to immediately stop the operation of the equipment.

[0092] 5. Wireless emergency stop button: Provides a handheld wireless emergency equipment stop device that allows the operator or safety supervisor to quickly stop the equipment even if they are far away from the equipment. Specific embodiment 2

[0094] A construction method, based on the shallow layer solidification multi-mode construction device of specific embodiment 1, comprising:

[0095] S1. Establishing a digital site model that maps the construction site 109 based on the characteristic information of the construction site 109, and at the same time, establishing a digital equipment model that maps the construction equipment based on the construction equipment; the characteristic information includes boundary characteristics, coordinate characteristics and address characteristics of the construction site 109; and establishing an association between the digital site model and the digital equipment model based on the coordinate characteristics and the coordinate information of the construction equipment collected by the sensor module;

[0096] S2. Inputting construction parameter information in the human-computer interaction screen display module according to the geological characteristics of the construction site 109, the construction parameter information includes the coordinates of the construction site 109, the construction depth, the plane side length of the three-dimensional grid body, the depth of the three-dimensional grid body, the set curing material dosage of the three-dimensional grid body and the set stirring times of the three-dimensional grid body; the geological characteristics include soil strength and soil bearing capacity;

[0097] S3. Divide the digital site model into m×n×l three-dimensional grids according to the plane side length and depth of the three-dimensional grid, and number each construction unit in the form of (i, p, o), where i represents the number of rows on the construction surface, p represents the number of columns on the construction surface, and o represents the sequence number in the construction depth direction; calculate the coordinates of each vertex and center coordinate of each three-dimensional grid;

[0098] S4. The operator selects the manual construction mode, the semi-automatic remote control guided construction mode or the fully automatic construction mode according to the needs, wherein the manual control construction mode enters S5; the semi-automatic remote control guided mode enters S6; and the fully automatic construction mode enters S7;

[0099] S5. The operator enters the cockpit of the construction equipment and controls the operation of each actuator 403 through the hydraulic system through the control console in the cockpit to perform shallow solidification construction on the three-dimensional grid body; then enters S9, and the local database stores and records the execution actions of each actuator 403 and the control signals of the hydraulic system corresponding to the execution actions;

[0100] S6. The operator remotely controls the hydraulic system to control the operation of each actuator 403. When the actuator reaches the three-dimensional grid, shallow solidification construction will be carried out. At the same time, the sensor module collects the operating conditions of each actuator 403 in real time, updates the posture and position of the digital device model on the digital site model in real time, and displays it to the operator through the human-computer interaction screen display module; then enters S9, and the local database stores and records the execution actions of each actuator 403 and the control signals of the hydraulic system corresponding to the execution actions;

[0101] S7. The cloud server calls the local database to store and record the execution actions of each actuator 403 and the control signals of the hydraulic system corresponding to the execution actions, uses reinforcement learning training for the control signals marked as qualified construction quality, and generates a control module in the fully automatic autonomous construction mode, and transmits the control parameters of the control module back to the local database;

[0102] S8. Automatically generate the construction area of ​​each construction cycle according to the construction starting point, construction end point, geological characteristics of the three-dimensional grid body and the construction area of ​​the construction equipment; determine the construction route according to the construction area of ​​each construction cycle; then the controller module generates the execution action of each actuator 403 and the control signal of the hydraulic system corresponding to the execution action according to the control module generated in S7; perform shallow solidification construction on each three-dimensional grid body, and then enter S9;

[0103] S9. Evaluate the construction quality of each three-dimensional grid body in the construction grid group according to the set curing material dosage and cumulative curing material injection volume of the three-dimensional grid body, as well as the set stirring times and cumulative stirring times. When entering the next construction cycle, synchronously update the geological characteristics of each three-dimensional grid body in the digital site model, and return to S8 until the shallow curing construction of the entire construction site 109 is completed.

[0104] Beneficial effects of the method of the present invention:

[0105] The shallow solidification mixing equipment of the present invention adopts three-dimensional model automatic operation area planning technology and intelligent calculation of dynamic positioning coordinates of each mechanism of the equipment. With the assistance of Beidou positioning signals, it can realize precise autonomous navigation, avoid collision, omission and repeated cross-construction of the construction route of the fleet, and greatly improve the construction efficiency and construction quality of the equipment.

[0106] The equipment of the present invention has the functions of fully automatic material preparation and feeding, and reduces the demand for labor and labor intensity through real-time communication with the communication unit 104 of the controller, thereby solving the construction quality problems caused by shortage of operators or lack of experience.

[0107] Through adaptive control and path planning strategies, the equipment of the present invention can flexibly respond to changes in the formations of various mixing heads 108, and utilize 24-hour unmanned continuous construction capabilities to significantly improve construction efficiency, shorten construction period, reduce construction costs, and ensure that construction quality is controllable and reliable.

[0108] The equipment of the present invention is equipped with an environmental monitoring perception module and cooperates with corresponding data processing and computing capabilities to detect and evaluate potential construction risks in real time. Its fully automatic autonomous construction, remote control construction and manual operation construction can be quickly switched, and can be widely used in various sub-item foundation treatment projects of civil engineering projects.

[0109] Fully automatic autonomous construction or remote control construction can avoid operators working for long periods of time in high-risk or toxic environments. When used in dangerous environments or special engineering construction environments, the equipment of the present invention can issue alarms in time and take hazard avoidance measures to avoid personal injury, equipment damage or project delays.

[0110] In a possible implementation manner, the operator remotely controls the hydraulic system in S6 to control the operation of each actuator 403, and the operation to the three-dimensional grid body to perform shallow solidification construction specifically includes:

[0111] S601. The sensor module collects the coordinate position of the construction equipment in real time, and matches the coordinate position on the digital site model. The operator understands the precise position of the construction equipment at the construction site 109 through the human-computer interaction screen module;

[0112] S602. Obtain (i,p,1), (i,p,2)…(i,p,o)…(i,p,l) of the three-dimensional grid body to be constructed in the depth direction as a construction grid group; the operator controls the construction equipment to move to the three-dimensional grid body (i,p,1);

[0113] S603. The operator controls and adjusts the robot arm 106 to move the mixing head 108 to the center coordinates of the three-dimensional grid body to be constructed, and then performs solidification material injection and mixing on each three-dimensional grid body of the three-dimensional construction grid group according to the construction parameter information; in the three-dimensional construction grid group, p=1, 2, ...n, i=1, 2, ...m; after the construction of each three-dimensional grid body is completed, enter S9.

[0114] In a possible implementation manner, the control parameters of the hydraulic system corresponding to the execution action in S6 specifically include the opening and closing state and amplitude, opening and closing duration, and opening and closing sequence of each channel of the solenoid valve group 105 .

[0115] In a possible implementation manner, the automatic generation of the construction area for each construction period in S8 according to the construction starting point, the construction end point, the geological characteristics of the three-dimensional grid body and the construction area of ​​the construction equipment specifically includes:

[0116] S8A1. Determine the construction starting point according to the occupied area of ​​the construction equipment and the construction area of ​​the construction equipment; construction period T = 1;

[0117] S8A2. At the initial point of construction, shallow solidification construction is carried out with the area occupied by the construction equipment as the construction area; after the construction is completed and the corresponding curing age has passed, the construction area is marked as an area that can be advanced;

[0118] S8A3.T=T+1, control the construction equipment to move to the advanceable area of ​​the construction period T, and perform shallow solidification construction on the non-advanceable area outside the advanceable area of ​​the construction period T with the construction area of ​​the construction equipment as the center; after the construction is completed, it is marked as the advanceable area; repeat A3 until the construction equipment reaches the construction end point.

[0119] In a possible implementation manner, the construction route determined in S8 according to the construction area of ​​each construction cycle is specifically moving along the edge of the advanceable area and shallow layer solidification construction.

[0120] In a possible implementation manner, the evaluation of the construction quality of each three-dimensional grid body of the construction grid group according to the set curing material dosage and the cumulative injection amount of the curing material and the set stirring times and the cumulative stirring times of the three-dimensional grid body in S9 specifically includes:

[0121] The quality score coefficient R of the three-dimensional mesh is:

[0122] R=R1 0.7 ×R2 2.3

[0123] R1 is the cumulative stirring times of the stirring head 108, when N≥350, R1=1; when 350>N≥300, R1=0.8; when 300>N≥250, R1=0.6; when 250>N≥200, R1=0.5;

[0124] R2 is the achieved value of the cumulative injection volume PV of the solidifying material and the set solidifying material dosage SV:

[0125] R2=PV / SV

[0126] By marking each three-dimensional grid body in the mixing head 108, those with R exceeding 0.6 are qualified, and the grid construction quality evaluation marks the grid in green, and those with R below 0.6 are unqualified, and the grid construction quality evaluation marks the grid in red;

[0127] The calculation formula for the cumulative number of stirring times is:

[0128] N=ΣM×n×(1 / V d +1 / V u )

[0129] The stirring times are N, ΣM is the number of blades on the stirring head 108, and V d 、V u are the descending and ascending speeds of the mixing head 108 respectively, and n is the number of mixing times. The flow data of the same coordinates are integrated to obtain the cumulative injection amount of the solidified material of the three-dimensional construction grid body.

[0130] The method of the present invention is further explained in combination with actual construction application:

[0131] The movement of the shallow layer solidification and mixing equipment is achieved by the walking mechanism 107, so as to complete the displacement of the shallow layer solidification and mixing equipment in all directions.

[0132] The satellite positioning unit is composed of two or more RTK antennas. The positioning coordinates adopt Mercator projection coordinates, and the longitude and latitude in the satellite positioning unit are converted into three-dimensional coordinates in the format (N, E, H), where N and E are the coordinates of the north-south direction and the east-west direction in the plane, respectively, and H is the elevation coordinate. The site grid generation module is used to establish a digital site model that maps the mixing head 108, and divide the digital site model into m×n×l three-dimensional grid bodies according to the construction requirement parameter information.

[0133] The path planning module generates the plane coordinates of the site to be completed and the design elevation to be achieved, and the grid generation module calculates the vertex coordinates and center coordinates of the three-dimensional grid body in the format of (N, E, H). According to the data sent back by the perception unit, the plane position of the shallow solidification construction equipment and the relative position of the shallow solidification construction equipment in the mixing head 108, as well as the three-dimensional position of the mixing head 108 and the relative position of the mixing head in the mixing head 108 can be determined; according to the above information, the action calculation module and the action execution module 401 are used to drive the various execution units of the shallow solidification construction equipment to complete the construction task.

[0134] The path planning module divides the site with a bearing capacity above the maximum ground pressure of the equipment into an accessible area, and the site with a bearing capacity below the maximum ground pressure of the equipment into a non-accessible area. Figure 7 The middle mixing head 108 is an example. The soil properties of the site are silt or silty clay, with a moisture content of 60% and a bearing capacity of less than 10kPa, which cannot meet the construction requirements. The relationship between the strength growth and age of the silty soil after construction is shown in the following table. 3 Under the ash content, the bearing capacity reaches 30kPa 24 hours after construction, which meets the maximum grounding pressure requirement of the equipment.

[0135]

[0136] Combination Figure 8As a demonstration case, at T=0d, the shallow curing construction equipment enters the predetermined position from the paved road surface. According to the design file of the mixing head 108, a grid of the mixing head 108 is formed in the grid construction module. The unconstructed grid of the mixing head 108 is a non-advance area and is marked in the path planning module. 801 is the construction range completed by the shallow curing construction equipment at T=1d. The shaded area is the preparation for the shallow curing construction equipment to enter the site. 24 hours after completion at T=2d, the bearing capacity of the treated soft foundation meets the ground pressure requirement of the equipment. The path planning module divides the construction area of ​​801 into an advanceable area. The shallow curing construction equipment drives into the shaded area of ​​801 and completes the soft foundation treatment within the shaded range of 802. The shaded area in 802 is determined by the rotation radius of the shallow curing construction equipment. According to the length of the equipment carrier robot arm 106, the coverable area in 802 is 80-200m 2 , when the shadow range in 802 is processed 24 hours later, T=3d, the path planning module divides the construction area of ​​802 into the area that can be advanced, and defines the construction range 803 of T=3d, and then enters T=4d, the path planning module divides the construction area of ​​803 into the area that can be advanced, and defines the construction range 804 of T=4d. When T=n days, the area that can be covered for construction will exceed the maximum daily construction volume of the shallow curing equipment, and its standardized construction range is capped by the maximum construction capacity of the equipment. Taking the equipment with a construction radius of 5 meters as an example, T=1,2,3,4d, the corresponding daily construction area is 24,189,277,389m 2 .

[0137] According to the construction plan in 802, based on the current position coordinates of the shallow solidification construction equipment, the construction range that day is calculated, the construction depth is 2m, and the construction area is 30m 2 , designed curing agent content 110kg / m 3 . Taking the wet spraying feeding background as an example, according to the water-cement ratio of 0.7, the material preparation plan for the day is 6600kg of curing agent, 4620kg of water, and a total mass of slurry of 11220kg. The controller controls the number of stirring times at 280 times / m. In order to ensure that the equipment complies with the established construction quality requirements under safe load, the action operation module controls the stirring speed at 60rpm according to the torque of the mixing head 108 and the pressure of the hydraulic oil. The lifting and lowering speed of the mixing head 108 is 3m / min. Under the control of the fully automatic autonomous mode, the action operation module calculates the trajectory 900 of the mixing head 108 in the soft soil, and marks the processed area 901 as processed in the path planning module. To match the construction parameters, the controller sends a control signal to the wet spraying feeding background through the communication unit 104 to control the slurry flow rate to 108L / min.

[0138] The construction data is collected by the sensor module of the shallow solidification construction equipment, processed by the quality evaluation module, and the evaluation result data is fed back to the controller. Based on the quality evaluation of the previous grid construction and the current status of the shallow solidification construction equipment, the route planning module and the action calculation module make construction strategies. For grids that do not meet the construction quality standards, the shallow solidification construction equipment will promptly carry out construction remediation for the grid. For grids that meet the construction quality standards, the construction of the next grid will be carried out.

[0139] The data of grid construction quality evaluation results are uploaded from the communication unit 104 to the cloud server, and the completion and quality evaluation of the project are displayed as follows: Figure 7 As shown in 903, the evaluation results are presented by using colors, so that the management personnel can remotely visualize the progress and quality of the equipment in the fully automatic autonomous mode. Furthermore, the color marking format is green for qualified and red for unqualified. The color of the grid under construction is blue

[0140] In the description of the embodiments of the present application, it should be noted that in the description of the present application, terms such as "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is only for the convenience of description, and does not indicate or imply that the device or component must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present application.

[0141] In the description of the present application, the description with reference to the terms "one embodiment", "some embodiments", "in the present embodiment", "specific example", or "some examples" etc. means that the specific features, mechanisms, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, mechanisms, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0142] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.

Claims

1. A shallow layer solidification multi-mode construction device, characterized in that: The invention comprises construction equipment, a controller, a sensor module, a safety monitoring module, a local database, a cloud server and a human-computer interaction screen display module, wherein the controller is connected to the construction equipment, the sensor module and the safety monitoring module are respectively arranged on the construction equipment, the sensor module is used to collect the operation parameters of the construction equipment, the safety monitoring module is used to monitor the construction safety of the construction equipment, the sensor module, the safety monitoring module, the human-computer interaction screen display module and the local database are respectively connected to the controller, and the local database is connected to the cloud server via a communication unit (104); the construction equipment comprises a mixing device and a feeding device, the mixing device comprises an operating terminal in a cockpit, a remote control terminal outside the cockpit, a liquid A hydraulic system and a plurality of actuators (403) driven by the hydraulic system, the remote control end and the operating end are both connected to a controller, the hydraulic system includes a solenoid valve group (105) for driving the plurality of actuators (403); the controller has three modes: a manual construction mode, a semi-automatic remote control guided construction mode, and a fully automatic construction mode. In the manual construction mode, an operator controls the hydraulic system to drive the actuators (403) through the controller from the operating end; in the semi-automatic remote control guided construction mode, an operator controls the hydraulic system to drive the actuators (403) through the controller from the remote control end; in the fully automatic construction mode, the controller autonomously generates a control signal to control the hydraulic system to drive the actuators (403); The controller comprises a control module, a site grid generation module, an equipment digital mapping module, a path planning module, an action calculation module, an action execution module (401) and a solenoid valve monitoring module (405); The site grid generation module is used to establish a digital site model that maps the construction site (109); The equipment digital mapping module is used to establish a digital equipment model that maps the construction equipment; The path planning module is used to automatically plan the construction area of ​​each construction period based on the construction period; The action calculation module is used to calculate the electronic signal of the solenoid valve group (105) in the hydraulic system; The action execution module (401) is used to convert the electronic signal into a voltage and current signal so as to enable the hydraulic system operation control actuator (403) to work; The solenoid valve monitoring module (405) is used to monitor and record the action program of the action calculation module and the action execution module (401) for constructing the three-dimensional grid body, and the solenoid valve monitoring module (405) is connected to a local database to store the action program; The control module is respectively connected to a local database, an equipment digital mapping module, a path planning module, an action execution module (401), and a solenoid valve monitoring module (405).

2. The shallow layer solidification multi-mode construction device according to claim 1 is characterized in that: The actuator (403) includes a mechanical arm (106), a stirring head (108) and a walking mechanism (107), and the sensor module includes a satellite positioning sensor (101) provided on the stirring device, a plurality of inclination sensors (102) provided on the mechanical arm (106), a satellite positioning sensor (101) provided on the stirring head (108), a rotary encoder, a hydraulic flow sensor and a hydraulic oil pressure sensor (103), a hydraulic oil temperature sensor, a stirring head (108) speed sensor, a feed pipe pressure sensor provided on the feed pipe, a feed pipe flow sensor and a background weighing sensor provided on the feeding device.

3. The shallow layer solidification multi-mode construction device according to claim 1, characterized in that: The hydraulic system comprises a hydraulic oil pump (404), a hydraulic oil tank (402), a solenoid valve group (105) and an electrically controlled reversing valve (406); the solenoid valve group (105) comprises a hydraulic oil delivery main pipeline (501), a hydraulic oil return main pipeline (502) and a plurality of electrically controlled proportional solenoid valves (503); the hydraulic oil delivery main pipeline (501) and the hydraulic oil return main pipeline (502) are respectively connected to the hydraulic oil tank (406) through the hydraulic oil pump (404). 2) connected, multiple electronically controlled proportional solenoid valves (503) are divided into forward oil delivery electronically controlled proportional valves (503A) and reverse oil return electronically controlled proportional valves (503B), one forward oil delivery electronically controlled proportional valve (503A) and one reverse oil return electronically controlled proportional valve (503B) form a group, the forward oil delivery electronically controlled proportional valve (503A) is connected to the hydraulic oil delivery main pipeline (501), and the reverse oil return electronically controlled proportional valve (503B) is connected to the hydraulic oil return main pipeline ( 502), each of the electrically controlled reversing valves (406) has an A port, a B port, a T port, a P port and an S port, and both ends of each of the actuators (403) are connected to the A port and the B port of the electrically controlled reversing valve (406) through a pipeline. The T port and the P port of the electrically controlled reversing valve (406) are respectively connected to the valve port channel (504) of the forward oil supply electrically controlled proportional valve (503A) and the reverse oil return electrically controlled proportional valve (503B) of the same group through a pipeline. The S port of the electrically controlled reversing valve (406) is a signal port. The action execution module (401) is respectively electrically connected to the hydraulic oil pump (404), the electrically controlled proportional solenoid valve (503) and the S port of the electrically controlled reversing valve (406) to receive the control signal sent by the action execution module (401). The sensor module is arranged on the actuator (403) to collect data of the actuator (403).

4. The shallow layer solidification multi-mode construction device according to claim 1, characterized in that: The shallow solidification multi-mode construction device also includes a quality evaluation module, which is connected to the site grid generation module and is used to calculate the construction progress and construction quality of each three-dimensional grid body. The controller plans the construction strategy for the next three-dimensional grid body based on the construction progress and construction quality of the current three-dimensional grid body and the real-time construction data of the construction equipment.

5. A construction method, based on the shallow layer solidification multi-mode construction device according to any one of claims 1 to 4, characterized in that: include: S1. Establishing a digital site model that maps the construction site (109) based on characteristic information of the construction site (109), and establishing a digital equipment model that maps the construction equipment based on the construction equipment; the characteristic information includes boundary characteristics, coordinate characteristics, and address characteristics of the construction site (109); and establishing an association between the digital site model and the digital equipment model based on the coordinate characteristics and the coordinate information of the construction equipment collected by the sensor module; S2. Inputting construction parameter information in the human-computer interaction display module according to the geological characteristics of the construction site (109), the construction parameter information including the coordinates of the construction site (109), the construction depth, the plane side length of the three-dimensional grid body, the depth of the three-dimensional grid body, the set curing material dosage of the three-dimensional grid body and the set stirring times of the three-dimensional grid body; the geological characteristics include soil strength and soil bearing capacity; S3. Divide the digital site model into A three-dimensional mesh, and according to Each construction unit is numbered in the form of Indicates the number of rows on the construction surface, Indicates the number of columns on the construction surface, Indicates the serial number of the construction depth direction; calculates the coordinates of each vertex and center of each three-dimensional mesh body; S4. The operator selects the manual construction mode, the semi-automatic remote control guided construction mode or the fully automatic construction mode according to the needs, wherein the manual control construction mode enters S5; the semi-automatic remote control guided mode enters S6; and the fully automatic construction mode enters S7; S5. The operator enters the cockpit of the construction equipment and controls the operation of each actuator (403) through the hydraulic system through the control console in the cockpit to perform shallow solidification construction on the three-dimensional grid body; then enters S9, and the local database stores and records the execution actions of each actuator (403) and the control signals of the hydraulic system corresponding to the execution actions; S6. The operator remotely controls the hydraulic system to control the operation of each actuator (403), and runs to the three-dimensional grid body to perform shallow solidification construction. At the same time, the sensor module collects the operating conditions of each actuator (403) in real time, updates the posture and position of the digital device model on the digital site model in real time, and displays it to the operator through the human-computer interaction screen display module; then enters S9, and the local database stores and records the execution actions of each actuator (403) and the control signals of the hydraulic system corresponding to the execution actions; S7. The cloud server calls the local database to store and record the execution actions of each actuator (403) and the control signals of the hydraulic system corresponding to the execution actions, uses the reinforcement learning method to train the control signals marked as qualified construction quality and generate a control module in the fully automatic autonomous construction mode, and transmits the control parameters of the control module back to the local database; S8. Automatically generate the construction area of ​​each construction cycle according to the construction starting point, the construction end point, the geological characteristics of the three-dimensional grid body and the construction area of ​​the construction equipment; determine the construction route according to the construction area of ​​each construction cycle; then the controller generates the execution action of each actuator (403) and the control signal of the hydraulic system corresponding to the execution action according to the control module generated in S7; perform shallow solidification construction on each three-dimensional grid body, and then enter S9; S9. Perform construction quality evaluation and quality marking on each three-dimensional grid body of the construction grid group according to the set curing material dosage and cumulative curing material injection volume of the three-dimensional grid body, as well as the set stirring times and cumulative stirring times. When entering the next construction cycle, synchronously update the geological characteristics of each three-dimensional grid body in the digital site model, and return to S8 until the shallow curing construction of the entire construction site (109) is completed.

6. The construction method according to claim 5, characterized in that: In S6, the operator remotely controls the hydraulic system to control the operation of each actuator (403), and shallow solidification construction is carried out at the three-dimensional grid body, which specifically includes: S601. The sensor module collects the coordinate position of the construction equipment in real time, and matches the coordinate position on the digital site model. The operator understands the precise position of the construction equipment on the construction site (109) through the human-computer interaction screen display module; S602. Obtain the depth of the three-dimensional mesh to be constructed. As a construction mesh group; the operator controls the construction equipment to move to the 3D mesh body Department; S603. The operator controls and adjusts the robot arm (106) to move the mixing head (108) to the center coordinate of the three-dimensional grid body to be constructed, and then injects and mixes the solidified material for each three-dimensional grid body of the three-dimensional construction grid group according to the construction parameter information; , ; After the construction of each three-dimensional mesh body is completed, enter S9.

7. The construction method according to claim 5, characterized in that: The control signal of the hydraulic system corresponding to the execution action in S6 specifically includes the opening and closing state and amplitude, opening and closing duration and opening and closing sequence of each channel of the solenoid valve group (105).

8. The construction method according to claim 5, characterized in that: In S8, the control signal generated by the controller module using the control module in the local database specifically includes the opening and closing state and amplitude, opening and closing duration, and opening and closing sequence of each channel of the solenoid valve group (105).

9. The construction method according to claim 5, characterized in that: The construction area of ​​each construction period is automatically generated in S8 according to the construction starting point, the construction end point, the geological characteristics of the three-dimensional grid body and the construction area of ​​the construction equipment, specifically including: S8A1. Determine the construction starting point according to the occupied area of ​​the construction equipment and the construction area of ​​the construction equipment; construction period T=1; S8A2. At the initial point of construction, shallow solidification construction is carried out with the area occupied by the construction equipment as the construction area; after the construction is completed and the corresponding curing age has passed, the construction area is marked as an area that can be advanced; S8A3.T=T+1, control the construction equipment to move to the advanceable area of ​​the construction period T, and perform shallow solidification construction on the non-advanceable area outside the advanceable area of ​​the construction period T with the construction equipment's construction area as the center; after the construction is completed, it is marked as the advanceable area; repeat A3 until the construction equipment reaches the construction end point; In S8, the construction route is determined according to the construction area of ​​each construction cycle, specifically moving along the edge of the advanceable area and shallow layer solidification construction.

10. The construction method according to claim 5, characterized in that: The step S9 specifically includes: evaluating the construction quality of each three-dimensional grid body of the construction grid group according to the set curing material dosage and the cumulative injection amount of the curing material and the set stirring times and the cumulative stirring times of the three-dimensional grid body. The quality score coefficient R of the three-dimensional mesh body is: R = R1 0.7 ×R2 2.3 R1 is the cumulative stirring times of the stirring head (108), when N≥350, R1=1; when 350>N≥300, R1=0.8; when 300>N≥250, R1=0.6; when 250>N≥200, R1=0.5; R2 is the achieved value of the cumulative injection volume PV of the solidifying material and the set solidifying material dosage SV: R2=PV / SV By marking each three-dimensional grid body in the construction site (109), those with R exceeding 0.6 are qualified, and the grid construction quality evaluation marks the grid in green, and those with R below 0.6 are unqualified, and the grid construction quality evaluation marks the grid in red; The calculation formula for the cumulative number of stirring times is: ; The stirring times are , is the number of blades on the stirring head (108), are the descending and ascending speeds of the mixing head (108), respectively, and n is the number of mixing times. The flow data at the same coordinates are integrated to obtain the cumulative injection amount of the solidified material of the three-dimensional construction grid body.

Citation Information

Patent Citations

  • Autonomous 3D excavation construction robot

    CN108797669A

  • Remote automatic control system of hydraulic excavator in special environment

    CN114592559A

  • Auxiliary control system of in-situ sludge solidification stirring equipment

    CN116282782A

  • Executed condition control method for ground improvement and executed condition control system

    JP2001336142A

  • Bottoming control method in foundation improvement and foundation improving device

    JP2007016586A

Cited By

  • Soft soil in-situ solidification stirring robot system and automatic operation method

    CN121556437A

  • Soft foundation in-situ solidification construction optimization method and system based on Beidou 3D positioning

    CN122022374A

  • Construction optimization method and system for soft foundation in-situ solidification based on beidou 3D positioning

    CN122022374B