Prefabricated plugging equipment for dam assembly type flood prevention plugging

Through the prefabricated flood prevention and blocking equipment of the dam, the combined structure of prefabricated plate components and limit frames, combined with the use of wire ropes, the problems of low efficiency and poor effect of blocking in the existing technology are solved, and the problem of low plugging efficiency and poor effect is realized. Quick and tight sealing of the blocking port ensures the safety and stability of the embankment.

CN119266167AActive Publication Date: 2025-01-07中水信通科技(武汉)有限公司
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411803413.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-10
Publication Date
2025-01-07
Estimated Expiration
2044-12-10

AI Technical Summary

Technical Problem

The existing technology is slow in the process of sealing the mouth, and the sealing effect is poor. The technical method cannot be adjusted according to the width of the mouth and the depth of the water surface, resulting in the inability to achieve a fast and tight sealing effect, especially when river embankment breach. Ordinary plugging materials are easily washed away by water flow, causing the breach to expand and endangering personal safety.

Method used

The prefabricated waterproof sealing equipment of dam prefabricated flood prevention entrance is used to form a complete waterproof wall through the splicing of multiple prefabricated plate components and the limit frames, and four steel wire ropes are used to feed it into the water surface. The prefabricated plate components are used to form a complete waterproof wall. The quantity can be adjusted according to the width of the plug to ensure the safety and efficiency of the plug.

Benefits of technology

It realizes rapid and effective sealing of the mouth, prevents the breach from expanding, enhances the water barrier strength, ensures the safety and stability of the embankment, and adapts to the gate conditions of different water surface depths and gate widths.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119266167A_ABST
    Figure CN119266167A_ABST
Patent Text Reader

Abstract

The invention provides dam assembly type flood prevention plugging prefabricating and plugging equipment, and relates to the technical field of flood prevention plugging and plugging, the dam assembly type flood prevention plugging prefabricating and plugging equipment comprises two sets of mounting frames, the tops of the two sets of mounting frames are symmetrically and rotatably provided with first winding seats through bearings, and the bottoms of the mounting frames are symmetrically and rotatably provided with second winding seats through bearings; steel wire ropes are wound in winding shafts of a first winding seat and a second winding seat on the same straight line of the two sets of mounting frames, a plurality of sets of prefabricated plate assemblies are arranged between the two sets of mounting frames, and each prefabricated plate assembly comprises an upper plate. A complete retention wall is formed through splicing of the multiple prefabricated plate assemblies and limiting of the two limiting frames, the retention wall is fed into the water surface through the four steel wire ropes, the prefabricated plate assemblies cannot be scattered in the process, meanwhile, the number of the prefabricated plate assemblies can be rapidly adjusted and installed according to the width of a plugging opening, and the plugging opening is effectively plugged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of flood control plugging and sealing, and in particular to a dam assembled flood control plugging and sealing device. Background Art

[0002] For dike breaches, especially those in the Yangtze River Basin, which are more common, rapid and effective rescue and reinforcement measures must be taken. For example, in the first few hours of a breach, the breach section can be promptly blocked by throwing in plugging materials, such as prefabricated blocks and caissons, to prevent the breach from further expanding; then the breach of the dike can be scientifically monitored and reinforced. The early blocking of the breach section is of great significance in the entire rescue process. The safe and efficient blocking can control the further development of the dangerous situation and ensure a safe flood season. Due to the large water flow of the breach, ordinary plugging materials such as sandbags will be washed away by the water flow, resulting in plugging failure. The plugging efficiency is too low. If the breach is not blocked in time, the breach will become larger and larger, endangering personal safety.

[0003] The shortcomings of the existing technology in plugging and sealing are that the efficiency is slow and the sealing effect is poor. The technical method of plugging cannot be adjusted according to the width of the plugging and the depth of the water surface, resulting in the inability to quickly and tightly seal the plugging. Summary of the invention

[0004] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a prefabricated plugging device for assembled flood-prevention plugging of dams to solve the problems raised in the above-mentioned background technology. The present invention has a novel structure. A complete water retaining wall is formed by splicing multiple prefabricated panel assemblies and limiting by two limit frames. It is sent into the water surface by four steel ropes. During this process, the prefabricated panel assemblies will not disperse. At the same time, the number of prefabricated panel assemblies can be quickly adjusted and installed according to the width of the plugging port, so as to effectively seal the plugging port.

[0005] In order to achieve the above-mentioned purpose, the present invention is implemented through the following technical scheme: a prefabricated plugging device for assembled flood prevention and plugging of a dam, including a mounting frame, wherein the mounting frame is provided with two groups, the tops of the two groups of mounting frames are symmetrically rotatably mounted with a first winding seat through a bearing, and the bottoms of the mounting frames are symmetrically rotatably mounted with a second winding seat through a bearing, and the winding shafts of the first winding seat and the second winding seat in the same straight line of the two groups of mounting frames are both wound with steel wire ropes, and a plurality of groups of prefabricated plate assemblies are arranged in the middle of the two groups of mounting frames, and the prefabricated plate assemblies include an upper plate, a splicing plate is installed at the bottom of the upper plate, and a lower plate is installed at the lower end of the splicing plate, and the fronts of the upper plate, the splicing plate and the lower plate are all opened There is a groove, and sliding frames are fixed on both sides of the top of the upper plate, and the sliding frames are slidably sleeved on the steel wire rope of the first winding seat, and pulleys are installed on both sides of the lower plate, and the pulleys slide along the steel wire rope of the second winding seat, and limit frames are provided on both sides of the prefabricated panel assembly, and two side panels are symmetrically fixed on the surface of the limit frame, and the side panels are slidably sleeved on the front and rear ends of the splicing panel, and the upper plate and the lower plate can be locked and connected with the limit frame, and the mounting frame is located on the back side of the prefabricated panel assembly. A support assembly is provided, and the support assembly includes a mounting plate, and a mounting plate is fixed on one side of the mounting frame. A fourth winding seat is installed at the same straight line position of the two mounting plates, and a third steel wire rope is wound inside the fourth winding seat.

[0006] Furthermore, the prefabricated panel assembly also includes bolts, bolts are installed on both sides of the top and bottom of the splicing plate, screw holes are provided on the upper plate and the lower plate at positions corresponding to the bolts, and the upper plate and the lower plate are locked and connected with the splicing plate by bolts, a wedge is fixed on one side of the upper plate and the lower plate, and a slot is provided on the other side of the upper plate and the lower plate, and the two groups of the prefabricated panel assemblies can be slidably plugged into the slot through the wedge.

[0007] Furthermore, the top and bottom of the limit frame are provided with notches, a lower seat is fixed inside the notches at the upper and lower ends of the limit frame, a cover plate is provided on the surface of the lower seat, and the steel wire ropes of the first winding seat and the second winding seat pass through the lower seat and the cover plate.

[0008] Furthermore, a spring plug is symmetrically fixed to one side of the cover away from the lower seat, and the spring plug is slidably inserted in the limiting frame, and the wedge can be inserted along the notch of the limiting frame to be pressed and contacted with the top of the cover.

[0009] Furthermore, a first electric push rod is fixed at the center of the mounting frame, and a magnetic suction cup is fixed to the extended end of the first electric push rod, and the magnetic suction cup can be adsorbed on the back side of the limiting frame.

[0010] Furthermore, the extended end of the first electric push rod is located on the back of the magnetic suction cup and two second electric push rods are fixedly installed, and the extended end of the second electric push rod is fixed with a pressure plate, and the pressure plate is in extrusion contact with the top of the steel wire rope of the first winding seat.

[0011] Furthermore, an insertion frame is fixed on the top and bottom of the sliding frame, two clamping frames are symmetrically arranged inside the sliding frame, and insertion rods are fixed equidistantly on the outside of the clamping frames. The insertion rods slide out of the sliding frame and are fixed with connecting plates, and the first spring is sleeved on the surface of the insertion rods between the connecting plates and the sliding frame.

[0012] Furthermore, a third winding seat is installed on the mounting frame at the middle position of the first winding seat, a pull rope is wound on the winding shaft of the third winding seat, and a connecting frame is fixed to one end of the pull rope, and an insertion plate is fixed on the surface of the connecting frame at positions corresponding to the four insertion frames of the upper plate, and the insertion plate can be slidably inserted into the insertion frame.

[0013] Furthermore, a transmission belt is installed on the top of the mounting frame located at the first winding seat, and the two pulleys of the transmission belt are connected to the winding shafts of the two first winding seats. A driving motor is fixed on the top of the mounting frame, and the output end of the driving motor is fixedly connected to the driving wheel of the transmission belt.

[0014] Furthermore, the support assembly also includes a movable groove, a movable groove is opened on the surface of the mounting plate, and a screw rod is rotatably installed inside the movable groove through a bearing, the back side of the fourth winding seat is threadedly sleeved on the screw rod, the back side of the upper plate is rotatably installed with a first telescopic plate through a rotating shaft, the back side of the lower plate is rotatably installed with a second telescopic plate through a rotating shaft, and the other end of the first telescopic plate and the second telescopic plate are rotatably connected through a rotating shaft, an insert cylinder is installed at one end where the first telescopic plate and the second telescopic plate are connected, and a third steel wire rope passes through the inside of the insert cylinder.

[0015] Beneficial effects of the present invention: 1. Before installing the prefabricated panel assembly, the present invention adjusts the length of the first telescopic plate and the second telescopic plate according to the water surface depth and the length of the splicing plate, and then locks the length, and sleeves the part of the insert sleeve on the outer end of the third steel wire rope to keep the rear support of each group of prefabricated panel assemblies in the same straight line, and the triangle formed by the first telescopic plate, the second telescopic plate and the prefabricated panel assembly has stability, which can keep the impact of the prefabricated panel assembly from top to bottom uniform, and the lead screw is driven by the motor to rotate, and the position of the fourth winding seat is adjusted in coordination with the descending height of the prefabricated panel assembly.

[0016] 2. After the prefabricated panel assembly is connected to the four steel wire ropes, the four plugging plates of the connecting frame are inserted into the plugging frame, the connecting plates are squeezed so that the plugging rods penetrate into the sliding frame, driving the two clamping frames to squeeze and wrap the steel wire rope of the first winding seat, turning on the driving motor, and transmitting through the transmission belt, the first winding seats of the two mounting frames reel in the steel wire rope one and unreel the other, and during this process, the third winding seat unreels the pull rope, and when the steel wire rope pulls the prefabricated panel assembly to move, the pull rope will also be unwound synchronously to keep the connection between the plugging plate and the plugging frame, and after the prefabricated panel assembly reaches the specified position, the pull rope is retracted by a separate motor of the third winding seat, and the plugging plate leaves the prefabricated panel assembly together with the connecting frame, at this time, the prefabricated panel assembly and the steel wire rope are in sliding connection contact, and when the subsequent steel wire rope drives other prefabricated panel assemblies to move, it will not interfere with the prefabricated panel assemblies that have been in place.

[0017] 3. After the prefabricated panel assembly is spliced, the first electric push rod of the mounting frame drives the two limit frames to move at the same time, and limits the two sides of the spliced ​​prefabricated panel assembly through the side panels of the limit frames, and as the first electric push rod continues to push, the limit frame is clamped with the prefabricated panel assembly and fixedly connected with the steel wire rope. At this time, the steel wire rope, the prefabricated panel assembly and the limit frame form a complete water retaining wall, and the first winding seat and the second winding seat at both ends both unwind the steel wire rope, and cooperate with the second electric push rod to drive the pressure plate to press down the steel wire rope outside the limit frame so that it is vertically inserted into the water surface.

[0018] 4. The prefabricated panel components of the present invention are composed of additional splicing plates, and prefabricated panels of different lengths can be composed of different splicing plates, so as to be used for plugging different water surface depths. When the limit frame moves to both sides of the prefabricated panel component, the wedge blocks will be inserted into the notches at the upper and lower ends of the limit frame to squeeze the cover plate. The cover plate and the lower seat cooperate to clamp and fix the steel wire rope to form an integrated structure of the steel wire rope, the prefabricated panel and the limit frame, thereby preventing the prefabricated panel component from dispersing during the movement and water blocking process, and enhancing the water blocking strength of the prefabricated panel.

[0019] 5. Compared with the prior art, the present invention forms a complete water retaining wall by splicing multiple prefabricated panel assemblies and limiting by two limit frames, and sends it into the water surface by four steel wire ropes. During this process, the prefabricated panel assemblies will not disperse. At the same time, the number of prefabricated panel assemblies can be quickly adjusted and installed according to the width of the plugging mouth, so as to effectively seal the plugging mouth. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the overall structure of a prefabricated plugging device for dam flood prevention assembled in the present invention; Figure 2 It is a schematic diagram of the structure of a prefabricated plate assembly of a dam assembled flood prevention plugging prefabricated plugging device according to the present invention; Figure 3A schematic diagram of the connection of prefabricated plate components of a prefabricated plugging device for assembled flood control plugging of a dam according to the present invention; Figure 4 It is a schematic diagram of the sliding frame structure of a prefabricated plugging device for assembled flood prevention plugging of a dam according to the present invention; Figure 5 It is a schematic diagram of the overall back structure of a prefabricated plugging device for dam assembled flood prevention plugging according to the present invention; Figure 6 It is a schematic diagram of the connection between the limit frame and the wedge block of a prefabricated plugging device for assembled flood prevention plugging of a dam according to the present invention; Figure 7 It is a schematic diagram of the surface structure of a limit frame of a prefabricated plugging device for assembled flood prevention plugging of a dam according to the present invention; Figure 8 It is a schematic structural diagram of the third winding seat of a dam assembled flood prevention plugging prefabricated plugging device of the present invention.

[0021] In the figure: 1, mounting frame; 11, first winding seat; 12, second winding seat; 13, driving motor; 14, transmission belt; 15, third winding seat; 16, pull rope; 17, connecting frame; 18, plug board; 2, prefabricated board assembly; 21, upper board; 22, splicing board; 23, lower board; 24, pulley; 25, bolt; 26, limit frame; 261, lower seat; 262, cover plate; 263, spring plug column; 264, side plate; 27, slide frame ; 271, clamping frame; 272, connecting plate; 273, plug rod; 274, first spring; 28, plug frame; 29, slot; 210, wedge block; 3, support assembly; 31, mounting plate; 32, movable slot; 33, screw rod; 34, fourth winding seat; 35, third wire rope; 36, first telescopic plate; 37, second telescopic plate; 38, insert tube; 4, first electric push rod; 41, magnetic suction cup; 42, pressure plate; 43, second electric push rod. DETAILED DESCRIPTION

[0022] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0023] See also Figures 1 to 8The present invention provides a technical solution: a prefabricated plugging device for flood prevention of dams, comprising a mounting frame 1, wherein the mounting frame 1 is provided with two groups, the tops of the two groups of mounting frames 1 are both provided with a first winding seat 11 symmetrically rotatably mounted through bearings, and the bottoms of the mounting frames 1 are provided with a second winding seat 12 symmetrically rotatably mounted through bearings, and the winding shafts of the first winding seat 11 and the second winding seat 12 in the same straight line of the two groups of mounting frames 1 are both provided with steel wire ropes, and a plurality of groups of winding shafts are provided in the middle of the two groups of mounting frames 1. The prefabricated panel assembly 2 comprises an upper panel 21, a splicing panel 22 is installed at the bottom of the upper panel 21, and a lower panel 23 is installed at the lower end of the splicing panel 22, and grooves are provided on the front of the upper panel 21, the splicing panel 22 and the lower panel 23, and sliding frames 27 are fixed on both sides of the top of the upper panel 21, and the sliding frames 27 are slidably sleeved on the steel wire rope of the first winding seat 11, and pulleys 24 are installed on both sides of the lower panel 23, and the pulleys 24 slide along the steel wire rope of the second winding seat 12, so that The prefabricated panel assembly 2 is provided with a limit frame 26 on both sides, and two side plates 264 are symmetrically fixed on the surface of the limit frame 26, and the side plates 264 are slidably sleeved on the front and rear ends of the splicing plate 22, and the upper plate 21 and the lower plate 23 can be locked and connected with the limit frame 26, and the mounting frame 1 is located on the back of the prefabricated panel assembly 2 and provided with a support assembly 3, and the support assembly 3 includes a mounting plate 31, and a mounting plate 31 is fixed on one side of the mounting frame 1, and a fourth winding seat 34 is installed at the same straight line position of the two mounting plates 31, and a third steel wire rope 35 is wound inside the fourth winding seat 34. When using the device, the two mounting frames 1 are respectively installed on the banks on both sides of the plugging, and the four steel wire ropes are connected and intermittently fed into the prefabricated panel assembly 2 along one side until the spliced ​​prefabricated panel assembly 2 can form a complete water retaining wall. After the width is the same as the plugging, the prefabricated panel is locked, and its bottom plate is inserted into the water, and the back of the prefabricated panel assembly 2 is supported by the support assembly 3 to maintain the strength of the prefabricated panel.

[0024] In this embodiment, the prefabricated panel assembly 2 also includes bolts 25, bolts 25 are installed on both sides of the top and bottom of the splicing plate 22, screw holes are provided on the upper plate 21 and the lower plate 23 at positions corresponding to the bolts 25, and the upper plate 21 and the lower plate 23 are locked and connected with the splicing plate 22 by the bolts 25, a wedge 210 is fixed on one side of the upper plate 21 and the lower plate 23, and a slot 29 is provided on the other side of the upper plate 21 and the lower plate 23, and the two groups of the prefabricated panel assemblies 2 can be slidably plugged into the slot 29 through the wedge 210, the top and bottom of the limit frame 26 are provided with notches, and a lower seat 261 is fixed inside the notches at the upper and lower ends of the limit frame 26, and a cover plate 262 is provided on the surface of the lower seat 261, and the steel wire ropes of the first winding seat 11 and the second winding seat 12 pass through the lower seat 261 and the cover plate 262, and the cover plate 262 is away from the lower seat A spring plug 263 is symmetrically fixed on one side of 261, and the spring plug 263 is slidably inserted into the limit frame 26. The wedge block 210 can be inserted along the notch of the limit frame 26 and squeezed into contact with the top of the cover plate 262. The prefabricated panel components 2 are composed of additional splicing plates 22, and prefabricated panels of different lengths can be composed according to different splicing plates 22, so as to be used for plugging at different water depths. When the limit frame 26 moves to both sides of the prefabricated panel component 2, the wedge block 210 will be inserted into the notches at the upper and lower ends of the limit frame 26 to squeeze the cover plate 262. The cover plate 262 cooperates with the lower seat 261 to clamp and fix the wire rope to form an integrated structure of the wire rope, the prefabricated panel and the limit frame 26, so as to prevent the prefabricated panel component 2 from dispersing during the movement process and the water blocking process, and strengthen the water blocking strength of the prefabricated panel. The spring plug 263 is a plug with a spring sleeved on the outer surface.

[0025] In this embodiment, a first electric push rod 4 is fixed at the center of the mounting frame 1, and a magnetic suction cup 41 is fixed to the extended end of the first electric push rod 4, and the magnetic suction cup 41 can be adsorbed on the back of the limit frame 26. The extended end of the first electric push rod 4 is located on the back of the magnetic suction cup 41, and two second electric push rods 43 are fixedly installed, and a pressing plate 42 is fixed to the extended end of the second electric push rod 43, and the pressing plate 42 is squeezed and contacted with the top of the steel wire rope of the first winding seat 11. The back of the limit frame 26 has a metal layer, which can be adsorbed by the magnetic suction cup 41, and then moves with the first electric push rod 4, and the prefabricated panel assembly 2 is assembled. After the connection is completed, the first electric push rod 4 of the mounting frame 1 drives the two limit frames 26 to move at the same time, and limits the two sides of the spliced ​​prefabricated panel assembly 2 through the side plates 264 of the limit frames 26, and as the first electric push rod 4 continues to push, the limit frames 26 are clamped with the prefabricated panel assembly 2 and fixedly connected with the wire rope. At this time, the wire rope, the prefabricated panel assembly 2 and the limit frames 26 form a complete water retaining wall, and the first winding seat 11 and the second winding seat 12 at both ends unwind the wire rope, and cooperate with the second electric push rod 43 to drive the pressure plate 42 to press down the wire rope outside the limit frame 26, so that it is vertically inserted into the water surface.

[0026] In this embodiment, the top and bottom of the sliding frame 27 are fixed with an insertion frame 28, the sliding frame 27 is symmetrically provided with two clamping frames 271, and the outer side of the clamping frame 271 is equidistantly fixed with an insertion rod 273, the insertion rod 273 slides out of the sliding frame 27 and is fixed with a connecting plate 272, the insertion rod 273 is located on the surface between the connecting plate 272 and the sliding frame 27 and is sleeved with a first spring 274, the mounting frame 1 is located in the middle position of the first winding seat 11 and is installed with a third winding seat 15, the winding of the third winding seat 15 A pull rope 16 is wound on the shaft, and a connecting frame 17 is fixed to one end of the pull rope 16. An insert plate 18 is fixed to the surface of the connecting frame 17 at positions corresponding to the four insert frames 28 of the upper plate 21, and the insert plate 18 can be slidably inserted into the insert frame 28. The mounting frame 1 is located at the top of the first winding seat 11 and is equipped with a transmission belt 14. The two pulleys of the transmission belt 14 are connected to the winding shafts of the two first winding seats 11. A driving motor 13 is fixed to the top of the mounting frame 1, and the output end of the driving motor 13 is connected to the driving wheel of the transmission belt 14. The third winding seat 15 is fixedly connected, and one side is the entry side of the prefabricated panel assembly 2. After the prefabricated panel assembly 2 is connected to the four steel wire ropes, the four plug plates 18 of the connecting frame 17 are inserted into the plug frame 28, and the connecting plate 272 is squeezed so that the plug rod 273 penetrates into the sliding frame 27, driving the two clamping frames 271 to squeeze and wrap the steel wire rope of the first winding seat 11, and the driving motor 13 is turned on. Through the transmission belt 14, the first winding seats 11 of the two mounting frames 1 wind up the steel wire rope one by one and unwind the other. In this process, The three winding seats 15 unwind the pull rope 16. When the steel wire rope pulls the prefabricated panel assembly 2 to move, the pull rope 16 will also be unwound synchronously to maintain the connection between the plug plate 18 and the plug frame 28. After the prefabricated panel assembly 2 reaches the specified position, the pull rope 16 is retracted by a separate motor of the third winding seat 15, and the plug plate 18 leaves the prefabricated panel assembly 2 together with the connecting frame 17. At this time, the prefabricated panel assembly 2 is in sliding connection with the steel wire rope. When the subsequent steel wire rope drives other prefabricated panel assemblies 2 to move, it will not interfere with the prefabricated panel assemblies 2 that have been in place.

[0027] In this embodiment, the support assembly 3 also includes a moving groove 32, a moving groove 32 is opened on the surface of the mounting plate 31, and a screw rod 33 is rotatably installed inside the moving groove 32 through a bearing, the back side of the fourth winding seat 34 is threadedly sleeved on the screw rod 33, a first telescopic plate 36 is rotatably installed on the back side of the upper plate 21 through a rotating shaft, a second telescopic plate 37 is rotatably installed on the back side of the lower plate 23 through a rotating shaft, and the first telescopic plate 36 and the second telescopic plate 37 are rotatably connected at the other end through a rotating shaft, an insertion sleeve 38 is installed at one end where the first telescopic plate 36 and the second telescopic plate 37 are connected, and a third steel wire rope 35 is connected from the insertion sleeve 38. The cylinder 38 passes through the inside. Before installing the prefabricated panel assembly 2, the length of the first telescopic plate 36 and the second telescopic plate 37 are adjusted according to the water surface depth and the length of the splicing plate 22, and then their lengths are locked. The part of the inserted cylinder 38 is sleeved on the outer end of the third steel wire rope 35 to keep the rear support of each group of prefabricated panel assemblies 2 in the same straight line, and the triangle formed by the first telescopic plate 36, the second telescopic plate 37 and the prefabricated panel assembly 2 has stability, which can keep the impact of the prefabricated panel assembly 2 from top to bottom uniform. The lead screw 33 is driven by a motor to rotate, and the position of the fourth winding seat 34 is adjusted in coordination with the height of the prefabricated panel assembly 2 falling.

[0028] When using the device, the two mounting frames 1 are respectively installed on the banks on both sides of the plugging, four steel wire ropes are connected, and the prefabricated panel assembly 2 is intermittently fed along one side. The prefabricated panel assemblies 2 are composed of additional splicing plates 22. Prefabricated panels of different lengths can be composed according to different splicing plates 22, so as to be used for plugging of different water depths. When the limit frame 26 moves to both sides of the prefabricated panel assembly 2, the wedge block 210 will be inserted into the notches at the upper and lower ends of the limit frame 26 to squeeze the cover plate 262. The cover plate 262 cooperates with the lower seat 261 to clamp and fix the steel wire rope, forming an integrated structure of the steel wire rope, the prefabricated panel and the limit frame 26, so as to prevent the prefabricated panel assembly 2 from dispersing during the movement and water blocking process, and enhance the water blocking strength of the prefabricated panel. After the prefabricated panel assembly 2 is spliced, the first electric push rod 4 of the mounting frame 1 drives the two limit frames 26 to move at the same time, and the side plates 264 of the limit frames 26 limit the two sides of the spliced ​​prefabricated panel assembly 2, and as the first electric push rod 4 continues to push, the limit frames 26 are clamped with the prefabricated panel assembly 2 and fixedly connected with the wire rope. At this time, the wire rope, the prefabricated panel assembly 2 and the limit frames 26 form a complete water retaining wall. The first winding seat 11 and the second winding seat 12 at both ends unwind the wire rope, and cooperate with the second electric push rod 43 to drive the pressing plate 42 to press down the wire rope outside the limit frame 26 so that it is vertically inserted into the water surface. After the prefabricated panel assembly 2 is connected to the four wire ropes, the four plug plates 18 of the connecting frame 17 are inserted in Inside the insertion frame 28, the connecting plate 272 is squeezed so that the insertion rod 273 penetrates into the sliding frame 27, driving the two clamping frames 271 to squeeze and wrap the steel wire rope of the first winding seat 11, and turning on the driving motor 13. Through the transmission belt 14, the first winding seats 11 of the two mounting frames 1 wind up the steel wire rope one by one and unwind the other. During this process, the third winding seat 15 unwinds the pull rope 16. When the steel wire rope pulls the prefabricated panel assembly 2 to move, the pull rope 16 will also be unwound synchronously to keep the connection between the insertion plate 18 and the insertion frame 28. After the prefabricated panel assembly 2 reaches the specified position, the pull rope 16 is retracted by a separate motor of the third winding seat 15, and the insertion plate 18 leaves the prefabricated panel assembly 2 together with the connecting frame 17. At this time, the prefabricated panel assembly 2 and the steel wire rope are in a sliding state. When the prefabricated panel assemblies 2 are connected, the subsequent steel wire rope will not interfere with the prefabricated panel assemblies 2 that have been in place when driving other prefabricated panel assemblies 2 to move. Before installing the prefabricated panel assemblies 2, adjust the length of the first telescopic plate 36 and the second telescopic plate 37 according to the water surface depth and the length of the splicing plate 22, and then lock their lengths. Part of the insert 38 is sleeved on the outer end of the third steel wire rope 35 to keep the rear support of each group of prefabricated panel assemblies 2 in the same straight line, and the triangle formed by the first telescopic plate 36, the second telescopic plate 37 and the prefabricated panel assembly 2 has stability, which can keep the impact of the prefabricated panel assembly 2 from top to bottom uniform. The lead screw 33 is driven by a motor to rotate, and the position of the fourth winding seat 34 is adjusted in coordination with the height of the prefabricated panel assembly 2 falling.

[0029] The basic principles and main features of the present invention and the advantages of the present invention are shown and described above. For those skilled in the art, it is obvious that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic characteristics of the present invention.

[0030] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A prefabricated plugging device for flood prevention of dams, comprising a mounting frame (1), characterized in that: The mounting frame (1) is provided with two groups, the tops of the two groups of mounting frames (1) are both symmetrically rotatably mounted with a first winding seat (11) via a bearing, and the bottoms of the mounting frames (1) are symmetrically rotatably mounted with a second winding seat (12) via a bearing, and the winding shafts of the first winding seat (11) and the second winding seat (12) in the same straight line of the two groups of mounting frames (1) are both wound with steel wire ropes, and a plurality of groups of prefabricated panel assemblies (2) are provided in the middle of the two groups of mounting frames (1), the prefabricated panel assemblies (2) comprising an upper plate (21), a splicing plate (22) being mounted at the bottom of the upper plate (21), and a lower plate (23) being mounted at the lower end of the splicing plate (22), the front surfaces of the upper plate (21), the splicing plate (22) and the lower plate (23) are all provided with grooves, and sliding frames (27) are fixed on both sides of the top of the upper plate (21), and the sliding frames (27) are slidably sleeved on the first winding seat. The prefabricated panel assembly (2) is provided with a plurality of pulleys (24) on the steel wire rope of the second winding seat (12). The prefabricated panel assembly (2) is provided with a limit frame (26) on both sides. Two side plates (264) are symmetrically fixed on the surface of the limit frame (26). The side plates (264) are slidably sleeved on the front and rear ends of the splicing plate (22). The upper plate (21) and the lower plate (23) can be locked and connected with the limit frame (26). The mounting frame (1) is provided with a support assembly (3) on the back side of the prefabricated panel assembly (2). The support assembly (3) includes a mounting plate (31). The mounting plate (31) is fixed on one side of the mounting frame (1). A fourth winding seat (34) is installed at a position in the same straight line of the two mounting plates (31). A third steel wire rope (35) is wound inside the fourth winding seat (34).

2. The prefabricated plugging device for flood prevention of dams according to claim 1 is characterized by: The prefabricated panel assembly (2) further comprises bolts (25), the bolts (25) being installed on both sides of the top and bottom of the splicing panel (22), the upper panel (21) and the lower panel (23) being provided with screw holes at positions corresponding to the bolts (25), and the upper panel (21) and the lower panel (23) being locked and connected with the splicing panel (22) via the bolts (25), a wedge block (210) being fixed on one side of the upper panel (21) and the lower panel (23), and a slot (29) being provided on the other side of the upper panel (21) and the lower panel (23), and two groups of the prefabricated panel assemblies (2) being slidably plugged into the slot (29) via the wedge block (210).

3. The prefabricated plugging device for flood prevention of dams according to claim 2 is characterized by: The limiting frame (26) is provided with notches at the top and bottom, a lower seat (261) is fixed inside the notches at the upper and lower ends of the limiting frame (26), a cover plate (262) is provided on the surface of the lower seat (261), and the steel wire ropes of the first winding seat (11) and the second winding seat (12) pass through the lower seat (261) and the cover plate (262).

4. The prefabricated plugging device for flood prevention of dams according to claim 3 is characterized by: A spring plug post (263) is symmetrically fixed to one side of the cover plate (262) away from the lower seat (261); the spring plug post (263) is slidably inserted into the interior of the limit frame (26); and the wedge block (210) can be inserted along the notch of the limit frame (26) to be pressed into contact with the top of the cover plate (262).

5. The prefabricated plugging device for flood prevention of dams according to claim 4 is characterized by: A first electric push rod (4) is fixed at the center of the mounting frame (1), and a magnetic suction cup (41) is fixed at the extended end of the first electric push rod (4), and the magnetic suction cup (41) can be adsorbed on the back of the limit frame (26).

6. The prefabricated plugging device for flood prevention of dams according to claim 5 is characterized by: The extended end of the first electric push rod (4) is located on the back of the magnetic suction cup (41) and two second electric push rods (43) are fixedly mounted thereon, and a pressing plate (42) is fixed to the extended end of the second electric push rod (43), and the pressing plate (42) is in compression contact with the top of the steel wire rope of the first winding seat (11).

7. The prefabricated plugging device for flood prevention of dams according to claim 2 is characterized by: Insertion frames (28) are fixed at the top and bottom of the sliding frame (27); two clamping frames (271) are symmetrically arranged inside the sliding frame (27); and insertion rods (273) are fixed equidistantly on the outside of the clamping frames (271); the insertion rods (273) slide through the sliding frame (27) and are fixed with a connecting plate (272); and a first spring (274) is sleeved on the surface of the insertion rods (273) located between the connecting plate (272) and the sliding frame (27).

8. The prefabricated plugging device for flood prevention of dams according to claim 7 is characterized by: The mounting frame (1) is located in the middle position of the first winding seat (11) and is provided with a third winding seat (15); a pull rope (16) is wound on the winding shaft of the third winding seat (15); and a connecting frame (17) is fixed to one end of the pull rope (16); and an inserting plate (18) is fixed on the surface of the connecting frame (17) at positions corresponding to four inserting frames (28) of the upper plate (21), and the inserting plate (18) can be slidably inserted into the inserting frame (28).

9. The prefabricated plugging device for flood prevention of dams according to claim 1 is characterized by: The mounting frame (1) is located on the top of the first winding seat (11) and is equipped with a transmission belt (14); two pulleys of the transmission belt (14) are connected to the winding shafts of the two first winding seats (11); a driving motor (13) is fixed on the top of the mounting frame (1), and the output end of the driving motor (13) is fixedly connected to the driving wheel of the transmission belt (14).

10. The prefabricated plugging device for flood prevention of dams according to claim 1, characterized in that: The support assembly (3) further comprises a movable groove (32), the movable groove (32) being provided on the surface of the mounting plate (31), and a screw rod (33) being rotatably mounted inside the movable groove (32) via a bearing, the back surface of the fourth winding seat (34) being threadedly sleeved on the screw rod (33), the back surface of the upper plate (21) being rotatably mounted with a first telescopic plate (36) via a rotating shaft, the back surface of the lower plate (23) being rotatably mounted with a second telescopic plate (37) via a rotating shaft, and the other ends of the first telescopic plate (36) and the second telescopic plate (37) being rotatably connected via a rotating shaft, an inserting sleeve (38) being mounted on one end where the first telescopic plate (36) and the second telescopic plate (37) are connected, and a third steel wire rope (35) passes through the inside of the inserting sleeve (38).

Citation Information

Patent Citations

  • Dike breach rescue method

    CN108978584A

  • Repairing device and method for flood control dam of water conservancy project

    CN114232561A

  • Modular flood prevention prefabricated section

    CN205348100U

  • Flood control structure for water conservancy project

    CN210049183U

  • Anti-flooding device

    EP2354326A1