Multi-stage supporting hydraulic support control system and method for ultra-thin coal seam

Through the multi-stage support hydraulic support and cluster collaborative control system, the pressure sensor is used to monitor the rock layer pressure and follow up the hydraulic support in batches, solving the support stability of hydraulic support in extremely thin coal seams under complex geological conditions, improving the support stability of hydraulic support in extremely thin coal seams mining efficiency and safety.

CN119084057APending Publication Date: 2024-12-06CHINA UNIV OF MINING & TECH
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410979072.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

During extremely thin coal seams mining, hydraulic support is difficult to achieve rapid and stable support under complex geological conditions. Traditional methods require lowering the frame first and then moving the frame to lift it, and it is impossible to adjust the follow-up of the hydraulic support according to local rock formation pressure, resulting in support effect. There are great shortcomings and safety risks.

Method used

Multi-stage support hydraulic support and cluster collaborative control system are adopted to monitor the rock layer pressure through pressure sensors, follow up the hydraulic support in batches, and give priority to moving the hydraulic support in low-pressure areas to achieve multi-level gradient frame follow-up.

Benefits of technology

The stable follow-up of hydraulic support in extremely thin coal seams is achieved, the support speed and stability are improved, local landslides are avoided, and the safety and efficiency of the mining process are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119084057A_ABST
    Figure CN119084057A_ABST
Patent Text Reader

Abstract

The multi-stage supporting hydraulic support control system comprises hydraulic supports and a cluster cooperative control system, the hydraulic supports are multi-stage supporting supports, and the multiple hydraulic supports are subjected to graded supporting through the cluster cooperative control system; and the cluster cooperative control system preferentially follows the hydraulic support part to which the low-pressure interval belongs according to the pressure interval. The hydraulic support is adopted, a follow-up process and a cluster follow-up strategy are given, multi-stage supporting of a working roadway is achieved, the supporting stability in the follow-up process is guaranteed, and supporting of important rock strata can be achieved in the follow-up process; and meanwhile, a batch cluster collaborative follow-up mode is adopted, the hydraulic supports at the positions with small rock stratum pressure are moved preferentially, multi-layer gradient support moving follow-up, batch support moving follow-up of hydraulic support clusters and preferential follow-up of the hydraulic supports in low-pressure areas are achieved, and therefore the stability of the whole supporting face is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a support hydraulic support control system and method thereof, in particular to a multi-stage support hydraulic support control system and method thereof for extremely thin coal seams, belonging to the technical field of extremely thin coal seam mining. Background Art

[0002] As one of the indispensable main energy sources, coal plays a vital role in social development and economic stability. The challenges faced by its mining are gradually showing new characteristics. Due to the diverse occurrence of coal seams, thin coal seams and ultra-thin coal seams have become the new focus of coal mining. Usually 1.3m and 0.8m are used as the dividing line. Coal seams with a thickness of less than 1.3m are called thin coal seams, while those below 0.8m are ultra-thin coal seams. Especially in the southwest, east China and northeast China, the reserves of thin coal seams and ultra-thin coal seams are more prominent. In recent years, due to the improvement of coal mine comprehensive mining equipment and technology level and the impact of over-exploitation of thick coal seams and medium-thick coal seams, these reserves have been sharply reduced or even exhausted. Therefore, thin coal seams and ultra-thin coal seams have gradually become the main mining areas of coal in my country.

[0003] The mining of extremely thin coal seams is of great significance for solving the contradiction of continuous mining in mining areas, improving resource recovery rates, and alleviating the contradiction between regional coal supply and demand. However, the mining of extremely thin coal seams faces a series of huge challenges. First, the mining space of extremely thin coal seams is limited, the coal seam structure is complex, and there are multiple geological problems such as folds, faults, and gas, which makes the working environment extremely harsh and there are many hidden dangers in production safety; secondly, comprehensive mining is difficult and requires extremely high adaptability of mechanical equipment. At present, traditional and backward methods such as wooden piles and monomers are used for support, which makes it difficult to ensure the safety of personnel. Therefore, it is particularly urgent and important to develop support equipment that can be applied to extremely thin coal seams.

[0004] Mining extremely thin coal seams is a complex and challenging task facing the coal industry. With the growing demand for energy resources, coal, as one of the main energy sources, has gradually increased the demand for mining thin coal seams. Ultra-thin coal seams generally refer to thin seams with a thickness of less than 1.2 meters, and their mining faces a series of technical and engineering difficulties. In the context of mining extremely thin coal seams, hydraulic supports, as an important coal mine support equipment, undertake the task of supporting and stabilizing the coal mine working face. However, the geological conditions of extremely thin coal seams are often varied, including thin coal seams, large rock gaps, and complex ground stress, which brings huge challenges to the work of hydraulic supports.

[0005] In the prior art, a hydraulic support and a method for moving the hydraulic support are disclosed in the announcement number CN116927843A. The hydraulic support has a first end and a second end arranged opposite to each other in the first direction. The hydraulic support comprises: a first rock-blocking support, comprising: a first base; a second base, wherein the first end of the second base is connected to the second end of the first base; a second rock-blocking support, comprising: a third base; a first hydraulic cylinder, wherein one end of the first hydraulic cylinder is connected to the first end of the first base, and the other end of the first hydraulic cylinder is connected to the second end of the third base, and the first hydraulic cylinder is used to drive the third base to move away from or close to the first base to change the distance between the third base and the first base; a second hydraulic cylinder is arranged on the second base, and the second hydraulic cylinder is used to drive the first rock-blocking support and the second rock-blocking support to move together; Although the technology discloses that there are multiple levels of support, there are still many problems: First, during the frame moving process, the first-level support top plate is used for rapid forward support to ensure the support speed of the mining face, but it is not possible to achieve rapid support, and it is impossible to achieve forward support when the scraper conveyor moves forward or even does not move. The geological conditions of extremely thin coal seams are complex and the rock formations vary greatly. Traditional support requires lowering the frame first and then moving and raising the frame. During this process, if the rock formation pressure is unstable, it may cause local collapse and affect the overall follow-up; second, for hydraulic support clusters, conventional follow-up is performed in batches simultaneously, and it cannot be adjusted according to the local pressure of the supporting rock formation. The hydraulic supports cannot be followed up in batches. During the follow-up process, the hydraulic supports in areas with low rock formation pressure cannot be moved and followed up first, which makes the support effect have great deficiencies. Summary of the invention

[0006] The purpose of the present invention is to provide a multi-level support hydraulic support control system and method for extremely thin coal seams in order to solve the problem of how to ensure stable follow-up support in extremely thin coal seams.

[0007] The present invention achieves the above-mentioned purpose through the following technical solutions: a multi-level support hydraulic support control system for extremely thin coal seams, including a hydraulic support and a cluster collaborative control system. The hydraulic support adopts a multi-level support support, and multiple hydraulic supports are graded for support through a cluster collaborative control system. The cluster collaborative control system gives priority to following up the hydraulic support part belonging to the low-pressure interval according to the pressure interval.

[0008] As a further solution of the present invention: the hydraulic support includes multiple supporting top plates, multiple hydraulic columns, side plates and a bottom plate, the side plates are movably connected to both sides of the bottom plate, and multiple supporting top plates are arranged above the bottom plate, and each supporting top plate is connected to the bottom plate through a hydraulic column.

[0009] As a further solution of the present invention: the supporting top plate includes a first-level supporting top plate, a second-level supporting top plate and a third-level supporting top plate, the hydraulic column includes a first hydraulic column, a second hydraulic column and a third hydraulic column, the first hydraulic column is connected to the first-level supporting top plate, the second hydraulic column is connected to the second-level supporting top plate, and the third hydraulic column is connected to the third-level supporting top plate.

[0010] As a further solution of the present invention: pressure sensors are installed on the upper surfaces of the first-level supporting top plate, the second-level supporting top plate and the third-level supporting top plate.

[0011] A control method for a multi-level support hydraulic support control system for an extremely thin coal seam, wherein the hierarchical control of the cluster collaborative control system comprises the following steps:

[0012] Step 1: Use the support roof of the hydraulic support to form multiple support surfaces for the extremely thin coal seam. Taking the support forward direction of the multi-level support support as the reference direction, the support surfaces of the hydraulic support for the extremely thin coal seam are the first support surface A 1 and the second support surface A 2 , further the second support surface A 2 Divided into sub-support surface A 21 Sub-support surface A 22 , and collect the support surface pressure on each support surface. The first support surface A 1 The support surface pressure is recorded as B 1 , the second support surface A 2 The combined pressure is recorded as B 2 ;

[0013] Step 2: Hydraulic support cluster follow-up is divided into three batches. Each hydraulic support corresponds to two follow-up instructions, namely the first support surface A 1 Forward, second support surface A 2 Move forward;

[0014] Step 3: For a multi-stage support bracket, if the first support surface A of the supporting top plate 1 No follow-up, and the support surface pressure B 1 If it is a low-pressure zone, the first-level support top plate will be moved, which is the first batch to follow up;

[0015] Step 4: If the first support surface A of the supporting top plate 1 Followed up, and B 2 If it is a low pressure zone, the second support surface A of the mobile support top plate 2 , otherwise the hydraulic support will not move, this is the second batch of follow-up;

[0016] Step 5. The low-pressure interval will change with the increase in the number of batches. When the low-pressure interval is the pressure collection of all unmoved support surfaces, it means that all remaining hydraulic supports will follow up. This is the third batch of follow-up.

[0017] As a further solution of the present invention: for the second support surface A 2 The combined pressure B 2 Evaluation method: The pressure sensors set on the first-level support top plate, the second-level support top plate and the third-level support top plate monitor the return pressure respectively. 1 , C 2 , C 3 ; B 2 That is C 2 With C 3 The combined pressure

[0018]

[0019] Where: μ is the pressure coefficient, μ = k 1 ·L 1 , k 1 is the stiffness coefficient of the secondary support plate, L 1 is the compensation coefficient of the secondary support plate; ν is the pressure coefficient, ν = k 2 ·L 2 , k 2 is the stiffness coefficient of the secondary support plate, L 2 is the compensation coefficient of the third-level support plate.

[0020] As a further solution of the present invention: the low pressure interval is a variable interval, which is changed according to the pressure data set monitored each time, and its definition process is:

[0021] The support pressure data of each support surface is collected to form a pressure data set, and the data are arranged in ascending order;

[0022] The specified low pressure range of the first batch of multi-level support brackets is [P 1 , P 0.4n ], that is, the first 40% of the pressure set is recorded as the low pressure interval;

[0023] The specified low pressure range of the second batch of multi-level support brackets is [P 1 , P 0.6n ], that is, the first 60% of the pressure set is recorded as the low pressure interval;

[0024] The specified low pressure range of the third batch of multi-level support brackets is [P 1 , P n ], that is, the entire pressure set is recorded as the low pressure interval;

[0025] Among them, the pressure data sets of the second batch of multi-level support brackets and the third batch of multi-level support brackets are new pressure data sets that have been updated.

[0026] As a further solution of the present invention: the pressure data set is the sensor return value of all the support plates that have not been moved.

[0027] The beneficial effects of the present invention are:

[0028] 1) For the support of the fully mechanized mining working face, the present invention uses a new type of multi-stage telescopic hydraulic support, and provides a follow-up process and a cluster follow-up strategy, which can realize multi-level support of the working tunnel and ensure the stability of the support during the follow-up process. In the follow-up process, it can also realize the support of important rock formations. At the same time, a batch cluster collaborative follow-up solution is adopted to preferentially move the hydraulic support at the position with low rock formation pressure, so as to realize multi-level gradient frame moving and follow-up;

[0029] 2) Multi-level support is adopted. In the process of forward feeding of the comprehensive mining working face, there is no need to lower the frame first, move the frame and then raise the frame. When the working face is fed, the first-level support top plate can be quickly in place to speed up the mining speed. At the same time, multi-level support ensures that the rock strata at the support positions before and after the frame can be supported at the same time, improving the stability of the support. A cluster collaborative control solution is adopted to move the hydraulic support cluster in batches and follow up. The hydraulic supports in the low-pressure area are given priority to follow up to ensure the stability of the overall support surface. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 This is a schematic diagram of the structure of the hydraulic support of the present invention;

[0031] Figure 2 This is a schematic diagram of the follow-up structure change of the hydraulic support of the present invention;

[0032] Figure 3 It is a structural schematic diagram of the hydraulic support frame moving follow-up process of the present invention;

[0033] Figure 4 This is a schematic diagram of the cluster follow-up control process of the present invention;

[0034] Figure 5 It is a schematic diagram of the low-pressure interval definition process of the present invention.

[0035] In the figure: 1. primary support top plate, 2. secondary support top plate, 3. tertiary support top plate, 4. first hydraulic column, 5. second hydraulic column, 6. third hydraulic column, 7. side plate, 8. bottom plate. DETAILED DESCRIPTION

[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] Embodiment 1, as Figure 1 to Figure 2 As shown, a multi-level support hydraulic support control system for extremely thin coal seams includes a hydraulic support and a cluster collaborative control system. The hydraulic support adopts a multi-level support support, and multiple hydraulic supports are graded supported by the cluster collaborative control system. The cluster collaborative control system gives priority to following up the hydraulic support part belonging to the low-pressure interval according to the pressure interval.

[0038] The hydraulic support includes multiple supporting top plates, multiple hydraulic columns, side plates 7 and bottom plates 8. The side plates 7 are movably connected to both sides of the bottom plate 8. Multiple supporting top plates are arranged above the bottom plate 8. Each supporting top plate is connected to the bottom plate 8 through a hydraulic column, so that the supporting top plates can be supported separately by the hydraulic columns. The corresponding supporting top plates can be pushed forward in a targeted manner through the hydraulic columns according to specific support instructions, and under the action of the cluster collaborative control system, multiple hydraulic supports can cooperate and operate simultaneously to realize multi-level and gradient frame shifting and follow-up.

[0039] The supporting top plate includes a primary supporting top plate 1, a secondary supporting top plate 2 and a tertiary supporting top plate 3, and the hydraulic column includes a first hydraulic column 4, a second hydraulic column 5 and a third hydraulic column 6. The first hydraulic column 4 is connected to the primary supporting top plate 1, the second hydraulic column 5 is connected to the secondary supporting top plate 2, and the third hydraulic column 6 is connected to the tertiary supporting top plate 3.

[0040] Pressure sensors are installed on the upper surfaces of the first-level support top plate 1, the second-level support top plate 2 and the third-level support top plate 3 to monitor the pressure of the rock formation on the support surface. For the hydraulic support, the greater the monitored rock formation pressure, the more complex the stress condition of the rock formation on the support surface, and the more prominent the necessity of support.

[0041] Embodiment 2, as Figures 2 to 3 As shown, this embodiment is based on the control method of the multi-stage support hydraulic support control system for extremely thin coal seams in the first embodiment, wherein the control method includes a hierarchical control method of a cluster collaborative control system, and the hierarchical control method includes the following steps:

[0042] Step 1: Use the support roof of the hydraulic support to form multiple support surfaces for the extremely thin coal seam. Taking the support forward direction of the multi-level support support as the reference direction, the support surfaces of the hydraulic support for the extremely thin coal seam are the first support surface A1 and the second support surface A 2 , further the second support surface A 2 Divided into sub-support surface A 21 Sub-support surface A 22 , and collect the support surface pressure on each support surface. The first support surface A 1 The support surface pressure is recorded as B 1 , the second support surface A 2 The combined pressure is recorded as B 2 ;

[0043] Step 2: Hydraulic support cluster follow-up is divided into three batches. Each hydraulic support corresponds to two follow-up instructions, namely the first support surface A 1 Forward, second support surface A 2 Move forward;

[0044] Step 3: For a multi-stage support bracket, if the first support surface A of the supporting top plate 1 No follow-up, and the support surface pressure B 1 If it is a low-pressure zone, the first-level support top plate will be moved, which is the first batch to follow up;

[0045] Step 4: If the first support surface A of the supporting top plate 1 Followed up, and B 2 If it is a low pressure zone, the second support surface A of the mobile support top plate 2 , otherwise the hydraulic support will not move, this is the second batch of follow-up;

[0046] Step 5. The low-pressure interval will change with the increase in the number of batches. When the low-pressure interval is the pressure collection of all unmoved support surfaces, it means that all remaining hydraulic supports will follow up. This is the third batch of follow-up.

[0047] Embodiment 3: In addition to all the technical features in Embodiment 2, this embodiment also includes:

[0048] like Figure 5 As shown, for the second support surface A 2 The combined pressure B 2 Evaluation method: The pressure sensors set on the primary support roof 1, the secondary support roof 2 and the tertiary support roof 3 monitor the return pressures, which are C 1 , C 2 , C 3 ; B 2 That is C 2 With C 3 The combined pressure

[0049]

[0050] Where: μ is the pressure coefficient, μ = k 1 ·L 1 , k 1 is the stiffness coefficient of the secondary support plate, L 1 is the compensation coefficient of the secondary support plate; ν is the pressure coefficient, ν = k 2 ·L 2 , k 2 is the stiffness coefficient of the secondary support plate, L 2 is the compensation coefficient of the third-level support plate.

[0051] The low pressure interval is a variable interval, which changes according to the pressure data set monitored each time. Its definition process is as follows:

[0052] The support pressure data of each support surface are collected to form a pressure data set and arranged in ascending order. The specified low pressure interval of the first batch of multi-level support brackets is [P 1 , P 0.4n ], that is, the first 40% of the pressure set is recorded as the low pressure interval; the specified low pressure interval of the second batch of multi-level support brackets is [P 1 , P 0.6n ], that is, the first 60% of the pressure set is recorded as the low pressure interval; the specified low pressure interval of the third batch of multi-level support brackets is [P 1 , P n ], that is, the entire pressure set is recorded as the low pressure interval;

[0053] Among them, the pressure data sets of the second batch of multi-level support brackets and the third batch of multi-level support brackets are new pressure data sets that have been updated.

[0054] The pressure data set contains the sensor return values ​​for all support plates that have not been moved.

[0055] The hydraulic support follow-up process and cluster follow-up strategy can achieve multi-level support for the working tunnel and ensure the stability of the support during the follow-up process. During the follow-up process, important rock formations can also be supported. At the same time, a batch cluster collaborative follow-up solution is adopted to give priority to moving the hydraulic supports at locations with low rock pressure, thereby achieving multi-level and gradient frame movement and follow-up.

[0056] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0057] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A multi-level support hydraulic support control system for extremely thin coal seams, characterized by: Including hydraulic supports and cluster collaborative control systems; Among them, the hydraulic support adopts a multi-level support support, and multiple hydraulic supports are graded supported by the cluster collaborative control system, and the cluster collaborative control system gives priority to following up the hydraulic support part belonging to the low-pressure interval according to the pressure interval.

2. The multi-level support hydraulic support control system according to claim 1 is characterized in that: The hydraulic support comprises a plurality of supporting top plates, a plurality of hydraulic columns, side plates (7) and a bottom plate (8); the side plates (7) are movably connected to both sides of the bottom plate (8); a plurality of supporting top plates are arranged above the bottom plate (8); and each supporting top plate is connected to the bottom plate (8) via a hydraulic column.

3. The multi-level support hydraulic support control system according to claim 2 is characterized in that: The supporting roof plate comprises a primary supporting roof plate (1), a secondary supporting roof plate (2) and a tertiary supporting roof plate (3); The hydraulic columns comprise a first hydraulic column (4), a second hydraulic column (5) and a third hydraulic column (6); the first hydraulic column (4) is connected to a primary support top plate (1); the second hydraulic column (5) is connected to a secondary support top plate (2); and the third hydraulic column (6) is connected to a tertiary support top plate (3).

4. The multi-level support hydraulic support control system according to claim 3 is characterized in that: Pressure sensors are installed on the upper surfaces of the primary supporting top plate (1), the secondary supporting top plate (2) and the tertiary supporting top plate (3).

5. A control method for a multi-stage support hydraulic support control system for an extremely thin coal seam as claimed in any one of claims 1 to 4, characterized in that: The hierarchical control of the cluster collaborative control system includes the following steps: Step 1: Form multiple support surfaces for the extremely thin coal seam through the support roof of the hydraulic support. Taking the support forward direction of the multi-level support as the reference direction, the support surfaces of the hydraulic support for the extremely thin coal seam are the first support surface A1 and the second support surface A2 in turn. The second support surface A2 is further divided into sub-support surface A1, A2 and A2. 21 Sub-support surface A 22 , and collect the support surface pressure on each support surface, the support surface pressure of the first support surface A1 is recorded as B1, and the comprehensive pressure of the second support surface A2 is recorded as B2; Step 2: The hydraulic support cluster follow-up is divided into three batches of follow-up. Each hydraulic support corresponds to two follow-up instructions, namely, the first support surface A1 moves forward and the second support surface A2 moves forward; Step 3: For a multi-stage support bracket, if the first support surface A1 of the support top plate is not followed up, and the support surface pressure B1 belongs to the low pressure range, then move the first-stage support top plate, which is the first batch of follow-up; Step 4: If the first support surface A1 of the supporting top plate has been followed up, and B2 belongs to the low-pressure zone, then move the second support surface A2 of the supporting top plate, otherwise the hydraulic support does not move, which is the second batch of follow-up; Step 5. The low-pressure interval will change with the increase in the number of batches. When the low-pressure interval is the pressure collection of all unmoved support surfaces, it means that all remaining hydraulic supports will follow up. This is the third batch of follow-up.

6. The control method according to claim 1, characterized in that: In the step 1, the method for evaluating the comprehensive pressure B2 of the second supporting surface A2 is as follows: the pressure sensors installed on the primary supporting top plate (1), the secondary supporting top plate (2) and the tertiary supporting top plate (3) monitor the returned pressures C1, C2 and C3 respectively; B2 is the comprehensive pressure of C2 and C3; Wherein: μ is the pressure coefficient, μ=k1·L1, k1 is the stiffness coefficient of the secondary support plate, L1 is the compensation coefficient of the secondary support plate, v is the pressure coefficient, v=k2·L2, k2 is the stiffness coefficient of the secondary support plate, and L2 is the compensation coefficient of the tertiary support plate.

7. The control method according to claim 1, characterized in that: In step 3, the low pressure interval is a variable interval, which is changed according to the pressure data set monitored each time, and its definition process is as follows: The support pressure data of each support surface is collected to form a pressure data set, and the data are arranged in ascending order; The specified low pressure range of the first batch of multi-level support brackets is [P1, P 0.4n ], that is, the first 40% of the pressure set is recorded as the low pressure interval; The specified low pressure range of the second batch of multi-level support brackets is [P1, P 0.6n ], that is, the first 60% of the pressure set is recorded as the low pressure interval; The specified low pressure range of the third batch of multi-level support brackets is [P1, P n ], that is, the entire pressure set is recorded as the low pressure interval; Among them, the pressure data sets of the second batch of multi-level support brackets and the third batch of multi-level support brackets are new pressure data sets that have been updated.

8. The control method according to claim 7, characterized in that: The pressure data set is the sensor return values ​​of all the support plates that have not been moved.

Citation Information

Patent Citations

  • Hydraulic support and method for moving hydraulic support

    CN116927843A