Lining trolley and construction method thereof

By designing a lining trolley with an annular track structure and an circumcision device in tunnel construction, the lining cracking caused by long and large lining trolleys is solved, and efficient construction and quality assurance is achieved.

CN119041946APending Publication Date: 2024-11-29CHINA RAILWAY 18TH BUREAU GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411448586.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-17
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

During tunnel construction, long and large lining trolleys cause lining cracking problems, affecting the quality of the tunnel, and the construction efficiency and progress are limited.

Method used

A lining trolley including an annular track structure and an circumcision device is designed to reduce the lining length and reduce the risk of cracking by reserved gaps in the lining concrete and cutting with a cutting mechanism.

Benefits of technology

It effectively reduces lining cracks, ensures the quality of lining, and does not need to shorten the length of lining trolleys, improving construction efficiency and progress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041946A_ABST
    Figure CN119041946A_ABST
Patent Text Reader

Abstract

The lining trolley comprises a trolley body (3) which is arranged in a tunnel (1) and located on a track system (2), an annular track structure (4) is arranged in the middle of the trolley body (3), and an annular cutting device (5) is arranged on the annular track structure (4); the lower portion of the annular track structure (4) is provided with a traction mechanism used for conducting traction on the annular cutting device (5). The device has the advantages of being ingenious in structural design, reliable and convenient to use and low in cost, after concrete pouring is completed, a one-plate lining is cut into multiple sections through joint cutting, and under the condition that the length of a lining trolley is not shortened, lining cracking is reduced, and lining quality is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a tunnel construction technology, in particular to a lining trolley and a construction method thereof. Background Art

[0002] At present, in the process of tunnel construction, after the tunnel excavation is completed, large hydraulic formwork trolleys are used for lining construction; the existing lining trolleys are mainly 12 meters long; in the TBM method of tunnel construction, due to the long tunnel length and high difficulty in organizing the construction inside the tunnel, in order to ensure construction efficiency, the lining trolley length has reached 16 meters. Due to the complex geological conditions of deep buried tunnels, lining cracking often occurs after the secondary lining construction of the tunnel, which has a certain impact on the quality of the tunnel.

[0003] There are many reasons for cracking of tunnel lining, such as concrete mix ratio problems, improper on-site construction operations, foundation settlement, external loads, and internal stress of lining concrete, etc. Generally, if the lining length is too long, the impact of uneven foundation settlement, external loads, and internal stress of lining concrete on the lining concrete will increase exponentially, and the probability of lining cracking will also increase exponentially. In addition, for the construction of long and long single-ended tunnels, the lining trolley is too short, which has a great impact on the on-site construction progress. Summary of the invention

[0004] The purpose of the present invention is to provide a lining trolley and a construction method thereof which can effectively reduce lining cracking and ensure lining quality.

[0005] The objective of the present invention is achieved through such a technical solution: a lining trolley, comprising a trolley arranged in a tunnel and located on a track system, a ring track structure being arranged in the middle of the trolley, a ring cutting device being arranged on the ring track structure; and a traction mechanism for pulling the ring cutting device being arranged at the lower part of the ring track structure.

[0006] Among them, the annular track structure includes a ring beam arranged on the tunnel lining formwork, a gear ring with a rack is arranged on the side of the reserved gap at the bottom of the ring beam; a fixing plate is arranged on the inner side of the ring beam, and a locking hook is arranged on the fixing plate; a limiting plate is arranged on the inner side of the bottom of the ring beam, and a concave track groove is formed between the limiting plate and the web of the ring beam.

[0007] In the present invention, the circular cutting device comprises a frame located in the concave track groove, a cutting mechanism is arranged in the frame, and the cutting mechanism cooperates with the rack.

[0008] Further description, the cutting mechanism includes a connecting column arranged in the frame and located at the upper part of the frame, a pulley A and a fixed component with a bearing are arranged on the connecting column, one side of the fixed component is connected to the pulley A, and a saw blade is arranged on the fixed component; gears are arranged on the connecting column and located on both sides of the pulley A and the saw blade, and the gears cooperate with the rack; a motor is arranged at the bottom of the frame, and the motor is connected to the pulley A through a pulley B and a belt arranged on the motor; roller groups are arranged on the outer walls on both sides of the frame, and the roller groups are located in the concave track groove.

[0009] Wherein, the roller group includes two front and rear rollers, and the rollers are connected to the outer wall of the frame through a bracket.

[0010] In the present invention, the traction mechanism includes a winch arranged at the bottom of the ring beam, a drum is arranged on the winch, and a traction rope is wound around the drum; a traction rod is arranged on the outer wall of the frame, and one end of the traction rope is connected to the traction rod.

[0011] A construction method for a lining trolley, the construction method comprising the following steps: 1) Measure and mark the position of the seam to be cut in the middle of the lining; 2) Anchor points are set on the wall of the primary support tunnel along the marked position of the seam to be cut, and a fixed annular steel frame is installed, and a fixed annular water stop is installed on the annular steel frame; 3) Install the geotextile between the ring steel bars through the hooks on the ring steel bars, and apply glue on the surface to paste the caulking plate; 4) The mobile trolley is put in place to seal the mold, and the trapezoidal groove template is assembled and reinforced at the reserved gap of the ring track structure; 5) pouring lining concrete; 6) After the lining concrete is finally set, remove the trapezoidal groove formwork; 7) Install the cutting device and cut the lining concrete along the circumferential direction; 8) Remove the cutting device and remove the formwork after the lining concrete strength reaches the formwork removal requirements; 9) Lining concrete maintenance.

[0012] Due to the adoption of the above technical scheme, the present invention has the advantages of ingenious structural design, reliable and convenient use, and low cost. After the concrete pouring is completed, a plate lining is cut into multiple sections by cutting. Without shortening the length of the lining trolley, the lining cracking is reduced and the lining quality is guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The accompanying drawings of the present invention are as follows: Figure 1 This is a schematic diagram of the cross-sectional structure of the lining trolley of the present invention; Figure 2 It is a schematic diagram of the arrangement of the ring cutting device of the present invention; Figure 3 This is a schematic diagram of the vertical structure of the lining trolley of the present invention; Figure 4 It is a schematic diagram of the detailed side arrangement of the ring cutting device of the present invention; Figure 5 It is a schematic diagram of the front arrangement of the details of the ring cutting device of the present invention; Figure 6 It is a schematic diagram of the detailed structure of the ring cutting device of the present invention; Figure 7 This is a schematic diagram of water stop structure installation; Figure 8 This is a schematic diagram of trapezoidal slot installation; Fig. 9 This is a schematic diagram of template blocking. DETAILED DESCRIPTION

[0014] The specific embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings, but the present invention is not limited to these embodiments, and any improvement or substitution based on the basic spirit of the present embodiment still falls within the scope of protection required by the claims of the present invention.

[0015] Embodiment 1, as Figure 1 , 2 As shown in Figures 3, 4, 5, 6, 7, 8 and 9, a lining trolley comprises a trolley 3 arranged in a tunnel 1 and located on a track system 2, a ring track structure 4 is arranged in the middle of the trolley 3, a ring cutting device 5 is arranged on the ring track structure 4; a traction mechanism for pulling the ring cutting device 5 is arranged at the lower part of the ring track structure 4.

[0016] Among them, the annular track structure 4 includes a ring beam 7 arranged on the tunnel lining formwork 6, and a gear ring 9 with a rack 8 is arranged on the side of the reserved gap at the bottom of the ring beam 7; a fixing plate 10 is arranged on the inner side of the ring beam 7, and a locking hook 11 is arranged on the fixing plate 10; a limiting plate 12 is arranged on the inner side of the bottom of the ring beam 7, and a concave track groove 13 is formed between the limiting plate 12 and the web of the ring beam 7.

[0017] In the present invention, the circular cutting device 5 comprises a frame 14 located in the concave track groove 13 , and a cutting mechanism is arranged in the frame 14 , and the cutting mechanism cooperates with the rack 8 .

[0018] Further description, the cutting mechanism includes a connecting column 15 arranged in the frame 14 and located at the upper part of the frame 14, a pulley A16 and a fixed component 17 with a bearing are arranged on the connecting column 15, one side of the fixed component 17 is connected to the pulley A16, and a saw blade 18 is arranged on the fixed component 17; gears 19 are arranged on the connecting column 15 and located on both sides of the pulley A16 and the saw blade 18, and the gears 19 cooperate with the rack 8; a motor 20 is arranged at the bottom of the frame 14, and the motor 20 is connected to the pulley A16 through a pulley B21 and a belt 22 arranged on the motor 20; roller groups are arranged on the outer walls on both sides of the frame 14, and the roller groups are located in the concave track groove 13.

[0019] The roller assembly includes two front and rear rollers 23 , and the rollers 23 are connected to the outer wall of the frame 14 via a bracket 24 .

[0020] In the present invention, the traction mechanism includes a winch 25 arranged at the bottom of the ring beam 7, a drum 26 is arranged on the winch 25, and a traction rope 27 is wound around the drum 26; a traction rod 28 is arranged on the outer wall of the frame 14, and one end of the traction rope 27 is connected to the traction rod 28.

[0021] The present invention works as follows: when the lining needs to be cut, the motor 20 works, drives the pulley A16 to rotate through the pulley B21 and the belt 22, thereby driving the fixed assembly 17 to rotate, and the fixed assembly 17 drives the saw blade 18 to rotate, thereby cutting the lining. While cutting, the winch 25 works, and the winch 25 drives the traction rope 27 through the roller 26 to pull the circular cutting device, and the circular cutting device can be pulled to make a circular motion along the circular track structure.

[0022] When the saw blade 18 needs to be replaced, the latch at the end of the connecting column 15 is opened, the cylinder is pulled out, the gear 19 and the damaged saw blade 18 are removed, a new saw blade 18 is replaced, and the gear 19 and the replaced saw blade 18 are installed on the connecting column 15.

[0023] A construction method for a lining trolley, the construction method comprising the following steps: 1) Measure and mark the position of the seam to be cut in the middle of the lining; 2) Anchor points are set on the wall of the primary support tunnel along the marked position of the seam to be cut, and a fixed annular steel reinforcement skeleton 29 is installed, and a fixed annular water stop 30 is installed on the annular steel reinforcement skeleton 29; 3) Install the geotextile 31 between the annular steel skeletons 29 through the hooks on the annular steel skeletons 29, and apply glue on the surface to paste the caulking plate; 4) The moving trolley is put in place to seal the mold, and the trapezoidal groove template 32 is assembled and reinforced at the reserved gap of the annular track structure; 5) pouring lining concrete; 6) After the lining concrete is finally set, the trapezoidal groove formwork 32 is removed; 7) Install the cutting device and cut the lining concrete along the circumferential direction; 8) Remove the cutting device and remove the formwork after the lining concrete strength reaches the formwork removal requirements; 9) Lining concrete maintenance.

[0024] In the present invention, the water stop installation structure is composed of a circumferential steel bar skeleton 29 and a water stop fixing steel bar 33. A connecting steel bar 34 is welded between the inner and outer annular steel bars of the circumferential steel bar skeleton 29 to strengthen the rigidity of the circumferential steel bar skeleton 29. Hooks are arranged at intervals on the circumferential steel bar skeleton 29. A layer of geotextile 31 is fixed between the inner and outer circumferential steel bar skeletons 29 by hooks. Glue is applied on the surface of the geotextile 31 and a caulking plate 35 is pasted. Water stop fixing steel bars 33 are welded at intervals on the circumferential steel bar skeleton 29. The middle part of the circumferential water stop 30 is close to the inner circumferential steel bar skeleton 29. The water stop fixing steel bars 33 are fixed to the circumferential steel bar skeleton 29 according to the shape of the circumferential water stop 30 around it. In order to ensure that the installation position of the circumferential water stop 30 is accurate and stable and does not shift during the pouring of concrete, the spacing of the water stop fixing steel bars 33 can be set densely.

[0025] Before pouring concrete, a trapezoidal groove template 36 is installed at the reserved gap in the circular track structure. The end size of the trapezoidal groove template 36 is consistent with the size of the designed trapezoidal groove. After the trapezoidal groove template 36 is inserted into the reserved gap, the back installation cross bar 37 is inserted into the lock hook 11 on the fixing plate 10, and the wedge 38 is inserted between the cross bar 37 and the back of the trapezoidal groove template 36. The trapezoidal groove template 36 is designed in sections and assembled section by section on site.

[0026] When there is no need to reserve a trapezoidal groove or cut a seam in the middle of the lining, a plugging template 39 can be installed at the reserved gap. The assembling method of the plugging template 39 is the same as that of the trapezoidal groove template 36.

[0027] According to design requirements, the geotextile 31 and the caulking plate 35 between the inner and outer annular steel skeletons 29 can be replaced by other materials.

Claims

1. A lining trolley, comprising a trolley (3) arranged in a tunnel (1) and located on a track system (2), wherein: An annular track structure (4) is provided in the middle of the trolley (3), and a ring cutting device (5) is provided on the annular track structure (4); and a traction mechanism for towing the ring cutting device (5) is provided at the bottom of the annular track structure (4).

2. The lining trolley according to claim 1, characterized in that: The annular track structure (4) comprises a ring beam (7) arranged on a tunnel lining template (6); a gear ring (9) with a rack (8) is arranged on the side of the reserved gap at the bottom of the ring beam (7); a fixing plate (10) is arranged on the inner side of the ring beam (7); a locking hook (11) is arranged on the fixing plate (10); a limiting plate (12) is arranged on the inner side of the bottom of the ring beam (7); a concave track groove (13) is formed between the limiting plate (12) and the web of the ring beam (7).

3. The lining trolley according to claim 2, characterized in that: The circular cutting device (5) comprises a frame (14) located in the concave track groove (13), a cutting mechanism is arranged in the frame (14), and the cutting mechanism cooperates with the rack (8).

4. The lining trolley according to claim 3, characterized in that: The cutting mechanism comprises a connecting column (15) arranged in a frame (14) and located at the upper part of the frame (14); a pulley A (16) and a fixed component (17) with a bearing are arranged on the connecting column (15); one side of the fixed component (17) is connected to the pulley A (16); a saw blade (18) is arranged on the fixed component (17); gears (19) are arranged on the connecting column (15) and located on both sides of the pulley A (16) and the saw blade (18); the gears (19) cooperate with the rack (8); a motor (20) is arranged at the bottom of the frame (14); the motor (20) is connected to the pulley A (16) via a pulley B (21) and a belt (22) arranged on the motor (20); roller groups are arranged on the outer walls of both sides of the frame (14); the roller groups are located in the concave track groove (13).

5. The lining trolley according to claim 4, characterized in that: The roller assembly comprises two front and rear rollers (23), and the rollers (23) are connected to the outer wall of the frame (14) via a bracket (24).

6. The lining trolley according to claim 5, characterized in that: The traction mechanism comprises a hoist (25) arranged at the bottom of the ring beam (7), a roller (26) being arranged on the hoist (25), and a traction rope (27) being wound around the roller (26); a traction rod (28) being arranged on the outer wall of the frame (14), and one end of the traction rope (27) being connected to the traction rod (28).

7. The construction method of a lining trolley according to any one of claims 1 to 6, characterized in that: The construction method comprises the following steps: 1) Measure and mark the position of the seam to be cut in the middle of the lining; 2) Anchor points are set on the wall of the primary support tunnel along the marked positions of the seams to be cut, and a fixed annular reinforcement skeleton (29) is installed, and a fixed annular water stop (30) is installed on the annular reinforcement skeleton (29); 3) Installing the geotextile (31) between the annular steel reinforcement frames (29) through the hooks on the annular steel reinforcement frames (29), brushing glue on the surface and pasting the caulking plate; 4) The moving trolley is put in place to seal the mold, and the trapezoidal groove template (32) is assembled and reinforced at the reserved gap of the annular track structure; 5) pouring lining concrete; 6) After the lining concrete has finally set, the trapezoidal groove formwork (32) is removed; 7) Install the cutting device and cut the lining concrete along the circumferential direction; 8) Remove the cutting device and remove the formwork after the lining concrete strength reaches the formwork removal requirements; 9) Lining concrete maintenance.