Through the construction method of anti-pile-pull-up pile-up as floor slab support and column replacement, the cover excavation reverse work and anti-pile-pull-up pile-up quick cutting device has solved the problems of low construction efficiency and high cost in the construction of subway station parking lots in the southern region, and achieved the Efficient anti-float and material saving effects.

CN119083448AInactive Publication Date: 2024-12-06CHINA RAILWAY FIRST GRP FIRST CONSTR CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411123777.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During construction in the parking lot of subway stations in the southern region, the soil layer has a high moisture content and a large foundation pit area, resulting in low construction efficiency. It is difficult for the existing technology to effectively resist floating and save materials and costs.

Method used

The construction method of anti-pull piles as both floor slab support and column replacement support is adopted. The cover plate is first constructed through the cover excavation and reverse operation method, and the column piles are directly built on the anti-pull pile for temporary support, and the lowest layer of the plate is filled. For pile construction, use anti-pile-pull-up quick cutting device to reduce the use of materials and construction difficulties.

Benefits of technology

It improves construction efficiency, saves support materials and construction costs of column piles, reduces the height and construction difficulty of cast-in piles, and achieves the dual effects of buoyancy resistance and temporary support.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083448A_ABST
    Figure CN119083448A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of parking lot construction, in particular to a construction method for using an uplift pile as a floor support and a stand column support replacement, which comprises the following steps: excavation of a foundation pit, construction of a three-shaft mixing pile and construction of a guide wall. Uplift pile construction: constructing a stand column pile on the uplift pile; laying a cover plate, and pouring laminates layer by layer from top to bottom; after the bottommost layer plate is poured, pouring a cast-in-place pile in the soil layer below the bottom layer, meanwhile, constructing a supporting pile on the cast-in-place pile, connecting the supporting pile with each layer plate in sequence, and connecting the top of the supporting pile with the topmost layer support; and cutting and removing the stand column pile, and cutting off the part of the uplift pile higher than the lowest layer plate. Construction is conducted in a cover and excavation top-down mode, the overall construction efficiency is improved, the upright pile is constructed on the uplift pile, confrontation with buoyancy borne by the uplift pile and the lowest layer of the laminate is facilitated, temporary supporting of the cover plate and the laminate is achieved while anti-floating is achieved, the uplift pile is used for supporting the upright pile, and the uplift pile is used for supporting the cover plate and the laminate. And materials required to be supported by the upright post pile and the construction cost are saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of parking lot construction, and in particular to a construction method in which anti-pullout piles are used as floor slab supports and column replacement supports. Background Art

[0002] When constructing a subway station parking lot, the forward excavation method is generally adopted, that is, the foundation pit is first excavated, and then pile foundation construction is carried out at the bottom of the foundation pit, and then each floor slab is constructed from bottom to top until the roof is completed.

[0003] However, during construction in the southern region, the soil layer contains relatively rich water, and anti-floating measures need to be added. At the same time, due to the large foundation pit area of ​​the subway station parking lot, the construction is likely to affect the construction of other projects and reduce the overall construction efficiency of the project. Summary of the invention

[0004] The technical problem to be solved by the present invention is: in order to solve the technical problems in the prior art, the present invention provides a construction method in which the anti-pulling piles are used as floor supports and column replacement supports.

[0005] The technical solution adopted by the present invention to solve the technical problem is: a construction method for using anti-pullout piles as floor support and column replacement support, comprising the following steps:

[0006] S1. The site within the foundation pit is sloped at 1:1.5 and excavated to the top support elevation, followed by pre-construction preparation work;

[0007] S2, carry out anchor rod processing, then start three-axis mixing pile construction, and then carry out guide wall construction after three-axis mixing pile construction;

[0008] S3, construct anti-pullout piles, and construct column piles on some of the anti-pullout piles, the number of column piles shall not exceed the anti-pullout piles, the height of the anti-pullout piles shall be higher than the lowest layer of slabs, and the column piles shall not be lower than the uppermost support;

[0009] S4. After the construction of the column piles is completed, the top support is constructed and the cover plate is laid, and the continuous wall is constructed at the same time;

[0010] S5. After the continuous wall is closed, the layer plates are poured layer by layer from top to bottom and the soil between the layers is excavated. Each poured layer plate is connected to the column piles, and connection holes are reserved for each layer plate;

[0011] S6. After the pouring of the bottom layer is completed, cast-in-place piles are poured in the soil layer below the bottom layer, and support piles are constructed on the cast-in-place piles. The support piles pass through the connection holes on each layer of the layer in turn and are connected to each layer of the layer. The top of the support pile is connected to the uppermost support.

[0012] S7. Cut and remove the column piles, and then cut off the part of the pull-out pile that is higher than the lowest layer of slabs.

[0013] The construction method of the pull-out piles of the present invention, which are used as floor support and column replacement support, is constructed by the cover-excavation reverse construction method. The cover plate is constructed first, which is convenient for transportation and other construction on the ground, and improves the overall construction efficiency. Secondly, the column piles are directly constructed on the pull-out piles, and the column piles are used to temporarily support the cover plate and the layer plate. On the one hand, it can resist the buoyancy of the pull-out piles and the bottom layer plate, and realize temporary support for the cover plate and the layer plate while achieving anti-floating. On the other hand, the pull-out piles are used to support the column piles, which saves the materials and construction costs required for the column piles to support. Secondly, the cast-in-place piles are constructed after the bottom layer plate is constructed, which can reduce the height of the cast-in-place piles, thereby saving costs, greatly reducing the construction difficulty, and improving the construction efficiency.

[0014] Furthermore, in step S6, the support piles are first connected to each layer of the slab by planting reinforcement, and then casting is performed at the connection between the slab and the support piles.

[0015] Furthermore, in step S5, when pouring the layer plate, a temporary support is first set under the layer plate. When the layer plate construction is completed and reaches the preset strength, the corresponding temporary support is removed; the connecting rod of the temporary support is connected to the upper layer plate through the connecting hole.

[0016] Furthermore, in step S7, a quick cutting device for the pull-out pile is used to cut the portion of the pull-out pile that is higher than the lowest layer of the slab.

[0017] Furthermore, the anti-pullout pile rapid cutting device includes a frame, the frame is provided with a guide rail, the guide rail is provided with two, and is relatively arranged on both sides of the anti-pullout pile; a saw belt machine, the saw belt machine slides on the two guide rails at the same time, and the saw belt machine has a circularly moving saw blade; a support assembly, the support assembly is arranged on the frame and is used to connect with the anti-pullout pile.

[0018] Furthermore, a first rotating member is provided on the side wall of the saw belt machine, a rolling wheel is provided on the output end of the first rotating member, the rolling wheel is arranged in the guide rail, and at least two groups of the first rotating member and the rolling wheel are provided, and each group is arranged corresponding to a guide rail.

[0019] Furthermore, the support assembly includes a support belt, one end of which is hinged to the support frame; and a locking member, the other end of which is locked by the locking member after being wrapped around the pull-out pile.

[0020] Furthermore, the locking member includes a guide plate, which is arranged on the support frame; a locking wheel, which is rotatably connected to the support frame, and a driving tooth is provided on the support belt, which passes between the locking wheel and the guide plate, and the driving tooth is meshed with the locking wheel.

[0021] Furthermore, the locking member also includes an anti-loosening block, which slides on the support frame and is provided with anti-loosening teeth; a fixed plate, which is provided on the support frame and is provided with a latch that slides on the fixed plate, and when the anti-loosening teeth are engaged with the locking wheel, the latch is inserted into the anti-loosening block.

[0022] The beneficial effects of the present invention are:

[0023] 1. Through the cover-excavation reverse construction method, the cover plate is constructed first to facilitate transportation and other construction on the ground, and improve the overall construction efficiency. Secondly, the column piles are constructed directly on the pull-out piles, and the column piles are used to temporarily support the cover plate and the layer plate. On the one hand, it can counteract the buoyancy of the pull-out piles and the bottom layer plate, and while achieving anti-floating, it also achieves temporary support for the cover plate and the layer plate. On the other hand, the pull-out piles are used to support the column piles, saving the materials and construction costs required for the column piles. Thirdly, the bored piles are constructed after the bottom layer plate is completed, which can reduce the height of the bored piles, thereby saving costs, and greatly reducing the difficulty of construction, and improving construction efficiency.

[0024] 2. Through the coordination of temporary support and cover excavation, the interlayer soil of the next layer can be excavated while the upper layer of slabs is waiting for solidification, which improves the construction efficiency. At the same time, the connection holes are not only used for the support piles to pass through and the connection between the support piles and the slabs, but also for the connection of temporary supports, which further reduces the cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0026] Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0027] Figure 2 It is a structural schematic diagram of the quick cutting device for anti-pulling piles in the present invention.

[0028] Figure 3 It is a structural schematic diagram of the support assembly in the present invention.

[0029] In the figure: 1. frame; 11. guide rail; 12. telescopic part; 2. band saw; 21. saw blade; 22. first rotating part; 23. rolling wheel; 3. support assembly; 31. support belt; 311. driving tooth; 32. locking wheel; 33. guide plate; 34. anti-loosening block; 35. anti-loosening tooth; 36. fixing plate; 361. latch; 4. support frame; 41. arc groove; 42. second rotating part; 43. rotating rod; 5. cover plate; 6. three-axis mixing pile; 7. anti-pull-out pile; 71. column pile; 8. cast-in-place pile; 81. support pile; 9. layer plate. DETAILED DESCRIPTION

[0030] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.

[0031] Reference Figure 1 and Figure 2 , a construction method in which pull-out piles are used as both floor support and column replacement support, referring to Figure 1 , including the following steps:

[0032] S1. The site within the foundation pit is excavated at a slope of 1:1.5 to the top support elevation, which is about two meters in this embodiment, followed by pre-construction preparation work such as hardening of the construction access road and arrangement of temporary water and electricity.

[0033] S2. Anchor rod treatment is performed, and then three-axis mixing piles 6 are constructed around the foundation pit. The three-axis mixing piles 6 also play a water-stopping role. After the construction of the three-axis mixing piles 6, guide wall construction is carried out to prepare for the subsequent continuous wall.

[0034] S3. Construct the pull-out piles 7 and construct column piles 71 on some of the pull-out piles 7. The number of column piles 71 is not more than the pull-out piles 7. In this embodiment, the pull-out piles 7 with column piles 71 do not exceed 70% of the total. The height of the pull-out piles 7 is higher than the lowest layer slab 9 to ensure the supporting force. The column piles 71 are not lower than the uppermost support to support the cover plate 5. The pull-out piles 7 are made of a combination of steel cage and concrete, and the column piles 71 are made of steel structure.

[0035] S4. After the construction of the column piles 71 is completed, the uppermost support is constructed and the cover plate 5 is laid. At the same time, a continuous wall is constructed to surround the foundation pit so as to achieve water stopping.

[0036] S5. After the continuous wall is closed, the layer plates 9 are poured layer by layer from top to bottom and the soil between the layers is excavated. Each poured layer plate 9 is connected to the column pile 71, and a connection hole is reserved for each layer plate 9. When pouring the layer plate 9, a temporary support is first set under the layer plate 9. When the layer plate 9 is completed and reaches the preset strength, the corresponding temporary support is removed, and the connecting rod of the temporary support is connected to the upper layer plate 9 through the connection hole.

[0037] S6. After the bottom layer slab 9 is poured, cast piles 8 are poured in the soil layer below the bottom layer, and support piles 81 are constructed on the cast piles 8. The support piles 81 pass through the connection holes on each layer slab 9 in turn and are connected to each layer slab 9. The bottom of the support piles 81 is connected to the top support. When the support piles 81 are connected to the slab 9, the support piles 81 are first connected to each layer slab 9 by planting reinforcement, and then the connection between the slab 9 and the support piles 81 is poured. The support piles 81 are in the form of a combination of a steel cage and concrete.

[0038] S7, cutting and removing the column pile 71, and then cutting off the part of the anti-pullout pile 7 that is higher than the lowest layer of the slab 9. When removing the anti-pullout pile 7, the part of the anti-pullout pile 7 that is higher than the lowest layer of the slab 9 is cut by using the anti-pullout pile quick cutting device.

[0039] Through the construction method of cover excavation and reverse construction, the cover plate 5 is constructed first, which is convenient for transportation and other construction on the ground, and improves the overall construction efficiency. Secondly, the column piles 71 are directly constructed on the anti-pull piles 7, and the column piles 71 are used to temporarily support the cover plate 5 and the layer plate 9. On the one hand, it can resist the buoyancy of the anti-pull piles 7 and the lowest layer plate 9, and while achieving anti-floating, it also achieves temporary support for the cover plate 5 and the layer plate 9. On the other hand, the anti-pull piles 7 are used to support the column piles 71, which saves the materials and construction costs required for the column piles 71. Secondly, the cast-in-place piles 8 are constructed after the construction of the lowest layer plate 9 is completed, which can reduce the height of the cast-in-place piles 8, thereby saving costs, greatly reducing the construction difficulty, and improving construction efficiency.

[0040] Reference Figure 2 and Figure 3 The quick cutting device for anti-pull piles includes a frame 1, on which a guide rail 11 is fixedly connected. Two guide rails 11 are provided and are relatively arranged on both sides of the anti-pull pile. A saw band machine 2 is also provided on the frame 1, on which a first rotating member 22 is fixedly connected to the side wall. The first rotating member 22 can adopt a stepping motor. There are four first rotating members 22. A rolling wheel 23 is coaxially fixed on the output end of each first rotating member 22, so that there are two rolling wheels 23 in each guide rail 11, which improves the stability of the saw band machine 2. The saw band machine 2 can adopt a band sawing machine. The saw band machine 2 has a circularly moving saw blade 21, which can cut the anti-pull pile. The saw blade 21 can adopt a large-toothed manganese steel saw blade 21, and is mainly used for cutting hollow anti-pull piles. The distance between the saw blade 21 and the saw band machine 2 is generally greater than the diameter of the anti-pull pile. If the diameter of the anti-pull pile is large, the overall position of the frame 1 can also be changed to perform multiple cuttings. A support assembly 3 is also provided on the frame 1. The support assembly 3 is provided on the frame 1 and is used to be connected with the pull-out piles to support the pull-out piles.

[0041] The exposed part of the anti-pull pile is supported and supported by the support assembly 3, and then the first rotating member 22 is started, driving the rolling wheel 23 to rotate, and then driving the band saw 2 to move, and the anti-pull pile is directly cut by the band saw 2, and the operator does not need to approach, which can reduce safety hazards. At the same time, because the band saw 2 can perform overall cutting, it can greatly improve the construction efficiency. The band saw 2 is fed by the rolling wheel 23 and the guide rail 11. When the band saw 2 encounters a large resistance, the rolling wheel 23 will slip between the guide rail 11, thereby reducing the possibility of damage to the saw blade 21. At this time, the operator can control the band saw 2 to feed multiple times to better complete the cutting task.

[0042] A telescopic member 12 is fixedly connected to the frame 1 of the band saw machine 2. The telescopic member 12 can be a hydraulic cylinder. The telescopic member 12 is arranged in the vertical direction, and the output end of the telescopic member 12 is connected to the support frame 4, and the support frame 4 is connected to the support assembly 3. The telescopic member 12 facilitates changing the height of the support frame 4 and the support assembly 3 to adapt to pull-out piles of different heights.

[0043] The support assembly 3 includes a support belt 31 and a locking member, and the locking member includes a guide plate 33 and a locking wheel 32. The guide plate 33 is fixedly connected to the support frame 4, and the locking wheel 32 is rotatably connected to the support frame 4. One end of the support belt 31 is hinged to the support frame 4, and the other end surrounds the pull-out pile and passes between the locking wheel 32 and the guide plate 33. A driving tooth 311 is provided on the back of the support belt 31, and the driving tooth 311 can engage with the locking wheel 32, so that when the locking wheel 32 rotates, it can drive the support belt 31 to move.

[0044] In order to prevent the support belt 31 from loosening, the locking member also includes an anti-loosening block 34, the bottom of which is fixedly connected with a dovetail block, and a dovetail groove is provided on the support frame 4, in which the dovetail block slides, so as to reduce the possibility of the anti-loosening block 34 being separated from the support frame 4. An anti-loosening tooth 35 is fixedly connected to the anti-loosening block 34, and the anti-loosening tooth 35 is used to engage with the locking wheel 32, thereby preventing the locking wheel 32 from rotating. A fixing plate 36 is also fixedly connected to the support frame 4, and a latch 361 slides in the fixing plate 36. When the anti-loosening tooth 35 engages with the locking wheel 32, the latch 361 is inserted into the anti-loosening block 34, so that the anti-loosening block 34 can be prevented from moving, thereby locking the locking wheel 32.

[0045] The support assembly 3 is provided with multiple groups along the vertical direction, and two groups are provided in this embodiment. Multiple locking wheels 32 are coaxially connected to the same rotating rod 43, and a second rotating member 42 is fixedly connected to the support frame 4, and the output end of the second rotating member 42 is connected to the rotating rod 43, so as to drive the rotating rod 43 to rotate. The output end of the second rotating member 42 can be connected to the rotating rod 43 through a worm and worm gear mechanism, that is, the output end of the second rotating member 42 is connected to the worm, and the rotating rod 43 is connected to the worm wheel, and the worm and the worm wheel are meshed, and the self-locking characteristics of the worm and worm gear are utilized, so that the second rotating member 42 can drive the rotating rod 43 to rotate, while the rotating rod 43 cannot drive the output end of the second rotating member 42 to rotate. The second rotating member 42 can adopt a stepping motor.

[0046] The support frame 4 is provided with an arc groove 41 , which is used to fit with the side wall of the anti-pullout pile to better support and support the anti-pullout pile.

[0047] Working principle: When working, the support belt 31 is firstly wrapped around the anti-pulling pile and extended between the guide plate 33 and the locking wheel 32, and then the second rotating member 42 is started to drive the rotating rod 43 to rotate, and the rotating rod 43 drives the locking wheel 32 to rotate, and the locking wheel 32 drives the support belt 31 to move, tighten the support belt 31, and then fix the support frame 4 and the anti-pulling pile relatively. Then move the anti-loosening block 34, so that the anti-loosening teeth 35 are engaged with the locking wheel 32, and then insert the pin 361 into the anti-loosening block 34 to lock the locking wheel 32.

[0048] Then, the first rotating member 22 is started, driving the rolling wheel 23 to rotate, thereby driving the band saw machine 2 to move, and the band saw machine 2 is used to directly cut the pull-out pile until the pull-out pile is completely cut off.

[0049] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. A construction method for using anti-pulling piles as floor support and column replacement support, characterized in that: The steps include: S1. The site within the foundation pit is excavated at a slope of 1:1.5 to the top support elevation, and then the preliminary preparation work is carried out; S2, carry out anchor rod processing, then start the construction of three-axis mixing piles (6), and after the construction of three-axis mixing piles (6), carry out guide wall construction; S3, constructing the anti-pullout piles (7), and constructing the column piles (71) on some of the anti-pullout piles (7), the number of the column piles (71) is not more than the anti-pullout piles (7), the height of the anti-pullout piles (7) is higher than the lowest layer of the slab (9), and the column piles (71) are not lower than the uppermost support; S4. After the construction of the column piles (71) is completed, the uppermost support is constructed and the cover plate (5) is laid, and the continuous wall is constructed at the same time; S5. After the continuous wall is closed, the layer plates (9) are poured layer by layer from top to bottom and the soil between the layers is excavated. Each poured layer plate (9) is connected to the column pile (71), and a connection hole is reserved for each layer plate (9); S6, after the pouring of the bottom layer (9) is completed, cast-in-place piles (8) are poured in the soil layer below the bottom layer, and at the same time, support piles (81) are constructed on the cast-in-place piles (8), the support piles (81) pass through the connection holes on each layer of the layer (9) in turn, and are connected to each layer of the layer (9), and the top of the support piles (81) is connected to the uppermost support; S7, cutting and removing the column pile (71), and then cutting off the part of the anti-pulling pile (7) that is higher than the lowest layer of the slab (9).

2. The construction method of using the anti-pulling piles as both floor support and column replacement support as claimed in claim 1, characterized in that: In step S6, the support piles (81) are first connected to each layer of the slab (9) by planting reinforcement, and then casting is performed at the connection between the slab (9) and the support piles (81).

3. The construction method of using the anti-pulling piles as both floor support and column replacement support as claimed in claim 1, characterized in that: In step S5, when pouring the layer plate (9), a temporary support is first set under the layer plate (9), and when the layer plate (9) is constructed and reaches a preset strength, the corresponding temporary support is removed; The connecting rod of the temporary support is connected to the upper layer plate (9) through a connecting hole.

4. The construction method of using anti-pulling piles as floor support and column replacement support as claimed in claim 1, characterized in that: In step S7, a quick-cutting device for anti-pull piles is used to cut the portion of the anti-pull piles (7) that is higher than the lowest layer of the slab (9).

5. The construction method of using anti-pulling piles as floor support and column replacement support as claimed in claim 4 is characterized in that: The anti-pulling pile quick cutting device comprises A frame (1), wherein the frame (1) is provided with a guide rail (11), wherein two guide rails (11) are provided and are arranged oppositely on two sides of the anti-pulling pile; A band saw machine (2), wherein the band saw machine (2) slides on two guide rails (11) at the same time, and the band saw machine (2) has a cyclically movable saw blade (21); A support assembly (3), wherein the support assembly (3) is arranged on the frame (1) and is used to be connected to the pull-out pile.

6. The construction method of using anti-pulling piles as floor support and column replacement support as claimed in claim 5, characterized in that: A first rotating member (22) is provided on the side wall of the band saw machine (2); a rolling wheel (23) is provided on the output end of the first rotating member (22); the rolling wheel (23) is arranged in the guide rail (11); the first rotating member (22) and the rolling wheel (23) are provided in at least two groups, and each group is arranged corresponding to a guide rail (11).

7. The construction method of using anti-pulling piles as floor support and column replacement support as claimed in claim 6, characterized in that: The frame (1) is provided with a telescopic member (12), the telescopic member (12) is arranged in a vertical direction, and the output end of the telescopic member (12) is connected to a support frame (4), and the support frame (4) is connected to a support assembly (3).

8. The construction method of using anti-pulling piles as floor support and column replacement support as claimed in claim 7, characterized in that: The support assembly (3) comprises a support belt (31), one end of which is hinged to the support frame (4); and a locking member, the other end of which is locked by the locking member after being wrapped around the anti-pulling pile.

9. The construction method of using anti-pulling piles as floor support and column replacement support as claimed in claim 8, characterized in that: The locking member comprises a guide plate (33), wherein the guide plate (33) is arranged on the support frame (4); a locking wheel (32), wherein the locking wheel (32) is rotatably connected to the support frame (4); a driving tooth (311) is arranged on the support belt (31), wherein the support belt (31) passes between the locking wheel (32) and the guide plate (33), and the driving tooth (311) is meshed with the locking wheel (32).

10. The construction method of using anti-pulling piles as floor support and column replacement support as claimed in claim 9, characterized in that: The locking member further comprises an anti-loosening block (34), the anti-loosening block (34) slides on the support frame (4), and the anti-loosening block (34) is provided with anti-loosening teeth (35); a fixing plate (36), the fixing plate (36) is arranged on the support frame (4), and a latch (361) slides on the fixing plate (36), and when the anti-loosening teeth (35) are engaged with the locking wheel (32), the latch (361) is inserted into the anti-loosening block (34).