Reinforcing construction method for pit-in-pit enclosure

By chiseling the enclosure piles and erecting steel grilles in the pit in the pit to form an overall support point, the problem of reinforcement of the enclosure structure in the pit is solved, ensuring the overall performance and bearing capacity, and avoiding the foundation pit bottom plate Destruction and construction space occupied.

CN119061910APending Publication Date: 2024-12-03SHANGHAI MECHANIZED CONSTR GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411491006.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-24
Publication Date
2024-12-03

Smart Images

  • Figure CN119061910A_ABST
    Figure CN119061910A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of foundation pit engineering, and discloses a reinforcement construction method for a pit-in-pit enclosure. Part of pile body concrete of a plurality of fender posts which are located at the top of a bearing platform and intrude into a bearing platform area is firstly chiseled away, and a top construction area is formed. And an enclosing purlin and a supporting structure are placed in the top construction area, the supporting structure is welded to the enclosing purlin, then concrete is poured, the supporting structure, the enclosing purlin and the remaining fender posts above the bearing platform are integrally poured, and a top overall supporting point is formed. And the boundary-invading fender posts are chiseled off from top to bottom in a root and section mode, one section of each fender post is chiseled off, a steel grating is placed in the chiseled-off area, and the steel grating is welded to the top overall supporting point above the steel grating or the steel grating. And after a single invasion fender post is chiseled away, the steel grating on the bottommost side and the fender post below the bearing platform area are integrally poured, and a bottom supporting point is formed. And the parts, invading the bearing platform area, of all the fender posts are chiseled away one by one, corresponding steel grids are erected, reinforcing construction of the enclosure structure is completed, and finally the bearing platform is poured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation pit engineering, and in particular to a reinforcement construction method for pit-in-pit enclosure. Background Art

[0002] In large underground projects, multi-level foundation pits are very common. A pit within a pit, also known as an inner pit, usually uses an inner row of piles and an outer water-stop curtain as the retaining structure of the foundation pit. In order to ensure the bearing performance of the superstructure, a cap structure needs to be constructed at the bottom of the pit within the pit. However, when the distance between the design boundary of the cap and the inner boundary of the row of piles is small, the verticality of the row of piles is prone to deviation, and the row of piles will intrude into the range of the cap. Before the subsequent construction of the cap, the pile body of the intruding part of the row of piles needs to be chiseled out. If the pile row intrusion is serious, it will greatly weaken the bearing capacity of the retaining structure, so the retaining structure needs to be reinforced.

[0003] In the prior art, the commonly used reinforcement measures are to install steel pipe piles or cement-soil steel mixing walls on the outside of the retaining structure. However, this measure requires opening holes on the outside of the retaining structure, which will penetrate the already formed bottom plate structure of the rest of the foundation pit outside, destroying the integrity of the foundation pit bottom plate. In addition, the construction equipment will also occupy a large amount of space in the outer foundation pit, affecting the construction progress of the rest of the foundation pit. Summary of the invention

[0004] The object of the present invention is to provide a reinforcement construction method for a pit-in-pit enclosure, which is simple and convenient and can ensure the integrity and bearing performance of the pit-in-pit enclosure structure.

[0005] To achieve this object, the present invention adopts the following technical solutions:

[0006] A reinforcement construction method for a pit-in-pit enclosure is provided, comprising the following steps:

[0007] S1: Set up the enclosure structure inside the pit;

[0008] A water-stop curtain is arranged along the circumference of the inner wall of the pit-in-pit, and a plurality of retaining piles are arranged at intervals along the circumference of the inner wall of the water-stop curtain, wherein the retaining piles extend in the vertical direction, and the soil in the pit-in-pit is excavated to the top of the cap;

[0009] S2: Cast the top integral support point and remove all soil in the cap area;

[0010] Chiseling away part of the pile concrete of the plurality of retaining piles intruding into the cap area at the top of the cap to form a top construction area, placing a purlin and a supporting structure in the top construction area, wherein the purlin extends in a horizontal direction, and the supporting structure is welded to the purlin; pouring concrete into the top construction area, so that the supporting structure, the purlin and the remaining retaining piles above the cap are integrally cast to form a top integral support point;

[0011] Excavating the soil in the base area to the bottom;

[0012] S3: Chisel out the encroaching area of ​​the retaining piles in sections and install overlapping steel grids;

[0013] Chiseling away the pile body concrete of the retaining pile intruding into the cap area in sections and roots, placing the steel grille in the removed area after each section of the pile body concrete of the retaining pile is chiseled away, and welding the steel grille to the top integral support point or the steel grille above;

[0014] S4: pouring bottom support point;

[0015] Cast the bottom end of the steel grille at the bottom side and the remaining retaining piles below the cap area as a whole to form a bottom support point;

[0016] Repeat steps S3 and S4, completely chisel out the portion of the retaining piles that intrude into the base area, set up the steel grid, and finally cast the base.

[0017] As an optional solution for the reinforcement construction method of the pit-in-pit enclosure, the support structure includes a plurality of steel plates and a plurality of horizontal anchor bars. The plurality of steel plates are arranged in the top construction area at intervals along the horizontal direction and are welded to the purlin; each of the horizontal anchor bars passes through the plurality of steel plates in sequence.

[0018] As an optional solution for the reinforcement construction method of the pit-in-pit enclosure, the steel grating includes a fixed plate and a plurality of T-shaped ribs, wherein the plurality of T-shaped ribs are spaced apart on one side of the fixed plate and welded to the fixed plate.

[0019] As an optional solution for the reinforcement construction method of the pit-in-pit enclosure, there is a fixed distance between two adjacent T-shaped ribs.

[0020] As an optional solution for the reinforcement construction method of the pit-in-pit enclosure, in the step S3, the fixing plate of the steel grating is stacked on the soil between the water-stop curtain and the enclosure piles.

[0021] As an optional solution for the reinforcement construction method of the pit-in-pit enclosure, a plurality of steel bars are arranged between the steel grating and the enclosure piles on both sides, the plurality of steel bars are arranged at intervals in the vertical direction, and each of the steel bars extends in the horizontal direction.

[0022] As an optional solution for the reinforcement construction method of the pit-in-pit enclosure, each of the steel bars is welded to the steel grille, the diameter of the steel bar is d, and the length of the weld between the steel bar and the steel grille is ≥10d.

[0023] As an optional solution for the reinforcement construction method of the pit-in-pit enclosure, the steel bars are threaded steel bars.

[0024] As an optional solution for the reinforcement construction method of the pit-in-pit enclosure, a connecting plate is welded between two adjacent steel grids.

[0025] As an optional solution for the reinforcement construction method of the pit-in-pit enclosure, horizontal support members are provided between the enclosure purlins.

[0026] Beneficial effects of the present invention:

[0027] The present invention provides a reinforcement construction method for pit-in-pit enclosure, firstly, the pile body concrete of part of the retaining piles located at the top of the cap is chiseled out to form a top construction area. A supporting structure is placed in the top construction area, and the supporting structure is welded to the purlin, and then concrete is poured into the top construction area, so that the supporting structure, the purlin and the remaining retaining piles above the cap are cast as one, forming an integral top support point. Then, the pile body concrete of the retaining piles intruding into the cap area is chiseled out in sections from top to bottom, and after each section of the pile body concrete of the retaining piles is chiseled out, a steel grille is placed in the chiseled out area, and the steel grille is welded to the supporting structure or steel grille above. After the encroaching retaining piles are completely chiseled out, the bottommost steel grille is cast as one with the remaining retaining piles below the cap area to form a bottom support point. The parts of all retaining piles intruding into the cap area are chiseled out, and the corresponding steel grilles are set up to complete the reinforcement construction of the retaining structure, and finally the cap is cast. This method can reinforce the retaining structure after the encroaching piles are chiseled out in sections and the steel grilles are spliced ​​in blocks, thereby ensuring the overall performance and bearing capacity of the retaining structure. At the same time, the construction process is convenient and fast, which can effectively improve the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a construction process flow chart of the present invention;

[0029] Figure 2 It is a first schematic diagram of the reinforcement construction process of the pit-in-pit enclosure provided by the specific implementation example of the present invention;

[0030] Figure 3 It is a second schematic diagram of the reinforcement construction process of the pit-in-pit enclosure provided in the specific implementation example of the present invention;

[0031] Figure 4 It is a third schematic diagram of the reinforcement construction process of the pit-in-pit enclosure provided in the specific implementation example of the present invention;

[0032] Figure 5 yes Figure 4 Side view of the middle retaining pile;

[0033] Figure 6It is a fourth schematic diagram of the reinforcement construction process of the pit-in-pit enclosure provided in the specific implementation example of the present invention;

[0034] Figure 7 yes Figure 6 Side view of the middle retaining pile;

[0035] Figure 8 It is a fifth schematic diagram of the reinforcement construction process of the pit-in-pit enclosure provided in the specific implementation example of the present invention;

[0036] Fig. 9 yes Figure 8 Side view of the middle retaining pile.

[0037] Fig.10 It is a structural schematic diagram of a steel grating provided in an embodiment of a specific implementation manner of the present invention.

[0038] In the figure:

[0039] 100, water-stop curtain; 200, retaining piles; 300, purlin; 400, capping platform; 500, horizontal support member;

[0040] 1. The overall support point at the top;

[0041] 2. Support structure; 21. Steel plate; 22. Horizontal anchor bar;

[0042] 3. Steel grille; 31. Fixed plate; 32. T-shaped rib;

[0043] 4. Bottom support point; 5. Steel bars; 6. Connecting plate. DETAILED DESCRIPTION

[0044] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0045] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0046] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0047] In the description of this embodiment, the terms "upper", "lower", "right", etc., directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0048] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific implementation methods.

[0049] like Figures 1 to 10 As shown, the present invention provides a reinforcement construction method for a pit-in-pit enclosure, comprising the following steps:

[0050] S1: Set up the enclosure structure inside the pit;

[0051] A water-stop curtain 100 is arranged along the inner circumference of the pit-in-pit, and a plurality of retaining piles 200 are arranged at intervals along the inner circumference of the water-stop curtain 100. The retaining piles 200 extend in the vertical direction, and the soil in the pit-in-pit is excavated to the top of the cap 400.

[0052] In the above steps, the water-stop curtain 100 is a commonly used structure in the art, and its specific structure refers to the prior art; the retaining piles 200 are commonly used concrete columns in the art.

[0053] Specifically, due to construction reasons or ground soil properties, the verticality of the retaining pile 200 may deviate. Figure 2 As shown, part of the retaining piles 200 will intrude into the designated area of ​​the foundation 400, causing the retaining piles 200 to invade the boundary.

[0054] S2: Cast the top integral support point 1 and remove all soil in the area of ​​400 of the cap;

[0055] like Figure 2As shown, part of the pile concrete of the multiple retaining piles 200 located at the top of the cap 400 and intruding into the cap 400 area is chiseled out to form a top construction area, and the purlin 300 and the support structure 2 are placed in the top construction area. The purlin 300 extends in the horizontal direction, and the support structure 2 is welded to the purlin 300; concrete is poured into the top construction area, so that the support structure 2, the purlin 300 and the remaining retaining piles 200 above the cap 400 are cast as a whole to form a top integral support point 1. All the soil in the cap 400 area is excavated to the bottom of the cap 400.

[0056] Optionally, refer to Figure 3 , a horizontal support member 500 is arranged on the purlin 300 to improve the stability of the enclosure structure in the foundation pit. Specifically, the horizontal support member 500 can be a support beam commonly used in the art.

[0057] Optionally, combined Figure 3 The support structure 2 includes a plurality of steel plates 21 and a plurality of horizontal anchoring bars 22. The plurality of steel plates 21 are arranged horizontally in the top construction area at intervals and welded to the purlin 300. Each horizontal anchoring bar 22 passes through the plurality of steel plates 21 in sequence to improve the stability and overall strength of the support structure 2.

[0058] Specifically, in this embodiment, the pile body concrete within 1000 mm height of the top of the pedestal 400 is chiseled out to form a top construction area; the steel plate 21 is 15 mm thick and 500 mm high; in addition, C50 grouting material is used to cast and form the top integral support point 1.

[0059] S3: Remove the encroaching area of ​​the retaining piles 200 by roots and sections, and lay out overlapping steel grids 3;

[0060] The pile body concrete of the retaining pile 200 invading the area of ​​the foundation 400 is removed root by root and section by section. After each section of the pile body concrete of the retaining pile 200 is removed, the steel grille 3 is placed in the removed area and welded to the top integral support point 1 above or the steel grille 3 above.

[0061] The above steps are specific to this embodiment, refer to Figure 4 and Figure 5 First, the pile concrete of the retaining pile 200 located within 1 / 3 of the height above the cap 400 area is removed, and the soil between the water-stop curtain 100 and the retaining pile 200 within the corresponding height range is removed. The top of the steel grille 3 is abutted against the steel plate 21 and welded to the steel plate 21.

[0062] Reference Figure 6 and Figure 7Then, the pile concrete of the retaining pile 200 located in the middle 1 / 3 of the height of the cap 400 is removed, and the soil between the water-stop curtain 100 and the retaining pile 200 within the corresponding height range is removed. The top end of the second steel grating 3 is abutted against the bottom end of the previous steel grating 3, and is welded and fixed to the previous steel grating 3.

[0063] Reference Figure 8 and Fig. 9 Finally, the pile concrete of the retaining pile 200 located within 1 / 3 of the bottom height of the cap 400 area is chiseled off, and the soil between the water-stop curtain 100 and the retaining pile 200 within the corresponding height range is excavated. The top of the third steel grating 3 is abutted against the bottom end of the previous steel grating 3, that is, abutted against the bottom end of the second steel grating 3, and welded and fixed thereto. The pile concrete of the retaining pile 200 intrusion area is chiseled off, and the layout and overlap of the steel grating 3 used for reinforcement support are completed.

[0064] Specifically, in this embodiment, the pile body concrete of the retaining pile 200 invading the area of ​​the foundation 400 is chiseled out three times in sections; in other embodiments, the number of section chiseling can be performed as needed according to the actual intrusion height, which is not specifically limited here.

[0065] Alternatively, if Fig.10 As shown, the steel grille 3 includes a fixing plate 31 and a plurality of T-shaped ribs 32, wherein the plurality of T-shaped ribs 32 are arranged at intervals on one side of the fixing plate 31 and welded to the fixing plate 31. The above arrangement can effectively improve the overall strength of the steel grille 3, ensure the stability of the enclosure structure and the safety during the construction process.

[0066] Furthermore, there is a fixed spacing between two adjacent T-shaped ribs, which effectively reduces the amount of material used and thus reduces the cost investment while ensuring the overall strength of the steel grid 3. Specifically, the size of the fixed spacing can be set as required and is not specifically limited here.

[0067] Optionally, in the above step S3, the fixing plate 31 of the steel grille 3 is stacked on the soil between the water-stop curtain 100 and the retaining piles 200, that is, the side of the fixing plate 31 provided with the T-shaped rib 32 faces the inside of the foundation pit to improve the stability of the fixing of the steel grille 3.

[0068] Alternatively, if Figure 5 , Figure 7 and Fig. 9 As shown, a plurality of steel bars 5 are arranged between the steel grille 3 and the retaining piles 200 on both sides, the plurality of steel bars 5 are arranged at intervals in the vertical direction, and each steel bar 5 extends in the horizontal direction. The above arrangement further improves the stability of the fixing of the steel grille 3.

[0069] Furthermore, each steel bar 5 is welded to the steel grille 3 , the diameter of the steel bar 5 is d, and the length of the weld between the steel bar 5 and the steel grille 3 is 10d, so as to ensure the connection strength and connection stability of the weld.

[0070] For example, in this embodiment, the diameter of the steel bar 5 is 25 mm, and the weld length needs to be ≥ 250 mm; in addition, the vertical spacing between two adjacent steel bars 5 is 300 mm.

[0071] Optionally, the steel bar 5 is a threaded rod, which has high strength, good durability and corrosion resistance, and is convenient for construction. For example, in this embodiment, the steel bar 5 is HRB400 threaded steel.

[0072] Alternatively, if Figure 6 and Figure 8 As shown, a connecting plate 6 is welded between two adjacent steel gratings 3 to improve the connection strength between the two adjacent steel gratings 3 and improve the stability of the enclosure structure.

[0073] S4: pouring bottom support point 4;

[0074] Reference Figure 8 The bottom end of the bottommost steel grid 3 is cast together with the remaining retaining piles 200 below the base 400 to form a bottom support point 4.

[0075] Repeat steps S3 and S4 until the parts of the plurality of retaining piles 200 that intrude into the area of ​​the pedestal 400 are completely chiseled out, and the steel grid 3 is set up to complete the reinforcement construction of the retaining structure, and finally pour concrete into the set area of ​​the pedestal 400 to form the pedestal 400 structure.

[0076] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.

Claims

1. A reinforcement construction method for a pit-in-pit enclosure, characterized in that: The steps include: S1: Set up the enclosure structure inside the pit; A water-stop curtain (100) is arranged along the inner wall of the pit-in-pit in the circumference direction, and a plurality of retaining piles (200) are arranged at intervals along the inner wall of the water-stop curtain (100) in the circumference direction. The retaining piles (200) extend in the vertical direction to excavate the soil in the pit-in-pit to the top of the cap (400); S2: pouring the top integral support point (1) and removing all soil in the area of ​​the cap (400); Chiseling away part of the pile body concrete of a plurality of the retaining piles (200) located at the top of the cap (400) and intruding into the cap (400) area to form a top construction area, placing a purlin (300) and a support structure (2) in the top construction area, wherein the purlin (300) extends in a horizontal direction, and the support structure (2) is welded to the purlin (300); pouring concrete into the top construction area so that the support structure (2), the purlin (300) and the remaining retaining piles (200) above the cap (400) are integrally poured to form a top integral support point (1); Excavating the soil in the area of ​​the foundation (400) to the bottom; S3: Chiseling away the encroaching areas of the retaining piles (200) in sections and roots, and laying out overlapping steel grilles (3); Chiseling away the pile body concrete of the retaining pile (200) in the area intruding the cap (400) in sections and roots, and after each section of the pile body concrete of the retaining pile (200) is chiseled away, placing the steel grille (3) in the chiseled away area, and welding the steel grille (3) to the top integral support point (1) or the steel grille (3) above; S4: pouring bottom support point (4); The bottom end of the steel grille (3) at the bottom is integrally cast with the remaining retaining piles (200) below the base (400) to form a bottom support point (4); Repeat steps S3 and S4, completely chisel out the portion of the retaining pile (200) that intrudes into the area of ​​the cap (400), set up the steel grid (3), and finally cast the cap (400).

2. The reinforcement construction method for pit-in-pit enclosure according to claim 1 is characterized in that: The support structure (2) comprises a plurality of steel plates (21) and a plurality of horizontal anchoring bars (22); the plurality of steel plates (21) are arranged in the top construction area at intervals along the horizontal direction and are welded to the purlin (300); and each of the horizontal anchoring bars (22) passes through the plurality of steel plates (21) in sequence.

3. The reinforcement construction method for pit-in-pit enclosure according to claim 1 is characterized in that: The steel grille (3) comprises a fixing plate (31) and a plurality of T-shaped ribs (32); the plurality of T-shaped ribs (32) are arranged at intervals on one side of the fixing plate (31) and are welded to the fixing plate (31).

4. The reinforcement construction method for pit-in-pit enclosure according to claim 3 is characterized in that: There is a fixed distance between two adjacent T-shaped ribs (32).

5. The reinforcement construction method for pit-in-pit enclosure according to claim 3 is characterized in that: In the step S3, the fixing plate (31) of the steel grille (3) is stacked on the soil between the water-stop curtain (100) and the retaining pile (200).

6. The reinforcement construction method for pit-in-pit enclosure according to claim 1 is characterized in that: A plurality of steel bars (5) are arranged between the steel grille (3) and the retaining piles (200) on both sides. The plurality of steel bars (5) are arranged at intervals in the vertical direction, and each of the steel bars (5) extends in the horizontal direction.

7. The reinforcement construction method for pit-in-pit enclosure according to claim 6 is characterized in that: Each of the steel bars (5) is welded to the steel grille (3), the diameter of the steel bars (5) is d, and the length of the weld between the steel bars (5) and the steel grille (3) is ≥10d.

8. The reinforcement construction method for pit-in-pit enclosure according to claim 6 is characterized in that: The steel bar (5) is a threaded steel bar.

9. The reinforcement construction method for a pit-in-pit enclosure according to any one of claims 1 to 8, characterized in that: A connecting plate (6) is welded between two adjacent steel grilles (3).

10. The reinforcement construction method for a pit-in-pit enclosure according to any one of claims 1 to 8, characterized in that: Horizontal support members (500) are arranged between the surrounding purlins (300).