Simple secondary lining trolley anti-cracking device and construction method thereof
By using a combination device of support structure, adjustment device, sensor and control system in the construction of the second liner, the crack problem in the construction of the second liner is solved, the stability and safety of the second liner is improved, and the construction cost and construction period are reduced.
Patent Information
- Application Number
- CN202411152968.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-12-06
AI Technical Summary
During the construction of the second liner of the tunnel, crack problems often occur, resulting in damage to stability and safety. The existing solutions are complex and costly, making it difficult to completely avoid the occurrence of cracks.
Design a simple two-lined trolley anti-crack device including a support structure, adjustment device, sensor and control system. Through the support structure, the trolley weight is evenly distributed, and the adjustment device adjusts the distance and contact area between the support structure and the trolley. The sensor is used to adjust the sensor Monitor and control the pressure on the surface of the second lining to ensure uniform stress.
Effectively control the pressure distribution of the surface of the second lining, reduce crack problems, improve the stability and safety of the second lining of the tunnel, reduce construction costs and construction periods, and extend the project service life.
Smart Images

Figure CN119084028A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of secondary lining trolleys, and in particular to a simple secondary lining trolley anti-cracking device and a construction method thereof. Background Art
[0002] As an important supporting structure in underground engineering, the secondary lining of tunnels has been widely used in subways, tunnels and other projects. However, during the construction of the secondary lining, problems such as cracks often occur, which seriously affect the stability and safety of the secondary lining and may even cause collapse. These problems not only increase the construction cost and construction period, but also pose a serious threat to the safety and durability of the project.
[0003] At present, the solutions to the problem of cracks in the secondary lining of tunnels mainly include measures such as increasing the strength of concrete and adding steel bars. However, these methods are usually complex and costly, and often cannot completely avoid the occurrence of cracks. Especially during the construction process, due to the limitations of construction technology and equipment, it is difficult to effectively control the force and pressure distribution of the secondary lining, resulting in the difficulty in completely solving the crack problem. Therefore, it is urgent to provide a simple and efficient secondary lining anti-cracking device and its construction method to solve the problems existing in the prior art. Summary of the invention
[0004] In view of the existing technical problems, the purpose of the present invention is to provide a simple second lining trolley anti-cracking device and a construction method thereof, which can effectively control the crack problem, reduce construction risks, have the advantages of simple construction, and at the same time can reduce maintenance costs, be environmentally friendly and energy-saving.
[0005] The above technical objectives of the present invention are achieved through the following technical solutions:
[0006] A simple secondary lining trolley anti-cracking device comprises a supporting structure, an adjusting device, a sensor and a control system, wherein the supporting structure comprises a top plate and side plates connected vertically, the side plates are connected to the secondary lining trolley, and the top plate is used to connect newly poured secondary lining concrete; the adjusting device is arranged between the top plate and the side plates to adjust the distance and contact area between the supporting structure and the trolley, the sensor is associated with the control system and the adjusting device to monitor the pressure on the surface of the secondary lining concrete, and the control system automatically adjusts the adjusting device according to the sensor data.
[0007] Preferably, the adjusting device includes a sleeve, a telescopic arm and a driving motor, the bottom of the sleeve is fixed to the side plate, the driving motor is fixed inside the sleeve and its output end is connected to the telescopic arm, and the end of the telescopic arm is connected to the top plate; the driving motor is electrically connected to the control system.
[0008] Preferably, the end of the telescopic arm is connected to an inclined support plate, and the inclined support plate is arranged parallel to the top plate and pressed against the top plate.
[0009] Preferably, a limiting block is provided in front of the top plate corresponding to the end of the telescopic arm.
[0010] Preferably, the side panels are detachably connected to the secondary lining trolley.
[0011] Preferably, the anti-cracking device is used to be connected between the original cast second lining concrete and the newly cast second lining concrete, and is used to support the newly cast second lining concrete.
[0012] The present invention provides a construction method of a simple second lining trolley anti-cracking device, which mainly adopts the above-mentioned simple second lining trolley anti-cracking device in combination with the second lining trolley, specifically:
[0013] A construction method for a simple secondary lining trolley anti-cracking device, characterized in that it comprises the following steps:
[0014] S1. Determine the installation location of the support structure at the tunnel secondary lining construction site and carry out necessary site cleaning and preparation work;
[0015] S2. Install the components of the support structure in sequence at the construction site to ensure the stability and firmness of the support structure;
[0016] S3. Install the adjustment device and connect it to the supporting structure to ensure that the device can accurately adjust the top pressure;
[0017] S4. Place the trolley on the support structure and adjust the adjustment device according to the actual situation so that the distance and contact area between the support structure and the trolley meet the predetermined requirements;
[0018] S5. Install the sensor system, place the sensor at a suitable position on the secondary lining surface, and connect it to the control system;
[0019] S6. Start the control system, monitor the pressure on the secondary lining surface in real time according to the sensor data, and automatically adjust the top pressure through the regulating device;
[0020] S7. Continuously monitor and adjust the top pressure to ensure uniform force on the secondary lining surface and avoid cracks;
[0021] S8. During the construction of the secondary lining, continuously monitor and adjust the top pressure to ensure the stability and safety of the secondary lining;
[0022] S9. According to the actual construction situation, adjust the adjustment device at any time to ensure that the secondary lining is evenly stressed.
[0023] In summary, the present invention has the following beneficial effects:
[0024] The support structure is used to support the trolley and evenly distribute its weight on the secondary lining surface. The adjustment device is used to adjust the distance and contact area between the support structure and the trolley according to actual needs to control the size of the top pressure. The sensor system is used to monitor the pressure on the secondary lining surface. The control system automatically adjusts the adjustment device according to the sensor data to maintain the appropriate top pressure on the secondary lining surface.
[0025] Through the coordination of multiple components and combined construction methods, the top pressure on the secondary lining can be effectively controlled, and the crack problem caused by uneven force can be reduced, thereby improving the stability and safety of the secondary lining, reducing construction costs and construction period, and ensuring the continuous operation of underground projects. Improve the stability and safety of the tunnel secondary lining, reduce construction risks, reduce maintenance costs, and extend the service life of underground projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 is an overall schematic diagram of the anti-cracking device of the present invention;
[0027] Figure numerals: 1. Support structure; 11. Side plate; 12. Top plate; 2. Adjustment device; 3. Inclined support plate; 4. Limit block; 5. Second lining trolley. DETAILED DESCRIPTION
[0028] The present invention is further described in detail below in conjunction with the accompanying drawings.
[0029] See also Figure 1 In a typical embodiment 1 of the application, a simple second lining trolley anti-cracking device is provided, and the anti-cracking device is used to connect between the original cast second lining concrete and the newly cast second lining concrete to support the newly cast second lining concrete.
[0030] The anti-cracking device includes a supporting structure 1, an adjusting device 2, a sensor and a control system. The supporting structure 1 includes a top plate 12 and a side plate 11 connected vertically. The side plate 11 is connected to the secondary lining trolley 5, and the top plate 12 is used to connect the newly poured secondary lining concrete. The side plate 11 is detachably connected to the secondary lining trolley 5, and is connected by bolts and nuts. Among them, the sensor adopts a pressure sensor, and the control system is the existing technology.
[0031] The adjusting device 2 is arranged between the top plate 12 and the side plate 11 to adjust the distance and contact area between the supporting structure 1 and the trolley. The sensor is associated with the control system and the adjusting device 2 to monitor the pressure on the surface of the secondary lining concrete. The control system automatically adjusts the adjusting device 2 according to the sensor data.
[0032] The adjusting device 2 includes a sleeve, a telescopic arm and a driving motor. The bottom of the sleeve is fixed on the side plate 11 , the driving motor is fixed inside the sleeve and its output end is connected to the telescopic arm, and the end of the telescopic arm is connected to the top plate 12 .
[0033] The driving motor is electrically connected to the control system. The end of the telescopic arm is connected to an inclined support plate 3 , which is arranged parallel to the top plate 12 and is pressed against the top plate 12 .
[0034] In a preferred embodiment, a limiting block 4 is provided in front of the top plate 12 corresponding to the end of the telescopic arm.
[0035] The support structure 1 is used to support the trolley and distribute its weight evenly on the secondary lining surface. The adjusting device 2 is used to adjust the distance and contact area between the supporting structure 1 and the trolley according to actual needs to control the size of the top pressure. The sensor system is used to monitor the pressure on the secondary lining surface. The control system automatically adjusts the adjusting device 2 according to the sensor data to maintain the appropriate top pressure on the secondary lining surface.
[0036] A typical embodiment 2 of the application provides a construction method of a simple second lining trolley anti-cracking device, which mainly uses the above-mentioned simple second lining trolley anti-cracking device in combination with the second lining trolley 5, specifically:
[0037] A construction method of a simple secondary lining trolley anti-cracking device comprises the following steps:
[0038] S1. Determine the installation location of the support structure 1 at the tunnel secondary lining construction site and perform necessary site cleaning and preparation work;
[0039] S2. Install the components of the support structure 1 sequentially at the construction site to ensure the stability and firmness of the support structure 1;
[0040] S3. Install the adjustment device 2 and connect it to the support structure 1 to ensure that the device can accurately adjust the top pressure;
[0041] S4. Place the trolley on the support structure 1 and adjust the adjustment device 2 according to the actual situation so that the distance and contact area between the support structure 1 and the trolley meet the predetermined requirements;
[0042] S5. Install the sensor system, place the sensor at a suitable position on the secondary lining surface, and connect it to the control system;
[0043] S6. Start the control system, monitor the pressure on the secondary lining surface in real time according to the sensor data, and automatically adjust the top pressure through the adjustment device 2;
[0044] S7. Continuously monitor and adjust the top pressure to ensure uniform force on the secondary lining surface and avoid cracks;
[0045] S8. During the construction of the secondary lining, continuously monitor and adjust the top pressure to ensure the stability and safety of the secondary lining;
[0046] S9. According to the actual construction situation, adjust the adjusting device 2 at any time to ensure that the secondary lining is evenly stressed.
[0047] Overall, through the coordination of multiple components and combined construction methods, the top pressure on the secondary lining can be effectively controlled, and the crack problem caused by uneven force can be reduced, thereby improving the stability and safety of the secondary lining, reducing construction costs and construction period, and ensuring the continuous operation of underground projects. Improve the stability and safety of the tunnel secondary lining, reduce construction risks, reduce maintenance costs, and extend the service life of underground projects.
[0048] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed. However, as long as they are within the scope of the claims of the present invention, they are protected by the patent law.
Claims
1. A simple secondary lining trolley anti-cracking device, characterized in that: It includes a supporting structure, an adjusting device, a sensor and a control system. The supporting structure includes a top plate and side plates connected vertically. The side plates are connected to a secondary lining trolley. The top plate is used to connect newly poured secondary lining concrete. The adjusting device is arranged between the top plate and the side plates to adjust the distance and contact area between the supporting structure and the trolley. The sensor is associated with the control system and the adjusting device to monitor the pressure on the surface of the secondary lining concrete. The control system automatically adjusts the adjusting device according to the sensor data.
2. A simple secondary lining trolley anti-cracking device according to claim 1, characterized in that: The adjusting device includes a sleeve, a telescopic arm and a driving motor. The bottom of the sleeve is fixed to the side plate. The driving motor is fixed inside the sleeve and its output end is connected to the telescopic arm. The end of the telescopic arm is connected to the top plate. The driving motor is electrically connected to the control system.
3. A simple secondary lining trolley anti-cracking device according to claim 2, characterized in that: The end of the telescopic arm is connected with an inclined support plate, and the inclined support plate is arranged parallel to the top plate and pressed tightly against the top plate.
4. A simple secondary lining trolley anti-cracking device according to claim 2, characterized in that: The top plate is provided with a limiting block in front of the end of the telescopic arm.
5. The simplified secondary lining trolley anti-cracking device according to claim 1 is characterized in that: The side panels are detachably connected to the secondary lining trolley.
6. A simple secondary lining trolley anti-cracking device according to claim 1, characterized in that: The anti-cracking device is used to be connected between the original cast second lining concrete and the newly cast second lining concrete, and is used to support the newly cast second lining concrete.
7. A construction method for a simple secondary lining trolley anti-cracking device, characterized in that: The following steps are involved: S1. Determine the installation location of the support structure at the tunnel secondary lining construction site and carry out necessary site cleaning and preparation work; S2. Install the components of the support structure in sequence at the construction site to ensure the stability and firmness of the support structure; S3. Install the adjustment device and connect it to the supporting structure to ensure that the device can accurately adjust the top pressure; S4. Place the trolley on the support structure and adjust the adjustment device according to the actual situation so that the distance and contact area between the support structure and the trolley meet the predetermined requirements; S5. Install the sensor system, place the sensor at a suitable position on the secondary lining surface, and connect it to the control system; S6. Start the control system, monitor the pressure on the secondary lining surface in real time according to the sensor data, and automatically adjust the top pressure through the regulating device; S7. Continuously monitor and adjust the top pressure to ensure uniform force on the secondary lining surface and avoid cracks; S8. During the construction of the secondary lining, continuously monitor and adjust the top pressure to ensure the stability and safety of the secondary lining; S9. According to the actual construction situation, adjust the adjustment device at any time to ensure that the secondary lining is evenly stressed.