Foam concrete production mixing station
By designing an integrated foam concrete production mixing station, the problem of lack of automation and standardization of existing equipment was solved, the industrial production of foam concrete was realized, and production efficiency and product quality were improved.
Patent Information
- Application Number
- CN202420481025.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-13
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-13
AI Technical Summary
The existing foam concrete production equipment lacks standardization and automation, resulting in low output, poor efficiency, inappropriate material compatibility, and difficulty in achieving industrial production.
A foam concrete production mixing station is designed that integrates raw material storage, metering, additives, liquid, foaming liquid storage and mixing mechanisms. It realizes automated production through a control mechanism, including mixers, metering delivery tanks, sensors, pneumatic butterfly valves and other components to ensure Precise metering and mixing of raw materials and additives.
It has realized the standardized and automated production of foam concrete, promoted the industrialization of foam concrete, reduced labor costs and repeated investment in equipment, improved production efficiency and product yield, and adapted to the production needs of different materials and mix ratios.
Smart Images

Figure CN221912653U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of foam concrete production, in particular to a foam concrete production mixing station. Background Art
[0002] Most of the equipment used to produce foam concrete in my country is based on simple on-site processes. The equipment and process layout is scattered, and feeding and production require a lot of manpower. The quality is difficult to control and balance, the output efficiency is extremely low, and the material diversity is not suitable for compatible production. For many years, it has always remained in the field of small-scale equipment without parameterization.
[0003] Therefore, how to achieve standardized and automated production of foam concrete has become a technical problem that needs to be solved. Utility Model Content
[0004] The utility model aims to provide a foam concrete production mixing station, which mainly solves the problem of how to realize the standardized and automated production of foam concrete in the above-mentioned prior art.
[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0006] A foamed concrete production mixing station, characterized in that: the foamed concrete production mixing station comprises a raw material storage mechanism, a raw material metering mechanism, an additive storage mechanism, an additive metering mechanism, a liquid storage mechanism, a liquid metering mechanism, a foaming liquid storage mechanism, a foaming mechanism, a stirring mechanism and a control mechanism, the outlet of the raw material storage mechanism is connected to the inlet of the raw material metering mechanism, the outlet of the raw material metering mechanism is connected to the first inlet of the stirring mechanism, the outlet of the additive storage mechanism is connected to the inlet of the additive metering mechanism, the outlet of the additive metering mechanism is connected to the second inlet of the stirring mechanism, the outlet of the liquid storage mechanism is connected to the inlet of the liquid metering mechanism, the outlet of the liquid metering mechanism is connected to the third inlet of the stirring mechanism, the foaming liquid storage mechanism is connected to the inlet of the foaming mechanism, the outlet of the foaming mechanism is connected to the fourth inlet of the stirring mechanism, and the control mechanism controls the operation of the raw material metering mechanism, the additive metering mechanism, the liquid storage mechanism, the liquid metering mechanism, the foaming liquid storage mechanism, the foaming mechanism and the stirring mechanism.
[0007] Further, the stirring mechanism includes a stirrer, the raw material metering mechanism includes a raw material metering and conveying tank, a fifth metering weighing sensor is provided on the raw material metering and conveying tank, an inlet of the raw material metering and conveying tank is connected to an outlet of the raw material storage mechanism, an outlet of the raw material metering and conveying tank is connected to a fifth conveying pipeline, one end of the fifth conveying pipeline is connected to a fifth screw conveyor, the other end of the fifth conveying pipeline is connected to a first inlet of the stirrer, and a fifth pneumatic butterfly valve is provided at the outlet of the raw material metering and conveying tank;
[0008] The fifth measuring weighing sensor feeds back information to the control mechanism, and the fifth pneumatic butterfly valve is controlled and operated by the control mechanism.
[0009] Further, the additive metering mechanism comprises an additive metering and conveying tank, the additive metering and conveying tank is provided with a ninth metering weighing sensor, the inlet of the additive metering and conveying tank is connected to the outlet of the additive storage mechanism, the outlet of the additive metering and conveying tank is connected to the second inlet of the mixer, and the outlet of the additive metering and conveying tank is provided with a ninth pneumatic butterfly valve;
[0010] The ninth metering weighing sensor feeds back information to the control mechanism, and the ninth pneumatic butterfly valve is controlled and operated by the control mechanism.
[0011] Furthermore, the additive storage mechanism comprises a first additive storage conveying feeder and a second additive storage conveying feeder, and the outlet of the first additive storage conveying feeder and the outlet of the second additive storage conveying feeder correspond to the inlet of the additive metering and conveying tank respectively.
[0012] Further, the liquid metering mechanism includes a liquid metering and conveying tank, the liquid metering and conveying tank is provided with a third metering weighing sensor, the outlet of the liquid metering and conveying tank is connected to one end of the third conveying pipeline, the other end of the third conveying pipeline is connected to the third inlet of the mixer, and the outlet of the liquid metering and conveying tank is also provided with a third pneumatic butterfly valve;
[0013] The third metering weighing sensor feeds back information to the control mechanism, and the third pneumatic butterfly valve is controlled and operated by the control mechanism.
[0014] Furthermore, the liquid storage mechanism includes a water tank, a heater and a liquid level controller are arranged in the water tank, a water inlet of the water tank is connected to a water source, an outlet of the water tank is connected to one end of a second delivery pipeline, a second delivery pipeline is provided with a second transmission pump, and a second manual valve is arranged on the second delivery pipeline between the second transmission pump and the water tank;
[0015] The other end of the second delivery pipeline is connected to the inlet of the liquid metering delivery tank. A second pneumatic angle seat valve is provided on the second delivery pipeline between the second transmission pump and the liquid metering delivery tank. The heater, liquid level controller, second transmission pump and second pneumatic angle seat valve are all controlled and operated by the control mechanism.
[0016] Further, the foaming liquid storage mechanism comprises a foaming liquid storage and conveying tank, a liquid level detector is arranged in the foaming liquid storage and conveying tank, an inlet of the foaming liquid storage and conveying tank is connected to a first conveying pipeline A, a first manual valve A and a first transmission pump are arranged on the first conveying pipeline A, an outlet of the foaming liquid storage and conveying tank is connected to an inlet of the foaming mechanism through a first conveying pipeline B, and a first manual valve B and a first filter are arranged on the first conveying pipeline B;
[0017] The liquid level detector feeds back information to the control mechanism, and the first transmission pump is controlled and operated by the control mechanism.
[0018] Further, the foaming mechanism includes a foaming machine, the first delivery pipeline B is connected to the inlet of the foaming machine, the outlet of the foaming machine is connected to the fourth inlet of the mixer, and the outlet of the mixer corresponds to the foam concrete discharge hopper;
[0019] The foaming liquid storage and conveying tank, the foam making machine, the mixer and the water storage tank are all arranged on the first supporting platform, and the foam concrete discharge hopper is connected to the first supporting platform;
[0020] A second supporting platform and a third supporting platform are arranged above the first supporting platform, a first additive storage conveying feeder and a second additive storage conveying feeder are fixed on the second supporting platform, and an additive metering and conveying tank is connected to the second supporting platform via a ninth metering weighing sensor.
[0021] The liquid metering and conveying tank is connected to the third supporting platform via a third metering and weighing sensor, and the raw material metering and conveying tank is connected to the third supporting platform via a fifth metering and weighing sensor.
[0022] Furthermore, the raw material metering and conveying tank is provided with a fifth vibrator, the additive metering and conveying tank is provided with a ninth vibrator, and the fifth vibrator and the ninth vibrator, the first additive storage and conveying feeder and the second additive storage and conveying feeder are all controlled and operated by the control mechanism;
[0023] The other end of the fifth delivery pipeline is connected to the first inlet of the mixer through a fifth flexible connecting pipe sleeve;
[0024] A ninth flexible connecting pipe sleeve is also provided between the outlet of the additive metering and conveying tank and the second inlet of the mixer;
[0025] The third delivery pipeline below the outlet of the liquid metering delivery tank is disconnected, and the disconnected portion is connected by a third soft connecting pipe sleeve.
[0026] Furthermore, the raw material storage mechanism includes a raw material storage and conveying tank, the outlet of the raw material storage and conveying tank is connected to the inlet of the raw material metering and conveying tank through a fourth conveying pipeline, the fourth conveying pipeline is connected to a fourth screw conveyor, and the fourth screw conveyor is controlled and operated by the control mechanism;
[0027] The outlet of the raw material storage and conveying tank is arranged at the bottom of the raw material storage and conveying tank, the outlet of the raw material storage and conveying tank is connected to the lower end of the fourth conveying pipeline, and the higher end of the fourth conveying pipeline is connected to the inlet of the raw material metering and conveying tank;
[0028] The second pneumatic angle seat valve is located on one side of the second delivery pipeline close to the inlet of the liquid metering delivery tank.
[0029] In view of the above technical features, the utility model has the following beneficial effects:
[0030] 1. The foamed concrete production mixing station provided by the utility model integrates a raw material storage mechanism, a raw material metering mechanism, an additive storage mechanism, an additive metering mechanism, a liquid storage mechanism, a liquid metering mechanism, a foaming liquid storage mechanism, a foaming mechanism, and a stirring mechanism, and uses a control mechanism to control the operation of the aforementioned mechanisms to achieve standardized and automated production of foamed concrete, indirectly realize the industrialization and commercialization of foam, and promote the rapid progress of the industrialization of foamed concrete.
[0031] 2. The foam concrete production mixing station provided by the utility model integrates multiple processes into one, reduces repeated investment in equipment, reduces labor costs, and reduces labor intensity.
[0032] 3. The foam concrete production mixing station provided by the utility model has strong adaptability and can freely set and adjust production to meet different cementitious raw materials, different mix ratios, and different bulk densities, thereby achieving product grade diversification.
[0033] 4. The foam concrete production mixing station provided by the utility model occupies a small area and can be flexibly designed according to different site areas. It is highly safe and the automation of the production line ensures the safety of production personnel. The equipment in each process is seamlessly connected, there is no dust pollution, and the production product yield is high and the production efficiency is high.
[0034] 5. The foamed concrete production and mixing station provided by the utility model can be integrated with the existing PC production line of the prefabricated factory to meet the multi-purpose requirements of the first line. The integrated installation method is to install the foamed concrete production and mixing station above the mold platform assembly line of the PC production line of the prefabricated factory, and directly pour the produced foamed slurry into the mold on the mold platform. Or, install the foamed concrete production and mixing station above the torpedo tank for transporting materials of the PC production line of the prefabricated factory, and transport the foamed slurry through the torpedo tank to the mold on the mold platform for use.
[0035] 6. The foam concrete production mixing station provided by the utility model solves the problems of scattered and messy pollution of traditional foam concrete production lines and the limitation of being limited to on-site operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a plan view (top view) of a foam concrete production mixing station.
[0037] Figure 2 yes Figure 1 Front view (AA section view) of a mixing station for the production of foamed concrete.
[0038] Figure 3 yes Figure 1 Left side view (BB section view) of a foam concrete production mixing station.
[0039] Figure 4 yes Figure 1 Right side view (CC section view) of a foam concrete production mixing station.
[0040] Figure 5 It is a structural schematic diagram of the foaming mechanism.
[0041] Figure 6 It is a structural diagram of a liquid metering mechanism.
[0042] Figure 7 It is a structural diagram of a liquid storage mechanism.
[0043] Figure 8 It is a structural diagram of the raw material metering mechanism.
[0044] Fig. 9 It is a structural schematic diagram of the additive metering mechanism.
[0045] Fig.10 It is the production process diagram of the foam concrete production mixing station.
[0046] In the figure: 1-1, mixer; 1-1-1, first inlet; 1-1-2, second inlet; 1-1-3, third inlet; 1-1-4, fourth inlet;
[0047] 1-2, foam making machine; 1-3, foaming liquid storage mechanism; 1-3-1, foaming liquid storage and delivery tank; 1-3-2, liquid level detector; 1-3-3, first transmission pump; 1-3-4, first manual valve A; 1-3-5, first filter; 1-3-6, first manual valve B; 1-3-7, first delivery pipeline A; 1-3-8, first delivery pipeline B;
[0048] 2. Liquid storage mechanism; 2-1. Water storage tank; 2-2-1. Heater; 2-2-2. Liquid level controller; 2-3. Second transmission pump; 2-4. Second pneumatic angle seat valve; 2-5. Second delivery pipeline; 2-6. Second manual valve;
[0049] 3. Liquid metering mechanism; 3-1. Liquid metering delivery tank; 3-2. Third metering weighing sensor; 3-3. Third pneumatic butterfly valve; 3-4. Third delivery pipeline; 3-5. Third flexible connecting pipe sleeve;
[0050] 4. Raw material storage mechanism; 4-1. Raw material storage and conveying tank; 4-2. Fourth conveying pipeline; 4-3. Fourth screw conveyor;
[0051] 5. Raw material measuring mechanism; 5-1. Raw material measuring and conveying tank; 5-2. Fifth measuring weighing sensor;
[0052] 5-3, fifth pneumatic butterfly valve; 5-4, fifth screw conveyor; 5-5, fifth vibrator; 5-6, fifth flexible connecting pipe sleeve; 5-7, fifth conveying pipeline;
[0053] 6. The third support platform;
[0054] 7. First additive storage, conveying and feeding machine;
[0055] 8. Second additive storage, conveying and feeding machine;
[0056] 9. Additive metering mechanism; 9-1. Additive metering delivery tank; 9-2. Ninth metering weighing sensor; 9-3. Ninth pneumatic butterfly valve; 9-4. Ninth vibrator; 9-5. Ninth flexible connecting pipe sleeve;
[0057] 10. Second support platform;
[0058] 11. PLC system operation cabinet;
[0059] 12. Foam concrete discharge hopper;
[0060] 13. The first support platform. DETAILED DESCRIPTION
[0061] The present invention is further described below in conjunction with specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. In addition, it should be understood that after reading the content taught by the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the claims attached to this application.
[0062] See also Figures 1 to 10 , see Figures 1 to 10, Specific embodiment 1, this embodiment 1 provides a foamed concrete production mixing station, which includes a raw material storage mechanism 4, a raw material metering mechanism 5, an additive storage mechanism, an additive metering mechanism 9, a liquid storage mechanism 2, a liquid metering mechanism 3, a foaming liquid storage mechanism 1-3, a foaming mechanism, a mixer 1-1 and a control mechanism, the outlet of the raw material storage mechanism 4 is connected to the inlet of the raw material metering mechanism 5, the outlet of the raw material metering mechanism 5 is connected to the first inlet 1-1-1 of the mixer 1-1, the outlet of the additive storage mechanism is connected to the inlet of the additive metering mechanism 9, The outlet of the additive metering mechanism 9 is connected to the second inlet 1-1-2 of the mixer 1-1, the outlet of the liquid storage mechanism 2 is connected to the inlet of the liquid metering mechanism 3, the outlet of the liquid metering mechanism 3 is connected to the third inlet 1-1-3 of the mixer 1-1, the foaming liquid storage mechanism 1-3 is connected to the inlet of the foaming mechanism, the outlet of the foaming mechanism is connected to the fourth inlet 1-1-4 of the mixer 1-1, and the control mechanism controls the operation of the raw material metering mechanism 5, the additive metering mechanism 9, the liquid storage mechanism 2, the liquid metering mechanism 3, the foaming liquid storage mechanism 1-3, the foaming mechanism and the mixer 1-1. In other words, the foam concrete production mixing station is an integrated device that integrates multiple processes. As long as the foam concrete production mixing station starts to operate, the production of foam concrete is automatically realized, reducing labor costs and labor intensity.
[0063] The raw material storage mechanism 4 includes a raw material storage and conveying tank 4-1. The raw material may be, for example, dry powder. The outlet of the raw material storage and conveying tank 4-1 is connected to the inlet of the raw material metering mechanism 5 (such as the raw material metering and conveying tank 5-1) through the fourth conveying pipeline 4-2. The fourth conveying pipeline 4-2 is connected to the fourth screw conveyor 4-3. The fourth screw conveyor 4-3 is controlled and operated by the control mechanism. The outlet of the raw material storage and conveying tank 4-1 is arranged at the bottom of the raw material storage and conveying tank 4-1. The outlet of the raw material storage and conveying tank 4-1 is connected to the lower end of the fourth conveying pipeline 4-2. The higher end of the fourth conveying pipeline 4-2 is connected to the inlet of the raw material metering and conveying tank 5-1. The fourth screw conveyor 4-3 is used to convey the raw material from the outlet of the raw material storage and conveying tank 4-1 to the inlet of the raw material metering and conveying tank 5-1. In particular, the fourth conveying pipeline 4-2 is arranged in an inclined manner. The fourth screw conveyor 4-3 is convenient for conveying the raw material from a low place to a high place. The control mechanism controls the output of the raw material from the outlet of the raw material storage and conveying tank 4-1 through the fourth screw conveyor 4-3. The fourth conveying pipeline 4-2 is set at an angle, which can also help lower the height of the raw material storage and conveying tank 4-1 and reduce the danger caused by the tipping of the raw material storage and conveying tank 4-1. In other words, the lower the height of the raw material storage and conveying tank 4-1, the smaller the danger caused by the tipping, and it is safer.
[0064] The mixer 1-1 structure includes a mixer 1-1 (such as a horizontal slurry mixer, or a spiral belt mixer 1-1), the raw material metering mechanism 5 includes a raw material metering and conveying tank 5-1, the raw material metering and conveying tank 5-1 is provided with a fifth metering weighing sensor 5-2, the fifth metering weighing sensor 5-2 feeds back information to the control mechanism, the inlet of the raw material metering and conveying tank 5-1 is connected to the outlet of the raw material storage mechanism 4, the outlet of the raw material metering and conveying tank 5-1 is connected to the fifth conveying pipeline 5-7, one end of the fifth conveying pipeline 5-7 is connected to the fifth screw conveyor 5-4, and the other end of the fifth conveying pipeline 5-7 is connected to the first inlet 1-1-1 of the mixer 1-1, the outlet of the raw material metering and conveying tank 5-1 is provided with a fifth pneumatic butterfly valve 5-3, the fifth pneumatic butterfly valve 5-3 is controlled by the control mechanism, and the fifth pneumatic butterfly valve 5-3 controls the opening or closing state of the outlet of the raw material metering and conveying tank 5-1; the fifth screw conveyor 5-4 is used to convey the raw materials coming out of the outlet of the raw material metering and conveying tank 5-1 to the mixer 1-1.
[0065] The fifth metering weighing sensor 5-2 is used to monitor the weight of the raw materials in the raw material metering and conveying tank 5-1, and timely feedback relevant information to the control mechanism to help the control mechanism control the operation of the fifth pneumatic butterfly valve 5-3, the fourth screw conveyor 4-3 and the fifth screw conveyor 5-4, to ensure that the weight or amount of the raw materials in the raw material metering and conveying tank 5-1 can accurately meet the standards each time, or to facilitate accurate control of the weight or amount of the raw materials in the raw material metering and conveying tank 5-1 each time.
[0066] The raw material metering and conveying tank 5-1 is also provided with a fifth vibrator 5-5, which is controlled by a control mechanism to help the raw materials in the raw material metering and conveying tank 5-1 to be deposited more fully and avoid the raw materials from sticking to the wall. It is also to ensure that the weight or quantity of the raw materials coming out of the raw material metering and conveying tank 5-1 is more accurately transported to the mixer 1-1.
[0067] The other end of the fifth conveying pipeline is connected to the first inlet 1-1-1 of the mixer 1-1 through the fifth flexible connecting pipe sleeve 5-6 (such as a flexible connecting silicone pipe sleeve). The fifth flexible connecting pipe sleeve 5-6 can effectively avoid vibration or hard collision between the raw material metering and conveying tank 5-1 and the mixer 1-1, and always keep the raw material metering and conveying tank 5-1 suspended, ensuring that the fifth metering weighing sensor 5-2 accurately measures the weight or quantity of the raw materials in the raw material metering and conveying tank 5-1 each time.
[0068] The additive storage mechanism includes a first additive storage conveying feeder 7 and a second additive storage conveying feeder 8, both of which can be used to store different additives. The outlet of the first additive storage conveying feeder 7 and the outlet of the second additive storage conveying feeder 8 correspond to the inlet of the additive metering conveying tank 9-1 respectively. The first additive storage conveying feeder 7 and the second additive storage conveying feeder 8 are both controlled and operated by the control mechanism to add corresponding additives to the additive metering conveying tank 9-1, so that more than two different additives can be measured and mixed in the additive metering conveying tank 9-1. The first additive storage conveying feeder 7 is used to store powder additives, also known as a powder additive storage conveying feeder, and the second additive storage conveying feeder 8 is used to store fiber additives, also known as a fiber additive storage conveying feeder.
[0069] The additive metering mechanism 9 includes an additive metering and conveying tank 9-1, which is provided with a ninth metering weighing sensor 9-2, which feeds back information to the control mechanism, and the inlet of the additive metering and conveying tank 9-1 is connected to the outlet of the additive storage mechanism (such as the outlet of the first additive storage and conveying feeder 7 and the outlet of the second additive storage and conveying feeder 8), and the outlet of the additive metering and conveying tank 9-1 is connected to the second inlet 1-1-2 of the mixer 1-1, and the outlet of the additive metering and conveying tank 9-1 is provided with a ninth pneumatic butterfly valve 9-3, which is controlled by the control mechanism. The ninth pneumatic butterfly valve 9-3 controls the opening or closing state of the outlet of the additive metering and conveying tank 9-1.
[0070] The ninth metering weighing sensor 9-2 is used to weigh or monitor the weight of the additive in the additive metering and conveying tank 9-1, and promptly feed back relevant information to the control mechanism to help the control mechanism control the ninth pneumatic butterfly valve 9-3, the first additive storage and conveying feeder 7 and the second additive storage and conveying feeder 8, to ensure that the weight or amount of the additive in the additive metering and conveying tank 9-1 can accurately meet the standard each time, or to facilitate accurate control of the weight or amount of the additive in the additive metering and conveying tank 9-1 each time.
[0071] The additive metering and conveying tank 9-1 is also provided with a ninth vibrator 9-4, which is controlled by a control mechanism to help the additive in the additive metering and conveying tank 9-1 to be more fully discharged and avoid the additive from sticking to the wall. It is also to ensure that the weight or quantity of the additive coming out of the additive metering and conveying tank 9-1 is more accurately transported to the mixer 1-1.
[0072] A ninth flexible connection sleeve 9-5 (such as a flexible connection silicone sleeve) is also provided between the outlet of the additive metering and conveying tank 9-1 and the second inlet 1-1-2 of the mixer 1-1. The ninth flexible connection sleeve can effectively prevent vibration or hard collision between the additive metering and conveying tank 9-1 and the mixer 1-1, always keep the additive metering and conveying tank 9-1 suspended, and ensure that the ninth metering weighing sensor 9-2 accurately measures the weight or amount of the additive in the additive metering and conveying tank 9-1 each time.
[0073] The liquid storage mechanism 2 includes a water tank 2-1, in which a heater 2-2-1 and a liquid level controller 2-2-2 are provided. The heater 2-2-1 is used to heat the liquid (also called mixing water) in the water tank 2-1 to ensure that the mixing water meets the temperature requirements. The liquid level controller 2-2-2 can monitor the liquid level in the water tank 2-1, and replenish the liquid in the water tank 2-1 in time by controlling the water inlet of the water tank 2-1 to maintain the liquid level in the water tank 2-1 stable. At the same time. The water inlet of the water tank 2-1 is connected to a water source (for example, external tap water), and the outlet of the water tank 2-1 is connected to one end of the second delivery pipe 2-5. The second delivery pipe 2-5 is provided with a second transmission pump 2-3. The second delivery pipe 2-5 between the second transmission pump 2-3 and the water tank 2-1 is provided with a second manual valve 2-6. The second transmission pump 2-3 is used to transport the liquid in the water tank 2-1 to the inlet of the liquid metering delivery tank 3-1. The second manual valve 2-6 controls the opening or closing state of the outlet of the water tank 2-1.
[0074] The other end of the second delivery pipeline 2-5 is connected to the inlet of the liquid metering delivery tank 3-1. A second pneumatic angle seat valve 2-4 is provided on the second delivery pipeline 2-5 between the second transmission pump 2-3 and the liquid metering delivery tank 3-1. The heater 2-2-1 liquid level controller 2-2-2, the second transmission pump 2-3 and the second pneumatic angle seat valve 2-4 are all controlled and operated by the control mechanism.
[0075] For example, the inlet of the liquid metering and conveying tank 3-1 is higher than the outlet of the water storage tank 2-1, and the second pneumatic angle seat valve 2-4 is located on the second conveying pipeline 2-5 on the side close to the inlet of the liquid metering and conveying tank 3-1. Since the liquid in the water storage tank 2-1 flows through the outlet of the water storage tank 2-1, the second manual valve 2-6, the second transmission pump 2-3, the second pneumatic angle seat valve 2-4 in sequence, and then enters the inlet of the liquid metering and conveying tank 3-1, in the actual production process, the second transmission pump 2-3 and the second pneumatic angle seat valve 2-4 are opened and closed synchronously, and the second pneumatic angle seat valve 2-4 plays a role of intercepting flow. For example, when the liquid in the water tank 2-1 first flows through the outlet of the water tank 2-1, the second manual valve 2-6, the second transmission pump 2-3, the second pneumatic angle seat valve 2-4, and then enters the inlet of the liquid metering and conveying tank 3-1, and then the second transmission pump 2-3 is closed to complete the first loading of the liquid metering and conveying tank 3-1 with a fixed amount of liquid, there will be residual liquid in the second delivery pipe 2-5 between the second transmission pump 2-3 and the inlet of the liquid metering and conveying tank 3-1, and the residual liquid will backflow into the inlet of the liquid metering and conveying tank 3-1 (or the liquid will flow by itself or by siphon effect), leading to This causes inaccurate first liquid metering in the liquid metering and delivery tank 3-1. At this time, a second pneumatic angle seat valve 2-4 is installed on the second delivery pipeline 2-5, and the second transmission pump 2-3 and the second pneumatic angle seat valve 2-4 are controlled by the control mechanism to close synchronously. At this time, there will be residual liquid in the second delivery pipeline 2-5 between the second transmission pump 2-3 and the inlet of the liquid metering and delivery tank 3-1, which will be blocked by the second pneumatic angle seat valve 2-4 in the second delivery pipeline 2-5, and the residual liquid cannot flow into the inlet of the liquid metering and delivery tank 3-1, thereby ensuring the accuracy of the first liquid metering in the liquid metering and delivery tank 3-1.
[0076] The liquid metering mechanism 3 includes a liquid metering and conveying tank 3-1, which is provided with a third metering weighing sensor 3-2, which feeds back information to the control mechanism, and the outlet of the liquid metering and conveying tank 3-1 is connected to one end of the third conveying pipeline 3-4, and the other end of the third conveying pipeline 3-4 is connected to the third inlet 1-1-3 of the mixer 1-1. The outlet of the liquid metering and conveying tank 3-1 is also provided with a third pneumatic butterfly valve 3-3, and the third pneumatic butterfly valve 3-3 is controlled by the control mechanism. The third pneumatic butterfly valve 3-3 controls the opening and closing state of the outlet of the liquid metering and conveying tank 3-1.
[0077] The third metering weighing sensor 3-2 is used to weigh or monitor the weight of the liquid in the liquid metering and conveying tank 3-1, and promptly feed back relevant information to the control mechanism to help the control mechanism control the operation of the third pneumatic butterfly valve 3-3, the second pneumatic angle seat valve 2-4 and the second transfer pump 2-3, to ensure that the weight or amount of the liquid in the liquid metering and conveying tank 3-1 each time can accurately meet the standard, or to facilitate accurate control of the weight or amount of the liquid in the liquid metering and conveying tank 3-1 each time.
[0078] The third delivery pipe 3-4 below the outlet of the liquid metering and conveying tank 3-1 is disconnected, and the disconnected part is connected by the third flexible connection pipe sleeve 3-5 (such as a flexible connection silicone pipe sleeve), so that the liquid metering and conveying tank 3-1 can always be kept suspended, ensuring that the third metering weighing sensor 3-2 can accurately measure the weight or amount of each liquid in the liquid metering and conveying tank 3-1. At the same time, it can also indirectly prevent the third delivery pipe 3-4 from vibrating or hard collision with the mixer 1-1 under the action of the liquid metering and conveying tank 3-1.
[0079] The foaming liquid storage mechanism 1-3 includes a foaming liquid storage and conveying tank 1-3-1, in which a liquid level detector 1-3-2 is provided, and the liquid level detector 1-3-2 feeds back information to the control mechanism, and the inlet of the foaming liquid storage and conveying tank 1-3-1 is connected to the first conveying pipe A1-3-7, on which a first manual valve A1-3-4 and a first transmission pump 1-3-3 are provided, and the first transmission pump 1-3-3 is controlled and operated by the control mechanism, and the outlet of the foaming liquid storage and conveying tank 1-3-1 is connected to the inlet of the foaming mechanism through the first conveying pipe B1-3-8, and on which a first manual valve B1-3-6 and a first filter 1-3-5 are provided.
[0080] The foaming liquid flows through the first manual valve A1-3-4, the first transmission pump 1-3-3, and the first delivery pipe A1-3-7 in sequence to the inlet of the foaming liquid storage and delivery tank 1-3-1, and then flows into the foaming liquid storage and delivery tank 1-3-1. Under the extraction action of the foaming machine 1-2, the liquid in the foaming liquid storage and delivery tank 1-3-1 flows through the first delivery pipe B1-3-8 in sequence through the first manual valve B1-3-6 and the first filter 1-3-5, and then flows into the foaming machine 1-2. The function of the first transmission pump 1-3-3 is to pressurize and transport the external foaming liquid to the foaming liquid storage and delivery tank 1-3-1. The first manual valve A1-3-4 controls the on-off of the first delivery pipeline A1-3-7. The first manual valve B1-3-6 controls the on-off of the first delivery pipeline B1-3-8. The first filter 1-3-5 is used to filter the foaming liquid flowing out of the foaming liquid storage and delivery tank 1-3-1, remove impurities, and then flow into the foaming machine 1-2 to protect the foaming machine 1-2. The liquid level detector 1-3-2 is used to monitor the liquid level of the foaming liquid in the foaming liquid storage and delivery tank 1-3-1, so that the control mechanism can control the operation of the first transmission pump 1-3-3, indirectly control the liquid inflow into the foaming liquid storage and delivery tank 1-3-1, maintain the liquid level of the foaming liquid in the foaming liquid storage and delivery tank 1-3-1 stable, and realize the function of automatic compensation transmission of the foaming liquid.
[0081] The foaming mechanism includes a foaming machine 1-2, a first conveying pipe B1-3-8 is connected to the inlet of the foaming machine 1-2, an outlet of the foaming machine 1-2 is connected to the fourth inlet 1-1-4 of the mixer 1-1, and the outlet of the mixer 1-1 corresponds to the foamed concrete discharge hopper 12, which is convenient for unloading the foamed concrete made by the mixer 1-1.
[0082] A second support platform 10 and a third support platform 6 are arranged above the first support platform 13. The foaming liquid storage and conveying tank 1-3-1, the foaming machine 1-2, the mixer 1-1 and the water storage tank 2-1 are all arranged on the first support platform 13 (also known as the steel frame platform of the foam concrete mixing station). The foam concrete discharge hopper 12 is connected to the first support platform 13. The first additive storage and conveying feeder 7 and the second additive storage and conveying feeder 8 are fixed on the second support platform 10. The additive metering and conveying tank 9-1 is connected to the second support platform 10 (also known as the additive metering steel frame platform) through the ninth metering weighing sensor 9-2. The liquid metering and conveying tank 3-1 is connected to the third support platform 6 (also known as the common steel frame platform for liquid metering and dry powder metering) through the third metering weighing sensor 3-2. The raw material metering and conveying tank 5-1 is connected to the third support platform 6 through the fifth metering weighing sensor 5-2. The first support platform 13 is generally placed on the floor of the factory building.
[0083] Three support platforms at different heights place the corresponding equipment at different heights, making full use of the longitudinal space, rationally arranging the corresponding equipment, reducing the overall floor space, avoiding the occurrence of scattered and poor industrial production environment, and facilitating the movement and transportation of the overall equipment of the foam concrete production mixing station.
[0084] The control mechanism includes a PLC control system and a control cabinet. The control cabinet is arranged on the first supporting platform 13, which is convenient for the operator to input various parameters and operating instructions, so as to realize the automated production of the foam concrete production mixing station, with large output, high production efficiency, constant and stable production quality, no defective products, and can meet the production of foam concrete of different materials and different bulk densities, reduce repeated equipment capital investment, and have high investment economic benefits.
[0085] In this embodiment 1, a foamed concrete production mixing station is specifically operated as follows:
[0086] 1. Preparation of various raw materials for production before production: filling raw materials (such as gelling powder materials) in the raw material storage and conveying tank 4-1, automatically limiting the filling of mixing water in the water storage tank 2-1 of the liquid storage mechanism 2, filling the first additive storage and conveying feeder 7 with powder additives, filling the second additive storage and conveying feeder 8 with concrete fibers, and automatically limiting the filling of foaming liquid in the foaming liquid storage and conveying tank 1-3-1;
[0087] 2. Input various parameters such as raw materials, additives, mixing water and foaming liquid in the control cabinet of the control mechanism. For example, input the single-machine quantity and proportion list table of various raw materials required for the current production of foam concrete in the material "proportion list" interface of the PLC system operation cabinet 11 of the foam concrete mixing station;
[0088] 3. Input various operation instructions of various equipment in the control cabinet of the control mechanism, such as inputting the setting of the conveying sequence of various raw materials, setting the operating speed parameters of the mixer 1-1 in different working stages, setting the operating time and foaming amount of the foaming machine 1-2, setting the upper and lower limits of the liquid level of the foaming liquid storage and conveying tank 1-3-1, and setting the upper and lower limits of the mixing water temperature in the water tank 2-1 of the liquid storage mechanism 2 in the "Equipment Parameter Setting" interface of the foam concrete mixing station PLC system operation cabinet 11;
[0089] 4. After the above-mentioned parameters are set, start production, manually open the first manual valve A1-3-4, the first manual valve B1-3-6 and the second manual valve 2-6, and click "production operation" in the "production" interface of the PLC system operation cabinet 11 of the foam concrete mixing station. At this time, various raw materials are automatically and synchronously measured according to the input single-machine quantity mix ratio list table. After all raw materials are automatically measured in place, the raw materials used for the first time are measured in place in the raw material metering and conveying tank 5-1, the mixed additives used for the first time are measured in place in the additive metering tank body, the mixing water used for the first time is measured in place in the liquid metering tank body, and the foaming liquid used for the first time is measured in place in the foam making machine 1-2;
[0090] At this time, the third pneumatic butterfly valve 3-3 in the liquid metering and conveying tank 3-1 is opened, and the mixing water is input into the mixer 1-1. After the input is completed, the third pneumatic butterfly valve 3-3 is automatically closed, and at the same time, the second transmission pump 2-3 and the second pneumatic angle seat valve 2-4 are started synchronously, and cooperate with the third metering weighing sensor 3-2 to automatically measure the water required for the next machine; at the same time, the heater 2-2-1 and the liquid level controller 2-2-2 in the water tank 2-1 of the liquid storage mechanism 2 automatically detect the water storage capacity in real time, automatically replenish it for standby, and automatically heat it for standby. After the PLC system of the control mechanism senses that the liquid delivery is completed, that is, the third metering weighing sensor 3-2 senses that the mixing water in the liquid metering and conveying tank 3-1 is completed, the ninth pneumatic butterfly valve 9-3 and the ninth vibrator 9-4 in the additive metering and conveying tank 9-1 are automatically opened, and the additive is input into the mixer 1-1. After the additive input is completed, that is, the ninth metering weighing sensor 9-2 senses that the additive in the additive metering and conveying tank 9-1 is completed, the ninth pneumatic butterfly valve 9-3 and the ninth vibrator 9-4 are automatically closed, and at the same time, the first additive storage and conveying feeder 7 and the second additive storage and conveying feeder 8 are started to automatically measure the amount of additives required for the next machine. It should be noted that the powder additive and the fiber additive in the additive are measured in a superimposed manner, and the first additive storage and conveying feeder 7 and the second additive storage and conveying feeder 8 respectively inject different additives into the inlet of the additive metering and conveying tank 9-1 in succession;
[0091] After the mixing water and additives are delivered, the mixer 1-1 receives the information from the control mechanism and runs at a frequency of 20HZ for 2 minutes to ensure the dissolution of the additives. After 2 minutes, the mixer 1-1 accelerates to run at a frequency of 40HZ. At the same time, the fifth screw conveyor 5-4 in the raw material metering and conveying tank 5-1 is started and runs for 3 seconds. Then, the fifth pneumatic butterfly valve 5-3 is opened. During the process of conveying raw materials (such as dry powder), the fifth vibrator 5-5 starts to vibrate synchronously to facilitate the smooth delivery of raw materials (such as dry powder). After the delivery of raw materials (such as dry powder) is completed, the fifth pneumatic butterfly valve 5-3 and the fifth vibrator 5-5 are automatically closed. At the same time, the raw material storage and conveying tank 4-1 is started (that is, the fourth screw conveyor 4-3 is started), and the fifth metering weighing sensor in the raw material metering and conveying tank 5-1 is connected. 5-2 cooperates with automatic metering of the amount of raw materials (such as dry powder) required by the next machine. After the mixer 1-1 receives the transmission completion information of the raw materials (such as dry powder), it continues to operate and stir for 3 minutes to make the dry powder and the mixing slurry fully and evenly mixed. After 3 minutes, the mixer 1-1 automatically adjusts to 20HZ frequency operation, and at the same time, the foam making machine 1-2 automatically starts to convey foam to the mixer 1-1, so that the foam and the mixing slurry are mixed. When the set foam making amount is reached, the foam making machine 1-2 is automatically closed. During the foam making process of the foam making machine 1-2, the liquid level detector 1-3-2 in the foaming liquid storage and conveying tank 1-3-1 detects the liquid level loss in real time, so that the control mechanism automatically controls the first transmission pump 1-3-3 to operate to replenish the foaming liquid in the foaming liquid storage and conveying tank 1-3-1;
[0092] When the mixer 1-1 receives the shut-down information of the foam making machine 1-2 from the control mechanism, the mixer 1-1 automatically adjusts to operate at a frequency of 30HZ, and automatically discharges the material into the foam concrete discharge hopper 12 after running for 1 minute, so as to facilitate the subsequent discharge of foam concrete, and the operation is completed.
[0093] The foam concrete production mixing station is suitable for the production of foam concrete with different materials, different properties and different bulk densities. The foam concrete production mixing station has high integration and can be seamlessly installed with the existing assembled PC production line. The operation is intelligent and the process saves time and effort, reduces labor intensity, and the production quality is stable without defective products. There is no three wastes in the production process and no pollution to the environment.
[0094] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A foam concrete production mixing station, characterized in that: The foam concrete production mixing station comprises a raw material storage mechanism (4), a raw material metering mechanism (5), an additive storage mechanism, an additive metering mechanism (9), a liquid storage mechanism (2), a liquid metering mechanism (3), a foaming liquid storage mechanism (1-3), a foaming mechanism, a stirring mechanism and a control mechanism. The outlet of the raw material storage mechanism (4) is connected to the inlet of the raw material metering mechanism (5), the outlet of the raw material metering mechanism (5) is connected to the first inlet (1-1-1) of the stirring mechanism, the outlet of the additive storage mechanism is connected to the inlet of the additive metering mechanism (9), and the outlet of the additive metering mechanism (9) is connected to the inlet of the additive metering mechanism (9). The second inlet (1-1-2) of the stirring mechanism is connected, the outlet of the liquid storage mechanism (2) is connected to the inlet of the liquid metering mechanism (3), the outlet of the liquid metering mechanism (3) is connected to the third inlet (1-1-3) of the stirring mechanism, the foaming liquid storage mechanism (1-3) is connected to the inlet of the foaming mechanism, and the outlet of the foaming mechanism is connected to the fourth inlet (1-1-4) of the stirring mechanism. The control mechanism controls the operation of the raw material metering mechanism (5), the additive metering mechanism (9), the liquid storage mechanism (2), the liquid metering mechanism (3), the foaming liquid storage mechanism (1-3), the foaming mechanism and the stirring mechanism.
2. A foam concrete production mixing station according to claim 1, characterized in that: The stirring mechanism comprises a stirring machine (1-1); the raw material metering mechanism (5) comprises a raw material metering conveying tank (5-1); a fifth metering weighing sensor (5-2) is provided on the raw material metering conveying tank (5-1); an inlet of the raw material metering conveying tank (5-1) is connected to an outlet of the raw material storage mechanism (4); an outlet of the raw material metering conveying tank (5-1) is connected to a fifth conveying pipeline (5-7); one end of the fifth conveying pipeline (5-7) is connected to a fifth screw conveyor (5-4); the other end of the fifth conveying pipeline (5-7) is connected to a first inlet (1-1-1) of the stirring machine (1-1); and a fifth pneumatic butterfly valve (5-3) is provided at the outlet of the raw material metering conveying tank (5-1); The fifth weighing sensor (5-2) feeds back information to the control mechanism, and the fifth pneumatic butterfly valve (5-3) is controlled to operate by the control mechanism.
3. A foamed concrete production mixing station according to claim 2, characterized in that: The additive metering mechanism (9) comprises an additive metering and conveying tank (9-1), the additive metering and conveying tank (9-1) is provided with a ninth metering weighing sensor (9-2), the inlet of the additive metering and conveying tank (9-1) is connected to the outlet of the additive storage mechanism, the outlet of the additive metering and conveying tank (9-1) is connected to the second inlet (1-1-2) of the mixer (1-1), and the outlet of the additive metering and conveying tank (9-1) is provided with a ninth pneumatic butterfly valve (9-3); The ninth measuring weighing sensor (9-2) feeds back information to the control mechanism, and the ninth pneumatic butterfly valve (9-3) is controlled to operate by the control mechanism.
4. A foam concrete production mixing station according to claim 3, characterized in that: The additive storage mechanism comprises a first additive storage conveying feeder (7) and a second additive storage conveying feeder (8), wherein the outlet of the first additive storage conveying feeder (7) and the outlet of the second additive storage conveying feeder (8) respectively correspond to the inlet of the additive metering and conveying tank (9-1).
5. A foam concrete production mixing station according to claim 4, characterized in that: The liquid metering mechanism (3) comprises a liquid metering delivery tank (3-1), the liquid metering delivery tank (3-1) is provided with a third metering weighing sensor (3-2), the outlet of the liquid metering delivery tank (3-1) is connected to one end of a third delivery pipeline (3-4), the other end of the third delivery pipeline (3-4) is connected to a third inlet (1-1-3) of the mixer (1-1), and the outlet of the liquid metering delivery tank (3-1) is also provided with a third pneumatic butterfly valve (3-3); The third measuring weighing sensor (3-2) feeds back information to the control mechanism, and the third pneumatic butterfly valve (3-3) is controlled to operate by the control mechanism.
6. A foamed concrete production mixing station according to claim 5, characterized in that: The liquid storage mechanism (2) comprises a water tank (2-1), a heater (2-2-1) and a liquid level controller (2-2-2) are arranged in the water tank (2-1), a water inlet of the water tank (2-1) is connected to a water source, an outlet of the water tank (2-1) is connected to one end of a second delivery pipeline (2-5), a second transmission pump (2-3) is arranged on the second delivery pipeline (2-5), and a second manual valve (2-6) is arranged on the second delivery pipeline (2-5) between the second transmission pump (2-3) and the water tank (2-1); The other end of the second delivery pipeline (2-5) is connected to the inlet of the liquid metering delivery tank (3-1); a second pneumatic angle seat valve (2-4) is provided on the second delivery pipeline (2-5) between the second transmission pump (2-3) and the liquid metering delivery tank (3-1); the heater (2-2-1), the liquid level controller (2-2-2), the second transmission pump (2-3) and the second pneumatic angle seat valve (2-4) are all controlled and operated by a control mechanism.
7. A foamed concrete production mixing station according to claim 6, characterized in that: The foaming liquid storage mechanism (1-3) comprises a foaming liquid storage and delivery tank (1-3-1), a liquid level detector (1-3-2) is arranged in the foaming liquid storage and delivery tank (1-3-1), an inlet of the foaming liquid storage and delivery tank (1-3-1) is connected to a first delivery pipeline A (1-3-7), a first manual valve A (1-3-4) and a first transmission pump (1-3-3) are arranged on the first delivery pipeline A (1-3-7), an outlet of the foaming liquid storage and delivery tank (1-3-1) is connected to the inlet of the foaming mechanism through a first delivery pipeline B (1-3-8), and a first manual valve B (1-3-6) and a first filter (1-3-5) are arranged on the first delivery pipeline B (1-3-8); The liquid level detector (1-3-2) feeds back information to the control mechanism, and the first transmission pump (1-3-3) is controlled and operated by the control mechanism.
8. A foamed concrete production mixing station according to claim 7, characterized in that: The foaming mechanism comprises a foaming machine (1-2), a first conveying pipeline B (1-3-8) is connected to the inlet of the foaming machine (1-2), the outlet of the foaming machine (1-2) is connected to the fourth inlet (1-1-4) of the mixer (1-1), and the outlet of the mixer (1-1) corresponds to the foam concrete discharge hopper (12); The foaming liquid storage and conveying tank (1-3-1), the foaming machine (1-2), the mixer (1-1) and the water storage tank (2-1) are all arranged on the first supporting platform (13), and the foam concrete discharge hopper (12) is connected to the first supporting platform (13); A second supporting platform (10) and a third supporting platform (6) are provided above the first supporting platform (13); a first additive storage, conveying and feeding machine (7) and a second additive storage, conveying and feeding machine (8) are fixed on the second supporting platform (10); an additive metering and conveying tank (9-1) is connected to the second supporting platform (10) via a ninth metering weighing sensor (9-2); The liquid metering and conveying tank (3-1) is connected to the third supporting platform (6) via a third metering weighing sensor (3-2), and the raw material metering and conveying tank (5-1) is connected to the third supporting platform (6) via a fifth metering weighing sensor (5-2).
9. A foamed concrete production mixing station according to claim 8, characterized in that: The raw material metering and conveying tank (5-1) is also provided with a fifth vibrator (5-5), the additive metering and conveying tank (9-1) is also provided with a ninth vibrator (9-4), and the fifth vibrator (5-5) and the ninth vibrator (9-4), the first additive storage and conveying feeder (7) and the second additive storage and conveying feeder (8) are all controlled and operated by a control mechanism; The other end of the fifth delivery pipeline (5-7) is connected to the first inlet (1-1-1) of the mixer (1-1) through a fifth flexible connecting pipe sleeve (5-6); A ninth flexible connecting pipe sleeve (9-5) is also provided between the outlet of the additive metering and conveying tank (9-1) and the second inlet (1-1-2) of the mixer (1-1); The third delivery pipeline (3-4) below the outlet of the liquid metering delivery tank (3-1) is disconnected, and the disconnected portion is connected by a third soft connection pipe sleeve (3-5).
10. A foamed concrete production mixing station according to claim 9, characterized in that: The raw material storage mechanism (4) comprises a raw material storage and conveying tank (4-1), the outlet of the raw material storage and conveying tank (4-1) is connected to the inlet of the raw material metering and conveying tank (5-1) through a fourth conveying pipeline (4-2), the fourth conveying pipeline (4-2) is connected to a fourth screw conveyor (4-3), and the fourth screw conveyor (4-3) is controlled and operated by a control mechanism; The outlet of the raw material storage and conveying tank (4-1) is arranged at the bottom of the raw material storage and conveying tank (4-1), the outlet of the raw material storage and conveying tank (4-1) is connected to the lower end of the fourth conveying pipeline (4-2), and the upper end of the fourth conveying pipeline (4-2) is connected to the inlet of the raw material metering and conveying tank (5-1); The second pneumatic angle seat valve (2-4) is located on a side of the second delivery pipeline (2-5) close to the inlet of the liquid metering delivery tank (3-1).