Big data-based complaint and objection processing method in bidding and tendering

Through a comprehensive assessment method based on big data, effective bidding objections and complaint materials are screened, and manual processing is reduced, which solves the problem of high labor costs in bidding and improves work efficiency and assessment accuracy.

CN119067606APending Publication Date: 2024-12-03CHONGQING DINGXIN CONSTR SUPERVISION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411184880.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2023-12-05
Filing Date
2024-08-27
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

During the bidding process, the handling of objections or complaints in the prior art relies on manual labor, resulting in an increase in human resource occupation and a decrease in work efficiency.

Method used

Using a big data-based method, obtain bidding information, approved winning information and cases, comprehensively evaluate the validity of third-party complaint or objection materials, push effective materials to the bidder and return invalid materials, reduce manual processing and improve work efficiency .

Benefits of technology

It reduces labor cost consumption, improves overall work efficiency, and speeds up the handling of objections and complaints through the accuracy and rapidity of assessment results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067606A_ABST
    Figure CN119067606A_ABST
Patent Text Reader

Abstract

The invention discloses a big data-based complaint and objection processing method in bidding and tendering. The method comprises the following steps of obtaining bid invitation information, approved bid winning information and approved bid winning reasons; obtaining complaint or objection materials of a third party; pushing materials to the bid invitation party and obtaining reply information; wherein previous objection complaint cases are also obtained; according to the method, the effectiveness of the materials is comprehensively evaluated on the basis of big data and by referring to previous objection complaint cases before the materials are pushed, the effectiveness of the materials is judged according to the evaluation result, the effective materials are pushed to a bid invitation party, and the invalid materials are returned to a third party. According to the method and the device, the objection and the litigation are preliminarily reviewed before the objection and the litigation are pushed, so that the ineffective objection and the ineffective litigation are prevented from being pushed, the occupation of human resources can be reduced, the labor cost consumption is reduced, and the overall working efficiency is improved. In addition, the evaluation efficiency of the material effectiveness can be improved by referring to previous objection complaint cases, and the overall working efficiency is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a method for handling complaints and objections in bidding, and in particular to a method for handling complaints and objections in bidding based on big data. Background Art

[0002] Bidding has become a common competitive procurement method, which can better improve efficiency and reduce transaction costs. With the use of online electronic bidding platforms, suppliers can register, browse, download and submit bidding documents online, and can also participate in bidding, objections and complaints through the electronic bidding platform, basically realizing the digitization and automation of the bidding process, which can improve information transparency and bidding efficiency, while reducing the use of paper documents and saving resources. For example, a bidding management system and method disclosed in Chinese patent document CN108492092A includes: a bidding information announcement module for publicizing bidding information; a qualification information review module for receiving qualification information sent by at least one bidder client and reviewing the qualification information; a bidding management module for allowing the first bidder to log in to the electronic hall through the bidder client to open the bid online when the qualification information review module determines that the first bidder among at least one bidder is qualified to bid, and manage the process in the bidding process, and display the progress of online bidding in the form of an electronic hall. In the prior art, all the processes of bidding are realized online, which greatly saves the time of the staff of all parties, greatly improves the work efficiency of the staff, and improves the user experience. However, when objections or complaints arise during the bidding process, they need to be handled in a timely manner. However, the prior art only discloses the information of the bidding project where the objection occurred and the status of the objection handling, but does not disclose how to handle the objection.

[0003] Another Chinese patent document CN114708072A discloses an electronic bidding management system based on big data, including: basic management module, bidding management module, tender management module and electronic bid evaluation analysis module; the present invention manages and verifies different types of user information through the basic management module, and analyzes and manages the bidding data to generate various reports, and suppliers and bidding agencies can use this module to ask questions and clarify replies and track complaint information; bidding agencies can upload bidding documents and supplementary document data through the bidding management module, and the module pre-examines the bidding qualifications and announces the bidding process information; the bidding management module is used for suppliers to declare and encrypt bidding materials, and to maintain and manage product information and manage and review bidding guarantee costs; the electronic bid evaluation analysis module is used to record and manage bid opening information and evaluate bids and sign contracts. In this prior art, the submitted complaint information is classified and summarized and then handed over to the supervisory department for acceptance and tracking and feedback on the complaint handling process.

[0004] In addition, Chinese patent document CN115907935B discloses an online auxiliary review system, including: a first receiving module, used to receive the bidding plan and bidding requirements sent by the bidding party terminal, determine a number of bidding terminals according to the bidding requirements, and send the bidding plan to the bidding terminals respectively; a second receiving module, used to receive the filled-in documents of the bidding terminal for the bidding plan; parse the filled-in documents to determine the qualification documents and non-qualification documents; review the qualification documents based on the evaluation model, and determine the bidding terminal corresponding to the qualification documents that have passed the review as the target bidding terminal; a first determination module, used to split the non-qualification files corresponding to the target bidding terminal based on a preset type to obtain a number of sub-files; classify the sub-files of the same type to obtain a number of sub-file sets; determine the review terminal that matches the type of the sub-file set; and a calculation module, used to obtain the total review score.

[0005] In the above two Chinese patent documents, when handling objections or complaints, all objections or complaints received are handled, and manual processing is still adopted when handling objections or complaints. This will occupy more human resources, increase labor costs, and reduce overall work efficiency. Summary of the invention

[0006] In order to solve the technical problem of increasing labor costs when handling objections or complaints in current bidding, the present invention provides a method for handling complaints and objections in bidding based on big data, comprising the following steps: obtaining bidding information, verified winning bid information and verified winning bid reasons; Obtain materials on complaints or objections from third parties; Push materials to the tenderer and obtain reply information; Among them, previous objection complaint cases are also obtained; before pushing the materials, a comprehensive assessment is made on the effectiveness of the complaint or objection materials based on big data and reference to previous objection complaint cases, and the validity of the materials is determined based on the assessment results. The valid materials are pushed to the tenderer, and the invalid materials are returned to the third party.

[0007] Since some of the objections or complaints received in the objection and complaint link are usually not accepted, such as unreasonable submission process, unreasonable materials, illegal identity of the submitter, etc., these objections or complaints are also invalid objections or complaints. If these invalid objections or complaints are pushed to the tenderer, the labor cost of the tenderer will increase, and the efficiency of the tenderer's overall handling of objections or complaints will be reduced. Therefore, in this scheme, before pushing the materials to the tenderer, the effectiveness of the materials is also comprehensively evaluated, and only the effective materials are pushed to the tenderer for processing according to the evaluation results, which can reduce the amount of objections and complaints that the tenderer needs to handle, thereby reducing the occupation of human resources, reducing labor cost consumption, and improving overall work efficiency. In addition, referring to previous objection complaint cases can speed up the evaluation efficiency of the effectiveness of materials, further improving the overall work efficiency. Preferably, when comprehensively evaluating the materials, the rationality of the material submission procedure, the rationality of the materials themselves, and the credit of the third party are comprehensively evaluated. This scheme can achieve a comprehensive evaluation of the materials and improve the accuracy of the evaluation results.

[0008] Preferably, when comprehensively evaluating the effectiveness of the material, the comprehensive score of the material is calculated according to formula ①, and the material is determined to be effective when the comprehensive score is not less than a preset value; S=0.4K1+0.4K2+0.2K3……Formula ① In formula ①, K1 refers to the assessment score of the rationality of the material submission procedure, K2 refers to the assessment score of the rationality of the material itself, and K3 refers to the assessment score of the credit status of the third party.

[0009] Preferably, the determination of procedural reasonableness of the material refers to a statistical analysis of the fairness, impartiality and scientifically sound nature of the complaint or objection raised.

[0010] Preferably, the assessment of the rationality of the materials themselves refers to a comprehensive analysis of the legality, compliance and authenticity of the supporting materials provided and various anti-unfair competition systems.

[0011] Preferably, the assessment of the third party's credit status refers to a comprehensive analysis based on the third party's past project quality, credit rating, and interest and social relationships with other potential bidders in the project.

[0012] Preferably, when the invalid material is returned to the third party, an assessment reason is generated according to the assessment result and returned to the third party together with the invalid material. In this solution, returning the assessment reason to the third party together helps the third party to modify the material.

[0013] The present invention has the following beneficial effects: the present invention conducts a preliminary review of objections and lawsuits before pushing them, avoiding pushing invalid objections and lawsuits, thereby reducing human resource occupation, reducing labor cost consumption, and improving overall work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 The present invention is a flowchart of an embodiment of a method for handling complaints and objections in bidding based on big data. DETAILED DESCRIPTION

[0015] The following is further described in detail through specific implementation methods: 1. Definition Bidding: refers to the process in which the bidding unit publicly invites qualified bidders to submit bidding documents within a certain scope according to demand, and selects the successful bidder through evaluation and subsequent procedures.

[0016] Objection: refers to the questions and objections raised by bidders participating in the bidding activities to the bidding unit after they find that the contents of the bidding documents are erroneous, unreasonable, or violate laws and regulations.

[0017] Complaint: refers to the behavior of bidders and other stakeholders who believe that the bidding activities do not comply with the provisions of laws, regulations and rules, and make suggestions to the relevant administrative supervision departments and request relevant entities to make corrections in accordance with the law.

[0018] Winning bid information: including project name and name of winning bidder.

[0019] 2. The embodiment is basically as shown in the attached Figure 1 As shown: A method for handling complaints and objections in bidding based on big data, including the following steps: obtaining bidding information, confirmed winning bid information and confirmed winning bid reasons, and previous objection complaint cases based on a big data engine; Obtain third-party complaint or objection materials based on the big data engine; Comprehensively evaluate the effectiveness of the materials based on big data. When conducting the comprehensive evaluation, calculate the comprehensive score of the materials according to formula ①. If the comprehensive score is not lower than the preset value, the materials are judged to be effective. S=0.4K1+0.4K2+0.2K3……Formula ① In formula ①, K1 refers to the evaluation score of the rationality of the material submission procedure. The judgment of the rationality of the material submission procedure refers to the data analysis of the fairness, impartiality and scientific rationality of the complaint or objection submitted; K2 refers to the evaluation score of the rationality of the materials themselves. The evaluation of the rationality of the materials themselves refers to a comprehensive analysis of the legality, compliance and authenticity of the supporting materials provided and various anti-unfair competition systems; K3 refers to the credit rating of a third party. The credit rating of a third party is based on a comprehensive analysis of the third party’s past project quality, credit rating, and interest and social relationships with other potential bidders in the project.

[0020] During the above process, the materials can be comprehensively evaluated by referring to the laws, regulations, rules and regulations related to bidding, the bidding information database, and previous objection and complaint cases.

[0021] The validity of the materials is determined based on the evaluation results, and the valid materials are pushed to the tenderer and a reply message is obtained, while the invalid materials are returned to the third party. When returning the invalid materials to the third party, an evaluation reason is also generated based on the evaluation results and returned to the third party together with the invalid materials.

[0022] The specific implementation process is as follows: Taking procurement bidding as an example, the platform uses the big data engine to obtain bidding information including but not limited to basic data such as procurement methods and procurement documents; obtains the approved winning bid information and the approved winning bid reasons, as well as any disclosure of potential conflicts of interest or other factors that may affect the fairness of the decision and other evaluation criteria.

[0023] When a supplier has objections or complaints about a bidding transaction, he / she shall submit the objections or complaints to the platform and, at the same time, submit the materials for the objection or complaint.

[0024] When the platform obtains the objection or complaint raised by the supplier, it will first conduct a comprehensive assessment of the objection or complaint to determine whether the objection or complaint is valid. If the objection or complaint is determined to be valid, it will be pushed to the purchaser's platform, which will make a formal reply to the objection or complaint and push it back to the supplier. If the objection or complaint is determined to be invalid, the platform will automatically reject the objection or complaint and return the assessment results and reasons to the corresponding supplier.

[0025] When making a comprehensive assessment of objections or complaints, we refer to the laws, regulations, rules and regulations related to procurement bidding, the bidding information database, and previous objection and complaint cases. During the assessment process, we make a comprehensive assessment based on the rationality of the material submission procedure, the rationality of the material itself, and the credit of the supplier who raised the objection or complaint: 1. Taking fairness, impartiality, and scientific rationality as the realistic dimension A, data analysis is conducted based on the fairness, impartiality, and scientific rationality of the objections or complaints raised by the supplier to obtain the evaluation score K1; 2. Taking the rationality of the objection and the materials themselves as the realistic dimension B, a comprehensive analysis is conducted based on the legitimacy and compliance of the objection or complaint raised by the supplier, the authenticity of the supporting materials provided, and various anti-unfair competition systems to arrive at an assessment score of K2; 3. Taking the supplier's credit status in past bidding activities and project implementation as the reality dimension C, a comprehensive analysis is conducted based on the supplier's past project quality, credit rating, and interest and social relations with other potential bidders in this project to obtain an assessment score of K3; 4. After calculating the evaluation scores K1, K2 and K3 respectively, calculate the comprehensive score according to formula ①: S=0.4K1+0.4K2+0.2K3.

[0026] When the comprehensive score S is not less than the preset value, the material is considered valid. The full score is set to 100 points, and the preset value is set to 80 points. When S≥80, the objection or complaint is considered valid, and the platform pushes the objection or complaint to the tenderer, who makes a formal reply to the objection or complaint and returns it to the supplier who raised the objection or complaint. When S<80, the objection or complaint is considered invalid, and the platform returns the objection or complaint together with the assessment reasons generated by the assessment results to the supplier who raised the objection or complaint. The supplier can know the reason why the objection or complaint was rejected based on the assessment reasons returned. If the assessment reasons can convince the supplier, it can be regarded as solving the objection or complaint raised by the supplier this time. If the assessment reasons fail to convince the supplier, the supplier can also make targeted modifications based on the reasons for rejection and then raise an objection or complaint on his own.

[0027] The above is only an embodiment of the present invention. The common sense such as the known specific structure and characteristics in the scheme is not described in detail here. The ordinary technicians in the relevant field know all the common technical knowledge in the technical field of the invention before the application date or priority date, can obtain all the existing technologies in the field, and have the ability to apply the conventional experimental means before that date. The ordinary technicians in the relevant field can improve and implement this scheme in combination with their own abilities under the enlightenment given by this application. Some typical known structures or known methods should not become obstacles for ordinary technicians in the relevant field to implement this application. It should be pointed out that for those skilled in the art, without departing from the structure of the present invention, several deformations and improvements can be made, which should also be regarded as the protection scope of the present invention, which will not affect the effect of the implementation of the present invention and the practicality of the patent. The protection scope required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. The method for handling complaints and objections in bidding based on big data includes the following steps: Obtain bidding information, verified winning bid information and verified winning bid reasons; Obtain materials on complaints or objections from third parties; Push materials to the tenderer and obtain reply information; Features: It also obtains previous objection complaint cases; Before pushing the materials, a comprehensive assessment will be made on the validity of the complaint or objection materials based on big data and reference to previous objection and complaint cases, and the validity of the materials will be determined based on the assessment results. Valid materials will be pushed to the tenderer, and invalid materials will be returned to the third party.

2. The method for handling complaints and objections in bidding based on big data according to claim 1 is characterized by: When conducting a comprehensive assessment of the materials, a comprehensive assessment will be made of the rationality of the material submission procedure, the rationality of the materials themselves, and the credit status of the third party.

3. The method for handling complaints and objections in bidding based on big data according to claim 2 is characterized by: When comprehensively evaluating the effectiveness of the material, the comprehensive score of the material is calculated according to formula ①, and the material is judged to be effective when the comprehensive score is not lower than the preset value; S=0.4K1+0.4K2+0.2K3……Formula ① In formula ①, K1 refers to the assessment score of the rationality of the material submission procedure, K2 refers to the assessment score of the rationality of the material itself, and K3 refers to the assessment score of the third-party credit status.

4. The method for handling complaints and objections in bidding based on big data according to claim 3 is characterized by: The determination of procedural reasonableness of the material refers to the data analysis of the fairness, impartiality and scientifically reasonable nature of the complaint or objection raised.

5. The method for handling complaints and objections in bidding based on big data according to claim 4 is characterized by: The assessment of the rationality of the materials themselves refers to a comprehensive analysis of the legality, compliance and authenticity of the supporting materials provided and various anti-unfair competition systems.

6. The method for handling complaints and objections in bidding based on big data according to claim 5 is characterized by: The assessment of a third party's credit status refers to a comprehensive analysis based on the third party's past project quality, credit rating, and interest and social relations with other potential bidders in the project.

7. The method for handling complaints and objections in bidding based on big data according to any one of claims 1 to 6, characterized in that: When the invalid materials are returned to the third party, an assessment reason is also generated based on the assessment result and returned to the third party together with the invalid materials.