Heat insulation roof plate structure and construction method
By adopting a combined structure of rammed earth bricks and a conveying pipeline network in the thermally insulated roof panel, the problem of moisture insulated insulated layer cannot be discharged is solved, the insulation and waterproof performance are improved, and the service life is extended.
Patent Information
- Application Number
- CN202411811050.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-10
- Publication Date
- 2025-03-04
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing thermally insulated roof panels cannot be discharged under high temperature conditions, resulting in a decrease in thermal insulation capacity, cracking of the waterproof layer, and the exhaust pipe has a risk of water leakage, affecting the thermal insulation and waterproof performance.
A thermally insulated roof panel structure is adopted, including structural layer, leveling layer, heat storage layer, thermal insulation plate layer, foam concrete layer, waterproof layer and surface layer. The moisture absorption and humidity regulating properties of rammed earth bricks are absorbed and the waterproof layer is installed, and a conveying pipeline network is installed in the thermal storage layer to improve the insulation effect.
Effectively maintain the thermal insulation performance of the insulation board, reduce damage to the waterproof layer, improve the thermal insulation and waterproof performance of the thermal insulation roof panel, and extend its service life.
Smart Images

Figure CN119553825A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of building technology, and in particular to a heat-insulating roof panel structure and a construction method. Background Art
[0002] In the prior art, in order to improve the thermal insulation performance of the thermal insulation roof board and reduce the energy consumption of the building, an insulation board is often laid in the thermal insulation roof board to form an insulation layer.
[0003] In the upright insulated roof panel structure, along the vertical upward direction, the insulated roof panel structure includes a structural layer, a leveling layer, an insulation layer, a waterproof layer and a surface layer in sequence; because the waterproof layer of the insulated roof panel is arranged on the upper part of the insulation layer; if the insulation layer contains moisture (water vapor), the moisture in the insulation layer is difficult to be released.
[0004] The moisture in the insulation layer mainly comes from the initial humidity of the insulation layer and the structural layer. If the moisture in the insulation layer cannot be discharged, it will evaporate upward under high temperature conditions. When water vapor enters the insulation layer through the structural layer, the moisture content of the insulation layer will increase, and the thermal conductivity will also increase, causing the insulation capacity of the insulation layer to decrease. When water vapor comes into contact with the waterproof layer, the water vapor will cause the waterproof membrane in the waterproof layer to expand, which will cause the waterproof layer to crack and break, and even cause penetration of the thermal insulation roof board.
[0005] In the prior art, an exhaust pipe is usually arranged in the insulation layer, and the exhaust pipe is arranged through the waterproof layer and the surface layer, so that the drainage pipe extends out of the insulation roof board to discharge moisture (water vapor) from the insulation layer. However, since the exhaust pipe is connected to the outside atmosphere and the exhaust pipe will damage the waterproof layer; rainwater may penetrate through the gap between the exhaust pipe and the insulation roof board, causing the insulation roof board to have the risk of water leakage, thereby affecting the insulation and waterproof performance of the insulation roof board. Summary of the invention
[0006] In order to improve the heat insulation and waterproof performance of the heat insulation roof panel and increase the service life of the heat insulation roof panel, the present application provides a heat insulation roof panel structure and a construction method.
[0007] The present application provides a heat-insulating roof panel structure and a construction method, which adopts the following technical solutions: A heat-insulating roof panel structure, which includes a structural layer, a leveling layer, a heat storage layer, a thermal insulation board layer, a foam concrete layer, a waterproof layer and a surface layer in sequence along the vertical upward direction; the heat storage layer is paved with a plurality of rammed earth bricks, the thermal insulation board layer is paved with a plurality of thermal insulation boards, and the thermal insulation board layer is bonded and fixed to the heat storage layer.
[0008] By adopting the above technical scheme, the insulation board has good thermal insulation performance, and the rammed earth bricks have good moisture absorption and humidity regulating performance, and the rammed earth bricks have thermal insulation and heat storage performance; thus, through the coordination relationship between the insulation board and the rammed earth bricks, the rammed earth bricks are used to absorb water vapor between the structural layer and the waterproof layer to reduce the influence of water vapor on the insulation board and the waterproof layer, so as to maintain the thermal insulation performance of the insulation board and reduce the damage to the waterproof layer, thereby improving the thermal insulation and waterproof performance of the thermal insulation roof board and increasing the service life of the thermal insulation roof board.
[0009] Optionally, the heat storage layer also includes a transmission pipeline network, which includes a plurality of transmission pipes, which are laid at intervals in the heat storage layer, and are used to contain gas or liquid; the rammed earth bricks include a first rammed earth brick and a second rammed earth brick arranged in a row, and the first rammed earth brick is provided with a first accommodating groove, which is used to accommodate the transmission pipe, and the end of the transmission pipe is sealed.
[0010] By adopting the above technical solution, by setting up a transmission pipe network in the heat storage layer, the transmission pipe can accommodate medium such as air and water. Still air is a poor conductor of heat, so as to further improve the insulation effect of the heat-insulating roof panel. At the same time, the transmission pipe can also accommodate water, and use the water to store energy, so as to reduce the change of indoor temperature and reduce the energy consumption of the building.
[0011] Optionally, a connecting hole is formed through the leveling layer and the structural layer; the delivery network also includes a connecting pipe, a first end of the connecting pipe is connected to the delivery pipe, a second end of the connecting pipe is passed through the connecting hole, and the second end of the connecting pipe is used for an external functional pipe; and under normal circumstances, the second end of the connecting pipe is sealed.
[0012] By adopting the above technical solution, a connecting hole is opened in the structural layer at the bottom of the heat-insulating roof panel, so that the transmission pipeline network can be connected to an external functional pipeline to achieve the purpose of transporting high-temperature gas and high-temperature water into the transmission pipeline, thereby achieving a heat-insulating effect on the heat-insulating roof panel and the top floor of the building, increasing the indoor temperature in winter and improving people's living comfort.
[0013] Optionally, the rammed earth brick contains tensile-resistant fibers, and the tensile-resistant fibers are dispersed and embedded in the rammed earth brick.
[0014] By adopting the above technical solution and adding tensile-resistant fibers to rammed earth bricks, the strength and durability of the rammed earth bricks can be improved, thereby increasing the service life of the thermal insulation roof panels.
[0015] Optionally, the rammed earth bricks further contain a thermal conductivity enhancer, and the thermal conductivity enhancer is dispersed and embedded in the rammed earth bricks.
[0016] By adopting the above technical solution, the thermal conductivity enhancer can make the heat conduction inside the rammed earth brick, so as to improve the heat storage capacity of the rammed earth brick and give full play to the temperature regulation ability of the rammed earth brick.
[0017] Optionally, the thermal insulation roof panel structure further comprises a water absorption component, the delivery pipe is provided with a plurality of first air holes, the water absorption component is arranged in the delivery pipe, the water absorption component is used to absorb water in the delivery pipe; the pipeline is connected to an external vacuum device; the outer periphery of the delivery pipe is paved with a geotextile, the geotextile is used to cover the first air holes.
[0018] By adopting the above technical solution, by placing a water absorbing component in the conveying pipeline and connecting the conveying pipeline to the air extraction device, when the conveying pipeline is evacuated, the water vapor between the structural layer and the waterproof layer will enter the conveying pipeline through the first air permeable hole arranged on the conveying pipeline under the action of the pressure difference, and the water absorbing component will absorb the above water; when a new water absorbing component is replaced, the water vapor in the heat-insulating roof board will also be taken out of the heat-insulating roof board, thereby reducing the water vapor between the waterproof layer and the structural layer.
[0019] That is, by absorbing water vapor in the insulating roof panel by the water-absorbing component, the influence of water vapor on the insulation board and the waterproof layer is reduced, so as to maintain the thermal insulation performance of the insulation board and reduce the damage of the waterproof layer, thereby improving the thermal insulation and waterproof performance of the insulating roof panel and increasing the service life of the insulating roof panel.
[0020] Optionally, the water absorption component includes a traction rope, a receiving bag, a water absorption component and a detection component; the receiving bag is used to accommodate the water absorption component and the detection component, and the bag body of the receiving bag is provided with a plurality of second air holes, the water absorption component is used to absorb water, and the detection component is used to detect the presence of water, one end of the traction rope is fixedly connected to the receiving bag, and the other end of the traction rope extends into the connecting pipe.
[0021] By adopting the above technical solution, when the water absorbing component in the water absorbing assembly absorbs the water in the heat insulating roof board, the water will also contact and react with the detection component, so that the water vapor content in the heat insulating roof board can be quickly judged by observing the changes in the detection component. The work is done by replacing the water absorbing component multiple times to fully absorb the water vapor between the waterproof layer and the structural layer until the detection component does not detect the presence of water. This shows that the water vapor content between the waterproof layer and the structural layer is low at this time, and the water vapor is not enough to affect the structure of the thermal insulation layer and the waterproof layer. After the staff disassembles the exhaust equipment, they seal the end of the connecting pipe.
[0022] That is, through the coordination of the water absorption effect of the water absorbent and the detection effect of the detection component, the water vapor content between the waterproof layer and the structural layer is ensured to be low, so that the waterproof layer and the thermal insulation layer can fully play their role, thereby improving the thermal insulation and waterproof performance of the thermal insulation roof panel and increasing the service life of the thermal insulation roof panel.
[0023] A heat-insulating roof panel structure and construction method, comprising the following steps: Preparation of rammed earth bricks: kaolin, weathered soil and lime are crushed into powder respectively, and then kaolin, weathered soil, lime, tensile fiber and water are fully mixed; the mixed mud blocks are put into a molding mold for pressing, and the mud blocks are pressed and dried to obtain rammed earth bricks; Structural layer construction: Lofting is carried out on the surface of the structural layer to confirm the installation position of the pipeline; the structural layer is provided with fixing rods, which are used to fix the pipeline; Leveling layer: Cement mortar is laid on the structural layer and leveled. The leveling layer is formed after the cement mortar solidifies and hardens; Heat storage layer: a connecting hole is drilled on the leveling layer and the structural layer, the delivery pipe is fixedly connected to the connecting pipe, the connecting pipe is passed through the connecting hole, and the fixing rod is welded and fixed to the delivery pipe, rammed earth bricks are laid on the leveling layer, and the delivery pipe is set in the receiving groove of the first rammed earth brick, and the delivery steel pipe and the rammed earth bricks form a heat storage layer; Insulation board layer: several insulation boards are laid on the heat storage layer to form an insulation layer; Foamed concrete layer: a foaming machine is used to mix a foaming agent with water to form foam, and the foam is evenly mixed with cement slurry to form foamed concrete. After the foamed concrete solidifies and hardens, a foamed concrete layer is formed; Waterproof layer construction: first hot-glue the waterproof membrane on the foam concrete layer, and then apply waterproof coating on the waterproof membrane after laying it; Surface layer construction: Pour fine stone concrete on the waterproof layer, and the surface layer is formed after the fine stone concrete solidifies and hardens.
[0024] Optionally, a heat-insulating roof panel structure and construction method further include the following steps: During the preparation stage of rammed earth bricks: powdered kaolin is stirred and fried at a temperature of 100℃-200℃, and the stirring and frying time of kaolin is more than 60 minutes; then, a thermal conductivity enhancer is added to the kaolin, and the mixture is stirred and fried at a temperature of 105℃-250℃ for more than 30 minutes; finally, kaolin, weathered soil, lime, thermal conductivity enhancer, tensile fiber and water are fully mixed, pressed and dried into rammed earth bricks.
[0025] A heat-insulating roof panel structure and construction method, comprising the following steps: Preparation of rammed earth bricks: kaolin, weathered soil and lime are crushed into powder respectively, and then kaolin, weathered soil, lime, tensile fiber and water are fully mixed; the mixed mud blocks are put into a molding mold for pressing, and the mud blocks are pressed and dried to obtain rammed earth bricks; Structural layer construction: Lofting is carried out on the surface of the structural layer to confirm the installation position of the pipeline; the structural layer is provided with fixing rods, which are used to fix the pipeline; Leveling layer: Cement mortar is laid on the structural layer and leveled. The leveling layer is formed after the cement mortar solidifies and hardens; Heat storage layer: a connecting hole is drilled on the leveling layer and the structural layer, the delivery pipe is fixedly connected to the connecting pipe, the connecting pipe is passed through the connecting hole, and the fixing rod is welded and fixed to the delivery pipe, rammed earth bricks are laid on the leveling layer, and the delivery pipe is set in the receiving groove of the first rammed earth brick, and the delivery steel pipe and the rammed earth brick form a heat storage layer; Insulation board layer: several insulation boards are laid on the heat storage layer to form an insulation layer; Foamed concrete layer: a foaming machine is used to mix a foaming agent with water to form foam, and the foam is evenly mixed with cement slurry to form foamed concrete. After the foamed concrete solidifies and hardens, a foamed concrete layer is formed; Waterproof layer construction: first hot-glue the waterproof membrane on the foam concrete layer, and then apply waterproof coating on the waterproof membrane after laying it; Surface layer construction: Pour fine stone concrete on the waterproof layer, and the fine stone concrete will form the surface layer after solidification and hardening; Construction of water absorption component: place the main body of the water absorption component in the conveying pipeline, connect one of the connecting pipes with the vacuum equipment, seal the other connecting pipes, use the vacuum equipment to vacuum the conveying pipeline, and the water absorption parts in the water absorption component absorb the water in the conveying pipeline; replace the new water absorption component, and vacuum the conveying pipeline until the detection part detects no water, dismantle the vacuum equipment, and seal the connecting pipes.
[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. The insulation board has good thermal insulation performance, while the rammed earth brick has good moisture absorption and humidity regulating performance, and the rammed earth brick has the performance of heat insulation and heat storage; therefore, through the cooperation between the insulation board and the rammed earth brick, the rammed earth brick is used to absorb the water vapor between the structural layer and the waterproof layer to reduce the influence of water vapor on the insulation board and the waterproof layer, so as to maintain the thermal insulation performance of the insulation board and reduce the damage of the waterproof layer, thereby improving the thermal insulation and waterproof performance of the thermal insulation roof board and prolonging the service life of the thermal insulation roof board; 2. By opening a connecting hole in the structural layer at the bottom of the heat-insulating roof board, the transmission pipe network can be connected to the functional pipe to achieve the purpose of transporting high-temperature gas and high-temperature water to the transmission pipe, thereby achieving the heat insulation effect on the heat-insulating roof board and the top floor of the building, increasing the indoor temperature in winter and improving people's living comfort; 3. Through the coordination of the water absorption effect of the water absorbent and the detection effect of the detection part, the water vapor content between the waterproof layer and the structural layer is ensured to be low, so as to ensure that the waterproof layer and the thermal insulation layer can fully play their role, so as to improve the thermal insulation and waterproof performance of the thermal insulation roof panel and increase the service life of the thermal insulation roof panel. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a cross-sectional view showing the structure of the heat-insulating roof panel in Example 1.
[0028] Figure 2 yes Figure 1 Enlarged view of point A in the middle.
[0029] Figure 3 It is a schematic diagram showing the installation position of the delivery pipeline in Example 1.
[0030] Figure 4 It is a schematic diagram of the heat storage layer structure in Example 1.
[0031] Figure 5 It is a structural schematic diagram reflecting the second function of the delivery pipeline in Example 1.
[0032] Figure 6 It is a cross-sectional view of the heat insulating roof panel structure in Example 4.
[0033] Figure 7 yes Figure 6 Enlarged view of point B in the middle.
[0034] Explanation of the reference numerals: 1. structural layer; 11. connecting hole; 2. leveling layer; 3. heat storage layer; 31. rammed earth brick; 311. first rammed earth brick; 3111. first receiving groove; 312. second rammed earth brick; 32. conveying pipe network; 321. conveying pipeline; 3211. longitudinal conveying pipeline; 3212. transverse conveying pipeline; 3213. first air hole; 322. connecting pipeline; 4. insulation board layer; 5. foam concrete layer; 6. waterproof layer; 7. surface layer; 8. air barrier layer; 9. water absorption component; 91. traction rope; 92. receiving bag; 93. water absorption part; 94. detection part; 10. geotextile; 12. structural column; 13. structural beam; 14. parapet; 15. wall; 16. fixing rod; 17. functional pipeline; 18. counterweight. DETAILED DESCRIPTION
[0035] The following is combined with Figure 1 -7 Provide further details of this application.
[0036] Example 1 The present application embodiment discloses a heat-insulating roof panel structure. Figure 1, along the vertical upward direction, the thermal insulation roof panel includes a structural layer 1, a leveling layer 2, a heat storage layer 3, an insulation board layer 4, a foam concrete layer 5, a waterproof layer 6 and a surface layer 7 in sequence.
[0037] Reference Figure 1 The structural layer 1 is a floor slab of reinforced concrete structure, and the structural layer 1 is cast integrally with other components of the building (structural columns 12 and structural beams 13). A parapet 14 is provided at the top of the structural layer 1, and a wall 15 is provided at the bottom of the structural layer 1.
[0038] Reference Figure 1 and Figure 2 The heat storage layer 3 includes a delivery pipe and rammed earth bricks 31. The delivery pipe network 32 is fixed on the structural layer 1. The rammed earth bricks 31 are laid on the delivery pipe network 32. The surfaces of several rammed earth bricks 31 are located on the same horizontal plane.
[0039] Reference Figure 1 and Figure 2 , the surface of the structural layer 1 is laid out to determine the installation position of the delivery pipeline 321. The structural layer 1 is provided with a fixing rod 16, which is used to be fixedly connected to the delivery pipe network 32 to fix the position of the delivery pipe network 32. The fixing rod 16 can be pre-buried in the structural layer 1, and the fixing rod 16 can also be fixedly connected to the structural layer 1 by other means such as anchor bolts. In this embodiment, the fixing rod 16 is fixedly connected to the structural layer 1 by anchor bolts. Finally, the staff brushes a vapor barrier layer on the surface of the structural layer 1, thereby blocking the water vapor from the room under the structural layer 1. In this embodiment, the vapor barrier layer is formed by brushing with a waterproof paint.
[0040] Reference Figure 2 and Figure 3 The delivery pipe network 32 includes a delivery pipe 321 and a connecting pipe 322; the delivery pipe 321 is arranged on the structural layer 1, and the delivery pipe 321 is used to contain gas or liquid, and the delivery pipe 321 is welded and fixed to the fixing rod 16. In this embodiment, the delivery pipe 321 has a rectangular cross-section to facilitate the installation of the delivery pipe 321. The delivery pipe 321 includes a longitudinal delivery pipe 3211 and a transverse delivery pipe 3212. The longitudinal delivery pipe 3211 is arranged along the length direction of the heat-insulating roof board, and there are two longitudinal delivery pipes 3211, and the two longitudinal delivery pipes are arranged at intervals. The transverse delivery pipe 3212 is arranged between the two longitudinal delivery pipes 3211, and there are a plurality of transverse delivery pipes 3212, and the plurality of transverse delivery pipes 3212 are arranged at intervals along the longitudinal delivery pipe 3211, and the longitudinal delivery pipe 3211 is connected with the transverse delivery pipe 3212.
[0041] Reference Figure 1 and Figure 2The leveling layer 2 and the structural layer 1 are penetrated with a connecting hole 11, the first end of the connecting pipe 322 is connected to the delivery pipe 321, the second end of the connecting pipe 322 is penetrated in the connecting hole 11, the second end of the connecting pipe 322 is arranged indoors on the top floor of the building, and the second end of the connecting pipe 322 is used to connect to the external functional pipe 17; under normal conditions, the second end of the connecting pipe 322 is sealed, and the second end of the connecting pipe is hidden in the ceiling on the top floor of the building. The cross section of the connecting pipe 322 is circular, so that the connecting pipe 322 can be connected to the external functional pipe 17. The connecting pipe 322 and the structural layer 1 are sealed with a sealant to improve the sealing inside the thermal insulation roof panel.
[0042] In this embodiment, the rammed earth brick 31 is composed of kaolin, weathered soil, lime and tensile fiber. Specifically, the staff mixes the powdered kaolin, weathered soil, lime and tensile fiber with water; and puts the mixed mud blocks into a molding mold for pressing. After the mud blocks are pressed into shape, they are dried to obtain the rammed earth brick 31.
[0043] By mixing kaolin and weathered soil, the fired rammed earth brick 31 has greater strength, and the shrinkage deformation of the rammed earth brick 31 is small, so that the surface of the rammed earth brick 31 is regular, which is convenient for laying the rammed earth brick 31. The tensile fiber filaments can also improve the structural strength of the rammed earth brick 31 and reduce the risk of breakage of the rammed earth brick 31. The tensile fiber filaments can be one of glass fiber filaments, polypropylene fiber, and steel fiber filaments; in this embodiment, the tensile fiber filaments are selected from glass fiber filaments to enhance the overall structural strength of the rammed earth brick 31.
[0044] Reference Figure 2 and Figure 4 The rammed earth bricks 31 include first rammed earth bricks 311 and second rammed earth bricks 312 arranged in a row. The first rammed earth bricks 311 are provided with first accommodating grooves 3111, which are used to accommodate the conveying pipes 321, so that the first rammed earth bricks 311 and the second rammed earth bricks 312 are located on the same plane away from the side of the structural layer 1.
[0045] Reference Figure 1 The insulation board layer 4 is formed by laying a plurality of insulation boards, and the insulation board layer 4 and the heat storage layer 3 can be fixed by asphalt adhesive. The insulation board can be a polystyrene foam board (EPS), an extruded polystyrene foam board (XPS), polyurethane foam, a rock wool board, etc. These materials have a low thermal conductivity and can effectively prevent the transfer of heat. In this embodiment, the insulation board is a polystyrene foam board (EPS).
[0046] Reference Figure 1Foamed concrete is a lightweight thermal insulation material. The foaming agent is fully foamed mechanically through the foaming system of the foaming machine, and the foam is evenly mixed with cement slurry; the mixed cement slurry is poured on the insulation layer, and the cement slurry solidifies and hardens to form foamed concrete. The foamed concrete contains a large number of closed pores, so that the foamed concrete layer 5 has a good thermal insulation effect, so as to improve the thermal insulation effect of the thermal insulation roof panel.
[0047] Reference Figure 1 The waterproof layer 6 is composed of waterproof coiled material and waterproof coating. The staff first hot-glue the waterproof coiled material on the foam concrete layer 5, and after laying the waterproof coiled material, the waterproof coating is brushed on the waterproof coiled material to prevent rainwater from penetrating into the insulation layer, the heat storage layer 3 and the structural layer 1, so as to protect the structural integrity of the building.
[0048] Reference Figure 1 Finally, fine stone concrete is poured on the waterproof layer 6, and the fine stone concrete forms a surface layer 7 after solidification and hardening, so as to protect the waterproof layer 6 from mechanical damage and ultraviolet damage.
[0049] The implementation principle of a heat-insulating roof panel structure in the embodiment of the present application is as follows: Reference Figure 1 and Figure 2 The insulation board has good thermal insulation performance, and the rammed earth brick 31 has good moisture absorption and humidity regulating performance, and the rammed earth brick 31 has thermal insulation and heat storage performance; thus, through the matching relationship between the insulation board and the rammed earth brick 31, the rammed earth brick 31 is used to absorb water vapor between the structural layer 1 and the waterproof layer 6 to reduce the influence of water vapor on the insulation board and the waterproof layer 6, so as to maintain the thermal insulation performance of the insulation board and reduce the damage of the waterproof layer 6, thereby improving the thermal insulation and waterproof performance of the insulation roof board, and improving the service life of the insulation roof board.
[0050] By setting the delivery pipe 321 in the heat storage layer 3, the delivery pipe 321 can contain medium such as air and water. Under normal conditions, both ends of the delivery pipe 321 are sealed by sealing covers and other components, and the delivery pipe 321 contains static air. Static air is a poor conductor of heat, so as to further improve the thermal insulation effect of the thermal insulation roof panel.
[0051] Reference Figure 5 At the same time, the connecting pipe 322 of the transmission pipe network 32 can also be connected to the functional pipe 17. After the functional pipe 17 is fixedly connected to the connecting pipe 322, the functional pipe 17 is passed through the wall 15 of the building and connected to the external equipment. The external equipment can be a water pump, an air source heat pump, a boiler equipment, etc. The purpose of transporting low-temperature water, high-temperature gas or high-temperature water in the transmission pipe network 32 is to have a heat insulation effect on the thermal insulation roof board and the top floor of the building, adjust the indoor temperature, and improve people's living comfort.
[0052] Example 2 Reference Figures 1 to 4 This embodiment 2 discloses a construction method of the heat-insulating roof panel structure in embodiment 1, comprising the following steps: Preparation of rammed earth bricks 31: kaolin, weathered soil and lime are crushed into powder respectively, and then kaolin, weathered soil, lime, tensile fiber and water are fully mixed; the mixed mud block is placed in a molding mold and pressed, and the mud block is pressed and dried to obtain a rammed earth brick 31.
[0053] Construction of structural layer 1: structural layer 1 is a floor slab of reinforced concrete structure. Structural layer 1 surface is staked out to confirm the installation position of conveying pipeline 321.
[0054] Leveling layer 2: Cement mortar is laid on the structural layer 1 and leveled. After the cement mortar solidifies and hardens, a leveling layer 2 is formed.
[0055] Heat storage layer 3: A connecting hole 11 is drilled on the leveling layer 2 and the structural layer 1, a conveying pipe 321 is fixedly connected to the connecting pipe, the connecting pipe is passed through the connecting hole 11, and the fixing rod 16 is welded and fixed to the conveying pipe 321, rammed earth bricks 31 are laid on the leveling layer 2, and the conveying pipe 321 is set in the accommodating groove of the first rammed earth brick 311, and the conveying steel pipe and the rammed earth brick 31 form a heat storage layer 3.
[0056] Insulation board layer 4: Several insulation boards are laid on the heat storage layer 3 to form an insulation layer.
[0057] Foamed concrete layer 5: using a foaming machine to mix a foaming agent with water to form foam, and evenly mixing the foam with cement slurry to form foamed concrete, and the foamed concrete solidifies and hardens to form a foamed concrete layer 5; Construction of waterproof layer 6: first hot-glue waterproof membrane on foam concrete layer 5, and after laying waterproof membrane, apply waterproof coating on the waterproof membrane; waterproof layer 6 is used to prevent rainwater from penetrating into insulation layer, heat storage layer 3 and structural layer 1 to protect the structural integrity of the building.
[0058] Construction of the surface layer 7: Fine stone concrete is poured on the waterproof layer 6. After the fine stone concrete solidifies and hardens, the surface layer 7 is formed to protect the waterproof layer 6 from mechanical damage and ultraviolet damage.
[0059] Example 3 In this embodiment, the rammed earth brick 31 contains a thermal conductivity enhancer, and the thermal conductivity enhancer is dispersed and embedded in the rammed earth brick 31. In this embodiment, the thermal conductivity enhancer is expanded graphite.
[0060] This embodiment 3 discloses a construction method of a heat-insulating roof panel structure. The difference between this embodiment 3 and embodiment 2 is that it also includes the following steps: In the preparation stage of the rammed earth brick 31: the powdered kaolin is stirred and fried at a temperature of 100°C-200°C for more than 60 minutes; then, a thermal conductivity enhancer is added to the kaolin, and the mixture is stirred and fried at a temperature of 105°C-250°C for more than 30 minutes; finally, the kaolin, weathered soil, lime, thermal conductivity enhancer, tensile fiber and water are fully mixed, pressed and dried to form the rammed earth brick 31. Among them, the thermal conductivity enhancer accounts for about 3% of the mass of the rammed earth brick 31.
[0061] The implementation principle of the construction method of the heat-insulating roof panel structure of the embodiment of the present application is: The thermal conductivity enhancer can conduct heat inside the rammed earth brick 31, so that the soil particles in the rammed earth brick 31 can absorb / release heat in time, thereby improving the heat storage capacity of the rammed earth brick 31 and giving full play to the temperature regulation ability of the rammed earth brick 31.
[0062] The expanded graphite has a low apparent density, which maintains the excellent properties of graphite, such as high thermal conductivity and corrosion resistance. The rich pore structure and large specific surface area of the expanded graphite give it good adsorption performance. The three-dimensional network structure of the expanded graphite is conducive to forming an effective heat channel to improve the absorption efficiency of the rammed earth brick 31 for thermal energy.
[0063] After kaolin is roasted at high temperature, organic matter in kaolin is burned and minerals are decomposed, thereby improving the mechanical properties and durability of kaolin. High temperature also reduces the thermal conductivity of kaolin, thereby improving the overall thermal insulation performance of the rammed earth brick 31.
[0064] Example 4 This embodiment 4 discloses a heat-insulating roof panel structure. The difference between this embodiment 4 and embodiment 1 is that: Reference Figure 6 and Figure 7 The heat-insulating roof panel structure also includes a water-absorbing component 9, and a plurality of first air holes 3213 are provided in the delivery pipe 321. The water-absorbing component 9 is arranged in the delivery pipe 321 through a connecting pipe 322. A geotextile 10 is laid on the periphery of the delivery pipe 321, and the geotextile 10 is used to cover the first air holes 3213. Subsequently, the connecting pipe 322 is externally connected to an exhaust device. That is, the longitudinal delivery pipe 3211 and the transverse delivery pipe 3212 are both provided with first air holes 3213 to increase the distribution range of the first air holes 3213. In this embodiment, the staff arranges the water-absorbing component 9 in the longitudinal delivery pipe 3211 through the connecting pipe 322; and one longitudinal delivery pipe 3211 is used to accommodate the water-absorbing component 9, and the connecting pipe 322 on the other longitudinal delivery pipe 3211 is connected to the exhaust device, so that the interior of the longitudinal delivery pipe 3211 and the transverse delivery pipe 3212 is a negative pressure environment.
[0065] Reference Figure 6 and Figure 7 In this embodiment, the water absorption component 9 includes a traction rope 91, a receiving bag 92, a water absorption member 93 and a detection member 94; the receiving bag 92 is used to accommodate the water absorption member 93 and the detection member 94, and the bag body of the receiving bag 92 is provided with a plurality of second air holes, the water absorption member 93 is used to absorb water, and the detection member 94 is used to detect the presence of water, one end of the traction rope 91 is fixedly connected to the receiving bag 92, and the other end of the traction rope 91 extends into the connecting pipe 322, so that the staff can replace the water absorption component 9. In this embodiment, a counterweight block 18 is provided at one end of the traction rope 91 away from the receiving bag 92, so that when the vacuum device evacuates the conveying pipe 321, the movement of the water absorption component 9 can be reduced.
[0066] The implementation principle of a heat-insulating roof panel structure in the embodiment of the present application is as follows: Reference Figure 6 and Figure 7 , by placing a water absorption component 9 in the delivery pipeline 321, and connecting the delivery pipeline 321 to the suction equipment.
[0067] Reference Figure 6 and Figure 7 When the delivery pipe 321 is evacuated, the water vapor between the structural layer 1 and the waterproof layer 6 will pass through the first air hole 3213 on the delivery pipe 321 under the action of the pressure difference and enter the delivery pipe 321, and the water absorbing component 93 will absorb the above water; when the new water absorbing component 9 is replaced, the water vapor in the insulation roof board will also be brought out of the insulation roof board, thereby reducing the water vapor between the waterproof layer 6 and the structural layer 1.
[0068] Reference Figure 6 and Figure 7 When the water absorbing member 93 in the water absorbing component 9 absorbs the water in the heat insulating roof board, the water will also contact and react with the detection member 94, so that the water vapor content in the heat insulating roof board can be quickly judged by observing the changes in the detection member 94. The work is done by replacing the water absorbing component 9 multiple times to fully absorb the water vapor between the waterproof layer 6 and the structural layer 1 until the detection member 94 does not detect the presence of water. This shows that at this time, the water vapor content between the waterproof layer 6 and the structural layer 1 is low, and the water vapor is not enough to affect the structure of the thermal insulation layer and the waterproof layer 6. After the staff disassembles the exhaust equipment, the end of the connecting pipe 322 is sealed.
[0069] Reference Figure 6 and Figure 7 The water absorbing member 93 has a strong water absorbing performance, but it is difficult to reflect the water vapor content in the air; the detection member 94 can be used to detect water vapor in the air, but the detection member 94 has a poor absorption effect on water vapor. In this embodiment, the water absorbing member 93 and the detection member 94 are placed together in the receiving bag 92, so that the water absorbing member 93 and the detection member 94 are used together.
[0070] Reference Figure 6 and Figure 7 That is, through the cooperation of the water absorption effect of the water absorption component 93 and the detection effect of the detection component 94, the water vapor content between the waterproof layer 6 and the structural layer 1 is ensured to be low, so as to ensure that the waterproof layer 6 and the thermal insulation layer can fully play their role, so as to improve the thermal insulation and waterproof performance of the thermal insulation roof board and increase the service life of the thermal insulation roof board.
[0071] The water absorbing member 93 can be a material with good water absorbing performance such as super absorbent resin, salt-containing gel, calcium oxide, etc. The water absorbing member 93 can also be a mixture of the above materials. This embodiment does not limit the specific material selection of the water absorbing member 93; in this embodiment, the water absorbing member 93 is selected from calcium oxide.
[0072] The detection element 94 can be a reagent or medicine that changes when in contact with water, such as moisture detection paper, Karl Fischer reagent, anhydrous copper sulfate, etc. This embodiment does not limit the specific material of the detection element 94. In this embodiment, the detection element 94 uses anhydrous copper sulfate reagent.
[0073] To sum up: in the prior art, water vapor between the waterproof layer 6 and the structural layer 1 is discharged upward to the insulating roof panel through the exhaust pipe. The water vapor is passively discharged from the insulating roof panel, and there is a risk of damaging the waterproof layer 6 and a risk of rainwater penetrating into the insulating roof panel.
[0074] The technology of the present application changes the flow path of water vapor between the waterproof layer 6 and the structural layer 1, and discharges the water vapor downward from the thermal insulation roof board. The present application does not damage the structure of the waterproof layer 6, so that the waterproof layer 6 has a good interception effect on rainwater, and can prevent rainwater from penetrating into the thermal insulation roof board, so as to give full play to the thermal insulation and waterproof performance of the thermal insulation roof board. In addition, the present application actively removes the water vapor between the waterproof layer 6 and the structural layer 1 through the exhaust equipment and the water absorption component 9, and actively protects the thermal insulation roof board to increase the service life of the thermal insulation roof board.
[0075] Example 5 This embodiment 5 discloses the construction method of the heat insulation roof panel structure in embodiment 4. The main differences between this embodiment 5 and embodiment 2 are as follows: Reference Figure 6 and Figure 7 , construction of the water absorption component 9: place the main body of the water absorption component 9 in the conveying pipe 321, connect one of the connecting pipes 322 with the vacuum equipment, seal the other connecting pipes 322, vacuum the conveying pipe 321 with the vacuum equipment, and the water absorption part 93 in the water absorption component 9 absorbs the water in the conveying pipe 321; replace the new water absorption component 9, and vacuum the conveying pipe 321 until the detection part 94 does not detect the existence of water, dismantle the vacuum equipment, and seal the connecting pipe 322.
[0076] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A heat-insulating roof panel structure, characterized in that: In the vertically upward direction, the heat-insulating roof panel comprises, in sequence, a structural layer (1), a leveling layer (2), a heat storage layer (3), a heat-insulating board layer (4), a foamed concrete layer (5), a waterproof layer (6), and a surface layer (7); the heat storage layer (3) is formed by paving a plurality of rammed earth bricks (31), the heat-insulating board layer (4) is formed by paving a plurality of heat-insulating boards, and the heat-insulating board layer (4) is bonded and fixed to the heat storage layer (3).
2. The heat-insulating roof panel structure according to claim 1, characterized in that: The heat storage layer (3) further comprises a delivery pipe network (32), the delivery pipe network (32) comprising a plurality of delivery pipes (321), the plurality of delivery pipes (321) being laid at intervals in the heat storage layer (3), the delivery pipes (321) being used to contain gas or liquid; the rammed earth bricks (31) comprising first rammed earth bricks (311) and second rammed earth bricks (312) arranged in a row, the first rammed earth bricks (311) being provided with a first accommodating groove (3111), the first accommodating groove (3111) being used to accommodate the delivery pipes (321), and the ends of the delivery pipes (321) being sealed.
3. The heat-insulating roof panel structure according to claim 2, characterized in that: The leveling layer (2) and the structural layer (1) are penetrated by a communication hole (11); the delivery pipe network (32) further comprises a communication pipe (322); a first end of the communication pipe (322) is connected to the delivery pipe (321); a second end of the communication pipe (322) is passed through the communication hole (11); the second end of the communication pipe (322) is used for connecting to an external functional pipe (17); and under normal conditions, the second end of the communication pipe (322) is sealed.
4. The heat-insulating roof panel structure according to claim 3, characterized in that: The rammed earth brick (31) contains a thermal conductivity enhancing agent and the tensile strength fibers are dispersedly embedded in the rammed earth brick (31).
5. The heat-insulating roof panel structure according to claim 4, characterized in that: The rammed earth brick (31) further contains a thermal conductivity enhancing agent, and the thermal conductivity enhancing agent is dispersed and embedded in the rammed earth brick (31).
6. The heat-insulating roof panel structure according to claim 3, characterized in that: The heat-insulating roof panel structure further comprises a water absorption component (9); the delivery pipe (321) is provided with a plurality of first air holes (3213); the water absorption component (9) is arranged in the delivery pipe (321); the water absorption component (9) is used to absorb water in the delivery pipe (321); the connecting pipe (322) is externally connected to an air extraction device; a geotextile (10) is laid on the outer periphery of the delivery pipe (321); the geotextile (10) is used to cover the first air holes (3213).
7. The heat-insulating roof panel structure according to claim 6, characterized in that: The water absorbing component (9) comprises a traction rope (91), a containing bag (92), a water absorbing member (93) and a detection member (94); the containing bag (92) is used to contain the water absorbing member (93) and the detection member (94), and the bag body of the containing bag (92) is provided with a plurality of second air holes; the water absorbing member (93) is used to absorb water, and the detection member (94) is used to detect the presence of water; one end of the traction rope (91) is fixedly connected to the containing bag (92), and the other end of the traction rope (91) extends into the connecting pipe (322).
8. A construction method of the heat-insulating roof panel structure according to claim 5, characterized in that: The following steps are involved: Preparation of rammed earth bricks (31): kaolin, weathered soil and lime are respectively crushed into powders, and then the kaolin, weathered soil, lime, tensile fiber and water are fully mixed; the mixed mud blocks are placed in a molding mold and pressed, and the mud blocks are pressed into shape and then dried to obtain rammed earth bricks (31); Construction of the structural layer (1): Stake out the surface of the structural layer (1) to confirm the installation position of the conveying pipeline (321); the structural layer (1) is provided with a fixing rod (16), and the fixing rod (16) is used to fix the pipeline; Leveling layer (2): Cement mortar is laid on the structural layer (1) and leveled, and the cement mortar solidifies and hardens to form the leveling layer (2); Heat storage layer (3): a connecting hole (11) is bored on the leveling layer (2) and the structural layer (1), a delivery pipe (321) is fixedly connected to the connecting pipe, the connecting pipe is passed through the connecting hole (11), and a fixing rod (16) and the delivery pipe (321) are welded and fixed, rammed earth bricks (31) are laid on the leveling layer (2), and the delivery pipe (321) is arranged in a receiving groove of a first rammed earth brick (311), and the delivery steel pipe and the rammed earth brick (31) form a heat storage layer (3); Insulation board layer (4): a plurality of insulation boards are laid on the heat storage layer (3) to form an insulation layer; Foamed concrete layer (5): using a foaming machine to mix a foaming agent with water to form foam, and then uniformly mixing the foam with cement slurry to form foamed concrete, and the foamed concrete solidifies and hardens to form a foamed concrete layer (5); Construction of waterproof layer (6): firstly hot-bond waterproofing membrane on the foam concrete layer (5), and after laying the waterproofing membrane, apply waterproof coating on the waterproofing membrane; Construction of the surface layer (7): Fine stone concrete is poured on the waterproof layer (6), and the fine stone concrete solidifies and hardens to form the surface layer (7).
9. A heat-insulating roof panel structure and construction method according to claim 8, characterized in that: The following steps are also included: In the preparation stage of rammed earth bricks (31): powdered kaolin is stirred and fried at a temperature of 100°C-200°C, and the stirring and frying time of the kaolin is more than 60 minutes; then, a thermal conductivity enhancer is added to the kaolin, and the mixture is stirred and fried at a temperature of 105°C-250°C for more than 30 minutes; finally, the kaolin, weathered soil, lime, thermal conductivity enhancer, tensile fiber and water are fully mixed, and the mixture is pressed and dried to form a rammed earth brick (31).
10. A heat-insulating roof panel structure and construction method as claimed in claim 7, characterized in that: The following steps are involved: Preparation of rammed earth bricks (31): kaolin, weathered soil and lime are respectively crushed into powders, and then the kaolin, weathered soil, lime, tensile fiber and water are fully mixed; the mixed mud blocks are placed in a molding mold and pressed, and the mud blocks are pressed into shape and then dried to obtain rammed earth bricks (31); Construction of the structural layer (1): Stake out the surface of the structural layer (1) to confirm the installation position of the conveying pipeline (321); the structural layer (1) is provided with a fixing rod (16), and the fixing rod (16) is used to fix the pipeline; Leveling layer (2): Cement mortar is laid on the structural layer (1) and leveled, and the cement mortar solidifies and hardens to form the leveling layer (2); Heat storage layer (3): a connecting hole (11) is bored on the leveling layer (2) and the structural layer (1), a delivery pipe (321) is fixedly connected to the connecting pipe, the connecting pipe is passed through the connecting hole (11), and a fixing rod (16) and the delivery pipe (321) are welded and fixed, rammed earth bricks (31) are laid on the leveling layer (2), and the delivery pipe (321) is arranged in a receiving groove of a first rammed earth brick (311), and the delivery steel pipe and the rammed earth brick (31) form a heat storage layer (3); Insulation board layer (4): a plurality of insulation boards are laid on the heat storage layer (3) to form an insulation layer; Foamed concrete layer (5): using a foaming machine to mix a foaming agent with water to form foam, and then uniformly mixing the foam with cement slurry to form foamed concrete, and the foamed concrete solidifies and hardens to form a foamed concrete layer (5); Construction of waterproof layer (6): firstly hot-bond waterproofing membrane on the foam concrete layer (5), and after laying the waterproofing membrane, apply waterproof coating on the waterproofing membrane; Construction of the surface layer (7): pouring fine stone concrete on the waterproof layer (6), and forming the surface layer (7) after the fine stone concrete solidifies and hardens; Construction of the water absorption component (9): the main body of the water absorption component (9) is placed in the conveying pipe (321), one of the connecting pipes (322) is connected to the air extraction device, the other connecting pipes (322) are sealed, the air extraction device vacuumizes the conveying pipe (321), and the water absorption component (93) in the water absorption component (9) absorbs the water in the conveying pipe (321); a new water absorption component (9) is replaced, and the conveying pipe (321) is vacuumized until the detection component (94) does not detect the presence of water, the air extraction device is disassembled, and the connecting pipe (322) is sealed.