Three-phase four-wire system energy storage grid-connected inverter relay failure detection device
By setting a relay group in a three-phase four-wire energy storage grid-connected inverter and collecting real-time voltage values, the inverter failure is solved, and the existing technology cannot meet the detection needs of the three-phase four-wire system, reducing the MCU Calculate the burden, realizes unbalanced current output and backup power supply.
Patent Information
- Application Number
- CN202420243434.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-01-31
AI Technical Summary
The existing three-phase grid-connected inverter relay failure detection method cannot meet the use requirements of three-phase four-wire grid-connected inverters, and the MCU data calculation requirements are high, resulting in high equipment costs.
A three-phase and four-wire energy storage grid-connected inverter relay failure detection device was designed. By setting up relay groups at the grid and EPS load ends, the real-time voltage value was collected using the sampling subsystem to calculate the inverter voltage and the power grid. The vector difference of voltage determines the adhesion or disconnection of the relay, and reduces the data calculation workload of the MCU.
Relay failure detection of three-phase four-wire energy storage grid-connected inverter is realized, which meets the system's usage requirements, reduces the calculation workload of the MCU, ensures the unbalanced current output of each phase, and stores it in the household It can provide single-phase load power supply for backup power ports in the grid-connected inverter.
Smart Images

Figure CN221977059U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of grid-connected and off-grid inverter control in energy storage equipment, and specifically relates to a three-phase four-wire energy storage grid-connected inverter relay failure detection device. Background Art
[0002] As a supporting system for household microgrids, energy storage systems are generally connected to the grid through grid-connected inverters. In order to achieve electrical isolation and ensure the safety factor, a grid-connected inverter relay needs to be set between the output end and the grid end. The stable and reliable performance of the grid-connected inverter relay is directly related to the safety and stability of electrical isolation. The traditional three-phase grid-connected inverter relay failure detection method is only applicable to three-phase three-wire grid-connected inverters, which do not have an isolation relay on the neutral line and no EPS load port, and cannot meet the use requirements of three-phase household energy storage grid-connected inverter systems. Or if there is no isolation relay on the N line, it is impossible to achieve single-phase load power supply at the backup power port of the three-phase four-wire energy storage grid-connected inverter.
[0003] In the prior art three-phase grid-connected inverter relay failure detection method, detection is performed by sampling and calculating whether the average value within a mains power cycle is greater than a set threshold. This method requires a large amount of data calculation, has high requirements on the MCU's RAM resources, and has high equipment cost investment. Summary of the invention
[0004] In order to solve the above-mentioned problems existing in the prior art, the purpose of the utility model is to provide a three-phase four-wire energy storage grid-connected inverter relay failure detection device, which can meet the use requirements of the three-phase four-wire energy storage grid-connected inverter, reduce the data calculation workload of the MCU, and realize unbalanced current output of each phase.
[0005] The technical solution adopted by the utility model is:
[0006] The first technical solution provides a three-phase four-wire energy storage grid-connected inverter relay failure detection device, comprising a detection control system, an energy storage grid-connected inverter, a grid end and an EPS load end, the grid end is a three-phase four-wire grid source, the EPS load end is a three-phase four-wire EPS load port, and the energy storage grid-connected inverter is connected in parallel to the grid end and the EPS load end through a three-phase four-wire wiring method;
[0007] The output end of the energy storage grid-connected inverter is connected to each grid phase line and grid neutral line at the grid end, and a relay is respectively provided on the grid side to form a grid-side relay group;
[0008] The output end of the energy storage grid-connected inverter is connected to each load phase line and load neutral line of the EPS load end, and a relay is also provided respectively to form an EPS load-side relay group;
[0009] The detection control system includes a sampling subsystem, which is used to collect and obtain the real-time voltage value of each inverter phase line of the energy storage grid-connected inverter, each grid phase line at the grid end, and each load phase line at the EPS load end at different phases;
[0010] The detection control system is used to independently drive and control the opening and closing state of each relay, calculate the real-time voltage signal value information according to the real-time voltage value collected by the sampling subsystem, and compare and determine whether any relay has a sticking fault or a disconnection fault.
[0011] Furthermore, the real-time voltage signal value information is the vector difference between the inverter voltage and the grid voltage of two different phases of each phase line within a sinusoidal wave voltage cycle.
[0012] Furthermore, the sampling subsystem includes a plurality of voltage sampling units respectively arranged on each phase line of the energy storage grid-connected inverter output end, the grid end and the EPS load end, and each of the voltage sampling units is used to collect and obtain the real-time voltage value of the corresponding phase line.
[0013] Furthermore, the sampling subsystem includes three inverter voltage sampling units, three grid voltage sampling units and three load voltage sampling units;
[0014] One end of each of the inverter voltage sampling units is connected to an inverter phase line, and the other end is connected to an inverter neutral line;
[0015] One end of each of the grid voltage sampling units is connected to a grid phase line, and the other end is connected to a grid neutral line;
[0016] One end of each of the load voltage sampling units is connected to a load grid phase line, and the other end is connected to a load neutral line.
[0017] Furthermore, the detection control system includes a main control module, a detection drive signal module, a detection result judgment module and the sampling subsystem;
[0018] The main control module is used to send opening and closing drive signals to all relays respectively, instruct the sampling subsystem to collect and obtain the real-time voltage value of each inverter phase line of the energy storage grid-connected inverter, each grid phase line at the grid end and each grid phase line at the EPS load end, and receive the sampling data information fed back by the sampling subsystem, perform calculations, compare and judge, and output the detection results.
[0019] Furthermore, the main control module includes a data processing unit, a judgment and comparison unit and a warning unit;
[0020] The data processing unit is used to perform calculations based on the sinusoidal voltage values of at least two phases of the same phase line fed back by the sampling subsystem to obtain real-time voltage signal value information;
[0021] The judgment and comparison unit is used to compare the real-time voltage signal value information with the preset threshold value and feed back the detection result to the warning unit;
[0022] The warning unit is used to provide sound, light or terminal display alarm prompts according to the detection results.
[0023] Furthermore, the real-time voltage signal value information is the vector difference between the inverter voltage and the grid voltage at the 90° phase and the 270° phase of the same phase line within a sinusoidal voltage cycle.
[0024] The preset threshold is 10V.
[0025] Furthermore, the three inverter phase lines at the output end of the energy storage grid-connected inverter are respectively provided with inverter inductors, and the inverter neutral line at the output end of the energy storage grid-connected inverter is respectively connected to the three inverter phase lines via safety capacitors.
[0026] The beneficial effects of the utility model are:
[0027] A three-phase four-wire energy storage grid-connected inverter relay failure detection device comprises a detection control system, an energy storage grid-connected inverter, a grid end and an EPS load end, wherein the grid end is a three-phase four-wire grid source, and the EPS load end is a three-phase four-wire EPS load port. The energy storage grid-connected inverter is connected to the grid end and the EPS load end in parallel through a three-phase four-wire wiring method; the output end of the energy storage grid-connected inverter is connected to each grid phase line and grid neutral line of the grid end, and relays are respectively arranged on each grid phase line and grid neutral line to form a grid-side relay group; the output end of the energy storage grid-connected inverter is connected to each grid phase line and grid neutral line of the EPS load end. Relays are also provided on the load phase line and the load neutral line, forming the EPS load-side relay group; the detection and control system includes a sampling subsystem, which is used to collect and obtain the real-time voltage values of each inverter phase line of the energy storage grid-connected inverter, each grid phase line at the grid end, and each load phase line at the EPS load end at different phases; the detection and control system is used to independently drive and control the opening and closing state of each relay, calculate the real-time electrical signal value information based on the real-time voltage value collected by the sampling subsystem, and compare and judge whether any relay has a sticking fault or a disconnection fault. It can meet the use requirements of the three-phase four-wire energy storage grid-connected inverter, reduce the data calculation workload of the MCU, and realize the unbalanced current output of each phase.
[0028] The three-phase four-wire energy storage grid-connected inverter relay failure detection device and method of the utility model can achieve the following purposes:
[0029] 1. A three-phase four-wire system is required for household three-phase energy storage grid-connected inverters. A relay is added on the neutral line and connected to the inside of the inverter to achieve unbalanced current output for each phase of the three-phase four-wire energy storage grid-connected inverter.
[0030] 2. A three-phase four-wire system is required for household three-phase energy storage grid-connected inverters. A relay is added to the neutral line, and a set of relays is also added between the EPS load port and the inverter to enable the backup power port of the three-phase four-wire energy storage grid-connected inverter to supply power to single-phase loads.
[0031] 3. The relays on the three-phase live wires R, S, T and the neutral wire N use the vector difference between the inverter voltage Vinv and the grid voltage VGrid at 90 degrees and 270 degrees on a sine wave voltage to detect whether the relay has a sticking or unable to absorb fault.
[0032] Adding relay detection for the neutral line can be used in household three-phase energy storage grid-connected inverter systems; adding a relay for the neutral line connected inside the inverter can achieve 100% unbalanced load on each phase; using the comparison of the vector difference between the inverter voltage Vinv and the grid voltage VGrid at the 90° phase and the 270° phase on a sinusoidal voltage for detection can reduce the data calculation workload of the MCU. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0034] Figure 1 This is a schematic diagram of the circuit structure principle of a three-phase four-wire energy storage grid-connected inverter relay failure detection device according to Embodiment 1 of the present utility model;
[0035] Figure 2-3 This is a schematic diagram of a three-phase four-wire energy storage grid-connected inverter relay failure detection device of the first embodiment of the utility model, which compares the vector difference between the inverter voltage Vinv and the grid voltage VGrid at the 90° phase and the 270° phase on a sine wave voltage to detect whether the relay is stuck or cannot be sucked;
[0036] Figures 4 to 7 A schematic diagram of the process principle of the three-phase four-wire energy storage grid-connected inverter relay failure detection device during the detection process of the first embodiment of the utility model. DETAILED DESCRIPTION
[0037] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0038] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed, but such modifications are protected by patent law as long as they are within the scope of the claims of the present invention.
[0039] like Figures 1-2 As shown, in order to provide a three-phase four-wire energy storage grid-connected inverter relay failure detection device, the overall planning scheme of the utility model is:
[0040] The first technical scheme provides a relay failure detection device for a three-phase four-wire energy storage grid-connected inverter. Based on the structure of a conventional three-phase four-wire energy storage grid-connected inverter, the device is composed of a detection control system, an energy storage grid-connected inverter, a grid end and an EPS load end. The grid end is a three-phase four-wire grid source, and the EPS load end is a three-phase four-wire EPS load port. The energy storage grid-connected inverter is connected to the grid end and the EPS load end in parallel through a three-phase four-wire wiring method; relays are respectively arranged on each grid phase line and grid neutral line connected to the grid end at the output end of the energy storage grid-connected inverter to form a grid-side relay group; relays are also respectively arranged on each load phase line and load neutral line connected to the EPS load end at the output end of the energy storage grid-connected inverter to form an EPS load-side relay group.
[0041] The sampling subsystem can collect and obtain the real-time voltage values of each inverter phase line of the energy storage grid-connected inverter, each grid phase line at the grid end, and each load phase line at the EPS load end at different phases; the detection control system can independently drive and control the opening and closing state of each relay, calculate the real-time electrical signal value information based on the real-time voltage value collected by the sampling subsystem, and compare and determine whether any relay has a sticking fault or a disconnection fault.
[0042] Furthermore, the real-time voltage signal value information is the vector difference between the inverter voltage and the grid voltage of two different phases of each phase line within a sinusoidal voltage cycle.
[0043] The sampling subsystem sets voltage sampling units on each phase line of the energy storage grid-connected inverter output end, the grid end and the EPS load end. The real-time voltage value of the corresponding phase line can be collected through each voltage sampling unit.
[0044] The sampling subsystem specifically sets up three inverter voltage sampling units, three grid voltage sampling units and three load voltage sampling units; the three inverter voltage sampling units are respectively a yellow inverter phase line voltage sampling unit, a green inverter phase line voltage sampling unit and a red inverter phase line voltage sampling unit; through the yellow inverter phase line voltage sampling unit, the green inverter phase line voltage sampling unit and the red inverter phase line voltage sampling unit, the yellow inverter phase line voltage VinvR, the green inverter phase line voltage VinvS and the red inverter phase line voltage VinvT between the three phase lines and the neutral line at the output end of the energy storage grid-connected inverter can be collected.
[0045] The three grid voltage sampling units are respectively a yellow grid phase line voltage sampling unit, a green grid phase line voltage sampling unit and a red grid phase line voltage sampling unit; through the yellow grid phase line voltage sampling unit, the green grid phase line voltage sampling unit and the red grid phase line voltage sampling unit; the yellow grid phase line voltage VgridvR, the green grid phase line voltage VgridS and the red grid phase line voltage VgridT between the three phase lines and the neutral line at the grid end can be collected and obtained.
[0046] The three load voltage sampling units are respectively a yellow load phase line voltage sampling unit, a green load phase line voltage sampling unit and a red load phase line voltage sampling unit; through the yellow load phase line voltage sampling unit, the green load phase line voltage sampling unit and the red load phase line voltage sampling unit, the yellow load phase line voltage VepsR, the green load phase line voltage VepsS and the red load phase line voltage VepsT between the three phase lines at the load end and the neutral line can be collected.
[0047] The specific calculation process of the absolute value of the vector difference between the two different phase sinusoidal voltages of each phase line is as follows:
[0048] The absolute value of the vector difference between VgridR and VinvR is:
[0049] Verr_grid_inv_R=┃VgridR-VinvR┃;
[0050] The absolute value of the vector difference between VgridS and VinvS is:
[0051] Verr_grid_inv_S=┃VgridS-VinvS┃;
[0052] The absolute value of the vector difference between VgridT and VinvT is:
[0053] Verr_grid_inv_T=┃VgridT-VinvT┃;
[0054] The absolute value of the vector difference between VinvR and VepsR is:
[0055] Verr_inv_eps_R=┃VinvR-VepsR┃;
[0056] The absolute value of the vector difference between VinvS and VepsS is:
[0057] Verr_inv_eps_S=┃VinvS-VepsS┃;
[0058] The absolute value of the vector difference between VinvT and VepsT is:
[0059] Verr_inv_eps_T=┃VinvT-VepsT┃.
[0060] One end of each inverter voltage sampling unit is connected to an inverter phase line, and the other end is connected to the inverter neutral line; one end of each grid voltage sampling unit is connected to a grid phase line, and the other end is connected to the grid neutral line;
[0061] One end of each load voltage sampling unit is connected to a load grid phase line, and the other end is connected to the load neutral line.
[0062] Furthermore, the detection control system is mainly composed of a main control module, a detection drive signal module, a detection result judgment module and a sampling subsystem;
[0063] The main control module can send opening and closing drive signals to all relays, instructing the sampling subsystem to collect the real-time voltage value of each inverter phase line of the energy storage grid-connected inverter, each grid phase line at the grid end, and each grid phase line at the EPS load end, and receive the sampling data information fed back by the sampling subsystem. After calculation and processing, it compares and judges and outputs the detection results.
[0064] The main structure of the main control module can be set up with a data processing unit, a judgment and comparison unit and a warning unit; the data processing unit can perform calculations based on the sinusoidal voltage values of at least two phases of the same phase line fed back by the sampling subsystem to obtain real-time voltage signal value information; the judgment and comparison unit can compare the real-time voltage signal value information with the preset threshold and feed back the detection result to the warning unit; the warning unit can issue an alarm prompt by sound, light or terminal display according to the detection result.
[0065] Furthermore, the real-time voltage signal value information is the vector difference between the inverter voltage and the grid voltage at the 90° phase and the 270° phase of the same phase line in one sinusoidal voltage cycle;
[0066] The preset threshold is 10V.
[0067] Because the maximum phase voltage of the energy storage grid-connected inverter involved in the utility model is 500V, and the sampling circuit accuracy is approximately 1%, the sampling error is approximately ±5V; when the relay is stuck, the error is 0V when the inverter voltage is the same as the grid voltage (considering the sampling error of ±5V), so the threshold is set to 10V; in actual operation, the threshold can be appropriately adjusted according to the different system parameters of each project, and the 10V in the present invention does not represent all threshold limit values.
[0068] Inverter inductors are respectively arranged on the three inverter phase lines at the output end of the energy storage grid-connected inverter, and the inverter neutral line at the output end of the energy storage grid-connected inverter is respectively connected to the three inverter phase lines via safety capacitors.
[0069] The second technical solution of the utility model provides a three-phase four-wire energy storage grid-connected inverter relay failure detection method, using the three-phase four-wire energy storage grid-connected inverter relay failure detection device as described in the claim, a grid phase line relay is respectively arranged between each inverter phase line of the energy storage grid-connected inverter and each grid phase line at the grid end, and a grid neutral line relay is arranged between the inverter neutral line of the energy storage grid-connected inverter and the grid neutral line at the grid end, forming a grid-side relay group;
[0070] A load phase line relay is provided between each inverter phase line of the energy storage grid-connected inverter and each load phase line of the load end, and a load zero line relay is provided between the inverter zero line of the energy storage grid-connected inverter and the load zero line of the load end, forming a load side relay group;
[0071] The failure detection method of the grid-side relay group includes the following steps:
[0072] S01, sending a disconnection drive signal to all relays of the grid-side relay group, so that all relays of the grid-side relay group are disconnected;
[0073] S02, real-time acquisition of the inverter voltage between each inverter phase line and the inverter neutral line;
[0074] S03, collecting the grid voltage between each grid phase line and the grid neutral line in real time;
[0075] S04, respectively calculating the vector difference between the grid voltage of each grid phase line and the inverter voltage of the inverter phase line at the corresponding position at a phase of 90° and a phase of 270°;
[0076] S05, comparing the absolute value of each vector difference with a preset threshold value;
[0077] S06, if the absolute values of all vector differences are greater than the preset threshold, it is determined that all grid phase line relays and grid neutral line relays are disconnected normally, and S08 is executed;
[0078] S07, if the absolute value of one or more of the vector differences is less than a preset threshold, it is determined that at least one of the phase line relays and the neutral line relay of the power grid has a simultaneous adhesion fault, and an alarm is issued;
[0079] The operator can perform corresponding maintenance measures according to the alarm prompt. The technical solution of the present invention does not involve the operation content after the alarm prompt, so it will not be explained in detail.
[0080] S08, if the detection in step S07 is normal, then sending a pull-in drive signal to the grid neutral line relay alone, and the grid neutral line relay is pulled in;
[0081] S09, real-time acquisition of the inverter voltage of the sinusoidal voltage between any inverter phase line and the inverter neutral line at the 90° phase and the 270° phase;
[0082] Real-time collection of the grid voltage at the 90° phase and the 270° phase of the sinusoidal voltage between the grid phase line and the grid neutral line at the corresponding position;
[0083] Calculate the vector difference between the grid voltage of each grid phase line and the inverter voltage of the inverter phase line at the corresponding position at the 90° phase and the 270° phase respectively;
[0084] S10, if the absolute values of all vector differences are greater than a preset threshold, it is determined that the grid phase line relay of the corresponding phase line is disconnected normally;
[0085] S11, if the absolute value of one or more vector differences is less than a preset threshold, it is determined that the grid phase line relay of the corresponding phase line has a adhesion fault, and an alarm is issued; similarly, the operator can perform corresponding maintenance measures according to the alarm prompt. The technical solution of the present invention does not involve the operation content after the alarm prompt, so it will not be explained in detail.
[0086] S12, repeatedly executing S09 to S11 until it is detected that all grid phase line relays and grid neutral line relays are normal;
[0087] S13, the energy storage grid-connected inverter completes the bus voltage soft start;
[0088] S14, simultaneously sending a pull-in drive signal to the grid neutral line relay and any one-phase grid phase line relay;
[0089] S15, real-time acquisition of the inverter voltage of the sinusoidal voltage between the inverter phase line and the inverter neutral line at the corresponding position at the 90° phase and the 270° phase;
[0090] Real-time collection of the grid voltage at the 90° phase and the 270° phase of the sinusoidal voltage between the grid phase line and the grid neutral line at the corresponding position;
[0091] Calculate the vector difference between the grid voltage of each grid phase line and the inverter voltage of the inverter phase line at the corresponding position at the 90° phase and the 270° phase respectively;
[0092] S16, if the absolute values of all vector differences are greater than the preset threshold, it is determined that the grid phase line relay and the grid neutral line relay of the corresponding phase line are closed normally;
[0093] S17, if the absolute value of one or more of the vector differences is less than a preset threshold, it is determined that the grid phase line relay and the grid neutral line relay of the corresponding phase line have a disconnection fault, and an alarm is issued; similarly, the operator can perform corresponding maintenance measures according to the alarm prompt. The technical solution of the present invention does not involve the operation content after the alarm prompt, so it will not be explained in detail.
[0094] S18, repeating S09 to S11 until all grid phase line relays are detected to be normal;
[0095] S19, sending a pull-in drive signal to the grid neutral line relay alone, so that the grid neutral line relay is pulled in;
[0096] S20, real-time acquisition of the inverter voltage of the sinusoidal voltage between the yellow inverter phase line and the inverter neutral line at the 90° phase and the 270° phase;
[0097] Real-time acquisition of the grid voltage at the 90° phase and 270° phase of the sinusoidal voltage between the yellow grid phase line and the grid neutral line;
[0098] Calculate the vector difference between the grid voltage of the yellow grid phase line and the inverter voltage of the yellow inverter phase line at the 90° phase and the 270° phase respectively;
[0099] S21, if the absolute values of all vector differences are greater than the preset threshold, it is determined that the grid neutral relay is disconnected normally, and S23 is executed;
[0100] S22, if the absolute value of one or more of the vector differences is less than the preset threshold, it is determined that the grid neutral relay has a adhesion fault and an alarm is issued; similarly, the operator can perform corresponding maintenance measures according to the alarm. The technical solution of the present invention does not involve the operation content after the alarm prompt, so it will not be explained in detail.
[0101] S23, if all grid phase line relays and grid neutral line relays are normal, the energy storage grid-connected inverter soft-starts and outputs three-phase off-grid AC sine wave voltage, and the inverter port is equivalent to the grid port.
[0102] The failure detection method of the load-side relay group includes the following steps:
[0103] P01, sends a disconnection drive signal to all relays in the load-side relay group, and all relays in the load-side relay group are disconnected;
[0104] P02, real-time acquisition of the inverter voltage between each inverter phase line and the inverter neutral line;
[0105] P03, real-time acquisition of the load voltage between each load phase line and the load neutral line;
[0106] P04, respectively calculate the vector difference between the load voltage of each load phase line and the inverter voltage of the inverter phase line at the corresponding position at the 90° phase and the 270° phase;
[0107] P05, compare the absolute value of each vector difference with a preset threshold value;
[0108] P06, if the absolute values of all vector differences are greater than the preset threshold, it is determined that all load phase relays and load neutral relays are disconnected normally, and P08 is executed;
[0109] P07, if the absolute value of one or more vector differences is less than the preset threshold, it is determined that at least one phase of the load phase line relay and the load neutral line relay are simultaneously stuck and faulty, and an alarm is given; similarly, the operator can perform corresponding maintenance measures according to the alarm prompt. The technical solution of the present invention does not involve the operation content after the alarm prompt, so it will not be explained in detail.
[0110] P08, if the detection in step P07 is normal, then a pull-in drive signal is sent to the load neutral line relay alone, and the load neutral line relay is pulled in;
[0111] P09, real-time acquisition of the inverter voltage between any inverter phase line and the inverter neutral line at the 90° phase and the 270° phase;
[0112] Real-time acquisition of the load voltage at the 90° phase and the 270° phase of the sinusoidal voltage between the load phase line and the load neutral line at the corresponding position;
[0113] Calculate the vector difference between the load voltage of each load phase line and the inverter voltage of the inverter phase line at the corresponding position at the 90° phase and the 270° phase respectively;
[0114] P10, if the absolute values of all vector differences are greater than the preset threshold, it is determined that the load phase relay of the corresponding phase line is disconnected normally;
[0115] P11, if the absolute value of one or more vector differences is less than the preset threshold, it is determined that the load phase line relay of the corresponding phase line has a adhesion fault, and an alarm is issued; similarly, the operator can perform corresponding maintenance measures according to the alarm prompt. The technical solution of the present invention does not involve the operation content after the alarm prompt, so it will not be explained in detail.
[0116] P12, repeat P09 to P11 until all load phase relays and load neutral relays are detected to be normal;
[0117] P13, the energy storage grid-connected inverter completes the bus voltage soft start;
[0118] P14, sends a pull-in drive signal to the load neutral relay and any phase load phase relay at the same time;
[0119] P15, real-time acquisition of the inverter voltage between the inverter phase line and the inverter neutral line at the corresponding position at the 90° phase and the 270° phase;
[0120] Real-time acquisition of the load voltage at the 90° phase and the 270° phase of the sinusoidal voltage between the load phase line and the load neutral line at the corresponding position;
[0121] Calculate the vector difference between the load voltage of each load phase line and the inverter voltage of the inverter phase line at the corresponding position at the 90° phase and the 270° phase respectively;
[0122] P16, if the absolute values of all vector differences are greater than the preset threshold, it is determined that the load phase line relay and the load neutral line relay of the corresponding phase line are closed normally;
[0123] P17, if the absolute value of one or more of the vector differences is less than the preset threshold, it is determined that the load phase line relay and the load neutral line relay of the corresponding phase line have a disconnection fault, and an alarm prompt is issued; similarly, the operator can perform corresponding maintenance measures according to the alarm prompt. The technical solution of the present invention does not involve the operation content after the alarm prompt, so it will not be explained in detail.
[0124] P18, repeat P09 to P11 until all load phase relays are detected to be normal;
[0125] P19, sends a pull-in drive signal to the load neutral relay alone, and the load neutral relay is pulled in;
[0126] P20, real-time acquisition of the inverter voltage between the yellow inverter phase line and the inverter neutral line at the 90° phase and the 270° phase;
[0127] Real-time acquisition of the load voltage of the sinusoidal voltage between the yellow load phase line and the load neutral line at the 90° phase and the 270° phase;
[0128] Calculate the vector difference between the load voltage of the yellow load phase line and the inverter voltage of the yellow inverter phase line at the 90° phase and the 270° phase respectively;
[0129] P21, if the absolute values of all vector differences are greater than the preset threshold, it is determined that the load neutral relay is disconnected normally, and P23 is executed;
[0130] P22, if the absolute value of one or more of the vector differences is less than the preset threshold, it is determined that the load neutral relay has a adhesion fault and an alarm is issued; similarly, the operator can perform corresponding maintenance measures based on the alarm prompt. The technical solution of the present invention does not involve the operation content after the alarm prompt, so it will not be explained in detail.
[0131] P23, if all load phase line relays and load neutral line relays are normal, the energy storage grid-connected inverter soft-start outputs a three-phase off-grid AC sine wave voltage, and the energy storage grid-connected inverter port is the load port.
[0132] The utility model discloses a three-phase four-wire energy storage grid-connected inverter relay failure detection device and method, comprising a detection control system, an energy storage grid-connected inverter, a grid end and an EPS load end, wherein the grid end is a three-phase four-wire grid source, and the EPS load end is a three-phase four-wire EPS load port. The energy storage grid-connected inverter is connected in parallel to the grid end and the EPS load end through a three-phase four-wire wiring method; the output end of the energy storage grid-connected inverter is connected to each grid phase line and grid neutral line of the grid end, and relays are respectively arranged on each grid, forming a grid-side relay group; the output end of the energy storage grid-connected inverter is connected to the EPS load Relays are also provided on each load phase line and load neutral line at the end, forming an EPS load-side relay group; the detection and control system includes a sampling subsystem, which is used to collect and obtain the real-time voltage values of each inverter phase line of the energy storage grid-connected inverter, each grid phase line at the grid end, and each load phase line at the EPS load end at different phases; the detection and control system is used to independently drive and control the opening and closing state of each relay, calculate the real-time electrical signal value information based on the real-time voltage value collected by the sampling subsystem, and compare and judge whether any relay has a sticking fault or a disconnection fault. It can meet the use requirements of the three-phase four-wire energy storage grid-connected inverter, reduce the data calculation workload of the MCU, and realize the unbalanced current output of each phase.
[0133] The three-phase four-wire energy storage grid-connected inverter relay failure detection device and method of the utility model can achieve the following purposes:
[0134] 1. A three-phase four-wire system is required for household three-phase energy storage grid-connected inverters. A relay is added on the neutral line to connect to the inside of the inverter to achieve unbalanced current output for each phase of the three-phase four-wire energy storage grid-connected inverter.
[0135] 2. A three-phase four-wire system is required for household three-phase energy storage grid-connected inverters. A relay is added to the neutral line, and a set of relays is also added between the EPS load port and the inverter to enable the backup power port of the three-phase four-wire energy storage grid-connected inverter to supply power to a single-phase load.
[0136] 3. The relays on the three-phase live wires R, S, T and the neutral wire N use the vector difference between the inverter voltage Vinv and the grid voltage VGrid at 90° and 270° on a sine wave voltage to detect whether the relay has a sticking or unable to absorb fault.
[0137] Adding relay detection for the neutral line can be used in household three-phase energy storage grid-connected inverter systems; adding a relay for the neutral line connected inside the inverter can achieve 100% unbalanced load on each phase; using the comparison of the vector difference between the inverter voltage Vinv and the grid voltage VGrid at the 90° phase and the 270° phase on a sinusoidal voltage for detection can reduce the data calculation workload of the MCU.
[0138] Embodiment 1:
[0139] Embodiment 1 Based on the above-mentioned scheme, a relay detection of the neutral line is added in the actual process, which can be used in household three-phase energy storage grid-connected inverter system; adding a relay of the neutral line to the inside of the inverter can achieve 100% unbalanced load for each phase; using the 90° phase and 270° phase on a sine wave voltage to compare the vector difference between the inverter voltage Vinv and the grid voltage VGrid to detect, which can reduce the data calculation workload of the MCU. The details are as follows:
[0140] 1. A three-phase four-wire system is required for household three-phase energy storage grid-connected inverters. A relay is added on the neutral line to connect to the inside of the inverter to achieve unbalanced current output for each phase of the three-phase four-wire energy storage grid-connected inverter.
[0141] 2. A three-phase four-wire system is required for household three-phase energy storage grid-connected inverters. A relay is added to the neutral line, and a set of relays is also added between the EPS load port and the inverter to enable the backup power port of the three-phase four-wire energy storage grid-connected inverter to supply power to a single-phase load.
[0142] 3. The relays on the three-phase live wires R, S, T and the neutral wire N use the vector difference between the inverter voltage Vinv and the grid voltage VGrid at 90° and 270° on a sine wave voltage to detect whether the relay has a sticking or unable to absorb fault.
[0143] The specific operation process is as follows: a group of relays are set at the output end of the three-phase four-wire energy storage grid-connected inverter, L1, L2, L3 phase lines and N neutral line are isolated from the grid end, and a group of relays are also set to isolate the EPS load end. Each relay is driven and controlled separately; the inverter voltages VinvR, VinvS, VinvT are sampled; the grid voltages VgridR, VgridS, VgridT are sampled; and the EPS port voltages VepsR, VepsS, VepsT are sampled.
[0144] Step 1: Send a disconnection drive signal to all relays S1, S2, S3, and S4, and perform vector difference at 90 degrees and 270 degrees of the sinusoidal voltage phase of each phase according to the real-time sampled voltages VgridR and VinvR, VgridS and VinvS, VgridT and VinvT. If the value of S06 is greater than the set threshold Verr, it is judged that the relay disconnection is normal; if the value of S07 is less than the set threshold Verr, it is judged that at least one phase and the N-line relay have adhesion faults at the same time.
[0145] Step 2: If the previous step is normal, S8 will only attract S4 relay, and perform vector difference at 90 degrees and 270 degrees of the sinusoidal voltage phase according to the real-time sampled voltage VgridR and VinvR. If the value of S10 is greater than the set threshold value Verr, it is judged that the R phase relay is disconnected normally; if the value of S11 is less than the set threshold value Verr, it is judged that there is a adhesion fault in R phase; the detection of S phase and T phase relays is the same.
[0146] Step 3. The previous step is normal. S13 inverter bus voltage soft start is completed. S14 energizes S1 and S4 relays. According to the real-time sampled voltages VgridR and VinvR, vector difference is performed at 90 degrees and 270 degrees of the sinusoidal voltage phase respectively. If the value of S16 is less than the set threshold value Verr, it is judged that the R phase and N line relays are closed normally. If the value of S17 is greater than the set threshold value Verr, it is judged that there is a disconnection fault between the R phase and the N phase. The detection of the S phase and T phase relays is the same.
[0147] Step 4: If the detection in the previous step is normal, S19 only closes the S1 relay, and performs vector difference at 90 degrees and 270 degrees of the sinusoidal voltage phase according to the real-time sampled voltages VgridR and VinvR. If the value of S21 is greater than the set threshold Verr, it is judged that the N-line relay is disconnected normally; if the value of S22 is less than the set threshold Verr, it is judged that there is a adhesion fault in the N phase.
[0148] Step 5. If the previous step is normal, the inverter soft starter outputs a three-phase off-grid AC sine wave voltage. At this time, the inverter port is equivalent to the grid port. Similarly, steps 1, 2, and 3 can be used to perform relay detection on the EPS load port.
[0149] Set the threshold Verr to 10V.
[0150] The above content is only used to illustrate the technical solution of the utility model rather than to limit it. The utility model is not limited to the above optional implementation modes. Other modifications or equivalent substitutions made to the technical solution of the utility model by ordinary technicians in this field, regardless of any changes in its shape or structure, should be included in the scope of the claims of the utility model as long as they do not depart from the spirit and scope of the technical solution of the utility model.
Claims
1. A three-phase four-wire energy storage grid-connected inverter relay failure detection device, characterized in that: It includes a detection control system, an energy storage grid-connected inverter, a grid end and an EPS load end, the grid end is a three-phase four-wire grid source, the EPS load end is a three-phase four-wire EPS load port, and the energy storage grid-connected inverter is connected in parallel to the grid end and the EPS load end through a three-phase four-wire wiring method; The output end of the energy storage grid-connected inverter is connected to each grid phase line and grid neutral line at the grid end, and a relay is respectively provided on the grid side to form a grid-side relay group; The output end of the energy storage grid-connected inverter is connected to each load phase line and load neutral line of the EPS load end, and a relay is also provided respectively to form an EPS load-side relay group; The detection control system includes a sampling subsystem, which is used to collect and obtain the real-time voltage value of each inverter phase line of the energy storage grid-connected inverter, each grid phase line at the grid end, and each load phase line at the EPS load end at different phases; The detection control system is used to independently drive and control the opening and closing state of each relay, calculate the real-time voltage signal value information according to the real-time voltage value collected by the sampling subsystem, and compare and determine whether any relay has a sticking fault or a disconnection fault.
2. The three-phase four-wire energy storage grid-connected inverter relay failure detection device according to claim 1 is characterized in that: The real-time voltage signal value information is the vector difference between the inverter voltage and the grid voltage of two different phases of each phase line within a sinusoidal wave voltage cycle.
3. The three-phase four-wire energy storage grid-connected inverter relay failure detection device according to claim 1 is characterized in that: The sampling subsystem includes a plurality of voltage sampling units respectively arranged on each phase line of the energy storage grid-connected inverter output end, the grid end and the EPS load end, and each of the voltage sampling units is used to collect and obtain the real-time voltage value of the corresponding phase line.
4. The three-phase four-wire energy storage grid-connected inverter relay failure detection device according to claim 1 is characterized in that: The sampling subsystem includes three inverter voltage sampling units, three grid voltage sampling units and three load voltage sampling units; One end of each of the inverter voltage sampling units is connected to an inverter phase line, and the other end is connected to an inverter neutral line; One end of each of the grid voltage sampling units is connected to a grid phase line, and the other end is connected to a grid neutral line; One end of each of the load voltage sampling units is connected to a load grid phase line, and the other end is connected to a load neutral line.
5. The three-phase four-wire energy storage grid-connected inverter relay failure detection device according to claim 1 is characterized in that: The detection control system includes a main control module, a detection drive signal module, a detection result judgment module and the sampling subsystem; The main control module is used to send opening and closing drive signals to all relays respectively, instruct the sampling subsystem to collect and obtain the real-time voltage value of each inverter phase line of the energy storage grid-connected inverter, each grid phase line at the grid end and each grid phase line at the EPS load end, and receive the sampling data information fed back by the sampling subsystem, perform calculations, compare and judge, and output the detection results.
6. The three-phase four-wire energy storage grid-connected inverter relay failure detection device according to claim 5 is characterized in that: The main control module includes a data processing unit, a judgment and comparison unit and a warning unit; The data processing unit is used to perform calculations based on the sinusoidal voltage values of at least two phases of the same phase line fed back by the sampling subsystem to obtain real-time voltage signal value information; The judgment and comparison unit is used to compare the real-time voltage signal value information with the preset threshold value and feed back the detection result to the warning unit; The warning unit is used to provide sound, light or terminal display alarm prompts according to the detection results.
7. The three-phase four-wire energy storage grid-connected inverter relay failure detection device according to claim 6 is characterized in that: The real-time voltage signal value information is the vector difference between the inverter voltage and the grid voltage at the 90° phase and the 270° phase of the same phase line within a sinusoidal voltage cycle.
8. The three-phase four-wire energy storage grid-connected inverter relay failure detection device according to claim 6 is characterized in that: The preset threshold is 10V.
9. The three-phase four-wire energy storage grid-connected inverter relay failure detection device according to claim 8 is characterized in that: The three inverter phase lines at the output end of the energy storage grid-connected inverter are respectively provided with inverter inductors, and the inverter neutral line at the output end of the energy storage grid-connected inverter is respectively connected to the three inverter phase lines via safety capacitors.