Parallel tank-to-serial tank type bell-less furnace top system
通过在并罐无钟炉顶设备改造为串罐无钟炉顶设备,采用串罐支撑框架和检修通道,改造粗煤气管路及均压回收设施,解决了并罐无钟炉顶设备改造的 High investment and long construction period problems reduce fabric segregation and improve the production reliability and environmental protection of blast furnaces.
Patent Information
- Application Number
- CN202420525224.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-18
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-18
AI Technical Summary
When the existing tank-free loading furnace top equipment is transformed into a tank-free loading furnace top equipment, it requires high investment and long construction periods, and fabric segregation problems are prone to occur.
After removing the tank-free furnace top equipment, the tank-free furnace top equipment is set in situ, after removing the tank-free furnace top valve and cloth device, the tank-free furnace top equipment is set in situ, and after removing the tank-free supporting frame, the tank-free furnace top valve and cloth device are set in situ, and after dismantling the tank-free supporting frame, the tank-free furnace top valve and cloth device are set in place. The tank supports the frame, and an inspection channel and fabric chute maintenance crane are added on the furnace top frame, the old crude gas pipeline is transformed into a new crude gas pipeline, and auxiliary platforms are added to lay out pressure equalization and recycling facilities.
Effectively save investment, shorten construction period, reduce the degree of fabric segregation, provide guarantees for the stable production of blast furnaces, improves the structural safety and operating reliability of the system, facilitates maintenance and reduces production costs.
Smart Images

Figure CN222007841U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of blast furnaces, and in particular relates to a bell-free furnace top system for converting parallel tanks into series tanks. Background Art
[0002] At present, blast furnaces using parallel tank bellless charging top equipment are prone to distribution segregation problems. The use of serial tank bellless charging top equipment can solve this distribution segregation problem. When it is necessary to improve the parallel tank bellless charging top equipment to serial tank bellless charging top equipment, it is generally done during the major renovation of the blast furnace, and the parallel tank bellless charging top system is dismantled and then a new serial tank bellless charging top system is built, which requires high investment and long construction period. Utility Model Content
[0003] The utility model relates to a bell-free furnace top system for converting parallel tanks into series tanks, which can at least solve some defects of the prior art.
[0004] The utility model relates to a bell-free furnace top system for converting parallel tanks into series tanks, comprising:
[0005] The serial tank bell-less furnace top charging equipment installed in situ after the parallel tank bell-less furnace top charging equipment is removed;
[0006] After removing the tank-joining unloading valve and the distributor, the original set tank-joining unloading valve and the distributor are connected with the tank-joining bellless furnace top charging equipment;
[0007] A tank string support frame is provided after the tank combination support frame is removed, and the tank string bell-free furnace top charging equipment is supported on the blast furnace skin by the tank string support frame;
[0008] Reuse the furnace body frame and furnace top frame, the furnace top frame includes a lower constant section section and an upper variable section section, the lower constant section section is connected to the furnace body frame, the upper variable section section is connected to the lower constant section section and gradually shrinks from bottom to top; the top end of the string tank support frame is flush with the top end of the lower constant section section;
[0009] The tank string support frame is provided with an inspection channel for inspecting the tank string discharge valve and the distributor.
[0010] As one of the embodiments, the string tank support frame includes a lower variable cross-section section and an upper constant cross-section section, the lower variable cross-section section is connected to the blast furnace shell and gradually expands from bottom to top, and the upper constant cross-section section is connected to the top of the lower variable cross-section section and supports the string tank bell-free furnace top loading equipment.
[0011] As one of the implementation modes, the tank string support frame includes a plurality of tank string support columns, and the tank string support columns include a lower inclined section and an upper vertical section, and each of the tank string support columns is distributed around the tank string bell-less furnace top charging equipment.
[0012] As one of the implementation modes, a material distribution chute maintenance crane is arranged on the inner side of the tank string support frame.
[0013] As one of the implementation modes, the top of the series tank support frame is higher than the top of the original parallel tank support frame.
[0014] As one of the implementation modes, the parallel tank to series tank type bell-free furnace top system also includes a series tank pressure equalizing and recovery facility installed after the parallel tank pressure equalizing and release facility is removed; wherein, an auxiliary platform is added on the upper part of the furnace top frame, and the series tank pressure equalizing and recovery facility is arranged along the furnace top frame and the auxiliary platform.
[0015] As one of the implementation methods, the parallel tank to series tank type bell-less furnace top system also includes a new crude gas pipeline transformed from an old crude gas pipeline, wherein:
[0016] In the old crude gas pipeline, four crude gas risers were laid from bottom to top and merged into one crude gas main, and then connected to the subsequent dust collector through a downcomer;
[0017] In the new crude gas pipeline, four crude gas risers are laid from bottom to top and merged to the top five-way ball, and then connected to the subsequent dust collector through a downcomer.
[0018] As one of the implementation modes, a furnace top maintenance crane for inspecting the furnace top material car rope wheel or the head wheel of the feeding main belt conveyor is arranged below the five-way ball.
[0019] The utility model has at least the following beneficial effects:
[0020] The utility model can effectively save investment and shorten construction period by transforming the combined tank bell-free furnace top system; in particular, the furnace top frame of the combined tank bell-free furnace top system is reused, which greatly saves the amount of demolition and new construction. After dismantling the combined tank bell-free furnace top charging equipment, a series of tank bell-free furnace top charging equipment is set at the corresponding position, and the series of tank bell-free furnace top charging equipment is used to replace the combined tank bell-free furnace top charging equipment, which can effectively reduce the degree of distribution segregation and provide a strong guarantee for the stable production of the blast furnace.
[0021] The traditional serial tank bell-free furnace top system generally only has one set of furnace top frames, and the main load is supported on the furnace body frame. Different from this method, the utility model constructs a serial tank support frame within the furnace top frame on the basis of reusing the old furnace top frame, forming a structure of furnace top frame + inner frame, without shifting the load transfer area of the original parallel tank bell-free furnace top system, and at the same time reliably supports the serial tank bell-free furnace top loading equipment, thereby ensuring the structural safety and working reliability of the serial tank bell-free furnace top system and the blast furnace body.
[0022] In the utility model, the support requirements and maintenance needs of the serial tank bell-less furnace top charging equipment are comprehensively considered, a serial tank support frame with a specific structural form is adopted, and a maintenance channel is reserved on the serial tank support frame. The maintenance of the modified serial tank discharge valve and distributor can be better completed, thereby ensuring the operating reliability of the modified serial tank bell-less furnace top system.
[0023] In addition, based on the structure of the string tank support frame and the newly installed distribution chute maintenance crane, the distribution chute can be easily inspected and maintained, especially the distribution chute can be easily replaced and maintained with the help of the maintenance channel, which can improve the reliability of blast furnace production. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 A schematic structural diagram of a bell-free furnace top system that converts parallel tanks into series tanks provided in an embodiment of the utility model. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] Embodiment 1
[0028] like Figure 1 The utility model provides a bell-free furnace top system for converting parallel tanks into series tanks, comprising:
[0029] The serial tank bell-less furnace top charging equipment 4 which was originally installed after the parallel tank bell-less furnace top charging equipment was removed;
[0030] After removing the tank-joining unloading valve and the distributor, the original set tank-joining unloading valve and the distributor 5 are connected with the tank-joining bellless furnace top charging device 4;
[0031] A series of tank support frame 6 is provided after the tank-joining support frame is removed, and the series of tank bell-free furnace top charging equipment 4 is supported on the blast furnace skin by the series of tank support frame 6;
[0032] The furnace body frame 2 and the furnace top frame 3 are reused, and the furnace top frame 3 includes a lower constant section section and an upper variable section section, the lower constant section section is connected to the furnace body frame 2, and the upper variable section section is connected to the lower constant section section and gradually decreases from bottom to top.
[0033] The furnace body frame 2 and the furnace top frame 3 are reused, which can save investment and shorten the construction period. The bell-less furnace top system that changes from a parallel tank charging method to a series tank charging method is preferably completed during the overhaul of the blast furnace 1.
[0034] After removing the parallel tank bell-free furnace top charging equipment, a series of tank bell-free furnace top charging equipment 4 is set at the corresponding position. Using the series of tank bell-free furnace top charging equipment 4 to replace the parallel tank bell-free furnace top charging equipment can effectively reduce the degree of charge distribution segregation and provide strong guarantee for the stable production of blast furnace 1.
[0035] The tank string support frame 6 is set after the tank combination support frame is removed, and the tank combination support frame can be removed at the same time as the tank combination bell-free furnace top charging equipment; the tank combination support frame generally includes a plurality of (generally four) vertically arranged tank combination support columns. After changing to the tank string support frame 6, preferably, as Figure 1 The series of tank support frame 6 includes a lower variable section section and an upper constant section section, wherein the lower variable section section is connected to the blast furnace skin and gradually expands from bottom to top, and the upper constant section section is connected to the top of the lower variable section section and supports the series of tank bell-less furnace top charging equipment 4. The support frame based on this structure can reliably support the series of tank bell-less furnace top charging equipment 4 and realize the setting of the maintenance channel.
[0036] Preferably, the tank string support frame 6 includes a plurality of tank string support columns, and each of the tank string support columns is distributed around the tank string bell-less furnace top loading device 4; for the tank string support frame 6 including a lower variable cross-section section and an upper constant cross-section section, each tank string support column correspondingly includes a lower inclined section and an upper vertical section; the number of tank string support columns includes but is not limited to 4.
[0037] Preferably, the tank string support frame 6 is provided with an inspection channel for inspecting the tank string discharge valve and the distributor 5. Wherein, for the structure of the tank string support frame 6 including a lower variable section section and an upper constant section section, the inspection channel is preferably reserved and formed on the upper constant section section, or partly located in the lower variable section section and partly located in the upper constant section section; the inspection channel preferably extends in the horizontal direction, including but not limited to an inspection channel with an elliptical cross section / arched cross section formed in a limited space.
[0038] Furthermore, a distribution chute maintenance crane 7 is arranged on the inner side of the string tank support frame 6, wherein the inner side of the string tank support frame 6 refers to the side of the string tank support frame 6 close to the string tank bell-less furnace top charging device 4; in this embodiment, based on the structure of the string tank support frame 6 and the newly arranged distribution chute maintenance crane 7, the distribution chute can be easily inspected and maintained, especially the distribution chute can be conveniently replaced and maintained with the help of the above-mentioned maintenance channel, which can improve the reliability of blast furnace 1 production.
[0039] In one of the embodiments, the top of the series tank support frame 6 is higher than the top of the original parallel tank support frame, which is conducive to supporting the series tank bell-free furnace top charging equipment 4 and facilitating the arrangement of the weighing sensor of the series tank bell-free furnace top charging equipment 4.
[0040] In one embodiment, if Figure 1 The top of the string tank support frame 6 is flush with the top of the lower constant cross-section segment. This structural design can ensure the flatness of the furnace roof structure and facilitate inspection and maintenance by staff.
[0041] In one embodiment, if Figure 1 The above-mentioned parallel tank to series tank bell-free furnace top system also includes a series tank pressure equalizing and recovery facility 8 installed after the parallel tank pressure equalizing and release facility is removed, wherein an auxiliary platform is added on the upper part of the furnace top frame 3, and the series tank pressure equalizing and recovery facility 8 is arranged along the furnace top frame 3 and the auxiliary platform.
[0042] Among them, the parallel tank pressure equalization and release facility is used to release the pressure-equalized gas in the feed tank after the feed tank is pressure-equalized. The modified series tank pressure equalization and recovery facility 8 is used to equalize the pressure of the feed tank to the charging pressure, and to recover the gas in the feed tank to the clean gas pipeline network after charging and start the next cycle, thereby reducing production costs and improving production environmental protection.
[0043] Different from the traditional method in which the pressure equalizing and recovery facilities of the traditional tank-connected bell-less furnace top system are arranged on a platform within a spacious and symmetrical furnace top frame, in this embodiment, on the basis of reusing the old furnace top frame 3, an auxiliary platform is added to the furnace top frame 3, and the tank-connected pressure equalizing and recovery facilities 8 are arranged along the furnace top frame 3 and the auxiliary platform. This method is convenient to design and construct, is conducive to the transformation of the tank-connected bell-less furnace top system, and can improve the working reliability and safety of the transformed tank-connected pressure equalizing and recovery facilities 8.
[0044] In one embodiment, if Figure 1 The above-mentioned parallel tank to series tank type bell-less furnace top system also includes a new crude gas pipeline 9 transformed from the old crude gas pipeline, wherein:
[0045] In the old crude gas pipeline, four crude gas risers were laid from bottom to top and merged into one crude gas main, and then the gas was transported to the subsequent dust collector through the downcomer;
[0046] In the new crude gas pipeline 9, four crude gas risers are arranged from bottom to top and merged into a five-way ball at the top, and then the gas is transported to the subsequent dust collector through the downcomer.
[0047] Among them, the raw gas riser and downcomer can be reused, which can save investment and shorten construction period.
[0048] In the old crude gas pipeline before the transformation, the top of the crude gas riser is at a lower position. In the new crude gas pipeline 9 after the transformation, the top of the crude gas riser is at a higher position, which can obtain a larger maintenance space. Moreover, the use of a five-way ball can obtain a larger maintenance space, which is conducive to the arrangement of the furnace top maintenance crane 10.
[0049] Accordingly, if Figure 1 A furnace top maintenance crane 10 is arranged below the five-way ball for maintenance of the furnace top material car rope pulley or the head pulley of the feeding main belt conveyor.
[0050] Embodiment 2
[0051] The utility model embodiment provides a method for transforming a bell-less furnace top system with tanks in parallel, comprising:
[0052] Replace the parallel tank bell-free furnace top charging equipment with the serial tank bell-free furnace top charging equipment 4, replace the parallel tank unloading valve and distributor with the serial tank unloading valve and distributor 5 accordingly, transform the parallel tank support frame into the serial tank support frame 6, and support the serial tank bell-free furnace top charging equipment 4 on the blast furnace skin through the serial tank support frame 6;
[0053] The furnace body frame 2 and the furnace top frame 3 are reused; the furnace top frame 3 includes a lower constant section section and an upper variable section section, the lower constant section section is connected to the furnace body frame 2, and the upper variable section section is connected to the lower constant section section and gradually shrinks from bottom to top; the top end of the string tank support frame 6 is flush with the top end of the lower constant section section;
[0054] Among them, the top of the series of tanks support frame 6 is higher than the top of the original parallel tank support frame, so as to facilitate supporting the series of tanks bell-free furnace top loading equipment 4 and placing the weighing sensor; the series of tanks support frame 6 is provided with an inspection channel for inspecting the series of tanks unloading valve and distributor 5.
[0055] The relevant technical contents and technical effects of this embodiment are consistent with the relevant technical contents and technical effects of the above-mentioned embodiment 1, and have mutual correspondence, for example:
[0056] As one of the embodiments, the string tank support frame 6 includes a lower variable cross-section section and an upper constant cross-section section, the lower variable cross-section section is connected to the blast furnace shell and gradually expands from bottom to top, and the upper constant cross-section section is connected to the top of the lower variable cross-section section and supports the string tank bell-free furnace top loading equipment 4.
[0057] As one of the implementation modes, the tank string support frame 6 includes a plurality of tank string support columns, and the tank string support columns include a lower inclined section and an upper vertical section, and each of the tank string support columns is distributed around the tank string bell-less furnace top charging device 4.
[0058] As one of the implementation modes, a material distribution chute maintenance crane 7 is arranged on the inner side of the tank string support frame 6, so that the material distribution chute can be replaced by utilizing the maintenance channel.
[0059] As one of the implementation modes, the transformation method further comprises:
[0060] The tank-connected pressure equalizing and release facilities are removed, and a series of tanks pressure equalizing and recovery facilities 8 are installed to equalize the pressure of the feeding tanks to the charging pressure, and to recover the gas in the feeding tanks to the clean gas network after charging and start the next cycle; wherein an auxiliary platform is added on the upper part of the furnace top frame 3, and the series of tanks pressure equalizing and recovery facilities 8 are arranged along the furnace top frame 3 and the auxiliary platform.
[0061] As one of the implementation modes, the transformation method further comprises:
[0062] The old crude gas pipeline is transformed into a new crude gas pipeline 9, wherein:
[0063] In the old crude gas pipeline, four crude gas risers were laid from bottom to top and merged into one crude gas main, and then the gas was transported to the subsequent dust collector through the downcomer;
[0064] In the new crude gas pipeline 9, four crude gas risers are arranged from bottom to top and merged into a five-way ball at the top, and then the gas is transported to the subsequent dust collector through the downcomer.
[0065] As one of the implementation modes, a furnace top maintenance crane 10 is arranged below the five-way ball for maintenance of the furnace top material car rope pulley or the head pulley of the feeding main belt conveyor.
[0066] For details, please refer to the content in the above embodiment 1, which will not be described in detail here.
[0067] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A bell-less furnace top system for converting parallel tanks into series tanks, characterized in that: include: The serial tank bell-less furnace top charging equipment installed in situ after the parallel tank bell-less furnace top charging equipment is removed; After removing the tank-joining unloading valve and the distributor, the original set tank-joining unloading valve and the distributor are connected with the tank-joining bellless furnace top charging equipment; A tank string support frame is provided after the tank combination support frame is removed, and the tank string bell-free furnace top charging equipment is supported on the blast furnace skin by the tank string support frame; Reuse the furnace body frame and furnace top frame, the furnace top frame includes a lower constant section section and an upper variable section section, the lower constant section section is connected to the furnace body frame, the upper variable section section is connected to the lower constant section section and gradually shrinks from bottom to top; the top end of the string tank support frame is flush with the top end of the lower constant section section; The tank string support frame is provided with an inspection channel for inspecting the tank string discharge valve and the distributor.
2. The bell-less furnace top system for converting parallel tanks to series tanks as claimed in claim 1, characterized in that: The string tank support frame includes a lower variable section section and an upper constant section section, the lower variable section section is connected to the blast furnace shell and gradually expands from bottom to top, the upper constant section section is connected to the top of the lower variable section section and supports the string tank bell-free furnace top loading equipment.
3. The bell-less furnace top system for converting parallel tanks into series tanks as claimed in claim 2, characterized in that: The tank string support frame includes a plurality of tank string support columns, each of which includes a lower inclined section and an upper vertical section, and each of the tank string support columns is distributed around the tank string bell-free furnace top charging equipment.
4. The bell-less furnace top system for converting parallel tanks into series tanks as claimed in claim 1, characterized in that: A material distribution chute maintenance crane is arranged on the inner side of the tank string support frame.
5. The bell-less furnace top system for converting parallel tanks into series tanks as claimed in claim 1, characterized in that: The top of the tank string support frame is higher than the top of the original tank parallel support frame.
6. The bell-less furnace top system for converting parallel tanks into series tanks as claimed in claim 1, characterized in that: It also includes a series of tank pressure equalization and recovery facilities installed after the tank pressure equalization and release facilities are removed; wherein an auxiliary platform is added on the upper part of the furnace top frame, and the series of tank pressure equalization and recovery facilities are arranged along the furnace top frame and the auxiliary platform.
7. The bell-less furnace top system for converting parallel tanks to series tanks as claimed in claim 1, characterized in that: It also includes new crude gas pipelines converted from old crude gas pipelines, including: In the old crude gas pipeline, four crude gas risers were laid from bottom to top and merged into one crude gas main, and then connected to the subsequent dust collector through a downcomer; In the new crude gas pipeline, four crude gas risers are laid from bottom to top and merged to the top five-way ball, and then connected to the subsequent dust collector through a downcomer.
8. The bell-less furnace top system for converting parallel tanks into series tanks as claimed in claim 7, characterized in that: A furnace top maintenance crane for inspecting the rope pulley of the furnace top material car or the head pulley of the feeding main belt conveyor is arranged below the five-way ball.