Beam type mounting structure for maintenance track frame under large bridge steel truss girder

By adopting the 'beam-mounted' installation method on the large bridge steel truss, the installation of the maintenance road is carried out separately from the main structure, which solves the problem of difficult transportation of construction materials, ensures the completion of the main structure on time, and reduces construction safety risk.

CN222043941UActive Publication Date: 2024-11-22SICHUAN ROAD & BRIDGE CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420697237.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-07
Publication Date
2024-11-22
Estimated Expiration
2034-04-07

AI Technical Summary

Technical Problem

In the construction of mountain suspension bridges, it is difficult to transport construction materials, which affects the construction of ancillary projects such as maintenance roads and drainage pipes, and affects the completion of the main structural project on time.

Method used

The "beam-mounted" installation method of the maintenance road under the steel truss of a large bridge is adopted to separate the installation of the maintenance road from the main structure, and use construction platforms, transportation systems and installation systems, including steel platforms, transportation tracks, electric hoists and pulley sets. , pre-assembled and lifted in sections, and installed by swaying and pulling of electric hoists.

Benefits of technology

The maintenance road installation and main structure are separated, ensuring the smooth progress of the main structure construction, simplifying the process and reducing construction safety risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222043941U_ABST
    Figure CN222043941U_ABST
Patent Text Reader

Abstract

The utility model provides a girder type installation structure of a maintenance track frame under a large bridge steel truss girder. The construction method of the structure comprises the following steps: (1) building a construction platform; (2) pre-assembling the lower maintenance way sections; (3) hoisting the lower maintenance way section; (4) mounting a first section of maintenance path; (5) laying a transportation track; (6) transporting the road plate to be mounted and overhauled; and (7) mounting the maintenance road plate. Through the implementation of the method, 1, the maintenance path installation construction procedure is separated from the main beam construction procedure, the splicing efficiency of the main structure is not influenced, and the smooth installation plan construction of the main structure construction is ensured; 2, the lower maintenance way is mounted in a beam erecting manner, so that the process is simple, and the construction safety risk is low;
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of bridge engineering, in particular to a "beam erection" type installation method for an under-steel truss girder of a large bridge. Background Art

[0002] As the expressway network extends to the western mountainous areas, large bridges spanning mountainous areas, river valleys, gullies, etc. emerge in an endless stream. Suspension bridges, cable-stayed bridges, arch bridges and other bridges with strong spanning capabilities are continuously used, among which suspension bridges are most widely used when spanning river valleys.

[0003] In the construction of suspension bridges in mountainous areas, some construction materials cannot be transported to the site in time due to the limitations of terrain and material transportation conditions, which affects the construction period on site. How to ensure the construction of ancillary projects, such as access roads, drainage pipes, and maintenance vehicles, does not affect the construction of the main structure and ensure that the bridge is completed on time and on schedule has become a research direction. Utility Model Content

[0004] The purpose of the present application is to provide a construction structure for installing the lower inspection road of a steel truss beam separately from the main structure of the steel truss beam, and then installing the lower inspection road after the main beam is installed.

[0005] A large bridge steel truss under the maintenance road beam installation structure, characterized by: comprising a lower beam, a lower flat joint, a cable tower beam, an installed maintenance road plate, and a maintenance road plate to be installed;

[0006] Including construction platform, transportation system and installation system;

[0007] The construction platform is a steel and steel plate platform, the transportation system includes a transportation track and a transportation trolley, and the installation system is an electric hoist and a steel wire rope used for the installation of the maintenance road segment;

[0008] A construction platform for hoisting the maintenance road is set up on the lower cross beam and the lower flat link. The construction platform is set up with steel sections and laid on steel truss beam members. Steel meshes or steel plates are laid on the steel sections.

[0009] Furthermore, the area below the construction platform is used as a pre-assembly area for the lower maintenance road segment. The lower maintenance road is pre-assembled into two parts, namely, panels and railings, according to the segment divisions on the ground, and are hoisted and installed separately.

[0010] Furthermore, a transport system for laying the maintenance slab to be installed is laid on the installed maintenance slab, and the transport track is a "concave" structure made of steel plates or steel sections, which is welded to the installed maintenance slab.

[0011] Furthermore, the maintenance road plate to be installed is placed on a transport trolley, and the transport trolley is pulled toward the installation area along the transport track by arranging a pulley group or guide wheel at the front.

[0012] Furthermore, an electric hoist is installed at the construction channel of the upper chord of the adjacent segment, and the maintenance road plate is installed by swinging, moving and pulling by two electric hoists.

[0013] Further, the transport trolley adopts a tank transport trolley;

[0014] Furthermore, the electric hoist is a finished lifting and transportation hoist, which is installed on the upper chord of the steel truss.

[0015] The implementation process of this patent is:

[0016] Step 1: Construction platform construction

[0017] The steel truss beam segment close to the cable tower is selected as the initial beam segment for the installation and construction of the lower inspection road, and a construction platform for hoisting the inspection road is set up on the lower crossbeam of the beam segment.

[0018] Step 2: Pre-assembly of lower maintenance road segments

[0019] The lower inspection road is pre-assembled into two parts, namely panels and railings, according to sections on the ground in front of the tower to facilitate subsequent lifting and installation.

[0020] Step 3: Lifting of the lower maintenance road segment

[0021] A winch and pulley set are set up on the construction platform to lift the pre-assembled panels and railings to the lower crossbeam of the steel truss.

[0022] Step 4: Installation of the first section of the maintenance road

[0023] Use equipment such as tower cranes or truck cranes to pull the lower inspection road plate located in the middle of the lower crossbeam of the steel truss to the edge for installation.

[0024] Step 5: Laying of transport tracks

[0025] A transport channel for the maintenance slab to be installed is laid on the installed maintenance slab.

[0026] Step 6: Transportation of the access slab to be installed

[0027] The maintenance road slab to be installed is placed on a transport trolley, and the transport trolley is pulled toward the installation area along the transport track by setting a pulley group at the front.

[0028] Step 7: Installation of access road plate

[0029] The maintenance road plate is installed by means of electric hoists installed at the upper chords of adjacent steel truss segments and by swinging, moving and pulling with two electric hoists.

[0030] Step 8: Repeat steps 5, 6, and 7 to complete the installation of the inspection road on the entire bridge.

[0031] The advantages of this application are: 1. This method separates the installation construction process of the maintenance road from the main beam construction process, does not affect the assembly efficiency of the main structure, and ensures the smooth installation and planned construction of the main structure. 2. This method uses the "beam erection" method to install the maintenance road, which is simple in process and has low construction safety risks. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is the layout drawing of the construction platform;

[0033] Figure 2 The construction layout drawing for transporting the lower maintenance road;

[0034] Figure 3 Installation construction layout drawing for the lower maintenance road.

[0035] Among them: 1-lower beam; 2-lower parallel joint; 3-tower beam; 4-steel; 5-steel plate or steel mesh; 6-installed maintenance road plate; 7-transport trolley and track; 8-maintenance road plate to be installed; 9-steering wheel; 10-upper chord construction channel; 11-electric hoist DETAILED DESCRIPTION

[0036] The following will be combined with the attached Figure 1-Figure 3 The method is described in detail, and the technical solution in the embodiment of the method is described clearly and completely. Obviously, the described embodiment is only a part of the embodiment of this patent, not all of the embodiments. Based on the embodiments in this patent, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this patent.

[0037] The utility model provides a "beam-racking" type installation structure for an under-bridge steel truss inspection road. The under-bridge inspection road is installed separately from the main structure of the steel truss, and the under-bridge inspection road is installed after the main beam is installed, thereby ensuring that the main structure construction proceeds smoothly as planned.

[0038] like Figure 1-Figure 3 As shown: it includes a lower cross beam 1, a lower flat link 2, a cable tower cross beam 3, an installed maintenance road plate 6, and a maintenance road plate 8 to be installed;

[0039] Including construction platform, transportation system and installation system;

[0040] The construction platform is a steel and steel plate platform, the transport system includes a transport track and a transport trolley 7, and the installation system is an electric hoist 11 and a steel wire rope used for installing the maintenance road segment;

[0041] A construction platform for hoisting the maintenance road is set up on the lower cross beam 1 and the lower flat link 2. The construction platform is set up with steel sections 4, which are laid on steel truss beams. Steel mesh or steel plate 5 is laid on the steel sections 4.

[0042] In the present application, the area below the construction platform is used as the pre-assembly area for the lower maintenance road segments. The lower maintenance road is pre-assembled into two parts, namely, panels and railings, on the ground according to the segments, and are hoisted and installed separately.

[0043] In the present application, a transport system for the maintenance slab to be installed is laid on the installed maintenance slab 6, and the transport track is a "concave" structure made of steel plates or steel sections, which is welded to the installed maintenance slab 6.

[0044] In the present application, the maintenance road slab 8 to be installed is placed on a transport trolley, and a pulley block or guide wheel 9 is arranged at the front to pull the transport trolley 7 along the transport track toward the installation area.

[0045] In the present application, an electric hoist 11 is installed at the upper chord construction channel 10 of the adjacent segment, and the maintenance road plate is installed by swinging, moving and pulling by two electric hoists 11 .

[0046] In the present application, the transport trolley is a tank transport trolley;

[0047] In the present application, the electric hoist 11 is a finished lifting and transporting hoist, which is installed on the upper chord of the steel truss.

[0048] The following is combined with Figure 1 , 2 3. Further describe the specific implementation methods of this patent:

[0049] Step 1: Construction platform construction

[0050] The steel truss segment close to the cable tower is selected as the initial beam section for the installation and construction of the lower inspection road. A construction platform for hoisting the inspection road is set up on the lower cross beam 1 and the lower flat link 2 of the beam section. The construction platform is set up with steel sections 4, which are laid on the steel truss members, and steel mesh or steel plates 5 are laid on the steel sections.

[0051] Step 2: Pre-assembly of lower maintenance road segments

[0052] The area below the construction platform is used as the pre-assembly area for the lower maintenance road segments. The lower maintenance road is pre-assembled into two parts, panels and railings, on the ground according to the segments, and are hoisted and installed separately.

[0053] Step 3: Lifting of the lower maintenance road segment

[0054] A pulley block 11 is arranged on the upper chord at the construction platform, and the pre-assembled panels and handrails are hoisted to the lower cross beam 1 of the steel truss by a winch arranged at the cross beam 3 .

[0055] Step 4: Installation of the first section of the maintenance road

[0056] By using equipment such as a tower crane or a truck crane, in conjunction with the lifting pulley group 11 at the construction platform, the lower inspection road plate located in the middle of the lower cross beam of the steel truss is pulled horizontally to the designed position for installation.

[0057] Step 5: Laying of transport tracks

[0058] A transport channel 7 for the maintenance slab to be installed is laid on the installed maintenance slab 6. The transport channel 7 is a "concave" structure made of steel plates or steel sections and is welded to the installed maintenance slab 6.

[0059] Step 6: Transportation of the access slab to be installed

[0060] The maintenance road slab 8 to be installed is placed on the transport trolley 7, and the transport trolley 7 is pulled toward the installation area along the transport track by arranging a pulley block or guide wheel 9 at the front.

[0061] Step 7: Installation of access road plate

[0062] An electric hoist 11 is installed at the construction channel 11 of the upper chord of the adjacent segment, and the maintenance road plate is installed by swinging, moving and pulling by two electric hoists 11.

[0063] Step 8: Repeat steps 5, 6, and 7 to complete the installation of the inspection road on the entire bridge.

[0064] The advantages of the utility model are:

[0065] 1. This method separates the installation construction process of the maintenance road from the main beam construction process, does not affect the assembly efficiency of the main structure, and ensures the smooth installation and planned construction of the main structure.

[0066] 2. This method uses the "beam erection" method to install the lower inspection road, which has a simple process and low construction safety risk.

Claims

1. A beam-type installation structure for the inspection road under the steel truss of a large bridge, characterized in that: include Construction platform, transportation system and installation system; The construction platform is a steel and steel plate platform, and the transportation system includes a transportation track and a transportation trolley (7); The installation system is an electric hoist (11) and a steel wire rope used for installing the maintenance road segment; A construction platform for hoisting the inspection road is set up on the lower cross beam (1) and the lower flat link (2). The construction platform is set up with steel sections (4) and laid on steel truss beam members. A steel mesh or steel plate (5) is laid on the steel sections (4).

2. According to claim 1, a large bridge steel truss under the maintenance road beam installation structure, characterized in that: The area below the construction platform serves as a pre-assembly area for the lower maintenance road segments. The lower maintenance road is pre-assembled into two parts, a panel and a railing, according to the segments on the ground, and are hoisted and installed separately.

3. According to claim 1, a large bridge steel truss under the maintenance road beam installation structure, characterized in that: A transport system for the maintenance slab to be installed is laid on the installed maintenance slab (6), wherein the transport track is a "concave" structure made of steel plates or steel sections and is welded to the installed maintenance slab (6); The inspection road plate (8) to be installed is placed on the transport trolley (7), and the transport trolley (7) is pulled toward the installation area along the transport track by arranging a pulley group or guide wheel (9) at the front.

4. According to claim 1, a large bridge steel truss under the maintenance road beam installation structure is characterized by: An electric hoist (11) is installed at the upper chord construction channel (10) of the adjacent segment, and the maintenance road plate is installed by swinging, moving and pulling by two electric hoists (11).

5. According to claim 1 or 4, a large bridge steel truss under the maintenance road beam installation structure, characterized in that: The transport trolley (7) is a tank transport trolley.

6. The large bridge steel truss under-mounted maintenance road beam mounting structure according to claim 1 or 4, characterized in that: The electric hoist (11) is a finished lifting and transporting hoist, which is installed on the upper chord of the steel truss.