Subway tunnel steel ring reinforcing operation vehicle and operation method thereof

By integrating power supply components, pressure relief components and lifting components on the steel ring reinforcement work vehicle in the subway tunnel, the function of automatically cleaning the surface of the steel ring is solved, and the problems of steel ring aging and shortening service life in the existing technology are improved. efficiency and service life of steel rings.

CN119491733APending Publication Date: 2025-02-21HUAIAN ZHONGQIU SHIELD TECH SERVICE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411633878.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-15
Publication Date
2025-02-21

AI Technical Summary

Technical Problem

After working, the existing subway tunnel steel ring reinforcement operation vehicle requires workers to manually clean the surface of the steel ring to avoid the residue of debris, dust and water mist, resulting in the aging of the steel ring and shortening the service life.

Method used

A subway tunnel steel ring reinforcement operation vehicle is designed, equipped with power supply components, pressure relief components and lifting components. The pressure relief assembly uses gas to clean the steel ring surface through a bendable pipe and piston system, avoiding manual cleaning steps.

Benefits of technology

It realizes automatic cleaning of the steel ring surface after the equipment is operated, extending the service life of the steel ring and reducing the complexity and time of the worker's operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119491733A_ABST
    Figure CN119491733A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of subway tunnel steel ring reinforcement, in particular to a subway tunnel steel ring reinforcement operation vehicle and an operation method thereof.The subway tunnel steel ring reinforcement operation vehicle comprises a power supply assembly, a rear supporting assembly is installed at the front end of the power supply assembly, and pressure relief assemblies are installed on the front side and the rear side of the upper portion of the supporting assembly; the pressure relief assembly comprises a connecting sleeve, a bendable pipeline, a piston, a spring, a moving block and a second threaded rod, compared with an existing subway tunnel steel ring reinforcing operation vehicle, after the equipment inclines, the inclined end of the equipment is powered on, so that the height of the inclined end is adjusted, the equipment recovers to be horizontal again, stable work of the equipment is facilitated, and the working efficiency is improved. According to the equipment, the steel ring can be pushed at constant pressure, so that the steel ring can be in close contact with the surface of a tunnel, a worker can conveniently install the steel ring, the equipment can clean the steel ring through pressure relief gas, in this way, cleaning of the steel ring is completed after the equipment works, and the worker does not need to carry out additional cleaning steps.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of subway tunnel steel ring reinforcement, in particular to a subway tunnel steel ring reinforcement operation vehicle and an operation method thereof. Background Art

[0002] The subway tunnel steel ring reinforcement operation vehicle is a special vehicle specially used for subway tunnel steel ring reinforcement projects. It is mainly used to transport steel rings and assist workers in installing steel rings.

[0003] After the existing subway tunnel steel ring reinforcement operation vehicle is in operation, workers are required to clean the surface of the installed steel ring to prevent the steel ring from carrying debris, dust, and water mist, which will damage the steel ring, accelerate the aging of the steel ring, and affect the service life of the steel ring. Summary of the invention

[0004] The object of the present invention is to provide a subway tunnel steel ring reinforcement operation vehicle and an operation method thereof to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical scheme: it includes a power supply component, a rear support component is installed at the front end of the power supply component, and a pressure relief component is installed on the front and rear sides above the support component, the pressure relief component includes a connecting sleeve, a connecting sleeve, a bendable pipe, a piston, a spring, a moving block and a second threaded rod, and the top of the connecting sleeve is connected to the bendable pipe, the internal Anzhou piston of the connecting sleeve, and a spring is connected to one side of the piston, the end of the spring away from the piston is connected to the moving block, and the side of the moving block away from the spring is connected to the second threaded rod power supply component, characterized in that: the front end of the power supply component is installed with the rear support component, and the pressure relief component is installed on the front and rear sides above the support component, the pressure relief component includes a connecting sleeve, a connecting sleeve, a bendable pipe, a piston, a spring, a moving block and a second threaded rod, and the top of the connecting sleeve is connected to the bendable pipe, the internal Anzhou piston of the connecting sleeve, and a spring is connected to one side of the piston, the end of the spring away from the piston is connected to the moving block, and the side of the moving block away from the spring is connected to the second threaded rod.

[0006] Preferably, a horizontal adjustment component is provided at the lower end of the power supply component, and a lifting component is installed at the upper end of the power supply component.

[0007] Preferably, the power supply assembly includes a power supply box, a first permanent magnet and a battery, and the first permanent magnet is installed on the front and rear sides of the power supply box, and the battery is installed on the upper part of the power supply box.

[0008] Preferably, the power supply assembly further includes a slider and a first electrode, and the lower end of the battery is connected to the slider, and the left and right ends of the slider are inlaid with the first electrode.

[0009] Preferably, the horizontal adjustment assembly includes a motor, a docking block, a second electrode and a first threaded rod, and the motor is connected to the docking block on one side close to the central axis of the power supply assembly, the second electrode is embedded inside the docking block, and the rotating end of the motor is connected to the first threaded rod.

[0010] Preferably, the horizontal adjustment assembly also includes a threaded sleeve, a mounting plate, a telescopic rod and a power wheel, and the outside of the first threaded rod is connected to the threaded sleeve, the lower end of the threaded sleeve is connected to the mounting plate, and the telescopic rod is installed above the front and rear ends of the mounting plate, and the power wheel is installed at the front and rear ends of the mounting plate.

[0011] Preferably, the lifting assembly includes a cylinder and a standing platform, and the upper end of the cylinder is connected to the standing platform.

[0012] Preferably, the supporting assembly includes a mounting frame, a two-way cylinder, a fan, an air duct, a slide rail, a telescopic outer sleeve and a telescopic inner rod, and a two-way cylinder is installed on the upper end of the mounting frame, a fan is installed at the front end of the mounting frame, and the air outlet of the fan is connected to the air duct, the left and right ends of the two-way cylinder are connected to the slide rail, and a telescopic outer sleeve is arranged behind the slide rail, and a telescopic inner rod is installed inside the telescopic outer sleeve.

[0013] Preferably, the support assembly also includes a connecting ball, a connecting sleeve, a contact plate and a second permanent magnet, and the upper end of the connecting ball is connected to the connecting sleeve, the upper end of the connecting sleeve is connected to the contact plate, and the upper surface of the contact plate is inlaid with the second permanent magnet.

[0014] An operation method of a subway tunnel steel ring reinforcement operation vehicle, used for the above-mentioned subway tunnel steel ring reinforcement operation vehicle, is characterized by comprising the following operation method steps: Step 1: Equipment preparation: First, place the equipment in the subway tunnel and on the designated moving track to facilitate the movement of the equipment. Then, place the steel ring used for reinforcement on the support assembly so that the central axis of the steel ring coincides with the central axis of the mounting frame. Then, through the rotating structure between the connecting ball and the connecting sleeve, the contact plate can automatically adjust its angle so that the contact plate fits the surface of the steel ring. Step 2: Horizontal adjustment: Then turn on the power wheel, and the staff moves the equipment through the power of the power wheel, so that the steel ring moves to the installation position. If the vehicle body tilts during the movement, the slider will slide on the lower surface of the power supply box. The lower surface of the power supply box has a track to guide the slider, so that the sliding direction of the slider can be determined. When the slider slides, it will contact the docking block, so that the first electrode and the second electrode are docked, so that the battery will supply power to the motor through the first electrode and the second electrode, so that the motor works and the first threaded rod rotates. The first threaded rod is extended by relying on the threaded connection between the first threaded rod and the threaded sleeve, so as to adjust the angle of one side of the power supply box and restore the power supply box to a horizontal state. After the power supply box is restored to a horizontal state, the slider will not be pulled by lateral gravity. At this time, the slider will be attracted and reset by the traction force of the first permanent magnet; Step 3: Jet adjustment: After the equipment is moved to the installation position, the worker stands on the standing platform. The worker can install guardrails and other protective devices around the standing platform according to work requirements. After the worker stands, the worker bends the bendable pipe so that the air outlet of the bendable pipe is aligned with the surface of the steel ring. In this way, the steel ring can be cleaned with gas when the bendable pipe is deflated, thereby avoiding the need for workers to clean the surface after the steel ring is installed; Step 4: Push up and make contact: When all preparations are done, turn on the fan and fill the telescopic jacket with gas through the air duct, so that the air pressure inside the telescopic jacket increases, and the telescopic inner rod extends, thereby pushing the steel ring and making the steel ring contact with the tunnel, so that it is convenient for the staff to install the steel ring on the tunnel. When pushing on the steel ring, the pressure will also be relieved through the pressure relief component, so that the telescopic inner rod maintains a constant upward thrust, which is convenient for the equipment to press the steel ring onto the tunnel; Step 5: Height adjustment: After the steel ring contacts the tunnel, the staff can adjust the height of the standing platform through the cylinder so that the staff can reach the steel ring and use screws to install and fix the steel ring; Step 6: Angle control: After the steel ring is installed, the slide rail will be pushed by the two-way cylinder to unfold the two telescopic sleeves, so that the contact plate will move along the curvature of the steel ring, making it easier for the staff to gradually fix the steel ring.

[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. After the device is tilted, the tilted end of the device will be energized, so that the height of the tilted end can be adjusted to restore the device to a level state, so that the device can work stably.

[0016] 2. The equipment can push the steel ring at a constant pressure, so that the steel ring can be in close contact with the tunnel surface, making it easier for workers to install the steel ring.

[0017] 3. The equipment will use the depressurized gas to clean the steel ring, so that the steel ring is cleaned after the equipment is working, and the staff does not need to perform additional cleaning steps. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a front view structural schematic diagram of the present invention; Figure 2 This is an enlarged structural schematic diagram of the power supply component of the present invention; Figure 3 This is a schematic diagram of the enlarged structure of the power supply assembly of the present invention when viewed from above; Figure 4 It is a schematic diagram of the enlarged structure of the level adjustment component of the present invention; Figure 5 It is a schematic diagram of the enlarged structure of the support assembly of the present invention; Figure 6 It is a schematic diagram of the enlarged structure of the pressure relief component of the present invention.

[0019] In the figure: 1. Power supply assembly; 101. Power supply box; 102. First permanent magnet; 103. Battery; 104. Slider; 105. First electrode; 2. Level adjustment assembly; 201. Motor; 202. Docking block; 203. Second electrode; 204. First threaded rod; 205. Threaded sleeve; 206. Mounting plate; 207. Telescopic rod; 208. Power wheel; 3. Lifting assembly; 301. Cylinder; 302. Standing platform; 4. Support assembly; 401, mounting frame; 402, bidirectional cylinder; 403, fan; 404, air duct; 405, slide rail; 406, telescopic outer sleeve; 407, telescopic inner rod; 408, connecting ball; 409, connecting sleeve; 410, contact plate; 411, second permanent magnet; 5, pressure relief assembly; 501, connecting sleeve; 502, bendable pipe; 503, piston; 504, spring; 505, moving block; 506, second threaded rod. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] See also Figure 1 and Figure 6The present invention provides a technical solution: comprising a power supply component 1, a rear support component 4 is installed at the front end of the power supply component 1, and a pressure relief component 5 is installed on the front and rear sides of the upper part of the support component 4, and the pressure relief component 5 comprises a connecting sleeve 501, a connecting sleeve 501, a bendable pipe 502, a piston 503, a spring 504, a moving block 505 and a second threaded rod 506, and the upper part of the connecting sleeve 501 is connected with the bendable pipe 502, the inner part of the connecting sleeve 501 is connected with a piston 503, and one side of the piston 503 is connected with a spring 504, and the end of the spring 504 away from the piston 503 is connected with the moving block 505, and the side of the moving block 505 away from the spring 504 is connected with the second threaded rod 506; The equipment will use the depressurized gas to clean the steel ring, so that the steel ring is cleaned after the equipment is working, and the staff does not need to perform additional cleaning steps.

[0022] like Figure 1 , Figure 2 and Figure 4 As shown, a horizontal adjustment component 2 is provided at the lower end of the power supply component 1, and a lifting component 3 is installed at the upper end of the power supply component 1.

[0023] like Figure 3 As shown, the power supply component 1 includes a power supply box 101, a first permanent magnet 102 and a battery 103, and the first permanent magnet 102 is installed on the front and rear sides of the power supply box 101, and the battery 103 is installed on the upper part of the power supply box 101. The power supply component 1 also includes a slider 104 and a first electrode 105, and the lower end of the battery 103 is connected to the slider 104, and the left and right ends of the slider 104 are inlaid with the first electrode 105.

[0024] like Figure 4 As shown, the horizontal adjustment component 2 includes a motor 201, a docking block 202, a second electrode 203 and a first threaded rod 204, and the motor 201 is connected to the docking block 202 on one side close to the central axis of the power supply component 1, the second electrode 203 is embedded in the docking block 202, the rotating end of the motor 201 is connected to the first threaded rod 204, the horizontal adjustment component 2 also includes a threaded sleeve 205, a mounting plate 206, a telescopic rod 207 and a power wheel 208, and the outside of the first threaded rod 204 is connected to the threaded sleeve 205, the lower end of the threaded sleeve 205 is connected to the mounting plate 206, and the telescopic rod 207 is installed above the front and rear ends of the mounting plate 206, and the power wheel 208 is installed at the front and rear ends of the mounting plate 206; After the device is tilted, the tilted end of the device will be energized, thereby adjusting the height of the tilted end to restore the device to a level state, thereby facilitating stable operation of the device.

[0025] like Figure 2As shown, the lifting assembly 3 includes a cylinder 301 and a standing platform 302 , and the upper end of the cylinder 301 is connected to the standing platform 302 .

[0026] like Figure 5 As shown, the support assembly 4 includes a mounting frame 401, a two-way cylinder 402, a fan 403, an air duct 404, a slide rail 405, a telescopic outer cover 406 and a telescopic inner rod 407, and the upper end of the mounting frame 401 is installed with a two-way cylinder 402, the front end of the mounting frame 401 is installed with a fan 403, and the air outlet of the fan 403 is connected with the air duct 404, the left and right ends of the two-way cylinder 402 are connected with slide rails 405, and the rear of the slide rails 405 is provided with a telescopic outer cover 406, and the interior of the telescopic inner rod 407 is installed. The support assembly 4 includes a mounting frame 401, a two-way cylinder 402, a fan 403, an air duct 404, a slide rail 405, a telescopic outer cover 406 and a telescopic inner rod 407. The support assembly 4 further comprises a connecting ball 408, a connecting sleeve 409, a contact plate 410 and a second permanent magnet 411, and the upper end of the connecting ball 408 is connected to the connecting sleeve 409, the upper end of the connecting sleeve 409 is connected to the contact plate 410, and the upper surface of the contact plate 410 is inlaid with the second permanent magnet 411; The equipment can push the steel ring at a constant pressure so that the steel ring can be in close contact with the tunnel surface, making it easier for workers to install the steel ring.

[0027] Working principle: First, place the device in the subway tunnel and on the designated moving track to facilitate the movement of the device. Then, place the steel ring used for reinforcement on the support assembly 4 so that the central axis of the steel ring coincides with the central axis of the mounting frame 401. Then, through the rotating structure between the connecting ball 408 and the connecting sleeve 409, the contact plate 410 can be automatically adjusted in angle, so that the contact plate 410 fits the surface of the steel ring, and the steel ring is adsorbed by the second permanent magnet 411, so that the steel ring will not move randomly on the device. Then the power wheel 208 is turned on, and the staff moves the equipment through the power of the power wheel 208, so that the steel ring moves to the installation position. If the vehicle body tilts during the movement, the slider 104 will slide on the lower surface of the power supply box 101. The lower surface of the power supply box 101 has a track to guide the slider 104, so that the sliding direction of the slider 104 can be determined. When the slider 104 slides, it will contact the docking block 202, so that the first electrode 105 and the second electrode 203 are docked, so that the battery 103 will supply power to the motor 201 through the first electrode 105 and the second electrode 203, so that the motor 201 works and the first threaded rod 204 rotates. The first threaded rod 204 is extended by relying on the threaded connection between the first threaded rod 204 and the threaded sleeve 205, so as to adjust the angle of one side of the power supply box 101, so that the power supply box 101 is restored to a horizontal state. After the power supply box 101 is restored to a horizontal state, the slider 10 4 will not be pulled by the lateral gravity. At this time, the slider 104 will be attracted and reset by the traction force of the first permanent magnet 102. The position where the slider 104 installs the first electrode 105 is made of ceramic material, and the front and rear ends of the slider 104 are made of metal material, which is convenient for the first permanent magnet 102 to attract the slider 104. At the same time, the power supply end of the battery 103 is connected to the first electrode 105 through a wire, so that the first electrode 105 is charged. The relationship between the docking block 202 and the second electrode 203 is the same as the relationship between the slider 104 and the first electrode 105. Both use the above structure for conductivity. When the mounting plate 206 is driven to rise and fall by the threaded sleeve 205, the telescopic rod 207 guides the mounting plate 206. At the same time, the motor 201 is installed inside the power supply box 101 by screws, but the installation of the motor 201 is not fixed. The motor 201 can be slightly swung left and right to balance the angle adjustment of the power supply box 101. After the equipment is moved to the installation position, the worker stands on the standing platform 302. The worker can install guardrails and other protective devices around the standing platform 302 according to work requirements. After the worker stands, the worker bends the bendable pipe 502 so that the air outlet of the bendable pipe 502 is aligned with the surface of the steel ring. In this way, when the bendable pipe 502 is deflated, the steel ring can be cleaned with gas, thereby avoiding the need for workers to clean the surface after the steel ring is installed. When all preparations are done, turn on the fan 403, and fill the telescopic outer sleeve 406 with gas through the air duct 404, so that the air pressure inside the telescopic outer sleeve 406 increases, and the telescopic inner rod 407 extends, thereby pushing the steel ring and making the steel ring contact with the tunnel, so that it is convenient for the staff to install the steel ring on the tunnel. When pushing on the steel ring, the pressure will also be relieved through the pressure relief component 5, so that the telescopic inner rod 407 maintains a constant upward thrust, which is convenient for the equipment to press the steel ring onto the tunnel. The position of the moving block 505 can be adjusted through the threaded connection between the second threaded rod 506 and the connecting sleeve 501, so that the pressure relief degree of the pressure relief component 5 can be adjusted, and the thrust of the telescopic inner rod 407 can be effectively controlled; After the steel ring contacts the tunnel, the worker can adjust the height of the standing platform 302 through the cylinder 301, so that the worker can reach the steel ring, which is convenient for the worker to install and fix the steel ring with screws; After the steel ring is installed, the slide rail 405 is pushed by the bidirectional cylinder 402, so that the two telescopic sleeves 406 are unfolded, which will make the contact plate 410 move along the curvature of the steel ring, making it easier for the staff to gradually fix the steel ring.

[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A subway tunnel steel ring reinforcement vehicle, comprising a power supply assembly (1), characterized in that: A rear support component (4) is installed at the front end of the power supply component (1), and pressure relief components (5) are installed on both sides of the upper part of the support component (4). The pressure relief component (5) comprises a connecting sleeve (501), a bendable pipe (502), a piston (503), a spring (504), a moving block (505) and a second threaded rod (506). The upper part of the connecting sleeve (501) is connected to the bendable pipe (502), the piston (503) is installed inside the connecting sleeve (501), and one side of the piston (503) is connected to the spring (504), the end of the spring (504) away from the piston (503) is connected to the moving block (505), and the side of the moving block (505) away from the spring (504) is connected to the second threaded rod (506).

2. A subway tunnel steel ring reinforcement vehicle according to claim 1, characterized in that: A horizontal adjustment component (2) is provided at the lower end of the power supply component (1), and a lifting component (3) is installed at the upper end of the power supply component (1).

3. The subway tunnel steel ring reinforcement vehicle according to claim 1, characterized in that: The power supply assembly (1) comprises a power supply box (101), a first permanent magnet (102) and a storage battery (103), wherein the first permanent magnet (102) is installed on both front and rear sides of the power supply box (101), and the storage battery (103) is installed on the upper part of the power supply box (101).

4. A subway tunnel steel ring reinforcement vehicle according to claim 3, characterized in that: The power supply component (1) further comprises a slider (104) and a first electrode (105), wherein the lower end of the storage battery (103) is connected to the slider (104), and the first electrode (105) is embedded at the left and right ends of the slider (104).

5. The subway tunnel steel ring reinforcement vehicle according to claim 2, characterized in that: The horizontal adjustment component (2) comprises a motor (201), a docking block (202), a second electrode (203) and a first threaded rod (204); the docking block (202) is connected to a side of the motor (201) close to the central axis of the power supply component (1); the second electrode (203) is embedded in the docking block (202); and the rotating end of the motor (201) is connected to the first threaded rod (204).

6. A subway tunnel steel ring reinforcement vehicle according to claim 5, characterized in that: The horizontal adjustment assembly (2) further comprises a threaded sleeve (205), a mounting plate (206), a telescopic rod (207) and a power wheel (208), wherein the threaded sleeve (205) is connected to the outside of the first threaded rod (204), the lower end of the threaded sleeve (205) is connected to the mounting plate (206), the telescopic rod (207) is mounted above the front and rear ends of the mounting plate (206), and the power wheel (208) is mounted at the front and rear ends of the mounting plate (206).

7. The subway tunnel steel ring reinforcement vehicle according to claim 2, characterized in that: The lifting assembly (3) comprises a cylinder (301) and a standing platform (302), and the upper end of the cylinder (301) is connected to the standing platform (302).

8. The subway tunnel steel ring reinforcement vehicle according to claim 1, characterized in that: The support assembly (4) comprises a mounting frame (401), a bidirectional cylinder (402), a fan (403), an air duct (404), a slide rail (405), a telescopic outer cover (406) and a telescopic inner rod (407), wherein the bidirectional cylinder (402) is mounted on the upper end of the mounting frame (401), the fan (403) is mounted on the front end of the mounting frame (401), and the air outlet of the fan (403) is connected to the air duct (404), the left and right ends of the bidirectional cylinder (402) are connected to the slide rail (405), and the telescopic outer cover (406) is arranged behind the slide rail (405), and the telescopic inner rod (407) is mounted inside the telescopic outer cover (406).

9. The subway tunnel steel ring reinforcement vehicle according to claim 8, characterized in that: The support assembly (4) further comprises a connecting ball (408), a connecting sleeve (409), a contact plate (410) and a second permanent magnet (411), wherein the upper end of the connecting ball (408) is connected to the connecting sleeve (409), the upper end of the connecting sleeve (409) is connected to the contact plate (410), and the upper surface of the contact plate (410) is inlaid with the second permanent magnet (411).

10. An operation method of a subway tunnel steel ring reinforcement operation vehicle, used for a subway tunnel steel ring reinforcement operation vehicle according to any one of claims 1 to 9, characterized in that: The following operation methods and steps are included: Step 1: Equipment preparation: First, place the equipment in the subway tunnel and on the designated moving track to facilitate the movement of the equipment. Then, place the steel ring used for reinforcement on the support assembly (4) so ​​that the central axis of the steel ring coincides with the central axis of the mounting frame (401). Then, through the rotating structure between the connecting ball (408) and the connecting sleeve (409), the contact plate (410) can be automatically adjusted in angle, so that the contact plate (410) fits the surface of the steel ring. Step 2: Horizontal adjustment: Then, the power wheel (208) is turned on, and the staff uses the power of the power wheel (208) to move the device, thereby moving the steel ring to the installation position. If the vehicle body tilts during the movement, the slider (104) will slide on the lower surface of the power supply box (101). The lower surface of the power supply box (101) has a track to guide the slider (104), so that the sliding direction of the slider (104) can be determined. When the slider (104) slides, it will contact the docking block (202), so that the first electrode (105) and the second electrode (203) are docked, so that the battery (103) is The motor (201) is powered through the first electrode (105) and the second electrode (203), thereby causing the motor (201) to work and causing the first threaded rod (204) to rotate. The first threaded rod (204) is extended by virtue of the threaded connection between the first threaded rod (204) and the threaded sleeve (205), thereby adjusting the angle of one side of the power supply box (101) so that the power supply box (101) is restored to a horizontal state. After the power supply box (101) is restored to a horizontal state, the slider (104) will no longer be pulled by lateral gravity, and the slider (104) will be attracted and reset by the pulling force of the first permanent magnet (102); Step 3: jet adjustment: after the equipment is moved to the installation position, the worker stands on the standing platform (302). The worker can install guardrails and other protective devices around the standing platform (302) according to work requirements. After the worker stands, the worker bends the bendable pipe (502) so that the air outlet of the bendable pipe (502) is aligned with the surface of the steel ring. In this way, when the bendable pipe (502) is deflated, the steel ring can be cleaned with gas, thereby avoiding the need for workers to clean the surface after the steel ring is installed. Step 4: Pushing up to make contact: When all preparations are completed, turn on the fan (403) and fill the telescopic outer sleeve (406) with gas through the air duct (404), thereby increasing the internal air pressure of the telescopic outer sleeve (406) and extending the telescopic inner rod (407), thereby pushing the steel ring and making the steel ring contact with the tunnel, so that it is convenient for the staff to install the steel ring on the tunnel. When pushing the steel ring, the pressure is also released through the pressure relief component (5), so that the telescopic inner rod (407) maintains a constant upward thrust, which makes it convenient for the equipment to press the steel ring onto the tunnel; Step 5: Height adjustment: After the steel ring contacts the tunnel, the worker can adjust the height of the standing platform (302) through the cylinder (301), so that the worker can reach the steel ring, which is convenient for the worker to install and fix the steel ring with screws; Step 6: Angle control: After the steel ring is installed, the two-way cylinder (402) pushes the slide rail (405) to expand the two telescopic sleeves (406), so that the contact plate (410) moves along the arc of the steel ring, making it easier for the staff to gradually fix the steel ring.