Online leaking stoppage method for water cooling jacket of garbage incinerator
Through online inspection and welding steel plates to seal and plug leaking holes, the water leakage problem caused by corrosion of water-cooled jackets in waste incinerators is solved, the maintenance process is simplified, production efficiency is improved, and adverse effects on other equipment are avoided.
Patent Information
- Application Number
- CN202411429700.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-14
- Publication Date
- 2024-12-03
AI Technical Summary
Water-cooled jackets are leaking due to high temperature corrosion in garbage incinerators, which leads to difficulties in repair and affects the normal operation of the equipment. Especially when water-cooled jackets come into contact with the feeder, it is difficult to carry out effective inspection.
By checking the leak location, cutting holes and marking steel plates, confirming the leak holes, and preparing matching steel plates for welding and sealing, the maintenance process is simplified, the need to remove other equipment components is avoided, and the maintenance time is shortened.
It achieves the simplicity of maintenance and improves production efficiency, reduces the adverse impact on other equipment components, and ensures effective solution to water leakage problems.
Smart Images

Figure CN119063001A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of water cooling jacket maintenance, and in particular relates to an online leak plugging method for a water cooling jacket of a garbage incinerator. Background Art
[0002] Domestic waste incinerators can harmlessly treat domestic waste by incineration, and convert the calorific value contained in domestic waste into electricity necessary for our daily life through a series of processes. Domestic waste incinerators are generally composed of: feed hopper, water-cooled jacket, pusher, grate, ash hopper, slag discharger, etc. The garbage passes through the feed hopper, the feed baffle, and the water-cooled jacket to the pusher platform, and the garbage is sent into the incinerator for combustion through the pusher trolley. Among them, due to the high temperature in the furnace under normal operating conditions of the incinerator, its heat may be transferred to the feed hopper through the metal structure of the incinerator body, which is very likely to cause a fire. Therefore, under the normal operating state of the incinerator, the water-cooled jacket needs to be continuously filled and replaced with water to keep the internal temperature of the water-cooled jacket at about 60-80°C. In this way, the high temperature in the incinerator can be prevented from being directly transferred to the feed hopper position through the metal structure of the incinerator body, so as to cause a fire.
[0003] As mentioned above, the water-cooling jacket plays a vital safety role in the operation of the incinerator. However, due to the particularity of the working conditions of the water-cooling jacket, the metal material of the water-cooling jacket is prone to corrosion. When the steel plate of the water-cooling jacket is corroded, the water-cooling jacket will leak very seriously, seriously affecting the normal operation of the incinerator, and may even cause safety accidents. When there is a water leak under the water-cooling jacket, especially when there is a water leak inside the jacket near the contact between the water-cooling jacket and the pusher, due to the particularity of the overall structure of the incinerator, the maintenance of the water-cooling jacket faces many difficulties.
[0004] First, since the pusher is installed close to the bottom of the water-cooling jacket, during installation, the pusher pusher trolley inspection port (inspection platform) is required to exceed the water-cooling jacket by a certain distance to facilitate the maintenance of the pusher trolley. Inside the incinerator, the pusher relies on the pusher trolley to push the garbage from the pusher platform into the grate for combustion. Usually, when the pusher trolley is in the starting position, the front of the pusher trolley exceeds the inner plate of the water-cooling jacket by a certain distance. When the pusher trolley is fully pushed out, the rear of the pusher trolley is still a certain distance from the inner plate of the water-cooling jacket. Therefore, when the incinerator is installed, the space under the water-cooling jacket near the pusher side is very limited. When water leakage occurs near it, it is very difficult to repair it, which takes a long time and the process is very troublesome. Therefore, an online plugging method for the water-cooling jacket of a garbage incinerator is needed to solve the above technical problems. Summary of the invention
[0005] The purpose of the present invention is to solve the above technical problems, and its technical solution is:
[0006] An online leak plugging method for a water-cooling jacket of a waste incinerator comprises the following steps: S1, checking the leaking position of the water-cooling jacket;
[0007] S2. Cut a hole one on the outer shell plate corresponding to the leaking part of the water cooling jacket, and mark the cut steel plate as steel plate one.
[0008] S3, observe the leaking position again through the hole and confirm the leaking hole;
[0009] S4, prepare a second steel plate matching the water leakage hole, and weld the second steel plate to the water leakage hole to seal the water leakage hole;
[0010] S5. Re-weld the steel plate to the hole to seal the hole.
[0011] Preferably, in S4, before welding the second steel plate, the corroded steel plate around the leakage hole needs to be removed.
[0012] Preferably, the welding of steel plate one and steel plate two are full welding.
[0013] Compared with the prior art, the beneficial effects of the present invention are: simple and convenient maintenance, no need to dismantle other components of the equipment, shortening the maintenance time, reducing the impact on production efficiency, and no adverse effects on other components of the equipment after maintenance. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a structural schematic diagram of an online leak plugging method for a water-cooling jacket of a waste incinerator in an embodiment.
[0015] Figure 2 for Figure 1 Schematic diagram of the structure of the water cooling jacket.
[0016] Figure 3 for Figure 2 The state diagram of the middle push-material trolley moving to the water-cooling jacket.
[0017] Figure 4 for Figure 3 Schematic diagram of the structure after the leakage of the water-cooling jacket is repaired.
[0018] Figure 5 for Figure 4 Enlarged view of point A in the middle.
[0019] In the figure: 1. Feed hopper; 2. Pusher; 3. Water-cooling jacket; 4. Grate; 5. Pusher trolley; 6. Fixed bracket; 7. Steel plate 2; 8. Water inlet pipe; 9. Water outlet pipe; 10. Hole 1; 11. Leakage hole; 12. Steel plate 1. DETAILED DESCRIPTION
[0020] The following is a detailed description of the embodiments of the present invention in conjunction with the accompanying drawings and specific embodiments.
[0021] The technology of the present invention is further described in detail.
[0022] Example
[0023] The garbage passes through the feed hopper 1, the feed baffle and the water-cooling jacket 3, and reaches the pushing platform of the pusher 2. The garbage is sent to the grate 4 in the incinerator for combustion through the pushing trolley 5. Cold water is circulated in the water-cooling jacket 3 through the water inlet pipe 8 and the water outlet pipe 9. When the water-cooling jacket 3 leaks, it has a great impact on production and needs to be repaired.
[0024] In the prior art, the conventional solution to the leaking water cooling jacket 3 is as follows:
[0025] 1) Check and confirm the specific leakage position of the water cooling jacket 3;
[0026] 2) Remove the fixed bracket 6 of the pusher trolley 5 of the pusher 2 near the position, and use a hoist or other tools to completely pull the trolley back until enough inspection space is reserved for the leaking part of the water-cooling jacket 3 inside the incinerator; in the incinerator (furnace), remove the garbage on the pusher platform near the leaking position;
[0027] 3) Appropriately cut off the steel plate at the leaking part of the water cooling jacket 3, and use a new steel plate to complete the cut part and weld it tightly;
[0028] 4) In the incinerator (furnace), use a hoist or other tool to properly pull the pusher trolley 5 forward. Install the fixing bracket 6 of the pusher trolley 5;
[0029] 5) Test the operation of the pusher trolley 5.
[0030] The above conventional solution requires much time and effort during maintenance, and the maintenance process is extremely complicated and has certain operational difficulties, and may even affect the normal operation of the pusher 2 and the pusher trolley 5, which is not conducive to production.
[0031] Therefore, if Figure 1-5 As shown, this embodiment proposes an online plugging method for a water-cooling jacket of a waste incinerator, comprising the following steps: S1, checking the leaking position of the water-cooling jacket 3. Specifically, if the inspection personnel find water stains and water marks in a large area of the outer shell plate (below) of the water-cooling jacket, it can be determined that there is a leak near the area; since the water-cooling jacket is filled with water and has a certain pressure, when the bottom of the water-cooling jacket leaks, it can be observed that there is an obvious water flow out near the leak, and even a water column can be observed near the leaking position;
[0032] S2, cutting a hole 10 on the outer shell plate corresponding to the leaking part of the water-cooling jacket 3, and marking the cut steel plate as steel plate 12,
[0033] S3, observe the leaking position again through hole 10 and confirm the leaking hole 11; the corroded steel plates around the leaking hole 11 need to be removed to prevent the corroded steel plates from continuing to have an adverse effect on the steel plates at other locations;
[0034] S4. Prepare a steel plate 2 7 that matches the leaking hole 11 after the corroded steel plate is cut off, and weld the steel plate 2 7 to the leaking hole 11 to block the leaking hole 11; the welding of the steel plate 2 7 is full welding, ensuring that the steel plate 2 and the water cooling jacket are completely welded and there is no gap to prevent leakage in the future. The area of the steel plate 2 is smaller than the area of the hole 1 and larger than the area of the leaking hole, ensuring that the steel plate 2 can enter the water cooling jacket through the hole 1 and block the leaking hole. After the welding of the steel plate 2 is completed, check the surrounding area again to see if there is leakage or seepage in other locations. If so, repair it;
[0035] S5. Re-weld the steel plate 12 to the hole 10 to seal the hole 10. The welding of the steel plate 12 is full welding to ensure that the steel plate 1 and the water-cooling jacket are completely welded and there is no gap to prevent water leakage in the later stage.
[0036] After completing the above maintenance, check the operation of the water-cooling jacket again during the trial operation phase of the domestic waste incinerator.
[0037] Maintenance is simple and convenient, and there is no need to remove other components of the equipment, which shortens the maintenance time and reduces the impact on production efficiency. After maintenance, there will be no adverse effects on other components of the equipment.
[0038] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for online plugging of water-cooling jacket of a waste incinerator, characterized in that: The steps include: S1. Check the leaking position of the water cooling jacket; S2. Cut a hole one on the outer shell plate corresponding to the leaking position of the water-cooling jacket, and mark the cut steel plate as steel plate one; S3, observe the leaking position again through the hole and confirm the leaking hole; S4, prepare a second steel plate matching the water leakage hole, and weld the second steel plate to the water leakage hole to seal the water leakage hole; S5. Re-weld the steel plate to the hole to seal the hole.
2. The method for online plugging of a water-cooling jacket of a waste incinerator according to claim 1 is characterized in that: In S4, before welding the second steel plate, the corroded steel plates around the leakage hole need to be removed.
3. The method for online plugging of water-cooling jacket of a waste incinerator according to claim 1 is characterized in that: The welding of steel plate 1 and steel plate 2 are both full welds.