Ladder type bridge for clean room
By introducing multiple installation holes and maintenance mechanisms into the clean room ladder bridge, combined with the design of magnetic blocks and clamping rods, the problem of difficulty in disassembling traditional bridges is solved, achieving quick disassembly and better sealing, improving Overall practicality and safety.
Patent Information
- Application Number
- CN202420347840.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-26
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2034-02-26
AI Technical Summary
The traditional clean room ladder bridge is troublesome to disassemble, making maintenance difficult and affecting cleanliness and production safety.
A clean room ladder-type bridge including a bridge main body and an inspection mechanism is designed. The bridge main body is provided with multiple mounting holes and an access plate. The access plate can be quickly installed and disassembled through magnetic blocks and clamping bars, and utilizes perlite boards. Side panels improve sealing and fire resistance.
It achieves fast and effective installation and disassembly of the bridge, improves the overall practicality and safety, ensures cleanliness and production safety, and reduces construction and transportation costs.
Smart Images

Figure CN221842247U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of dust-free room pipeline installation structures, in particular to a ladder-type bridge for dust-free rooms. Background Art
[0002] A dust-free room, also known as a clean room or a clean room, is a specially designed room that removes pollutants such as particles, harmful air, and bacteria from the air within a certain space, and controls the indoor temperature, cleanliness, indoor pressure, air flow velocity and distribution, noise, vibration, lighting, and static electricity within a certain required range. The ladder bridge for clean rooms plays an important role in clean rooms, and is mainly used to support and arrange cables.
[0003] When using ladder-type cable trays in existing clean rooms, unsealed cable trays are generally used. However, the cables may be exposed to the outside due to the unsealed cable tray, which increases the risk of damage. In order to ensure the cleanliness of the clean room and production safety, the ladder-type cable tray is sealed. However, it is troublesome to disassemble the cable when it is damaged after sealing. Therefore, in the design of ladder-type cable trays for clean rooms, it is necessary to provide a novel maintenance mechanism that can remove the seal more quickly and efficiently, and can be installed better and faster, thereby improving the overall practicality. Utility Model Content
[0004] Based on this, the purpose of the utility model is to provide a ladder-type bridge for a clean room, so as to solve the technical problem that the traditional ladder-type bridge with sealing properties is troublesome to disassemble, thus causing difficulty in maintenance.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a ladder-type bridge for a clean room, comprising a bridge body, wherein two bridge bodies are provided, a first mounting hole and a second mounting hole are provided at the bottom of the two bridge bodies, a maintenance mechanism is installed inside the second mounting hole, the maintenance mechanism comprises an inspection plate, two mounting grooves are provided on the top of the inspection plate, a magnetic block is slidably engaged inside the mounting groove, a clamping rod is provided on the top of the magnetic block, and a clamping block is provided on the top of the clamping rod.
[0006] By adopting the above technical solution, since two bridge main bodies are provided, pipelines and other components can be effectively installed through the two bridge main bodies.
[0007] Furthermore, the second mounting hole includes a round hole and a straight hole, the round hole is adapted to the clamping block, the clamping rod is slidably engaged with the straight hole, and the round hole is engaged with the straight hole.
[0008] By adopting the above technical solution, the inspection plate can be installed and fixed quickly and effectively.
[0009] Furthermore, a plurality of the inspection panels are provided, and the plurality of inspection panels are equidistantly arranged in a linear array.
[0010] By adopting the above technical solution, since a plurality of inspection panels are provided, the inspection panels arranged in sections can be disassembled and inspected according to different damaged positions, thus avoiding the problem of difficult disassembly.
[0011] Furthermore, side panels are provided on both sides of the inspection panel, and the material of the side panels is perlite board.
[0012] By adopting the above technical solution, since side panels are provided on both sides of the inspection panel, the side panels can further promote the sealing of the bridge frame body, and the material of the side panels is perlite board, so the use of the side panels in the sealing of the bridge frame body can improve the fire protection level of the entire bridge frame and increase safety.
[0013] Furthermore, the top of the first mounting hole is fixedly connected to a mounting cross bar via bolts, and the top of the mounting cross bar is detachably connected to a pipeline via a fixing piece.
[0014] By adopting the above technical solution, the pipeline can be placed by installing the cross bar.
[0015] Furthermore, a third mounting hole is opened on the top of the bridge frame body, and the third mounting hole is fixedly connected to the top plate by fixing bolts.
[0016] By adopting the above technical solution, since the third mounting hole is opened on the top of the bridge frame body, the top plate can be fixed by using fixing bolts through the third mounting hole.
[0017] Furthermore, a plurality of the top plates are provided, the plurality of the top plates are abutted against each other, and the plurality of the top plates are arranged in a linear array.
[0018] By adopting the above technical solution, since a plurality of top plates are provided, the interior of the bridge frame body can be effectively sealed by the plurality of top plates.
[0019] Furthermore, the bridge frame body is arranged in a "C"-shaped structure, and the inspection plate and the top plate are arranged in a rectangular structure.
[0020] By adopting the above technical solution, since the bridge frame body is arranged in a "C" shape, the bridge frame body has good structural stability and can withstand large loads and pressures, ensuring that the bridge frame can operate safely and reliably under various working conditions.
[0021] Furthermore, the first mounting hole, the second mounting hole, and the third mounting hole are each provided in plurality, and the plurality of the first mounting holes, the second mounting holes, and the third mounting holes are equidistantly arranged.
[0022] By adopting the above technical solution, since a plurality of first mounting holes, second mounting holes and third mounting holes are provided, the cross bar, the top plate and the inspection plate can be fixedly mounted through the first mounting holes, the second mounting holes and the third mounting holes.
[0023] Furthermore, the material of the bridge frame body is aluminum alloy, and the material of the inspection plate is stainless steel.
[0024] By adopting the above technical solution, since the material of the bridge frame body is aluminum alloy, the weight of the bridge frame body is lighter, which is conducive to construction, transportation and installation, and can greatly save manpower and material costs.
[0025] In summary, the utility model mainly has the following beneficial effects:
[0026] 1. The utility model sets up a maintenance mechanism. After the main body of the bridge is installed, the pipeline is fixed by a fixing piece. At this time, the card block is placed inside the round hole according to the position of the card rod. Then the staff can hold the magnetic block by hand to absorb the magnetic block and drag it forward. At this time, the card rod will move to the inside of the straight hole. Then the card block will be stuck in the inside of the straight hole to clamp the maintenance plate. The above arrangement can quickly and effectively install and fix the maintenance plate. Moreover, after a problem occurs in the pipeline, the maintenance personnel only need to hold the magnet to absorb the magnetic block and drag the card rod to the position of the round hole to facilitate the purpose of quick disassembly. In addition, since no holes are exposed during installation, it also has better sealing performance, which improves the overall safety.
[0027] 2. The utility model sets side panels. Since the side panels are made of perlite panels, the side panels can be used in the sealing of the bridge frame body to improve the fire resistance level of the entire bridge frame and increase safety. The perlite panels are light in weight and high in strength. Using them can reduce the overall weight of the bridge frame body while ensuring that its structural strength meets the use requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0029] Figure 2 It is a top view cross-sectional three-dimensional structure schematic diagram of the utility model;
[0030] Figure 3 It is a schematic diagram of a partial three-dimensional structure of the bridge main body of the utility model;
[0031] Figure 4 It is a schematic diagram of the partial three-dimensional structure of the maintenance mechanism of the utility model.
[0032] In the figure: 1. bridge frame body; 2. mounting cross bar; 3. fixing piece; 4. pipeline; 5. top plate; 6. first mounting hole; 7. second mounting hole; 701. round hole; 702. straight hole; 8. maintenance mechanism; 801. maintenance plate; 802. mounting groove; 803. magnetic block; 804. clamping rod; 805. clamping block; 9. side plate; 10. third mounting hole. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. The embodiments described below with reference to the drawings are exemplary and are only used to explain the utility model, and cannot be understood as limiting the utility model.
[0034] The following describes an embodiment of the utility model based on its overall structure.
[0035] Embodiment 1:
[0036] A ladder bridge for clean rooms, such as Figure 1-Figure 4 As shown, it includes a bridge frame body 1, and two bridge frame bodies 1 are provided. A first mounting hole 6 and a second mounting hole 7 are provided at the bottom of the two bridge frame bodies 1. A maintenance mechanism 8 is installed inside the second mounting hole 7. The maintenance mechanism 8 includes an inspection plate 801. Two mounting grooves 802 are provided on the top of the inspection plate 801. A magnetic block 803 is slidingly engaged inside the mounting groove 802. A clamping rod 804 is provided on the top of the magnetic block 803. A clamping block 805 is provided on the top of the clamping rod 804. The pipeline 4 and other components can be effectively installed through the two bridge frame bodies 1, and the inspection plate 801 can be quickly and effectively installed and fixed through the above-mentioned arrangement.
[0037] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 The second mounting hole 7 includes a round hole 701 and a straight hole 702. The round hole 701 is adapted to the clamping block 805. The clamping rod 804 is engaged and slidably engaged with the straight hole 702. The round hole 701 is engaged with the straight hole 702. When a problem occurs in the pipeline 4, the maintenance personnel only need to hold a magnet to absorb the magnetic block 803 and drag the clamping rod 804 to the position of the round hole 701 to facilitate quick disassembly. In addition, since no holes are exposed during installation, it also has better sealing performance, thereby improving overall safety.
[0038] Embodiment 2:
[0039] See also Figure 1 , Figure 2 , Figure 3 , Figure 4There are multiple inspection panels 801, and the multiple inspection panels 801 are arranged equidistantly in a linear array. Therefore, the segmented inspection panels 801 can be disassembled and repaired according to different damage locations, avoiding the problem of difficult disassembly, and the multiple inspection panels 801 can have a good sealing effect when spliced.
[0040] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 Side panels 9 are arranged on both sides of the inspection plate 801. The material of the side panels 9 is perlite board. The side panels 9 can further promote the sealing of the bridge frame body 1. The material of the side panels 9 is perlite board. Therefore, the side panels 9 are used in the sealing of the bridge frame body 1 to improve the fire resistance level of the entire bridge frame and increase safety. Moreover, the perlite board has the characteristics of light weight and high strength. Using it can reduce the overall weight of the bridge frame body 1, while ensuring that its structural strength meets the use requirements.
[0041] See also Figure 1 , Figure 2 , Figure 3 The top of the first mounting hole 6 is fixedly connected to the mounting cross bar 2 by bolts, and the top of the mounting cross bar 2 is detachably connected to the pipeline 4 through the fixing member 3. The mounting cross bar 2 can place the pipeline 4, and the fixing member 3 can clamp the pipeline 4.
[0042] See also Figure 1 , Figure 2 , Figure 3 A third mounting hole 10 is opened on the top of the bridge frame body 1, and the third mounting hole 10 is fixedly connected to the top plate 5 by fixing bolts. The top plate 5 can be fixed by fixing bolts through the third mounting hole 10, and when the top plate 5 needs to be disassembled, it is only necessary to loosen the fixing bolts.
[0043] See also Figure 1 , Figure 2 , Figure 3 A plurality of top plates 5 are provided, the plurality of top plates 5 are abutted against each other, and the plurality of top plates 5 are arranged in a linear array. The interior of the bridge frame body 1 can be effectively sealed by the plurality of top plates 5, and the plurality of top plates 5 can be effectively spliced, thereby achieving good airtightness.
[0044] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 The bridge body 1 is arranged in a "C" shape, and the inspection plate 801 and the top plate 5 are arranged in a rectangular structure. Therefore, the bridge body 1 has good structural stability and can withstand large loads and pressures, ensuring that the bridge can operate safely and reliably under various working conditions. Moreover, the design of the bridge body 1 can make full use of materials, reduce waste, and reduce production costs.
[0045] See also Figure 1 , Figure 2 , Figure 3 There are multiple first mounting holes 6, second mounting holes 7, and third mounting holes 10, and the multiple first mounting holes 6, second mounting holes 7, and third mounting holes 10 are equidistantly arranged. Therefore, the first mounting holes 6, the second mounting holes 7, and the third mounting holes 10 can be used to fix the mounting cross bar 2, the top plate 5, and the inspection plate 801, and the mounting cross bar 2, the top plate 5, and the inspection plate 801 will not interfere with each other during the installation process.
[0046] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 The material of the bridge body 1 is aluminum alloy, and the material of the maintenance plate 801 is stainless steel, so the weight of the bridge body 1 is lighter, which is conducive to construction, transportation and installation, and can greatly save manpower and material costs. Moreover, the surface of the maintenance plate 801 is smooth and not easy to rust, and it has a beautiful and neat appearance, which can not only enhance the overall image of the bridge, but also help maintain the cleanliness of the dust-free room.
[0047] The implementation principle of the utility model is as follows: first, the bridge frame body 1 needs to be installed on the roof of the clean room through the connecting frame, and then multiple installation cross bars 2 need to be installed according to the installation position through multiple fixing bolts, and then the pipeline 4 needs to be installed and fixed through the fixing member 3 to ensure the safety of the pipeline 4, and then the top plate 5 can be installed and fixed through the fixing bolts, which has the benefit of sealing the top of the bridge frame body 1;
[0048] Then, the card block 805 is placed into the inside of the circular hole 701 according to the position of the card rod 804. Then the staff can hold the magnet in hand to absorb the magnetic block 803 and drag it forward. At this time, the card rod 804 will move, allowing the card rod 804 to move to the inside of the straight hole 702. Then the card block 805 will be stuck in the inside of the straight hole 702 to clamp the maintenance plate 801. Through the above arrangement, the maintenance plate 801 can be installed and fixed quickly and effectively. Moreover, after a problem occurs in the pipeline 4, the maintenance personnel only need to hold the magnet in hand to absorb the magnetic block 803 and drag the card rod 804 to the position of the circular hole 701 to facilitate the purpose of quick disassembly.
[0049] Parts not involved in the present invention are the same as the prior art or can be implemented by using the prior art, and will not be described in detail here.
[0050] Although an embodiment of the utility model has been shown and described, this specific embodiment is only an explanation of the utility model and is not a limitation of the utility model. The specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions and variations to the embodiments without creative contribution as needed without departing from the principles and purpose of the utility model. However, as long as they are within the scope of the claims of the utility model, they are protected by patent law.
Claims
1. A ladder bridge for clean rooms, Features: The invention comprises a bridge frame body (1), wherein two bridge frame bodies (1) are provided, a first mounting hole (6) and a second mounting hole (7) are provided at the bottom of the two bridge frame bodies (1), a maintenance mechanism (8) is installed inside the second mounting hole (7), and the maintenance mechanism (8) comprises a maintenance plate (801), two mounting grooves (802) are provided on the top of the maintenance plate (801), a magnetic block (803) is slidably engaged inside the mounting groove (802), a clamping rod (804) is provided on the top of the magnetic block (803), and a clamping block (805) is provided on the top of the clamping rod (804).
2. The ladder bridge for clean room according to claim 1, Features: The second mounting hole (7) comprises a circular hole (701) and a straight hole (702); the circular hole (701) is adapted to the clamping block (805); the clamping rod (804) is engaged and slidably engaged with the straight hole (702); and the circular hole (701) is engaged with the straight hole (702).
3. The ladder bridge for clean room according to claim 1, Features: A plurality of the inspection panels (801) are provided, and the plurality of inspection panels (801) are arranged equidistantly in a linear array.
4. The ladder bridge for clean room according to claim 1, Features: Side panels (9) are provided on both sides of the inspection plate (801), and the material of the side panels (9) is perlite board.
5. The ladder bridge for clean room according to claim 1, Features: The top of the first mounting hole (6) is fixedly connected to a mounting cross bar (2) via bolts, and the top of the mounting cross bar (2) is detachably connected to a pipeline (4) via a fixing member (3).
6. The ladder bridge for clean room according to claim 5, Features: A third mounting hole (10) is provided on the top of the bridge frame body (1), and the third mounting hole (10) is fixedly connected to the top plate (5) via fixing bolts.
7. The ladder bridge for clean room according to claim 6, Features: A plurality of the top plates (5) are provided, the plurality of the top plates (5) are in contact with each other, and the plurality of the top plates (5) are arranged in a linear array.
8. The ladder bridge for clean room according to claim 1, Features: The bridge frame body (1) is arranged in a "C"-shaped structure, and the inspection plate (801) and the top plate (5) are arranged in a rectangular structure.
9. The ladder bridge for clean room according to claim 1, Features: A plurality of the first mounting holes (6), the second mounting holes (7) and the third mounting holes (10) are provided, and the plurality of the first mounting holes (6), the second mounting holes (7) and the third mounting holes (10) are arranged at equal distances.
10. The ladder bridge for clean room according to claim 1, Features: The material of the bridge frame body (1) is aluminum alloy, and the material of the inspection plate (801) is stainless steel.