Panel steel bar assembling equipment and panel steel bar mesh

Through the tooling platform and robotic arm assembly of the panel steel bar assembly equipment, the problems of low efficiency, high safety hazards, and serious material loss in the processing and installation of panel steel bar mesh at the construction site are solved, achieving high-quality and rapid construction progress and material utilization. Waste and transportation volumes are reduced.

CN221920334UActive Publication Date: 2024-10-29HUNAN FIFTH ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420255610.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-01
Publication Date
2024-10-29
Estimated Expiration
2034-02-01

AI Technical Summary

Technical Problem

In the existing technology, the processing and installation of panel steel mesh at the construction site has problems such as tediousness, low efficiency, high labor costs, large safety hazards, serious material loss, and unsatisfactory processing quality. Especially in the construction of high-rise buildings, there are local tie-ups. Problems such as missing points, uneven spacing, and insufficient cutting of steel bars.

Method used

A panel steel bar assembly equipment is provided, which includes a tooling platform and a robotic arm assembly. The panel steel bar mesh of different specifications is assembled through positioning mold adjustment, and the robotic arm is used for automated welding and binding, reducing human intervention and improving quality and efficiency.

Benefits of technology

On the premise of ensuring construction quality, it is possible to speed up the construction progress, reduce material loss, save project costs, reduce on-site space requirements, improve the assembly method construction rate, reduce waste output and transportation volume, save energy, and improve steel bar utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221920334U_ABST
    Figure CN221920334U_ABST
Patent Text Reader

Abstract

The utility model provides panel reinforcing steel bar assembling equipment and a panel reinforcing steel bar mesh. The panel reinforcing steel bar assembling equipment comprises a tool platform and a mechanical arm assembly connected to the tool platform and used for assembling the panel reinforcing steel bar mesh. Positioning dies with adjustable intervals are arranged on the tool platform; the panel reinforcing mesh is provided with a plurality of prefabricated reinforcing steel bars which are arranged in a crossed mode, the prefabricated reinforcing steel bars are limited and located in the positioning mold, and the mechanical arm assembly and the prefabricated reinforcing steel bars are connected in a matched mode to form the integrated panel reinforcing mesh. The panel reinforcing meshes of different specifications are prefabricated through automatic mechanical equipment, and it is ensured that the overall quality standard of the panel reinforcing meshes is greatly improved. Meanwhile, the utility model further provides a panel reinforcing mesh, and the panel reinforcing mesh accelerates the construction progress, reduces the material loss, saves the construction cost, saves the site construction site, improves the construction rate of an assembly method, reduces the output of wastes such as iron slag in the site reinforcing steel bar machining process, reduces the repeated transportation amount and saves energy on the premise of ensuring the construction quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of steel mesh processing in building construction, and in particular to a panel steel mesh assembly device and a panel steel mesh. Background Art

[0002] In the prior art, the panel steel mesh required for the cast-in-place construction stage is generally processed and installed at the construction site. For example, the floor (ground) steel mesh of the construction project is generally processed and installed manually at the production site. However, there are many problems in the on-site processing and assembly of panel steel bars. For example, the steel bars need to be hoisted and stacked when they are transported to the construction site. After processing and forming, they need to be sorted and stacked again, and then hoisted to the binding point on the construction site. Before installation, it is necessary to manually draw lines on the template surface to control the placement spacing. Manual installation requires placement and binding one by one, and manual binding needs to be performed point by point. The operation is relatively cumbersome, with high labor costs and low efficiency. Raw materials and semi-finished products need to be stacked in categories, and the construction site requires a relatively large stacking site, which requires multiple handling, and consumes a lot of labor and machinery. Especially in the construction of high-rise buildings, long-term manual outdoor high-altitude operations are required, which poses a great safety hazard and cannot provide the required operating space.

[0003] At the same time, the processing quality of the panel steel mesh is not ideal. For example, there are omissions of local binding points, uneven spacing of local steel bars, and the quality of steel bar binding needs to be repeatedly checked and rectified on site to ensure the qualified rate. This results in a long installation period, and there are problems in both quick installation and ensuring a high qualified rate. In addition, it is impossible to match the processing of steel bar lengths to obtain panel steel meshes of multiple specifications. After a single steel bar is cut, it is not fully utilized, and a large number of steel bar heads have to be left, resulting in serious steel loss. Utility Model Content

[0004] The present application provides a panel steel bar assembly equipment and panel steel bars, which, under the premise of ensuring construction quality, speed up construction progress, reduce material loss, save project costs, save on-site construction sites, improve assembly construction rate, reduce the output of waste such as iron slag during on-site steel bar processing, reduce multiple transportation volumes, and save energy.

[0005] In a first aspect, a panel reinforcement assembly device is provided, the panel reinforcement assembly device comprising a tooling platform and a mechanical arm assembly connected to the tooling platform and used for assembling a panel reinforcement mesh; wherein:

[0006] The tooling platform is provided with a positioning die with adjustable spacing;

[0007] The panel steel mesh has a plurality of prefabricated steel bars arranged crosswise, the plurality of prefabricated steel bars are limitedly positioned in the positioning mold, and the mechanical arm assembly is matched and connected with the plurality of prefabricated steel bars to form the integrated panel steel mesh.

[0008] Preferably, the positioning mold includes: a fixed horizontal plate and a sliding horizontal plate symmetrically arranged at both ends of the tooling platform, and a fixed vertical plate and a sliding vertical plate symmetrically arranged at both sides of the tooling platform;

[0009] The sliding horizontal plate slides relative to the fixed horizontal plate and can be locked on the tooling platform;

[0010] The sliding vertical plate slides relative to the fixed vertical plate and can be locked on the tooling platform.

[0011] Preferably, the tooling platform is symmetrically provided with a first slide groove along the length direction, and the sliding cross plate is equipped with a first sliding block matched with the first slide groove.

[0012] Preferably, the tooling platform is symmetrically provided with a second slide groove along the width direction, and the sliding vertical plate is equipped with a second sliding block matched with the second slide groove.

[0013] Preferably, the first sliding groove and the second sliding groove cross each other and penetrate each other.

[0014] Preferably, the sliding horizontal plate and the sliding vertical plate are both provided with magnetic suction parts or top screw parts matching with the tooling platform.

[0015] Preferably, the plurality of prefabricated steel bars are connected by node welding or node binding to form an integrated panel steel mesh.

[0016] Preferably, the mechanical arm assembly comprises: a working mechanical arm and a transport mechanical arm; wherein,

[0017] When the plurality of prefabricated steel bars are connected to form the panel steel mesh as an integral whole through node welding, the working mechanical arm places the plurality of prefabricated steel bars at intervals in the positioning mold and welds the nodes of the plurality of prefabricated steel bars;

[0018] The transport robot arm transports the panel steel meshes welded together into a whole by classification.

[0019] In the utility model, panel steel meshes of different specifications are assembled by adjusting the positioning mold, and the panel steel meshes can be selectively produced according to the length of the steel bars, thereby reducing the waste rate of steel bar materials. At the same time, mechanical arm components are used for assembly to reduce human intervention, thereby ensuring a significant improvement in the production quality qualification rate.

[0020] In a second aspect, a panel reinforcement mesh comprises a panel reinforcement mesh assembled by the panel reinforcement assembly device described in the first aspect;

[0021] The panel reinforcement mesh is the reinforcement mesh of the bottom layer of the plate and / or;

[0022] The panel steel mesh is a plate surface layer steel mesh.

[0023] Preferably, any two adjacently connected panel steel meshes are provided with a reserved staggered joint.

[0024] It can be seen that the specifications of the panel steel mesh are positioned in an appropriate range to ensure convenient lifting and not easy to deform. The optional and assembled panel steel mesh can speed up the construction progress, reduce material loss, save engineering costs, save on-site construction sites, increase the assembly method construction rate, reduce the output of waste such as iron slag during on-site steel bar processing, reduce multiple transportation, and save energy, while ensuring the construction quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 A schematic diagram of the structure of the panel reinforcement assembly equipment provided in the embodiment of the present application;

[0026] Figure 2 A schematic diagram of the structure of the bottom steel mesh of the slab provided in the embodiment of the present application;

[0027] Figure 3 A schematic diagram of the structure of the steel mesh of the plate surface layer provided in the embodiment of the present application;

[0028] Figure 4 A schematic diagram of the assembly of the panel reinforcement mesh provided in an embodiment of the present application.

[0029] Figure Number:

[0030] Tooling platform-10, fixed vertical plate-11, fixed horizontal plate-12, second slide groove-13, first slide groove-14, sliding vertical plate-15, sliding horizontal plate-16, top screw-17;

[0031] The bottom layer of the plate has a steel mesh-20, a first transverse steel bar-21, and a first vertical steel bar-22;

[0032] Working robot arm-30;

[0033] Transport manipulator-40;

[0034] Plate surface layer steel mesh-50, second transverse steel bar-51, second vertical steel bar-52;

[0035] Panel - 100;

[0036] Side beam - 200. DETAILED DESCRIPTION

[0037] In order to make the objectives, technical solutions and advantages of the present disclosure more clearly understood, the present disclosure is further described in detail below in combination with specific embodiments and with reference to the accompanying drawings.

[0038] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in one or more embodiments of this specification should be understood by people with ordinary skills in the field to which this disclosure belongs. The "first", "second" and similar words used in one or more embodiments of this specification do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0039] In order to facilitate the understanding of the panel steel bar assembly equipment provided in the embodiment of the present application, its application scenario is first explained. The panel steel bar assembly equipment is mainly used in the field of panel steel bar technology in the cast-in-place construction stage. In the prior art, the panel steel bar mesh required in the cast-in-place construction stage is generally processed and installed at the construction site. For example, the floor (ground) steel bar mesh of the construction project is generally processed and installed manually at the production site. However, there are many problems in the on-site processing and assembly of panel steel bars. For example, the steel bars need to be hoisted and stacked when they are transported to the construction site. After processing and forming, they need to be classified and stacked again, and then hoisted to the binding point at the construction site. Before installation, it is also necessary to manually draw lines on the template surface to control the placement spacing. Manual installation requires placement and binding one by one, and manual binding needs to be performed point by point. The operation is relatively cumbersome, the labor cost is high, and the efficiency is low. Raw materials and semi-finished products need to be classified and stacked, and the construction site needs a relatively large stacking site, which needs to be transported multiple times, and the labor and machinery consumption is large. Especially in the construction of high-rise buildings, long-term manual outdoor high-altitude operations are required, there are major safety hazards, and the required operating space cannot be provided.

[0040] At the same time, the processing quality of the panel steel mesh is not ideal. For example, there are omissions of local binding points, uneven spacing of local steel bars, and the quality of steel bar binding needs to be repeatedly checked and rectified on site to ensure the qualified rate. This results in a long installation period, and there are problems in both quick installation and ensuring a high qualified rate. In addition, it is impossible to match the processing of steel bar lengths to obtain panel steel meshes of multiple specifications. After a single steel bar is cut, it is not fully utilized, and a large number of steel bar heads have to be left, resulting in serious steel loss.

[0041] In view of this, the present application provides a panel steel bar assembly equipment and panel steel bars, which, under the premise of ensuring construction quality, speed up construction progress, reduce material loss, save project costs, save on-site construction sites, improve assembly construction rate, reduce the output of waste such as iron slag during on-site steel bar processing, reduce multiple transportation volumes, and save energy.

[0042] refer to Figure 1 The panel reinforcement assembly equipment provided in the embodiment of the present application includes a tooling platform 10; the tooling platform 10 serves as the assembly body in the embodiment of the present application, and the tooling platform 10 is arranged inside the working workshop to prefabricate and connect the panel reinforcement mesh.

[0043] The tooling platform 10 is provided with a positioning die with adjustable spacing, which is used to adjust the positioning of the prefabricated steel bars in the panel steel mesh assembly process after corresponding cutting, so as to form panel steel meshes of different specifications. In order to facilitate hoisting and not easily deformed, the panel steel mesh in this application adopts a panel steel mesh with smaller assembly specifications, and the specification range is controlled below 3m×6m. When the floor area of ​​the building (ground) is larger than 3m×6m, multiple panel steel meshes can be spliced, so that the length of the steel bars can be reasonably and fully utilized.

[0044] When the spacing of the point mold is specifically made adjustable, the positioning mold in this application includes: a fixed horizontal plate 12 and a sliding horizontal plate 16 symmetrically arranged at both ends of the tooling platform 10, and a fixed vertical plate 11 and a sliding vertical plate 15 symmetrically arranged on both sides of the tooling platform 10; the sliding horizontal plate 16 slides relative to the fixed horizontal plate 12 and can be locked on the tooling platform 10; the sliding vertical plate 15 slides relative to the fixed vertical plate 11 and can be locked on the tooling platform 10. The width of the tooling platform 10 is set at 3m, and the length of the tooling platform 10 is set at 6m, so as to be better suitable for assembling the panel steel mesh. Of course, it should be understood that the specifications of the prefabricated steel bars used in this application are 6mm, 8mm, 10mm, 12mm, etc., and the gap between the prefabricated steel bars that form the panel steel mesh is between 100mm and 300mm. Of course, in some specific construction situations, the width and length of the tooling platform 10 in this application are not limited to 3m×6m, and can be widened and lengthened accordingly.

[0045] When the sliding horizontal plate 16 and the sliding vertical plate 15 are slid and positioned, the tooling platform 10 in the present application is symmetrically provided with a first slide groove 14 along the length direction, and the sliding horizontal plate 16 is equipped with a first slider matched with the first slide groove 14. Thus, the sliding horizontal plate 16 can slide along the first slide groove 14, moving away from or approaching each other toward the fixed horizontal plate 12. The tooling platform 10 is symmetrically provided with a second slide groove 13 along the width direction, and the sliding vertical plate 15 is equipped with a second slider matched with the second slide groove 13. Thus, the sliding vertical plate 15 can slide along the second slide groove 13, moving away from or approaching each other toward the fixed vertical plate 11. At the same time, in order to prevent the sliding position from being crossed by the first slide groove 14 and the second slide groove 13 and interpenetrating each other. It should be specifically explained that the length of the sliding horizontal plate 16 in the present application is preferably limited to 3m, and the sliding horizontal plate 16 slides on the 6m long tooling platform 10 to form a panel steel mesh with a width of 3m and different lengths. Of course, in special circumstances, if a 2m wide panel steel mesh needs to be processed, the sliding horizontal plate 16 can be replaced, and the sliding vertical plate 15 can slide along the second slide groove 13 to realize panel steel mesh positioning modules of different specifications.

[0046] In order to position the sliding horizontal plate 16 and the sliding vertical plate 15, the sliding horizontal plate 16 and the sliding vertical plate 15 are provided with magnetic suction parts or top screw parts 17 that match the tooling platform 10. The positioning mold is positioned by magnetic suction or top screw to ensure the stable position when assembling the panel steel mesh.

[0047] Combination Figure 2 and Figure 3 As shown in the figure, the panel reinforcement mesh has a plurality of prefabricated reinforcements arranged crosswise, and the panel reinforcement mesh is the bottom layer reinforcement mesh 20 and / or the panel reinforcement mesh is the surface layer reinforcement mesh 50. The bottom layer reinforcement mesh 20 is composed of the first transverse reinforcements 21 arranged in an array and the first vertical reinforcements 22 arranged in an array. The surface layer reinforcement mesh 50 is composed of the second transverse reinforcements 51 arranged in an array and the second vertical reinforcements 52 arranged in an array, and bends for matching with the bottom layer reinforcement mesh 20 are provided at both ends of the second vertical reinforcement 52.

[0048] It can be seen that the prefabricated steel bars need to be placed and connected as a whole no matter in the processing of the bottom steel mesh 20 and the surface steel mesh 50. In order to reduce human intervention and ensure the qualified rate of assembly, the tooling platform 10 in the present application is provided with a mechanical arm assembly for assembling the panel steel mesh.

[0049] The robot arm assembly performs a series of operations such as placing, welding or binding, and transporting prefabricated steel bars by pre-inputting the system program, thereby realizing automatic and high-quality assembly of the plate surface steel mesh. It needs to be specifically explained that the robot arm assembly is a mechanical equipment commonly used in existing industrial production. The set work command is input into the system, and the robot arm assembly works accordingly. This is a technical method commonly used in the prior art and will not be elaborated on here.

[0050] The plurality of prefabricated steel bars are connected to form an integrated panel steel mesh by node welding or node binding. In the embodiment of the present application, it is preferred to use a panel steel mesh in which the prefabricated steel bars are connected to form an integrated panel steel mesh by node welding. The robot arm assembly includes: a working robot arm 30 and a transport robot arm 40; wherein, the working robot arm 30 and the transport robot arm 40 adopt a three-axis or five-axis robot arm, and the working robot arm 30 is responsible for positioning and placing the prefabricated steel bars, and welding or binding the connection nodes of the prefabricated steel bars. When the plurality of prefabricated steel bars are connected to form an integrated panel steel mesh by node welding, the working robot arm 30 places the plurality of prefabricated steel bars in a positioning mold at intervals and welds and connects the nodes of the plurality of prefabricated steel bars; the transport robot arm 40 transports the panel steel mesh welded into one by classification. The panel steel meshes of different sizes are classified and placed to ensure flexible application during later assembly.

[0051] In the utility model, panel steel meshes of different specifications are assembled by adjusting the positioning mold, and the panel steel meshes can be selectively produced according to the length of the steel bars, thereby reducing the waste rate of steel bar materials. At the same time, mechanical arm components are used for assembly to reduce human intervention, thereby ensuring a significant improvement in the production quality qualification rate.

[0052] In addition, the present application also provides a panel steel mesh, including a panel steel mesh assembled by a panel steel assembly device; the panel steel mesh is Figure 2 The bottom steel mesh 20 and / or Figure 3 The panel surface reinforcement mesh 50 is shown in FIG.

[0053] In order to prevent the panel steel mesh from deformation during the lifting process and facilitate the lifting operation, according to the plane size of the 100-area grid of the floor (ground) panel on the construction drawing, the plane size of the panel grid is less than or equal to 3m×3m and can be processed into one panel steel mesh, and it can be processed into multiple panel steel meshes if it is greater than 3m×6m. Displaced joints are reserved at the connection between each two adjacent panel steel meshes, and the displaced joints need to be manually tied. The plane size of each panel steel mesh is controlled to be less than 3m×6m.

[0054] Combination Figure 4 As shown in Figure 4The assembly diagram of the panel steel mesh provided in the embodiment of the present application. When assembling the panel steel mesh, a side beam 200 is arranged around the panel 100. According to the steel construction drawing, the professional software calculates the blanking list of various types of steel bar lengths and processing sizes according to the construction progress by region, floor, plate, and stage. According to the blanking list, various types of panel steel meshes are mass-produced. The panel steel meshes are transported to the construction site in batches according to the progress, and the vertical transportation equipment on the construction site lifts the panel steel meshes to the installation locations on the corresponding floors according to the specifications and batches. The bottom layer steel mesh 20 of the board adopts the diagonal insertion method, and the plane position is slightly adjusted to ensure the anchor lap length in all directions, and then the steel bar protective layer pad is inserted, and then the board surface layer steel mesh 50 is placed, and the plane position is slightly adjusted, and the upper steel bar support frame is inserted. For the board surface with a plane size greater than 3m×6m, two or more panel steel meshes are overlapped, and the overlap parts are manually tied.

[0055] It can be seen that the present application improves the level of automated production of panel steel mesh, and solves the problems of efficiency and space limitation in processing and installing panel steel mesh at the construction site during the cast-in-place construction phase. The lifting and stacking operation space required at the production site is greatly reduced, reducing labor costs. Especially in the construction of high-rise buildings, long-term manual outdoor high-altitude operations can be avoided. At the same time, the processing quality of the panel steel mesh is improved, effectively avoiding the phenomenon of missing local binding points and uneven spacing of local steel bars, and improving the qualified rate of steel bar binding quality. It saves the installation period of the panel steel mesh, and obtains panel steel meshes of multiple specifications according to the matching processing of the steel bar length. A single steel bar can be fully utilized after cutting, reducing steel loss.

[0056] Those skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present disclosure (including the claims) is limited to these examples. Based on the concept of the present disclosure, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of different aspects of one or more embodiments of the present specification as above, which are not provided in detail for the sake of simplicity.

[0057] In addition, to simplify the description and discussion, and in order not to make one or more embodiments of the present specification difficult to understand, the known power / ground connections of other components may or may not be shown in the provided figures. In addition, the structure can be shown in the form of a block diagram to avoid making one or more embodiments of the present specification difficult to understand, and this also takes into account the fact that the details of the implementation of these block diagram structures are highly dependent on the platform on which one or more embodiments of the present specification will be implemented (that is, these details should be fully within the scope of understanding of those skilled in the art). Where specific details are set forth to describe exemplary embodiments of the present disclosure, it is apparent to those skilled in the art that one or more embodiments of the present specification can be implemented without these specific details or with changes in these specific details. Therefore, these descriptions should be considered illustrative rather than restrictive.

[0058] One or more embodiments of this specification are intended to cover all such substitutions, modifications and variations that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of one or more embodiments of this specification should be included in the scope of protection of this disclosure.

Claims

1. A panel reinforcement assembly device, characterized in that: include: A tooling platform, and a mechanical arm assembly connected to the tooling platform and used for assembling a panel reinforcement mesh; wherein, The tooling platform is provided with a positioning die with adjustable spacing; The panel steel mesh has a plurality of prefabricated steel bars arranged crosswise, the plurality of prefabricated steel bars are limitedly positioned in the positioning mold, and the mechanical arm assembly is matched and connected with the plurality of prefabricated steel bars to form the integrated panel steel mesh.

2. The panel reinforcement assembly equipment according to claim 1, characterized in that: The positioning mold includes: a fixed horizontal plate and a sliding horizontal plate symmetrically arranged at both ends of the tooling platform, and a fixed vertical plate and a sliding vertical plate symmetrically arranged at both sides of the tooling platform; The sliding horizontal plate slides relative to the fixed horizontal plate and can be locked on the tooling platform; The sliding vertical plate slides relative to the fixed vertical plate and can be locked on the tooling platform.

3. The panel reinforcement assembly equipment according to claim 2, characterized in that: The tooling platform is symmetrically provided with a first slide groove along the length direction, and the sliding cross plate is equipped with a first sliding block matched with the first slide groove.

4. The panel reinforcement assembly equipment according to claim 3, characterized in that: The tooling platform is symmetrically provided with a second slide groove in the width direction, and the sliding vertical plate is equipped with a second sliding block matched with the second slide groove.

5. The panel reinforcement assembly equipment according to claim 4, characterized in that: The first sliding groove and the second sliding groove cross each other and penetrate each other.

6. The panel reinforcement assembly equipment according to claim 5, characterized in that: The sliding horizontal plate and the sliding vertical plate are both provided with magnetic suction parts or top screw parts matching with the tooling platform.

7. The panel reinforcement assembly equipment according to claim 1, characterized in that: The plurality of prefabricated steel bars are connected by node welding or node binding to form an integrated panel steel mesh.

8. The panel reinforcement assembly equipment according to claim 7, characterized in that: The mechanical arm assembly includes: a working mechanical arm and a transport mechanical arm; wherein, When the plurality of prefabricated steel bars are connected to form the panel steel mesh as an integral whole through node welding, the working mechanical arm places the plurality of prefabricated steel bars at intervals in the positioning mold and welds the nodes of the plurality of prefabricated steel bars; The transport robot arm transports the panel steel meshes welded together into a whole by classification.

9. A panel steel mesh, characterized in that: A panel reinforcement mesh assembled by the panel reinforcement assembly equipment according to any one of claims 1 to 8; The panel reinforcement mesh is the reinforcement mesh of the bottom layer of the plate and / or; The panel steel mesh is a plate surface layer steel mesh.