Parallel liquid cooling plate and manufacturing process thereof

CN119069893AActive Publication Date: 2024-12-03马鞍山众翌科技有限公司

Patent Information

Application Number
CN202411140388.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-12-03
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

The existing liquid-cooled plates are easily contaminated by surface impurities and foreign matters during the spraying of insulating coatings, resulting in protrusions and reduced spray quality, and are not easy to dry after spraying, affecting manufacturing efficiency.

Method used

The parallel liquid-cooled plate and its manufacturing process are designed, using the outflow, inlet, main channel and branch channel structure, combined with cleaning mechanisms and protective parts to remove surface impurities and accelerate paint drying.

Benefits of technology

It improves the heat dissipation performance and manufacturing efficiency of liquid-cooled plates, ensures spray quality and appearance quality, and reduces external impurities pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119069893A_ABST
    Figure CN119069893A_ABST
Patent Text Reader

Abstract

The invention discloses a parallel type liquid cooling plate and a manufacturing process thereof, and relates to the technical field of liquid cooling plate manufacturing, spraying equipment comprises a chain conveyor and a top cover mounted at the top of the chain conveyor, the top of the chain conveyor is provided with a plurality of groups of rollers, and the top of the top cover is fixedly provided with a discharge pipe; through the designed cleaning mechanism, during use, impurities and foreign matters attached to the surface of a plate body can be cleaned before the plate body enters the top cover from the left side of the spraying equipment to be sprayed, and the impurities and foreign matters passing through the surface of the plate body are blown away outwards through a blowing nozzle on the left side of the spraying equipment; and then the plate body enters the top cover to be sprayed with the insulating paint, the plate body moves rightwards to leave the top cover after spraying is completed, at the moment, the undried insulating paint sprayed on the surface of the plate body is blow-dried through the blowing nozzle located on the right side of the spraying equipment, drying of the insulating paint is accelerated, and the efficiency of manufacturing the liquid cooling plate is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of liquid cooling plate manufacturing, and in particular relates to a parallel liquid cooling plate and a manufacturing process thereof. Background Art

[0002] The liquid cooling plate is an electronic component used for battery heat dissipation. It is usually made of metal materials such as copper and aluminum. Its surface will dissipate heat through direct liquid cooling or heating tube liquid cooling. The surface of the liquid cooling plate usually needs to be sprayed with a layer of insulating paint to achieve the effect of insulation. At this time, the insulating paint will be sprayed on the surface of the liquid cooling plate through spraying equipment.

[0003] In the prior art, a liquid cooling plate is placed on a roller on a chain conveyor and conveyed to a top cover in a spraying device. At this time, a spray head at the bottom of a movable seat sprays insulating coating on the liquid cooling plate passing below. The movable seat moves back and forth on a gantry to increase the uniformity of the liquid cooling plate during the spraying process. In the process of conveying the liquid cooling plate to the top cover through the roller in the chain conveyor, if there are some impurities or foreign matter attached to the surface of the liquid cooling plate, these impurities and foreign matter will also follow the liquid cooling plate into the top cover. When the spray head sprays insulating coating on the liquid cooling plate, these insulating coatings will also cover the impurities and foreign matter attached to the surface of the liquid cooling plate, causing bulges on the surface of the liquid cooling plate, which will not only affect the appearance quality of the liquid cooling plate, but also affect the subsequent use effect of the liquid cooling plate, thereby reducing the spraying quality of the liquid cooling plate by the spraying equipment. In addition, the liquid cooling plate after spraying is not easy to dry quickly, which affects the manufacturing efficiency of the liquid cooling plate. For this reason, we propose a parallel liquid cooling plate and its manufacturing process. Summary of the invention

[0004] The object of the present invention is to provide a parallel liquid cooling plate and a manufacturing process thereof to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a parallel liquid cooling plate, comprising a plate body, wherein an outlet pipe, an inlet pipe, eight groups of main channels and eight groups of branch channels are respectively arranged inside the plate body, the main channel is connected with the inlet pipe and the branch channel, the branch channel is connected with the outlet pipe, the outlet pipe is arranged on the outlet pipe, and the inlet pipe is arranged on the inlet pipe.

[0006] Preferably, a manufacturing process of a parallel liquid cooling plate comprises the following steps:

[0007] Step 1: Cutting: First, cut the raw metal sheet into appropriate sizes using a CNC machine tool;

[0008] Step 2: stamping: stamping the metal sheet into a plate body by a stamping forming device, so that the surface is concave downward to form the outlet pipe, inlet pipe, main channel and branch channel areas;

[0009] Step 3, spraying: Place the plate body in the spraying equipment, and convey the plate body to the top cover through the roller moving in the chain conveyor on the spraying equipment. Before being conveyed to the top cover, the plate body will be cleaned by the soft hair at the bottom of the bottom strip in the cleaning component to clean up some of the attached impurities and foreign matter. At the same time, the blowing nozzle in the cleaning mechanism blows air to the surface of the plate body to blow away the impurities and foreign matter attached to the surface of the plate body, and then the plate body enters the cover body, and the moving seat moving back and forth on the gantry drives the spray head to move to spray the insulating paint on the plate body passing below. The sprayed plate body is conveyed out again through the moving roller, and at this time, the blowing nozzle in the cleaning mechanism blows air to the surface of the plate body again to dry the plate body sprayed with the insulating paint, and accelerate the drying speed of the insulating paint on the surface of the plate body. Then, the conveyed plate body is blocked and protected by the transparent cover and the lifting baffle in the protective member to reduce the external dust and impurities from falling on the plate body sprayed with the insulating paint that has not been completely dried.

[0010] Step 4, brazing: by placing the plate body into a brazing device, placing a metal plate on the top of the plate body, the brazing device welds the plate body and the metal plate together to form a closed outlet pipe, inlet pipe, main channel and branch channel;

[0011] Step 5: Inspection: Use the inspection equipment to inspect the finished product of the board.

[0012] Preferably, the spraying equipment comprises a chain conveyor and a top cover installed on the top of the chain conveyor, the top of the chain conveyor is provided with multiple groups of rollers, the top of the top cover is fixedly provided with a discharge pipe, the top of the chain conveyor is fixedly provided with a gantry, a moving seat is slidably provided on the gantry, a spray head is fixedly provided at the bottom of the moving seat, a paint delivery hose is fixedly provided on the top of the moving seat, and cleaning mechanisms are provided on both sides of the top cover, and the cleaning mechanism comprises a mounting pipe and a rotating member for rotating the mounting pipe;

[0013] A plurality of groups of lower tubes are evenly fixedly arranged at the bottom of the mounting tube and along the length direction of the mounting tube, a blowing nozzle is fixedly arranged at the bottom of the lower tube, a support plate is fixedly arranged at the front of the top cover, a blower is fixedly arranged on the top of the support plate, and a connecting hose is fixedly arranged between the blower and the mounting tube.

[0014] Preferably, the rotating member includes a support plate and a fixing rod fixed on the back side of the top cover, a gear ring is fixedly provided on the outer side of the end of the mounting tube, a gear plate is meshed with the bottom of the gear ring, two sets of bearings are fixedly provided on the outside of the fixing rod, the outer wall of the mounting tube is fixedly connected to the outer wall of the bearing, and two sets of connecting frames are fixedly provided between the fixing rod and the top cover.

[0015] Preferably, a cylinder is fixedly provided on the top of the support plate, a slide bar is fixedly provided on the working end of the cylinder, a fixed frame is provided on the outside of the slide bar, and the fixed frame is fixed to the back side of the top cover, a fixed plate is fixedly provided on the bottom of the fixed frame, a plurality of groups of ball bearings are rollingly provided on the upper surface of the fixed plate, and the tooth plate is fixed on the end of the slide bar.

[0016] Preferably, a cleaning component is provided on one side of the cleaning mechanism, and the cleaning component includes a bottom strip and movable blocks fixed on the tops of both ends of the bottom strip, a plurality of groups of soft bristles are fixedly provided on the bottom of the bottom strip, a top strip is fixedly provided between the tops of two groups of the movable blocks, a circular plate is provided on the outside of the movable block, a connecting plate is fixedly provided between the two groups of the circular plates, and a plurality of groups of springs are fixedly provided between the connecting plate and the bottom strip.

[0017] Preferably, a first bracket and a second bracket are fixedly arranged between the circular plate and the fixing plate and the end of the fixing rod, respectively.

[0018] Preferably, a protective member for blocking and protecting the insulating paint sprayed on the surface of the plate body is provided on the other side of the top cover, and the protective member includes a transparent cover fixed on the top of the chain conveyor, and a lifting baffle is provided on the side of the transparent cover, and L-shaped plates are fixedly provided on the front and back of the lifting baffle, and vertical columns are fixedly provided on the front and back of the transparent cover, and a movable ring is provided on the outside of the vertical column, and the end of the L-shaped plate is fixedly connected to the movable ring.

[0019] Preferably, a screw rod is threadedly connected inside the movable ring, and an end of the screw rod is fixedly connected to the vertical column.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] (1) The present invention combines the designed outlet pipe, inlet pipe, main channel and branch channel, and adopts eight groups of main channels in parallel to split the flow on the inlet pipe at the inlet. Each group of the eight main channels is connected in series with a branch channel, and finally converges at the outlet, which effectively utilizes the advantages of the series-parallel structure, optimizes the overall heat dissipation performance of the liquid cooling plate, and fully improves the heat dissipation efficiency.

[0022] (2) The cleaning mechanism designed in the present invention can clean impurities and foreign objects attached to the surface of the plate body before the plate body enters the top cover from the left side of the spraying equipment for spraying. The impurities and foreign objects on the surface of the plate body passing through are blown outwards through the blowing nozzle on the left side of the spraying equipment. Then the plate body enters the top cover for spraying of insulating paint. After spraying, it moves to the right and leaves the top cover. At this time, the insulating paint sprayed on the surface of the plate body that has not yet dried is blown dry through the blowing nozzle located on the right side of the spraying equipment, thereby accelerating the drying of the insulating paint and improving the efficiency of manufacturing liquid cooling plates.

[0023] (3) The cleaning component of the present invention is designed so that, before the plate enters the device from the left side, the soft hair at the bottom of the lower strip will first clean the impurities and foreign objects attached to the surface of the plate, thereby reducing the situation where some of the attached impurities and foreign objects are difficult to blow away when the cleaning nozzle is used, thereby further improving the cleaning effect of the impurities and foreign objects on the surface of the plate.

[0024] (4) The protective part designed in the present invention allows the plate body to pass through the inside of the top cover and come out from the right side of the top cover after being sprayed with insulating paint. The transparent cover and the lifting baffle on the top can then block and protect it, thereby reducing external dust and impurities from falling on the insulating paint that has not yet completely dried in the plate body, thereby improving the spraying quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the overall structure of the liquid cooling plate of the present invention;

[0026] Figure 2 It is a schematic diagram of the structure of the spraying equipment of the present invention;

[0027] Figure 3 It is a left-side structural schematic diagram of the cover body of the present invention;

[0028] Figure 4 It is a schematic diagram of the cover body and transparent cover of the present invention when viewed from above;

[0029] Figure 5 It is a schematic diagram of the cleaning mechanism and gantry structure of the present invention;

[0030] Figure 6 It is a rear view structural schematic diagram of the cleaning mechanism of the present invention;

[0031] Figure 7 It is a rear view structural schematic diagram of the cylinder of the present invention;

[0032] Figure 8 It is a right view structural schematic diagram of the lifting baffle of the present invention;

[0033] Fig. 9 It is a schematic diagram of the structure of the cover body from the right side of the present invention;

[0034] In the figure: 100, plate; 101, outlet; 102, inlet; 103, main channel; 104, outlet pipe; 105, branch channel; 200, chain conveyor; 201, top cover; 202, discharge pipe; 203, spray head; 204, gantry; 205, moving seat; 300, top bar; 301, bottom bar; 303, first bracket; 304, second bracket; 305, circular plate; 306, connecting plate; 307, spring; 308, moving block; 400, Transparent cover; 401, lifting baffle; 402, vertical column; 403, moving ring; 404, screw; 405, L-shaped plate; 500, connecting hose; 501, support plate; 502, mounting tube; 503, blower; 509, tooth plate; 510, gear ring; 511, cylinder; 512, blowing nozzle; 513, fixing plate; 514, connecting frame; 515, bearing; 516, fixing rod; 517, support plate; 518, slide bar; 519, fixing frame; 521, ball bearing. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] Example 1

[0037] See also Figure 1 The present invention provides a technical solution: a parallel liquid cooling plate, including a plate body 100, wherein an outlet pipe 104, an inlet pipe, eight groups of main channels 103 and eight groups of branch channels 105 are respectively arranged inside the plate body 100, the main channel 103 is connected with the inlet pipe and the branch channel 105, the branch channel 105 is connected with the outlet pipe 104, an outlet 101 is arranged on the outlet pipe 104, and an inlet 102 is arranged on the inlet pipe. The traditional liquid cooling plate with a series structure is changed into a combination of multi-branch parallel and series, the structure is optimized and reinforced, and the heat dissipation efficiency is fully improved.

[0038] The present invention combines the designed outlet pipe 104, inlet pipe, main channel 103 and branch channel 105, and adopts eight groups of main channels 103 in parallel to split the flow on the inlet pipe at the inlet 102. Each group of the eight main channels 103 is further connected in series with a branch channel 105, and finally converges at the outlet 101, which effectively utilizes the advantages of the series-parallel structure, optimizes the overall heat dissipation performance of the liquid cooling plate, and fully improves the heat dissipation efficiency.

[0039] During use, external refrigerant enters the inlet pipe from the inlet 102, then flows into the main channel 103, and is branched to the branch channel 105 in parallel through the main channel 103. The branch channel 105 flows into the outlet pipe 104 and is then discharged through the outlet 101. The heat of the battery is dissipated and discharged through the refrigerant, thereby completing the cooling of the battery.

[0040] Example 2

[0041] Based on Example 1, please refer to Figure 1-Figure 9 , a manufacturing process of a parallel liquid cooling plate, comprising the following steps:

[0042] Step 1: Cutting: First, cut the raw metal sheet into appropriate sizes using a CNC machine tool;

[0043] Step 2, stamping: stamping the metal sheet into a plate body 100 by a stamping forming device, so that the surface thereof is concave downward to form an outlet pipe 104, an inlet pipe, a main channel 103 and a branch channel 105;

[0044] Step 3, spraying: Place the plate 100 in the spraying equipment, and convey the plate 100 to the top cover 201 through the roller moving in the chain conveyor 200 on the spraying equipment. Before being conveyed to the top cover 201, the plate 100 will be cleaned by the soft hair at the bottom of the bottom strip 301 in the cleaning component to clean some of the attached impurities and foreign matter. At the same time, the blowing nozzle 512 in the cleaning mechanism blows air to the surface of the plate 100 to clean the impurities and foreign matter attached to the surface of the plate 100, and blow away the attached impurities and foreign matter. Then the plate 100 enters the cover and is moved back and forth on the gantry 204. The movable seat 205 drives the spray head 203 to move and spray the insulating paint on the plate body 100 passing below. The sprayed plate body 100 is transported out again through the moving roller. At this time, the blowing nozzle 512 in the cleaning mechanism blows air to the surface of the plate body 100 again to dry the plate body 100 sprayed with the insulating paint, thereby accelerating the drying speed of the insulating paint on the surface of the plate body 100. Then, the plate body 100 transported out is blocked and protected by the transparent cover 400 and the lifting baffle 401 in the protective member to reduce external dust and impurities from falling on the plate body 100 sprayed with the insulating paint that has not yet completely dried;

[0045] Step 4, brazing: placing the plate body 100 into a brazing device, placing a metal plate on the top of the plate body 100, and the brazing device welds the plate body 100 and the metal plate together to form a closed outlet pipe 104, an inlet pipe, a main channel 103 and a branch channel 105;

[0046] Step 5: Testing: Perform finished product testing on the board 100 through testing equipment.

[0047] Example 3

[0048] Based on Example 2, please refer to Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 and Fig. 9 The spraying equipment includes a chain conveyor 200 and a top cover 201 installed on the top of the chain conveyor 200. A plurality of rollers are arranged on the top of the chain conveyor 200. The rollers are driven to move by the chains on the chain conveyor 200, and the moving rollers drive the plate 100 to move. A discharge pipe 202 is fixedly arranged on the top of the top cover 201. The top of the discharge pipe 202 is connected to an exhaust gas processor, which can process and purify the sprayed insulating coating. A gantry 204 is fixedly arranged on the top of the chain conveyor 200. The gantry A movable seat 205 is slidably provided on 204, a spray head 203 is fixedly provided at the bottom of the movable seat 205, and the plate 100 passing below is sprayed with insulating paint by the spray head 203, a paint delivery hose is fixedly provided on the top of the movable seat 205, and an external container filled with insulating paint is connected to the paint delivery hose to deliver insulating paint to the spray head 203, and cleaning mechanisms are provided on both sides of the top cover 201, and the cleaning mechanisms include a mounting tube 502 and a rotating member for rotating the mounting tube 502;

[0049] A plurality of groups of lower tubes are evenly fixedly arranged at the bottom of the installation tube 502 and along the length direction of the installation tube 502. A blowing nozzle 512 is fixedly arranged at the bottom of the lower tube. The blowing nozzle 512 can blow air to the surface of the plate body 100 to blow away impurities and foreign matter on the surface. A support plate 501 is fixedly arranged at the front of the top cover 201. A blower 503 is fixedly arranged on the top of the support plate 501. Air is transported to the blowing nozzle 512 through the blower 503. A connecting hose 500 is fixedly arranged between the blower 503 and the installation tube 502.

[0050] The rotating member includes a support plate 517 and a fixing rod 516 fixed to the back of the top cover 201. A toothed ring 510 is fixedly arranged on the outer side of the end of the mounting tube 502. A toothed plate 509 is meshed at the bottom of the toothed ring 510. Two groups of bearings 515 are fixedly arranged on the outside of the fixing rod 516. The bearings 515 facilitate the mounting tube 502 to rotate around the fixing rod 516. The outer wall of the mounting tube 502 is fixedly connected to the outer wall of the bearing 515. Two groups of connecting frames 514 are fixedly arranged between the fixing rod 516 and the top cover 201.

[0051] A cylinder 511 is fixedly provided on the top of the support plate 517, and the cylinder 511 can drive the tooth plate 509 to move to the left or right, thereby driving the gear ring 510 to rotate. A slide bar 518 is fixedly provided on the working end of the cylinder 511, and a fixed frame 519 is provided on the outside of the slide bar 518, and the fixed frame 519 is fixed to the back of the top cover 201. A fixed plate 513 is fixedly provided on the bottom of the fixed frame 519, and multiple groups of ball bearings 521 are rollingly provided on the upper surface of the fixed plate 513. When the tooth plate 509 moves to the left or right, the ball bearings 521 are driven to roll, thereby avoiding wear caused by direct contact between the lower surface of the tooth plate 509 and the lower fixed plate 513. The tooth plate 509 is fixed to the end of the slide bar 518.

[0052] The cleaning mechanism designed in the present invention can clean the impurities and foreign objects attached to the surface of the plate body 100 before the plate body 100 enters the top cover 201 from the left side of the spraying equipment for spraying, and the impurities and foreign objects on the surface of the passing plate body 100 are blown outwards through the blowing nozzle 512 on the left side of the spraying equipment, and then the plate body 100 enters the top cover 201 for spraying of insulating paint. After spraying, it moves to the right and leaves the top cover 201. At this time, the insulating paint that has not yet dried on the surface of the plate body 100 is blown dry through the blowing nozzle 512 located on the right side of the spraying equipment, thereby accelerating the drying of the insulating paint and improving the efficiency of manufacturing liquid cooling plates.

[0053] In use, the plate body 100 first enters the top cover 201 from the left side of the spraying equipment. During this period, the air is transported to the installation pipe 502 through the connecting hose 500 by the blower 503, and then blown to the plate body 100 through the blowing nozzle 512, and the impurities and foreign objects attached to the surface of the plate body 100 are blown out by the wind. In the process of blowing air to the plate body 100, the blowing nozzle 512 starts the cylinder 511, and the working end of the cylinder 511 moves and extends toward the fixed frame 519, driving the slide bar 518 to slide in the fixed frame 519, and then the plate body 100 is blown out by the blowing nozzle 512. The movable tooth plate 509 moves, which will drive the meshing tooth ring 510 to rotate, and then drive the mounting tube 502 and the multiple groups of blowing nozzles 512 at the bottom to rotate around the fixed rod 516. When it rotates to a suitable angle, the working end of the cylinder 511 moves away from the fixed frame 519, and then drives the tooth plate 509 to move toward the fixed frame 519, so that the mounting tube 502 and the blowing nozzle 512 rotate in opposite directions. Repeating this process can make the blowing nozzle 512 swing up and down, thereby increasing the effect of blowing away impurities and foreign matter on the plate body 100.

[0054] Example 4

[0055] Based on Example 3, please refer to Figure 2 , Figure 3 , Figure 4 , Figure 5 and Fig. 9A cleaning component is provided on one side of the cleaning mechanism, and the cleaning component includes a bottom strip 301 and moving blocks 308 fixed on the tops of both ends of the bottom strip 301. A plurality of groups of soft hairs are fixedly provided on the bottom of the bottom strip 301, and the bottom of the soft hairs are in contact with the surface of the passing plate body 100, thereby increasing the cleaning effect on impurities and foreign matters attached to the surface of the plate body 100. A top strip 300 is fixedly provided between the tops of the two groups of moving blocks 308, and a circular plate 305 is provided on the outside of the moving block 308. A connecting plate 306 is fixedly provided between the two groups of circular plates 305, and a plurality of groups of springs 307 are fixedly provided between the connecting plate 306 and the bottom strip 301. The springs 307 can always cause the bottom strip 301 to have a tendency to move downward, thereby increasing the close contact between the soft hairs below the bottom strip 301 and the plate body 100.

[0056] The first bracket 303 and the second bracket 304 are fixedly disposed between the circular plate 305 and the ends of the fixing plate 513 and the fixing rod 516 , respectively.

[0057] The present invention has a cleaning component that is designed so that, before the plate body 100 enters the device from the left side, the soft hair at the bottom of the bottom strip 301 will first clean the impurities and foreign objects attached to the surface of the plate body 100, thereby reducing the situation where some of the attached impurities and foreign objects are difficult to blow away when cleaning with the blowing nozzle 512, thereby further improving the cleaning effect of the impurities and foreign objects on the surface of the plate body 100.

[0058] During use, the board body 100 will first pass under the soft hair at the bottom of the bottom strip 301, and the soft hair will clean the impurities and foreign objects attached to the surface of the board body 100. The spring 307 presses the bottom strip 301 downward, so that the soft hair at the bottom of the bottom strip 301 can always be in close contact with the surface of the board body 100, thereby increasing the cleaning effect of the board body 100.

[0059] Example 5

[0060] Based on Example 4, please refer to Figure 1 , Figure 2 , Figure 5 and Figure 6 , a protective member for blocking and protecting the insulating paint sprayed on the surface of the plate body 100 is provided on the other side of the top cover 201, and the protective member includes a transparent cover 400 fixed on the top of the chain conveyor 200, and the transparent cover 400 and the lifting baffle 401 can reduce the probability of external impurities and dust falling on the insulating paint on the surface of the plate body 100 after the plate body 100 comes out from the right side of the top cover 201, and a lifting baffle 401 is provided on the side of the transparent cover 400, and an L-shaped plate 405 is fixedly provided on the front and back of the lifting baffle 401, and a vertical column 402 is fixedly provided on the front and back of the transparent cover 400, and a moving ring 403 is provided on the outside of the vertical column 402, and the moving ring 403 can be moved up and down on the vertical column 402, and the end of the L-shaped plate 405 is fixedly connected to the moving ring 403;

[0061] The interior of the moving ring 403 is connected with a screw rod 404 through a thread. The moving ring 403 and the vertical column 402 can be connected and fixed by the screw rod 404, and the end of the screw rod 404 is fixedly connected to the vertical column 402.

[0062] The present invention has a designed protective part. When the plate body 100 passes through the inside of the top cover 201 and is sprayed with insulating paint, it comes out from the right side of the top cover 201. Then, the transparent cover 400 and the lifting baffle 401 on the top have a blocking and protective effect on it, thereby reducing external dust and impurities from falling on the insulating paint that has not yet completely dried in the plate body 100, thereby improving the spraying quality.

[0063] During use, when the plate body 100 passes through the inside of the top cover 201 and is sprayed with insulating paint, it comes out from the right side of the top cover 201, and then is blocked and protected by the transparent cover 400 and the lifting baffle 401 on the top, and the lifting baffle 401 can be lifted and lowered. When lifting and lowering, the screw 404 is loosened, and the working end of the screw 404 is separated from the surface of the vertical column 402. Then, the lifting baffle 401 is moved up or down to a suitable height position as needed, and then the screw 404 is tightened to fix the moving ring 403. At this time, the height of the lifting baffle 401 can be adjusted so that the distance between the bottom of the lifting baffle 401 and the passing plate body 100 is appropriate.

[0064] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A manufacturing process of a parallel liquid cooling plate, characterized in that: The following steps are involved: Step 1: Cutting: First, cut the raw metal sheet into appropriate sizes using a CNC machine tool; Step 2, stamping: stamping the metal sheet into a plate body (100) by a stamping forming device, so that the surface thereof is concave downward to form an outlet pipe (104), an inlet pipe, a main channel (103) and a branch channel (105); Step 3, spraying: the plate body (100) is placed in the spraying equipment, and the plate body (100) is transported to the top cover (201) by the roller moving in the chain conveyor (200) on the spraying equipment. Before being transported to the top cover (201), the plate body (100) is cleaned by the soft hair at the bottom of the bottom strip (301) in the cleaning component to clean a part of the attached impurities and foreign matter. At the same time, the blowing nozzle (512) in the cleaning mechanism blows air to the surface of the plate body (100) to clean the impurities and foreign matter attached to the surface of the plate body (100), and the attached impurities and foreign matter are blown away. Then the plate body (100) enters the cover and is moved back and forth on the gantry (204). The movable seat (205) drives the spray head (203) to move and spray the insulating coating on the plate body (100) passing below. The sprayed plate body (100) is transported out again through the moving roller. At this time, the blowing nozzle (512) in the cleaning mechanism blows air to the surface of the plate body (100) to dry the plate body (100) sprayed with the insulating coating, thereby accelerating the drying speed of the insulating coating on the surface of the plate body (100). Then, the transported plate body (100) is blocked and protected by the transparent cover (400) and the lifting baffle (401) in the protective member to reduce the amount of external dust and impurities falling on the plate body (100) sprayed with the insulating coating that has not yet completely dried; Step 4, brazing: placing the plate body (100) into a brazing device, placing a metal plate on top of the plate body (100), and the brazing device welds the plate body (100) and the metal plate together to form a closed outlet pipe (104), an inlet pipe, a main channel (103) and a branch channel (105); Step 5: Testing: Perform finished product testing on the plate body (100) using testing equipment.

2. The manufacturing process of a parallel liquid cooling plate according to claim 1, characterized in that: The spraying equipment comprises a chain conveyor (200) and a top cover (201) installed on the top of the chain conveyor (200), a plurality of rollers are arranged on the top of the chain conveyor (200), a discharge pipe (202) is fixedly arranged on the top of the top cover (201), a gantry (204) is fixedly arranged on the top of the chain conveyor (200), a moving seat (205) is slidably arranged on the gantry (204), a spray head (203) is fixedly arranged at the bottom of the moving seat (205), a paint delivery hose is fixedly arranged on the top of the moving seat (205), and cleaning mechanisms are arranged on both sides of the top cover (201), and the cleaning mechanisms comprise a mounting pipe (502) and a rotating member for rotating the mounting pipe (502); A plurality of groups of lower tubes are evenly and fixedly arranged at the bottom of the installation tube (502) and along the length direction of the installation tube (502); a blowing nozzle (512) is fixedly arranged at the bottom of the lower tube; a support plate (501) is fixedly arranged at the front of the top cover (201); a blower (503) is fixedly arranged at the top of the support plate (501); and a connecting hose (500) is fixedly arranged between the blower (503) and the installation tube (502).

3. The manufacturing process of a parallel liquid cooling plate according to claim 2, characterized in that: The rotating member comprises a support plate (517) and a fixing rod (516) fixed to the back of the top cover (201); a gear ring (510) is fixedly arranged on the outer side of the end of the mounting tube (502); a gear plate (509) is meshed at the bottom of the gear ring (510); two groups of bearings (515) are fixedly arranged on the outside of the fixing rod (516); the outer wall of the mounting tube (502) is fixedly connected to the outer wall of the bearing (515); and two groups of connecting frames (514) are fixedly arranged between the fixing rod (516) and the top cover (201).

4. The manufacturing process of a parallel liquid cooling plate according to claim 3, characterized in that: A cylinder (511) is fixedly arranged on the top of the support plate (517), a slide bar (518) is fixedly arranged on the working end of the cylinder (511), a fixing frame (519) is arranged outside the slide bar (518), and the fixing frame (519) is fixed on the back of the top cover (201), a fixing plate (513) is fixedly arranged on the bottom of the fixing frame (519), a plurality of groups of balls (521) are rollingly arranged on the upper surface of the fixing plate (513), and the tooth plate (509) is fixed on the end of the slide bar (518).

5. The manufacturing process of a parallel liquid cooling plate according to claim 4, characterized in that: A cleaning component is arranged on one side of the cleaning mechanism, and the cleaning component comprises a bottom strip (301) and moving blocks (308) fixed on the tops of both ends of the bottom strip (301); a plurality of groups of soft bristles are fixedly arranged on the bottom of the bottom strip (301); a top strip (300) is fixedly arranged between the tops of two groups of the moving blocks (308); a circular plate (305) is arranged outside the moving block (308); a connecting plate (306) is fixedly arranged between the two groups of the circular plates (305); and a plurality of groups of springs (307) are fixedly arranged between the connecting plate (306) and the bottom strip (301).

6. The manufacturing process of a parallel liquid cooling plate according to claim 5, characterized in that: A first bracket (303) and a second bracket (304) are respectively fixedly arranged between the circular plate (305) and the fixing plate (513) and the end of the fixing rod (516).

7. The manufacturing process of a parallel liquid cooling plate according to claim 6, characterized in that: A protective member for blocking and protecting the insulating paint sprayed on the surface of the plate body (100) is arranged on the other side of the top cover (201), and the protective member comprises a transparent cover (400) fixed on the top of the chain conveyor (200), a lifting baffle (401) is arranged on the side of the transparent cover (400), and L-shaped plates (405) are fixedly arranged on the front and back of the lifting baffle (401), and vertical columns (402) are fixedly arranged on the front and back of the transparent cover (400), and a movable ring (403) is arranged outside the vertical column (402), and the end of the L-shaped plate (405) is fixedly connected to the movable ring (403).

8. The manufacturing process of a parallel liquid cooling plate according to claim 7, characterized in that: The interior of the movable ring (403) is connected with a screw rod (404) via a thread, and the end of the screw rod (404) is fixedly connected to the vertical column (402).

9. A parallel liquid cooling plate, characterized in that: The invention is prepared by the manufacturing process according to any one of claims 1 to 8, comprising a plate body (100), wherein an outlet pipe (104), an inlet pipe, eight groups of main channels (103) and eight groups of branch channels (105) are respectively arranged inside the plate body (100), the main channel (103) is connected with the inlet pipe and the branch channel (105), the branch channel (105) is connected with the outlet pipe (104), the outlet pipe (104) is provided with an outlet (101), and the inlet pipe is provided with an inlet (102).

Citation Information

Patent Citations

  • Rapid sample piece structure of battery liquid cooling plate and manufacturing method thereof

    CN112171210A

  • Production method of battery module liquid cooling plate

    CN116329686A

  • Device and method for manufacturing stainless steel aluminum liquid cooling plate

    CN117900768A

  • Cooling unit for at least one component to be cooled and method for manufacturing a cooling unit

    EP2701190A2

Cited By

  • Paint spraying device for wheel-mounted brake disc of motor train unit

    CN120861324A

  • A motor train unit wheel-mounted brake disc paint spraying device

    CN120861324B

  • Metal cabinet combination machining device

    CN121403072A

  • Metal cabinet body combined processing device

    CN121403072B