Thermal management system for graphitization furnace production workshop
By designing the thermal management system of the graphitization furnace production workshop, the waste heat of the graphitization furnace is used for nearby preheating, the problem of waste heat utilization caused by heat source instability is solved, the efficient recycling of heat energy is achieved, and equipment investment and use are saved Electricity fee.
Patent Information
- Application Number
- CN202420285080.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-06
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-02-06
AI Technical Summary
The difficulty in utilizing waste heat during the graphitization furnace production process is mainly due to the difficulty in heat source instability and the difficulty in thermal energy conversion caused by the reduction of temperature gradient during cooling.
A thermal management system for graphitization furnace production workshop was designed, including graphitization furnace production unit, thermal working fluid storage unit, heat exchange unit, cooling water recovery unit, cold working fluid storage unit and conveying device, which was extracted through the heat extraction device. The heat during cooling of the graphitization furnace is preheated by using hot working fluid to heat, and the heat energy recycling is realized through heat exchange and cooling water recovery.
Effectively utilize the waste heat of the graphitization furnace for nearby preheating, avoiding the difficulty of waste heat utilization caused by heat source instability, saving equipment investment and production costs, and increasing the starting temperature of the material, reducing the heating time and electricity consumption costs.
Smart Images

Figure CN221959292U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of waste heat utilization of a graphitization furnace, and in particular to a heat management system for a graphitization furnace production workshop. Background Art
[0002] Graphitization furnaces are used to produce special carbon material products such as steelmaking carbon anode materials, battery negative electrode materials, carbon fibers, graphite thermal conductive materials, crucibles, carburizing agents, carbon composite materials, etc. In the existing production process of graphitization furnaces, the furnace core temperature generally needs to be raised to above 3000°C, and the graphite material needs to be cooled to 300-400°C after calcination. In this process, a large amount of waste heat will be generated, and the rational use of waste heat can improve energy utilization efficiency and reduce energy waste and environmental pollution.
[0003] For example, CN107445156A discloses a graphitization furnace with rapid cooling and waste heat recovery functions, including a furnace body, a furnace cover covering the top of the furnace body, and a waste heat utilization device. The side wall of the furnace body is provided with two layers, namely, the inner wall of the furnace wall and the outer wall of the furnace wall sleeved outside the inner wall of the furnace wall. A hollow channel is provided between the outer wall of the furnace wall and the inner wall of the furnace wall. The lower part of the hollow channel is connected to the air intake pipe arranged at the bottom of the furnace body, and the upper part of the hollow channel is connected to the waste heat utilization device through the exhaust main pipe. The graphitization furnace uses air as a medium to recover the waste heat of the graphitization furnace, thereby recovering the waste heat generated during the operation of the graphitization furnace and avoiding serious waste of energy.
[0004] CN103900390A discloses a method for utilizing waste energy of a graphitization furnace based on forced cooling, in which the cooling method of the graphitization furnace is changed from natural cooling to forced cooling, and the waste heat in the cooling process of the graphitized product is converted into steam through a heat-carrying gas to generate electricity and heat.
[0005] CN108662910A discloses a method for producing Taixi calcined coal and electric calcined coal by using graphitization waste heat to replace the calcining furnace, including the steps of loading the furnace and graphitization, using the washed Taixi anthracite as insulation material, heating it to 800°C or 1800°C using the waste heat of graphitization, and converting it into calcined anthracite after calcination.
[0006] However, since the production process of the graphitization furnace is intermittent, and the loading, suction and other processes often cause instability of the heat source during the waste heat utilization process, it is difficult to use the waste heat of the graphitization furnace for steam production or power generation in actual production. In addition, as the cooling process proceeds, the temperature gradient at the inlet and outlet of the working fluid gradually decreases, which makes the conversion of thermal energy more difficult.
[0007] Therefore, developing a thermal management system for a graphitization furnace production workshop to effectively utilize the waste heat of the graphitization furnace is a technical problem that urgently needs to be solved in this field. Utility Model Content
[0008] In view of the deficiencies in the prior art, the purpose of the utility model is to provide a thermal management system for a graphitization furnace production workshop, which can use the waste heat of the graphitization furnace to preheat other nearby graphitization furnaces that need to be heated, thereby avoiding the difficulty in utilizing waste heat due to unstable heat sources and saving equipment investment and production costs.
[0009] To achieve this purpose, the utility model adopts the following technical solutions:
[0010] The utility model provides a thermal management system for a graphitization furnace production workshop, the thermal management system comprising a graphitization furnace production unit, a hot working medium storage unit, a heat exchange unit, a cooling water recovery unit, a cold working medium storage unit and a conveying device;
[0011] The outlet of the hot working medium storage unit is connected to the hot working medium inlet of the heat exchange unit, the hot working medium outlet of the heat exchange unit is connected to the cold working medium storage unit, the cooling water inlet of the heat exchange unit is connected to the cooling water pipeline, the cooling water outlet of the heat exchange unit is connected to the cooling water recovery unit, and the outlet of the cold working medium storage unit is connected to the inlet main pipe via the conveying device;
[0012] The graphitization furnace production unit comprises at least two graphitization furnaces, each of which is provided with a heat extraction device; the outlet of the inlet main pipe is respectively connected to the main input pipeline of each graphitization furnace, the outlet of the main input pipeline is connected to at least one branch input pipeline, the outlet of the branch input pipeline is connected to the working medium inlet of the heat extraction device, and the inlet of the main input pipeline of each graphitization furnace is also respectively connected to the through pipe;
[0013] The inlet of the thermal working medium storage unit is connected to the outlet main pipe; the inlet of the outlet main pipe is respectively connected to the main output pipeline of each graphitization furnace, the inlet of the main output pipeline is connected to at least one branch output pipeline, the inlet of the branch output pipeline is connected to the working medium outlet of the heat extraction device, and the outlet of the main output pipeline of each graphitization furnace is also respectively connected to the through pipe.
[0014] In the present invention, in order to solve the problem of difficulty in utilizing waste heat from graphitization furnaces, a thermal management system for a graphitization furnace production workshop is provided. The graphitization furnace production unit can be, for example, a production workshop with multiple graphitization furnaces, including at least two graphitization furnaces, for example, 2, 3 or 4, but not limited to the listed values, and other values not listed in the numerical range are also applicable. In the present invention, the total input pipeline is connected to at least one branch input pipeline, for example, 1, 2 or 3, but not limited to the listed values, and other values not listed in the numerical range are also applicable; the inlet of the total output pipeline is connected to at least one branch output pipeline, for example, 1, 2 or 3, but not limited to the listed values, and other values not listed in the numerical range are also applicable.
[0015] In the utility model, a heat extraction device capable of extracting heat is provided in the graphitization furnace, so as to extract heat when the graphitization furnace is cooled. The heat extraction device is provided with a working medium outlet and a working medium inlet. After the heat is extracted, the working medium carrying heat is merged into the outlet main pipe through the total output pipeline and stored in the hot working medium storage unit, or the working medium carrying heat is entered into the total input pipeline of the graphitization furnace to be heated through the through pipe and finally enters the heat extraction device to preheat the material in the graphitization furnace. The preheated working medium is merged into the outlet main pipe through the total output pipeline and stored in the hot working medium storage unit. The working medium in the hot working medium storage unit exchanges heat with cooling water through the heat exchange unit. After the cooling water absorbs the heat, it generates steam or enters the cooling water recovery unit to dissipate the unusable heat. After the heat exchange, the hot working medium is converted into a cold working medium and stored in the cold working medium storage unit. When the graphitization furnace needs to be cooled, the cold working medium is transported to the total input pipeline of the graphitization furnace to be cooled through the conveying device and the inlet main pipe and finally enters the heat extraction device to cool the material in the graphitization furnace. Since the cooling period of the graphitization furnace is much longer than the preheating period, if the graphitization furnace to be cooled has not been cooled down after the preheating of one graphitization furnace is completed, the remaining hot working fluid can be sent to the hot working fluid storage tank or other graphitization furnaces that need to be preheated.
[0016] In the present utility model, there is no special limitation on the thermal working fluid storage unit, which may be any device suitable for storing thermal working fluids in the art, such as a thermal working fluid storage tank; there is no special limitation on the heat exchange unit, which may be any device suitable for heat exchange in the art, such as a heat exchanger; there is no special limitation on the cooling water recovery unit, which may be any device suitable for recovering and storing cooling water in the art, such as a cooling tower; there is no special limitation on the cold working fluid storage unit, which may be any device suitable for storing cold working fluids in the art, such as a cold working fluid storage tank; there is no special limitation on the conveying device, which may be any conveying device suitable for conveying working fluids in the art, such as a circulating pump.
[0017] In the present invention, the heat extraction device has the function of cooling and heating materials by using working fluid, for example, it can be a heat exchange coil or a high-temperature heat pipe. In the present invention, due to the high temperature characteristics of the graphitization furnace, it is generally not suitable to use water as the working fluid, and molten salt or heat transfer oil is generally selected as the working fluid.
[0018] Preferably, the outlet of the conveying device is connected to the inlet main pipe via an inlet main valve.
[0019] In the present invention, the communication includes direct communication or indirect communication. As a preferred technical solution, the indirect communication includes communication through a valve, and the flow of the working medium is controlled by designing the valve.
[0020] Preferably, the number of heat extraction devices in each graphitization furnace is at least 1, for example, it can be 1, 2, 3, 4, 5 or 6, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0021] Preferably, the inlet of the thermal medium storage unit is connected to the outlet main pipe via an outlet main valve.
[0022] Preferably, a main input valve is provided at the outlet of the main input pipeline of each graphitization furnace.
[0023] Preferably, the inlet main pipe is communicated with the main input pipeline of each graphitization furnace through a first valve; and the through pipe is communicated with the main input pipeline of each graphitization furnace through a second valve.
[0024] In the present invention, the first valve refers to a valve used to connect the inlet main pipe and the main input pipeline, and the second valve refers to a valve used to connect the through pipe and the main input pipeline. The number of the first valve and the second valve in the thermal management system can be multiple, and the valve used in the present invention can be manually controlled or remotely controlled.
[0025] Preferably, the inlet main pipe, the through pipe and the main input pipeline of each graphitizing furnace are respectively connected through a first three-way reversing valve; the outlet of the first three-way reversing valve is fixedly connected to the main input pipeline; the inlet of the first three-way reversing valve is respectively connected to the inlet main pipe and the through pipe by rotating the valve.
[0026] Preferably, a main output valve is provided at the inlet of the main output pipeline of each graphitization furnace.
[0027] In the utility model, by preferably setting the main input valve and the main output valve, it can play a role in risk prevention. If the working fluid leaks in the graphitization furnace during the cooling process of a single furnace, more working fluid can be prevented from entering the heat extraction device in the furnace by closing the main input valve; if the working fluid leaks in the graphitization furnace to be preheated during the cooling and preheating process of the double furnaces, more working fluid can be prevented from entering the graphitization furnace to be preheated by closing the main output valve.
[0028] Preferably, the outlet main pipe is communicated with the main output pipeline of each graphitization furnace through a third valve; and the through pipe is communicated with the main output pipeline of each graphitization furnace through a fourth valve.
[0029] In the present invention, the third valve refers to a valve used to connect the outlet main pipe and the total output pipeline, and the fourth valve refers to a valve used to connect the through pipe and the total output pipeline. The number of the third valve and the fourth valve in the thermal management system can be multiple.
[0030] Preferably, the outlet main pipe, the through pipe and the total output pipeline of each graphitization furnace are respectively connected through a second three-way reversing valve; the inlet of the second three-way reversing valve is fixedly connected to the total output pipeline; the outlet of the second three-way reversing valve is respectively connected to the outlet main pipe and the through pipe by rotating the valve.
[0031] In the present invention, by preferably using a three-way reversing valve, the number of valves used can be reduced, and the control difficulty can be reduced. In the present invention, the first three-way reversing valve refers to a three-way reversing valve connecting the inlet main pipe, the through pipe and the main input pipeline, and the second three-way reversing valve refers to a three-way reversing valve used to connect the outlet main pipe, the through pipe and the main output pipeline. The number of the first three-way reversing valve and the second three-way reversing valve in the thermal management system can be multiple.
[0032] Compared with the prior art, the beneficial effects of the utility model are:
[0033] (1) The thermal management system for a graphitization furnace production workshop provided by the utility model can effectively utilize the waste heat of the graphitization furnace to realize the preheating of other graphitization furnaces to be heated in the workshop nearby, thereby avoiding the difficulty in utilizing waste heat caused by the instability of the heat source and saving the equipment investment for utilizing waste heat.
[0034] (2) The thermal management system for the graphitization furnace production workshop provided by the utility model utilizes waste heat to preheat materials in other graphitization furnaces, thereby increasing the starting temperature of the materials during power heating, reducing the power heating time, and saving electricity costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1This is a schematic diagram of the structure of the thermal management system described in Example 1 of the utility model;
[0036] Figure 2 This is a schematic diagram of the structure of the thermal management system described in Example 2 of the present utility model;
[0037] Figure 3 This is a schematic diagram of the structure of the reversing valve V1-101 described in Example 2 of the utility model;
[0038] Figure 4 This is a schematic diagram of the structure of the reversing valve V1-102 described in Example 2 of the utility model;
[0039] In the figure: 1-hot medium storage tank; 2-heat exchanger; 3-cooling tower; 4-cold medium storage tank; 5-transport device; 6-cooling water pipeline; 7-graphitization furnace No. 1; 8-graphitization furnace No. 2; 9-graphitization furnace No. 3; 10-heat extraction device; 11-inlet main pipe; 12-outlet main pipe; 13-through pipe; 14-total input pipeline; 15-total output pipeline;
[0040] Among them, VI, VO, V1-1, V1-2, V1-3, V1-4, V1-5, V1-6, V2-1, V2-2, V2-3, V2-4, V2-5, and V2-6 are all valves;
[0041] V1-101, V1-102, V2-101, and V2-102 are all reversing valves. DETAILED DESCRIPTION
[0042] The technical solution of the utility model is further explained below with reference to the accompanying drawings and through specific implementation methods.
[0043] The utility model is further described in detail below. However, the following examples are only simple examples of the utility model and do not represent or limit the scope of protection of the utility model. The scope of protection of the utility model shall be subject to the claims.
[0044] It should be understood that, in the description of the present utility model, the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.
[0045] It should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "set", "connected", and "connected" should be understood in a broad sense, for example, it can be fixed connection, detachable connection, or integrated connection; it can be mechanical connection or electrical connection; it can be directly connected or indirectly connected through an intermediate working medium, or it can be internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0046] Those skilled in the art should understand that the present invention necessarily includes necessary pipelines, conventional valves and general pump equipment for realizing a complete process, but the above content does not belong to the main invention point of the present invention. Those skilled in the art can add layouts on their own based on the process flow and equipment structure selection, and the present invention does not make special requirements and specific limitations on this.
[0047] Example 1
[0048] This embodiment provides a thermal management system for a graphitization furnace production workshop, such as Figure 1 As shown, the thermal management system includes a graphitization furnace production unit, a hot working fluid storage unit, a heat exchange unit, a cooling water recovery unit, a cold working fluid storage unit and a conveying device 5, wherein the hot working fluid storage unit is a hot working fluid storage tank 1, the heat exchange unit is a heat exchanger 2, the cooling water recovery unit is a cooling tower 3, the cold working fluid storage unit is a cold working fluid storage tank 4, the conveying device 5 is a circulating pump, and the working fluid used is heat transfer oil;
[0049] The outlet of the hot working medium storage tank 1 is communicated with the hot working medium inlet of the heat exchanger 2, the hot working medium outlet of the heat exchanger 2 is communicated with the cold working medium storage tank 4, the cooling water inlet of the heat exchanger 2 is communicated with the cooling water pipeline 6, the cooling water outlet of the heat exchanger 2 is communicated with the cooling water tower 3, the graphitization furnace production unit includes 3 graphitization furnaces, namely No. 1 graphitization furnace 7, No. 2 graphitization furnace 8 and No. 3 graphitization furnace 9, each of which is provided with a plurality of heat extraction devices 10; the outlet of the cold working medium storage tank 4 is communicated with the inlet main pipe 11 through the circulation pump and the inlet main valve (i.e., valve VI) in sequence, the outlet of the inlet main pipe 11 is communicated with the main input pipeline 14 of each graphitization furnace through the first valve respectively, the outlet of the main input pipeline 14 of each graphitization furnace is respectively provided with a main input valve, and the outlet of the main input pipeline 14 is communicated with two branch input pipelines, i.e., the first branch input pipeline and the second branch input pipeline. The working medium inlet of the heat extraction device 10 is communicated with the outlets of the first branch input pipeline and the second branch input pipeline respectively, and the inlet of the total input pipeline 14 of each graphitization furnace is also communicated with the through pipe 13 through the second valve. The inlet of the hot working medium storage tank 1 is communicated with the outlet main pipe 12 through the outlet main valve (i.e., valve VO), and the inlet of the outlet main pipe 12 is communicated with the total output pipeline 15 of each graphitization furnace through the third valve. The inlet of the total output pipeline 15 of each graphitization furnace is respectively provided with a total output valve. The inlet of the total output pipeline 15 is communicated with two branch output pipelines, i.e., the first branch output pipeline and the second branch output pipeline. The working medium outlet of the heat extraction device 10 is respectively communicated with the inlet of the first branch output pipeline and the second branch output pipeline, and the outlet of the total output pipeline 15 of each graphitization furnace is also communicated with the through pipe 13 through the fourth valve.
[0050] Taking the No. 1 graphitization furnace 7 and the No. 2 graphitization furnace 8 as examples, the first valve includes a valve V1-1 and a valve V2-1, the outlet of the inlet main pipe 11 is connected to the main input pipeline 14 of the No. 1 graphitization furnace 7 through the valve V1-1, and the outlet of the inlet main pipe 11 is connected to the main input pipeline 14 of the No. 2 graphitization furnace 8 through the valve V2-1;
[0051] The second valve includes a valve V1-2 and a valve V2-2, the through-pipe 13 is connected to the main input pipeline 14 of the No. 1 graphitization furnace 7 through the valve V1-2, and the through-pipe 13 is connected to the main input pipeline 14 of the No. 2 graphitization furnace 8 through the valve V2-2;
[0052] The third valve includes valve V1-5 and valve V2-5, the outlet main pipe 12 is connected to the total output pipeline 15 of the No. 1 graphitization furnace 7 through the valve V1-5, and the outlet main pipe 12 is connected to the total output pipeline 15 of the No. 2 graphitization furnace 8 through the valve V2-5;
[0053] The fourth valve includes a valve V1-6 and a valve V2-6, the through pipe 13 is connected to the total output pipeline 15 of the No. 1 graphitization furnace 7 through the valve V1-6, and the through pipe 13 is connected to the total output pipeline 15 of the No. 2 graphitization furnace 8 through the valve V2-6;
[0054] The outlets of the total input pipelines 14 of the No. 1 graphitization furnace 7 and the No. 2 graphitization furnace 8 are respectively provided with total input valves, which are valves V1-3 and valve V2-3 in sequence; the inlets of the total output pipelines 15 of the No. 1 graphitization furnace 7 and the No. 2 graphitization furnace 8 are provided with total output valves, which are valves V1-4 and V2-4 in sequence.
[0055] The control process of the thermal management system for the graphitization furnace production workshop provided in the above embodiment includes a single furnace cooling stage and a double furnace cooling stage, which are specifically as follows:
[0056] Single furnace cooling stage: when the No. 1 graphitization furnace 7 enters the cooling stage after heating is completed, and there is no other graphitization furnace that needs to be heated, valve VI, valve VO, valve V1-1, valve V1-3, valve V1-4 and valve V1-5 are opened, valve V1-2 and valve V1-6 are closed, and the valves on other graphitization furnaces are also in a closed state. At this time, the working fluid passes through valve VI, valve V1-1 and valve V1-3 from the cold working fluid storage tank 4 to enter the No. 1 graphitization furnace 7 to take heat. After the heat is taken, the working fluid flows through valve V1-4, valve V1-5 and valve VO to enter the hot working fluid storage tank 1. The hot working fluid in the hot working fluid storage tank 1 passes through the heat exchanger 2, and after heat exchange with cooling water in the heat exchanger 2, it becomes a cold working fluid and enters the cold working fluid storage tank 4 to enter the next cycle.
[0057] Double furnace cooling and preheating stage: When the No. 1 graphitization furnace 7 is cooling, the No. 2 graphitization furnace 8 is loaded and enters the heating stage. At this time, open valve VI, valve VO, valve V1-1, valve V1-3, valve V1-4, valve V1-6, valve V2-2, valve V2-3, valve V2-4 and valve V2-5, close valve V2-1, valve V2-6, valve V1-5 and valve V1-2, and after the heat is taken out of the No. 1 graphitization furnace 7 The working fluid enters the No. 2 graphitization furnace 8 through valve V1-4, valve V1-6, valve V2-2, and valve V2-3 in sequence to preheat the material in the No. 2 graphitization furnace 8. The preheated working fluid returns to the hot working fluid storage tank 1 through valve V2-4, valve V2-5, and valve VO in sequence. The hot working fluid in the hot working fluid storage tank 1 passes through the heat exchanger 2, and after heat exchange with cooling water in the heat exchanger 2, it becomes a cold working fluid and enters the cold working fluid storage tank 4 to enter the next cycle.
[0058] Among them, valves V1-3, valve V2-3, valves V1-4 and valves V2-4 can play a role in risk prevention. For example, if the working fluid in graphitization furnace No. 1 7 leaks during the cooling stage of a single furnace, valve V1-3 can be closed in time to prevent more working fluid from entering graphitization furnace No. 1 7; if the working fluid leaks in graphitization furnace No. 2 8 during the cooling and preheating stage of the double furnaces, valve V1-4 can be closed in time to prevent the working fluid from entering graphitization furnace No. 2 8.
[0059] After applying the thermal management system for the graphitization furnace production workshop provided in Example 1, the waste heat after the cooling of the graphitization furnace No. 1 7 can be used to preheat the material of the graphitization furnace No. 2 8 to 200° C., and based on the graphite output of 110 tons per furnace, the electricity consumption can be saved by about 6,800 degrees.
[0060] Example 2
[0061] This embodiment provides a thermal management system for a graphitization furnace production workshop, such as Figure 2 As shown, the only difference compared with Example 1 is that the first valve and the second valve are replaced by a first three-way reversing valve, that is, the inlet main pipe 11, the through pipe 13 and the main input pipeline 14 of each graphitization furnace are respectively connected through the first three-way reversing valve, the outlet of the first three-way reversing valve is fixedly connected to the main input pipeline 14, and the inlet of the first three-way reversing valve is respectively connected to the inlet main pipe 11 and the through pipe 13 by rotating the valve;
[0062] At the same time, the third valve and the fourth valve are replaced by a second three-way reversing valve, that is, the outlet main pipe 12, the through pipe 13 and the total output pipeline 15 of each graphitization furnace are connected through the second three-way reversing valve respectively, the inlet of the second three-way reversing valve is fixedly connected to the total output pipeline 15, and the outlet of the second three-way reversing valve is connected to the outlet main pipe 12 and the through pipe 13 respectively by rotating the valve.
[0063] Taking the No. 1 graphitization furnace 7 and the No. 2 graphitization furnace 8 as examples, the first three-way reversing valve includes a reversing valve V1-101 and a reversing valve V2-101. The reversing valve V1-101 is arranged between the inlet main pipe 11, the through pipe 13 and the total input pipeline 14 of the No. 1 graphitization furnace 7. The outlet of the reversing valve V1-101 is fixedly connected to the total input pipeline 14 of the No. 1 graphitization furnace 7, and the inlet of the reversing valve V1-101 is respectively connected to the inlet main pipe 11 and the through pipe 13 by rotating the valve (taking the reversing valve V1-101 as an example, as shown in FIG. Figure 3As shown, the inlet of the first three-way reversing valve includes an a end and a b end, and is connected to the inlet main pipe 11 when the valve is rotated to connect to the a end, and is connected to the through pipe 13 when the valve is rotated to connect to the b end; when the a end is connected, the b end is considered to be closed, and when the b end is connected, the a end is considered to be closed). A reversing valve V2-101 is arranged between the inlet main pipe 11, the through pipe 13 and the main input pipeline 14 of the No. 2 graphitization furnace 8, and the outlet of the reversing valve V2-101 is fixedly connected to the main input pipeline 14 of the No. 2 graphitization furnace 8, and the inlet of the reversing valve V2-101 is respectively connected to the inlet main pipe 11 and the through pipe 13 through the rotating valve;
[0064] The second three-way reversing valve includes a reversing valve V1-102 and a reversing valve V2-102. The reversing valve V1-102 is arranged between the outlet main pipe 12, the through pipe 13 and the total output pipeline 15 of the No. 1 graphitization furnace 7. The inlet of the reversing valve V1-102 is fixedly connected to the total output pipeline 15, and the outlet of the reversing valve V1-102 is respectively connected to the outlet main pipe 12 and the through pipe 13 by rotating the valve (taking the reversing valve V1-102 as an example, as shown in FIG. Figure 4 As shown, the outlet of the second three-way reversing valve includes the c end and the d end. When the valve is rotated to connect to the c end, it is connected to the outlet main pipe 12, and when the valve is rotated to connect to the d end, it is connected to the through pipe 13; when the c end is connected, the d end is considered to be closed, and when the d end is connected, the c end is considered to be closed). A reversing valve V2-102 is arranged between the outlet main pipe 12, the through pipe 13 and the total output pipeline 15 of the No. 2 graphitizing furnace 8. The inlet of the reversing valve V2-102 is fixedly connected to the total output pipeline 15, and the outlet of the reversing valve V2-102 is respectively connected to the outlet main pipe 12 and the through pipe 13 through the rotating valve.
[0065] The control process of the thermal management system for the graphitization furnace production workshop provided in the above embodiment includes a single furnace cooling stage and a double furnace cooling stage, which are specifically as follows:
[0066] Single furnace cooling stage: When the No. 1 graphitization furnace 7 enters the cooling stage after heating, and there is no other graphitization furnace that needs to be heated, valve VI, valve VO, reversing valve V1-101, reversing valve V1-102, valve V1-3, valve V1-4 are opened at this time, and the valves on other graphitization furnaces are in the closed state. At this time, the reversing valve V1-101 is connected to the a end, that is, connected to the inlet main pipe 11, and the reversing valve V-102 is connected to the c end, that is, connected to the outlet main pipe 12 The working fluid passes through valve VI, end a of reversing valve V1-101 and valve V1-3 from the cold working fluid storage tank 4 to enter graphitizing furnace 7 to extract heat. After the heat extraction is completed, the working fluid flows through valve V1-4, end c of reversing valve V1-102 and valve VO to enter hot working fluid storage tank 1. The hot working fluid in hot working fluid storage tank 1 passes through heat exchanger 2, and after heat exchange with cooling water in heat exchanger 2, it becomes cold working fluid and enters cold working fluid storage tank 4 to enter the next cycle.
[0067] Double furnace cooling and preheating stage: when the No. 1 graphitization furnace 7 is cooling, the No. 2 graphitization furnace 8 is loaded and enters the heating stage. At this time, open valve VI, valve VO, reversing valve V1-101, valve V1-3, valve V1-4, reversing valve V1-102, reversing valve V2-101, valve V2-3, valve V2-4 and reversing valve V2-102. At this time, the reversing valve V1-101 is connected to the a end, that is, it is connected to the inlet main pipe 11, the reversing valve V-102 is connected to the d end, that is, it is connected to the through pipe 13, and the reversing valve V2-101 is connected to the b end, that is, the total input pipeline 14 of the No. 2 graphitization furnace 8 is connected to the through pipe 13 , the reversing valve V2-102 is connected to the c end, that is, it is connected to the outlet main pipe 12. After the heat is taken out from the No. 1 graphitization furnace 7, the working fluid passes through the valve V1-4, the d end of the reversing valve V-102, the b end of the reversing valve V2-101, and the valve V2-3 in turn to enter the No. 2 graphitization furnace 8 and preheat the materials in the No. 2 graphitization furnace 8. The preheated working fluid passes through the valve V2-4, the c end of the reversing valve V2-102 and the valve VO in turn to return to the hot working fluid storage tank 1. The hot working fluid in the hot working fluid storage tank 1 passes through the heat exchanger 2, and after heat exchange with cooling water in the heat exchanger 2, it becomes a cold working fluid and enters the cold working fluid storage tank 4 to enter the next cycle.
[0068] After applying the thermal management system for the graphitization furnace production workshop provided in Example 2, the material in the graphitization furnace No. 2 8 can be preheated to 200° C. using the waste heat after the cooling of the graphitization furnace No. 1 7. Based on the graphite output of 110 tons per furnace, the electricity consumption can be saved by about 6,800 degrees.
[0069] In summary, the thermal management system provided by the utility model can use the waste heat of the graphitization furnace to preheat other nearby graphitization furnaces that need to be heated, avoiding the difficulty in utilizing waste heat caused by unstable heat sources and saving equipment investment and production costs.
[0070] The applicant declares that the above is only a specific implementation method of the present utility model, but the protection scope of the present utility model is not limited thereto. The technicians in the relevant technical field should understand that any changes or substitutions that can be easily thought of by the technicians in the relevant technical field within the technical scope disclosed in the present utility model fall within the protection scope and disclosure scope of the present utility model.
Claims
1. A thermal management system for a graphitization furnace production workshop, It is characterized in that The thermal management system includes a graphitization furnace production unit, a hot working medium storage unit, a heat exchange unit, a cooling water recovery unit, a cold working medium storage unit and a conveying device; The outlet of the hot working medium storage unit is connected to the hot working medium inlet of the heat exchange unit, the hot working medium outlet of the heat exchange unit is connected to the cold working medium storage unit, the cooling water inlet of the heat exchange unit is connected to the cooling water pipeline, the cooling water outlet of the heat exchange unit is connected to the cooling water recovery unit, and the outlet of the cold working medium storage unit is connected to the inlet main pipe via the conveying device; The graphitization furnace production unit comprises at least two graphitization furnaces, each of which is provided with a heat extraction device; the outlet of the inlet main pipe is respectively connected to the main input pipeline of each graphitization furnace, the outlet of the main input pipeline is connected to at least one branch input pipeline, the outlet of the branch input pipeline is connected to the working medium inlet of the heat extraction device, and the inlet of the main input pipeline of each graphitization furnace is also respectively connected to the through pipe; The inlet of the thermal working medium storage unit is connected to the outlet main pipe; the inlet of the outlet main pipe is respectively connected to the main output pipeline of each graphitization furnace, the inlet of the main output pipeline is connected to at least one branch output pipeline, the inlet of the branch output pipeline is connected to the working medium outlet of the heat extraction device, and the outlet of the main output pipeline of each graphitization furnace is also respectively connected to the through pipe.
2. According to claim 1, the thermal management system for the graphitization furnace production workshop, It is characterized in that The outlet of the conveying device is communicated with the inlet main pipe via an inlet main valve.
3. According to claim 1, the thermal management system for the graphitization furnace production workshop, It is characterized in that The number of heat extraction devices in each graphitization furnace is at least one.
4. According to claim 1, the thermal management system for the graphitization furnace production workshop, It is characterized in that The inlet of the thermal medium storage unit is connected to the outlet main pipe through an outlet main valve.
5. According to claim 1, the thermal management system for the graphitization furnace production workshop, It is characterized in that A main input valve is respectively provided at the outlet of the main input pipeline of each graphitization furnace.
6. The thermal management system for a graphitization furnace production workshop according to claim 5, It is characterized in that The inlet main pipe is connected to the main input pipeline of each graphitization furnace through a first valve; The through pipe is communicated with the main input pipeline of each graphitization furnace via a second valve.
7. According to the thermal management system for graphitization furnace production workshop according to claim 5, It is characterized in that The inlet main pipe, the through pipe and the main input pipeline of each graphitization furnace are respectively connected through a first three-way reversing valve; The outlet of the first three-way reversing valve is fixedly connected to the main input pipeline; The inlet of the first three-way reversing valve is communicated with the inlet main pipe and the through pipe respectively through a rotating valve.
8. The thermal management system for a graphitization furnace production workshop according to claim 1, It is characterized in that A main output valve is respectively arranged at the inlet of the main output pipeline of each graphitization furnace.
9. The thermal management system for a graphitization furnace production workshop according to claim 8, It is characterized in that The outlet main pipe is connected to the main output pipeline of each graphitization furnace through a third valve; The through pipe is communicated with the total output pipeline of each graphitization furnace via a fourth valve.
10. The thermal management system for a graphitization furnace production workshop according to claim 8, It is characterized in that The outlet main pipe, the through pipe and the main output pipeline of each graphitization furnace are respectively connected through a second three-way reversing valve; The inlet of the second three-way reversing valve is fixedly connected to the main output pipeline; The outlet of the second three-way reversing valve is communicated with the outlet main pipe and the through pipe respectively through a rotating valve.
Citation Information
Cited By
Graphitization furnace workshop waste heat recycling system and method and storage medium
CN119063500A
