Building engineering quality management system

By using technical means such as procurement modules, quality management platforms and inspection modules in the construction project quality management system, the problems of difficulty in tracking building materials and difficulty in quality control are solved, efficient material management and quality control are achieved, and management efficiency is improved and the processing capacity of problem materials.

CN119273290AInactive Publication Date: 2025-01-07SHENYANG ZHONGSHENG MECHANICAL & ELECTRICAL AUTOMATION TECHNOLOGY CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410485075.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-04-22
Publication Date
2025-01-07
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

It is difficult to track materials in construction projects and control quality. It is difficult to effectively manage the procurement, entry and exit processes of building materials in existing technologies, resulting in low management efficiency.

Method used

A construction project quality management system was designed, including procurement module, quality management platform, database, material management module, inspection module, data comparison module, early warning module and data analysis module. Procurement information is generated through the BIM model, preliminary review and acceptance, performance Detection, data comparison and classification processing to achieve effective tracking and quality control of materials.

Benefits of technology

It reduces the difficulty of material tracking, improves material quality management efficiency, ensures that the material quality meets preset requirements, promptly detects and deals with unqualified materials, avoids construction losses, and improves the processing efficiency of problematic materials through early warning and classified treatment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119273290A_ABST
    Figure CN119273290A_ABST
Patent Text Reader

Abstract

The invention discloses a constructional engineering quality management system, which belongs to the technical field of constructional engineering and comprises a purchasing module, a quality management platform, a database, a material management module and an engineering management module. The purchasing module is used for purchasing building materials; the database is used for data storage; the material management module is used for warehouse-in and warehouse-out auditing of materials; according to the invention, a material manager calls out the purchase information in the database through the material management module, and carries out the preliminary verification and acceptance with the material information, thereby achieving the preliminary judgment of whether the incoming materials are qualified or not. When the incoming material information is not consistent, the material management personnel uploads preliminary examination and acceptance unqualified information in the material management module, the unqualified information is stored in the database, an unqualified management report is generated through the quality management platform, and the unqualified management report is transmitted to the purchasing module; and the purchaser checks the incoming material information through the purchase module so as to deal with problem incoming materials in time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of construction engineering, and more specifically, to a construction engineering quality management system. Background Art

[0002] Construction engineering refers to the construction process of buildings, structures and other engineering facilities, usually including various stages such as design, construction, supervision, and acceptance. The quality and safety of buildings are crucial to people's lives and health, so construction projects need to strictly comply with relevant laws, regulations and standards, and also need to adopt advanced technology and processes to improve project quality and efficiency. Quality management systems are also often used in construction projects to help project managers and teams track, record and analyze various stages of the project, so as to promptly discover and solve problems that may affect the quality of the project.

[0003] The document with the prior art publication number CN113610390B provides a prefabricated building quality information management system based on blockchain. The device can effectively and real-time integrate the quality information of prefabricated buildings, and the public quality information management system can ensure that the quality information is authentic and traceable, providing an innovative and efficient information management system for the quality management of prefabricated building projects. The system provides an information management system based on blockchain technology, through which the quality information can be updated in time, openly shared, effectively traced, and the information flow is normal, which is conducive to the quality management of prefabricated buildings.

[0004] Although the above-mentioned existing technical solutions can achieve relevant beneficial effects through the structure of the existing technology, the quality management of construction projects not only involves the timely update of quality information, but also requires the use of a quality management system to track construction materials during the procurement, warehousing, outbound and use of construction materials. In view of this, we propose a construction project quality management system. Summary of the invention

[0005] 1. Technical problems to be solved

[0006] The purpose of this application is to provide a construction project quality management system, which solves the technical problems of difficulty in tracking construction materials and difficulty in quality control in the prior art, and achieves the technical effect of reducing the difficulty of tracking construction materials and improving the efficiency of construction material quality management.

[0007] 2. Technical solution

[0008] The embodiment of the present application provides a construction project quality management system, including a procurement module, a quality management platform, a database, a material management module and a project management module;

[0009] The purchasing module is used for purchasing building materials;

[0010] The database is used for data storage;

[0011] The material management module is used for the review of incoming and outgoing materials;

[0012] When materials purchased by the procurement module are put into storage, the material management personnel retrieve the procurement information in the database through the material management module, and conduct preliminary review and acceptance with the material information. When the incoming material information is in compliance, the material management personnel determine that the preliminary review and acceptance is qualified in the material management module; when the incoming material information is not in compliance, the material management personnel upload the preliminary review and acceptance unqualified information in the material management module. The unqualified information is stored in the database and an unqualified management report is generated through the quality management platform. At the same time, the unqualified management report is transmitted to the procurement module, and the procurement personnel check the incoming material information through the procurement module.

[0013] By adopting the above technical solution, the purchasing staff can retrieve the BIM model from the storage database through the quality management platform, and generate purchasing information based on the type and specification of building materials preset in the BIM model and combined with the quantity, packaging method and supplier of materials, thereby realizing the generation of purchasing information for materials, reducing the difficulty of purchasing and improving management efficiency;

[0014] BIM model is a building model created by architectural designers using BIM software. When building the model, designers can preset materials that meet the design and construction requirements and generate a detailed material list, including the specific location and quantity of each material, so as to better manage materials on the construction site and avoid waste and errors. It also makes it easier for procurement personnel to purchase materials based on the material list.

[0015] When incoming materials arrive, the material management personnel will retrieve the purchasing information in the database through the material management module, and conduct preliminary review and acceptance with the material information to improve the acceptance efficiency. When the incoming material information is not in compliance, the material management personnel will upload the preliminary review and acceptance unqualified information in the material management module. The unqualified information is stored in the database and an unqualified management report is generated through the quality management platform. At the same time, the unqualified management report is transmitted to the procurement module. The procurement personnel will check the incoming material information through the procurement module, so that the procurement personnel can understand the status of the materials in time, and respond and deal with them in time to avoid irreparable losses to the construction.

[0016] As an optional solution of the technical solution of this application document, a logistics platform is also included;

[0017] The logistics platform and the quality management platform are connected via a wireless network for order tracking.

[0018] By adopting the above technical solution, the logistics platform tracks the order progress of construction materials according to the purchased order number. The purchasing staff can understand the order dynamics in real time by entering the order number on the quality management platform interconnected with the logistics platform and tracking the order according to the order number.

[0019] As an optional solution to the technical solution of this application document, the preliminary review and acceptance of material information at least includes material name, specification model, quantity, packaging method and manufacturer information.

[0020] As an optional solution of the technical solution of this application document, it also includes a detection module and a data comparison module;

[0021] The detection module is used to detect the performance of the incoming materials;

[0022] The data comparison module is used to compare the actual performance data of the material with the preset performance data.

[0023] As an optional solution of the technical solution of the present application document, the detection module performs performance detection on the incoming materials to obtain actual performance data, and transmits the data to the data comparison module. The data comparison module retrieves the preset performance data of the corresponding building materials from the database. The data comparison module compares the actual performance data with the preset performance data. If the actual performance data is within the range of the preset performance data, it is qualified, otherwise, it is unqualified.

[0024] By adopting the above technical solution, the performance of incoming building materials is tested through the detection module and the data comparison module, further ensuring that the quality of building materials meets the preset requirements.

[0025] As an optional solution to the technical solution of this application document, if the performance data of the building materials is unqualified, the data comparison module will transmit the unqualified material information to the database for storage and generate an unqualified management report through the quality management platform, and at the same time transmit the unqualified management report to the procurement module.

[0026] By adopting the above technical solution, if the performance data of the building materials is unqualified, the data comparison module will transmit the unqualified material information to the procurement module through the quality management platform, so as to promptly remind the procurement personnel of material problems, communicate with suppliers and engineering personnel in time to solve the problems, and improve the efficiency of quality feedback.

[0027] As an optional solution of the technical solution of this application document, it also includes an early warning module. When the incoming construction materials are unqualified products, the quality management platform sends a material quality early warning signal to the early warning module for early warning, and the construction materials corresponding to the material management module are in a locked state.

[0028] By adopting the above technical solution, when the incoming construction materials are unqualified products, the material management module will lock the corresponding construction materials to avoid the problem of incorrect delivery.

[0029] As an optional solution of the technical solution of this application document, it also includes a data analysis module;

[0030] When incoming construction materials are determined to be unqualified products, the data analysis module classifies the unqualified types of construction materials, including general unqualified materials and special unqualified materials. The classification of general unqualified materials and special unqualified materials is distinguished by whether they affect the performance of the materials.

[0031] As an optional solution of the technical solution of this application document, the generally unqualified materials can be changed to qualified materials after being checked by the procurement module, and the qualified information is transmitted to the material management module, and the materials corresponding to the material management module are in a usable state;

[0032] The purchasing staff transmits the special non-conforming material information to the engineering management module, and the engineering staff further analyzes the batch of building materials and determines whether the special non-conforming materials are available;

[0033] If available, the engineering staff will change the status of the special unqualified materials to qualified materials through the engineering management module, and transmit the qualified information to the material management module and the procurement module. The batch of materials corresponding to the material management module is in a usable state.

[0034] By adopting the above technical solution, unqualified materials are divided into general unqualified materials and special unqualified materials, and different treatments are performed to improve the treatment efficiency of problem materials.

[0035] As an optional solution of the technical solution of this application document, it also includes a query platform;

[0036] The query platform is used to query data information of the management system.

[0037] By adopting the above technical solution, different query permissions can be set to control the query scope of the query platform.

[0038] 3. Beneficial effects

[0039] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:

[0040] 1. The material management personnel of this application retrieves the purchase information in the database through the material management module, and conducts preliminary review and acceptance with the material information, so as to make a preliminary judgment on whether the incoming materials are qualified; when the incoming material information does not meet the requirements, the material management personnel upload the preliminary review and acceptance unqualified information in the material management module, and the unqualified information is stored in the database and an unqualified management report is generated through the quality management platform. At the same time, the unqualified management report is transmitted to the procurement module, and the procurement personnel check the incoming material information through the procurement module, so as to deal with the problematic incoming materials in a timely manner.

[0041] 2. This application tests the performance of incoming building materials through a detection module and a data comparison module to further ensure that the quality of building materials meets the preset requirements.

[0042] 3. When the incoming construction materials of this application are determined to be unqualified products, the data analysis module classifies the unqualified types of construction materials according to whether they affect the performance of the materials. By classifying the unqualified materials into general unqualified materials and special unqualified materials, different processing methods are carried out according to the types of unqualified materials, thereby improving the processing efficiency of problem materials.

[0043] 4. After the general unqualified materials of this application are checked by the procurement module, if they are only information errors and do not affect the performance of the materials, their status can be changed to qualified materials, and the qualified information is transmitted to the material management module. The materials corresponding to the material management module are in a usable state;

[0044] Special unqualified materials can be transmitted to the engineering management module, and the engineering staff will further analyze the batch of building materials and determine whether the special unqualified materials are available. If available, the engineering staff will change the status of the special unqualified materials to qualified materials through the engineering management module, and transmit the qualified information to the material management module and the procurement module. The batch of materials corresponding to the material management module is in a usable state. Through further analysis and judgment of the unqualified materials, the final shaping of the materials can be achieved, avoiding the inability of usable materials to be shipped out, resulting in an extension of the construction period, and effectively ensuring the orderly use.

[0045] 5. This application also sets up an early warning module and a query platform to further enhance the practical functions of the management system. The early warning module can provide timely early warning reminders for problem materials to reduce the risk of using problem materials in construction. The query platform is used to query data information in the management system, making it convenient for relevant personnel to view information in the management system. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 This is a schematic diagram of the principles of a construction project quality management system disclosed in a preferred embodiment of the present application.

[0047] Explanation of the numbers in the figure: 1. Procurement module; 2. Quality management platform; 3. Database; 4. Logistics platform; 5. Material management module; 6. Early warning module; 7. Detection module; 8. Data comparison module; 9. Data analysis module; 10. Engineering management module; 11. Query platform. DETAILED DESCRIPTION

[0048] The present application is further described in detail below in conjunction with the accompanying drawings.

[0049] Reference Figure 1 , the embodiment of the present application discloses a construction project quality management system, including a procurement module 1, a quality management platform 2, a database 3, a logistics platform 4, a material management module 5, an early warning module 6, a detection module 7, a data comparison module 8, a data analysis module 9, a project management module 10 and a query platform 11;

[0050] The procurement module 1 is used for the procurement of building materials. The procurement personnel retrieve the BIM model from the storage database 3 through the quality management platform 2, and generate procurement information based on the parameters such as the type and specifications of building materials (such as size, shape, surface treatment and performance, etc.) preset in the BIM model and combined with the quantity, packaging method and supplier of the materials, and store it in the database 3.

[0051] It should be noted that the BIM model is a building model created by architectural designers using BIM software. When building the model, the designer can preset materials that meet the design and construction requirements and generate a detailed material list, including the specific location and quantity of each material, so as to better manage materials on the construction site and avoid waste and errors. It is also convenient for purchasing personnel to purchase materials based on the material list. The BIM model is stored in the database 3 and can be retrieved through the quality management platform 2.

[0052] The logistics platform 4 is connected to the quality management platform 2 via a wireless network. The logistics platform 4 tracks the order progress of construction materials according to the purchase order number. Purchasers can enter the order number on the quality management platform 2 interconnected with the logistics platform 4 and track the order according to the order number, so as to understand the order dynamics in real time.

[0053] When the purchased materials arrive, the material management personnel retrieve the purchase information in the database 3 through the material management module 5, and conduct a preliminary review and acceptance of the material information. The preliminary review and acceptance of the material information includes information such as material name, specification model, quantity, packaging method, manufacturer, etc. When the incoming material information meets the requirements, the material management personnel determine that the preliminary review and acceptance is qualified in the material management module 5. When the incoming material information does not meet the requirements, the material management personnel upload the preliminary review and acceptance unqualified information in the material management module 5. The unqualified information is stored in the database 3 and an unqualified management report is generated through the quality management platform 2. At the same time, the unqualified management report is transmitted to the procurement module 1 to remind the procurement personnel to check the procurement information in time, so as to determine the problem procurement source and make corresponding processing in time. When the incoming material information does not meet the requirements, the quality management platform 2 sends a material incoming quality warning signal to the warning module 6 for warning.

[0054] The testing personnel randomly sample the materials and perform performance testing through the testing module 7 to obtain actual performance data. The testing module 7 transmits the tested data to the data comparison module 8. The data comparison module 8 retrieves the preset performance data of the corresponding building materials from the database 3. The data comparison module 8 compares the actual performance data with the preset performance data. If the actual performance data is within the range of the preset performance data, it is qualified; otherwise, it is unqualified.

[0055] If the performance data of the building materials is unqualified, the data comparison module 8 will transmit the unqualified material information to the database 3 for storage and generate an unqualified management report through the quality management platform 2. At the same time, the unqualified management report will be transmitted to the procurement module 1, so that the procurement personnel can check the procurement information in time, thereby determining the source of the problem and making corresponding treatment in time. The quality management platform 2 sends a material incoming quality warning signal to the warning module 6 for warning.

[0056] When the incoming construction materials are determined to be unqualified products, the corresponding construction materials of the material management module 5 are in a locked state and cannot be taken out of the warehouse for use.

[0057] When incoming building materials are determined to be unqualified products, the data analysis module 9 classifies the unqualified types of building materials, including general unqualified materials and special unqualified materials. The classification of general unqualified materials and special unqualified materials is distinguished by whether they affect the performance of the materials. For example, if the quantity or list information (writing error) of the incoming materials is incorrect, or the packaging method is not in compliance, they are generally unqualified materials. After verification by the procurement module 1, the purchaser can change the status of the general unqualified materials to qualified materials, and transmit the qualified information to the material management module 5. The batch of materials corresponding to the material management module 5 is in a usable state;

[0058] Special unqualified materials are materials whose types, specifications and performances do not conform to the preset materials, and there are problems that affect the quality of the building. The purchasing staff can transmit the information of special unqualified materials to the engineering management module 10, and the engineering staff will further analyze and confirm the batch of building materials to determine whether the special unqualified materials are available (for example, although the mechanical performance parameters of the incoming materials do not meet the preset parameters, the performance parameters are higher than the preset parameters). If available, the engineering staff will change the status of the special unqualified materials to qualified materials through the engineering management module 10, and transmit the qualified information to the material management module 5 and the purchasing module 1. The batch of materials corresponding to the material management module 5 is in a usable state.

[0059] The data generated during the change of the information status of the material are all stored in the database 3 for later maintenance and viewing.

[0060] The detection module 7 is various types of detection equipment, such as a tensile testing machine for measuring important mechanical performance parameters such as tensile strength, elongation and cross-sectional shrinkage, a bending testing machine for measuring bending resistance and fatigue performance parameters, and an impact testing machine for measuring impact toughness and fatigue life.

[0061] The query platform 11 is used to query the data information of the management system, and the query scope of the query platform 11 can be controlled by setting different query permissions.

Claims

1. A construction project quality management system, characterized by: It includes a procurement module (1), a quality management platform (2), a database (3), a material management module (5) and an engineering management module (10); The purchasing module (1) is used for purchasing building materials; The database (3) is used for data storage; The material management module (5) is used for checking the incoming and outgoing materials; When the materials purchased by the purchasing module (1) are put into storage, the material management personnel retrieve the purchasing information in the database (3) through the material management module (5) and conduct preliminary review and acceptance with the material information. When the incoming material information meets the requirements, the material management personnel determine that the preliminary review and acceptance are qualified in the material management module (5); when the incoming material information does not meet the requirements, the material management personnel upload the preliminary review and acceptance unqualified information in the material management module (5), and the unqualified information is stored in the database (3) and an unqualified management report is generated through the quality management platform (2). At the same time, the unqualified management report is transmitted to the purchasing module (1), and the purchasing personnel check the incoming material information through the purchasing module (1).

2. The construction project quality management system according to claim 1, characterized in that: It also includes logistics platforms (4); The logistics platform (4) is connected to the quality management platform (2) via a wireless network for order tracking.

3. The construction project quality management system according to claim 1, characterized in that: The preliminary review and acceptance of material information includes at least the material name, specification, quantity, packaging method and manufacturer information.

4. The construction project quality management system according to claim 1, characterized in that: It also includes a detection module (7) and a data comparison module (8); The detection module (7) is used to detect the performance of the incoming materials; The data comparison module (8) is used to compare the actual performance data of the material with the preset performance data.

5. The construction project quality management system according to claim 4, characterized in that: The detection module (7) performs performance detection on the incoming materials to obtain actual performance data, and transmits the data to the data comparison module (8). The data comparison module (8) retrieves preset performance data of the corresponding building materials from the database (3). The data comparison module (8) compares the actual performance data with the preset performance data. If the actual performance data is within the range of the preset performance data, it is qualified; otherwise, it is unqualified.

6. The construction project quality management system according to claim 5, characterized in that: If the performance data of the building materials is unqualified, the data comparison module (8) transmits the unqualified material information to the database (3) for storage and generates an unqualified management report through the quality management platform (2), and transmits the unqualified management report to the procurement module (1).

7. The construction project quality management system according to claim 6, characterized in that: It also includes an early warning module (6). When the incoming building materials are unqualified products, the quality management platform (2) sends a material quality early warning signal to the early warning module (6) for early warning, and the building materials corresponding to the material management module (5) are in a locked state.

8. The construction project quality management system according to claim 7, characterized in that: Also includes a data analysis module (9); When incoming building materials are determined to be unqualified products, the data analysis module (9) classifies the unqualified types of building materials into general unqualified materials and special unqualified materials. The classification of general unqualified materials and special unqualified materials is distinguished by whether they affect the performance of the materials.

9. The construction project quality management system according to claim 8, characterized in that: After being checked by the purchasing module (1), the generally unqualified materials can be changed to qualified materials, and the qualified information is transmitted to the material management module (5), and the materials corresponding to the material management module (5) are in a usable state; The purchasing staff transmits the special non-conforming material information to the engineering management module (10), and the engineering staff further analyzes the building materials and determines whether the special non-conforming material is available; If available, the engineering personnel change the status of the special unqualified material to qualified material through the engineering management module (10), and transmit the qualified information to the material management module (5) and the procurement module (1), and the material corresponding to the material management module (5) is in a usable state.

10. The construction project quality management system according to any one of claims 1 to 9, characterized in that: Also included is a query platform (11); The query platform (11) is used for querying data information of the management system.