Cooling water system for metal smelting
By introducing components such as pre-cooling boxes and vacuum heat conduction pipes into the metal smelting cooling water system, the furnace body cooling and the effective utilization of circulating water heat in the event of power outage are achieved, and the safety hazards and heat waste of existing systems are solved. , improves the security and economic benefits of the system.
Patent Information
- Application Number
- CN202323448503.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-18
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2033-12-18
AI Technical Summary
The existing metal smelting cooling water system cannot operate normally in the event of power outage, causing the furnace body to heat up rapidly, posing safety hazards, and the waste of circulating water heat leads to economic losses.
A system including cooling tower, smelting furnace, pre-cooling box, water pump and backup self-flow pipe was designed. Automatic emergency water supply is realized through normally open solenoid valve and manual gate valve, and the combination structure of the pre-cooling box and the cooling tower is used to circulate water. Pre-cooling and re-cooling, using vacuum heat conduction pipes and deflectors to improve heat exchange efficiency.
In the event of power outage, ensure the cooling effect of the melting furnace body, reduce waste of circulating water and heat, reduce economic losses, and ensure the safety of the system.
Smart Images

Figure CN222048549U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a metal smelting cooling water system, belonging to the technical field of cooling systems. Background Art
[0002] The cooling system plays a vital role in ensuring the safe operation of equipment, especially in high-risk working conditions such as metal smelting. If there is a sudden power outage during the smelting process, the cooling water system will not be able to operate normally, and the smelting furnace body and water-cooling coil will heat up rapidly in a short period of time. The valve of the standby gravity cooling water pipeline is usually far away from the operating table due to the special working conditions on site. If the operator cannot open it in time, a major safety accident such as the furnace body piercing the steel and exploding will occur.
[0003] The metal smelting cooling water system has always been composed of a cooling tower, a circulating water pump and a water tank for circulating cooling. The heat of the circulating water is brought into the surrounding air by the cooling tower, and the heat is wasted. For the enterprise, this is a considerable loss.
[0004] In summary, the prior art obviously has inconveniences and defects in practical use, so it is necessary to improve it. Utility Model Content
[0005] In view of the deficiencies in the background technology, the utility model provides a metal smelting cooling water system, which can still operate normally to ensure the furnace cooling effect in the event of a sudden power outage, and timely and effectively ensure the safety of the entire smelting system; it can also reduce the waste of circulating water heat and reduce losses.
[0006] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0007] A metal smelting cooling water system comprises a cooling tower and a smelting furnace, wherein the cooling tower and the smelting furnace are both provided with a circulating water inlet and a circulating water outlet, the circulating water outlet of the cooling tower is connected to the circulating water inlet of the smelting furnace through a cooling water inlet pipe, and the circulating water outlet of the smelting furnace is connected to the circulating water inlet of the cooling tower through a cooling water return pipe;
[0008] A water tank, a precooling tank and a water pump are installed on the cooling water return pipe in sequence. The cooling water inlet pipe is connected to the spare gravity water pipeline. A normally open solenoid valve and a manual gate valve are installed in parallel on the spare gravity water pipeline.
[0009] An upper cavity and a lower cavity are symmetrically arranged inside the precooling box in the vertical direction, a partition plate is arranged between the upper cavity and the lower cavity, and a plurality of vacuum heat conduction pipes are evenly distributed on the partition plate.
[0010] Furthermore, the connection between the standby gravity water pipeline and the cooling water inlet pipe is arranged close to the smelting furnace.
[0011] Furthermore, the water pump is arranged close to the cooling tower.
[0012] Furthermore, the cavity walls at both ends of the upper cavity and the lower cavity along the length direction adopt an elliptical structure.
[0013] Furthermore, the heating section of the vacuum heat pipe is located in the lower cavity, and the cooling section of the vacuum heat pipe is located in the upper cavity.
[0014] Furthermore, a plurality of guide plates arranged in an alternating manner are respectively installed inside the upper cavity and the lower cavity.
[0015] Furthermore, both ends of the lower cavity along the length direction are connected to the cooling water return pipe.
[0016] Furthermore, one end of the upper cavity along the length direction is connected to the external water inlet pipe, and the other end is connected to the external water outlet pipe.
[0017] Compared with the prior art, the utility model has the following advantages after adopting the above technical solution:
[0018] The circulating water flowing out of the smelting furnace is first pre-cooled through a pre-cooling box, then re-cooled through a cooling tower, and then returned to the smelting furnace after re-cooling to ensure a good cooling effect on the furnace body;
[0019] When the circulating water flows into the precooling box for precooling, it fully exchanges heat with the external water. The external water after heat exchange and temperature rise can be used as domestic water, which reduces the waste of circulating water heat and reduces losses.
[0020] If an emergency power outage occurs during the operation of the smelting furnace, the normally open solenoid valve will automatically open when the power is off, and the emergency water can enter the water cooling system in time to continue supplying water. The water cooling system will still operate normally to ensure the cooling effect of the furnace body, and timely and effectively ensure the safety of the overall smelting system.
[0021] The utility model is described in detail below with reference to the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a structural schematic diagram of the utility model;
[0023] Figure 2 It is a structural diagram of the precooling box.
[0024] In the figure, 1-smelting furnace, 2-water tank, 3-water pump, 4-cooling tower, 5-normally open solenoid valve, 6-manual gate valve, 7-cooling water inlet pipe, 8-cooling water return pipe, 9-spare gravity water pipeline, 10-precooling box, 101-lower cavity, 102-upper cavity, 103-partition plate, 104-vacuum heat conduction pipe, 105-guide plate, 106-external water inlet pipe, 107-external water outlet pipe. DETAILED DESCRIPTION
[0025] In order to have a clearer understanding of the technical features, purposes and effects of the utility model, the specific implementation methods of the utility model are now described with reference to the accompanying drawings.
[0026] like Figure 1 and Figure 2 As shown together, the utility model provides a metal smelting cooling water system, including a cooling tower 4 and a smelting furnace 1, and both the cooling tower 4 and the smelting furnace 1 are provided with a circulating water inlet and a circulating water outlet.
[0027] The circulating water outlet of the cooling tower 4 is connected to the circulating water inlet of the smelting furnace 1 through the cooling water inlet pipe 7 , and the circulating water outlet of the smelting furnace 1 is connected to the circulating water inlet of the cooling tower 4 through the cooling water return pipe 8 .
[0028] A water tank 2 , a precooling tank 10 and a water pump 3 are sequentially installed on the cooling water return pipe 8 , and the water pump 3 is arranged close to the cooling tower 4 .
[0029] The precooling box 10 in the utility model precools the circulating water, and the cooling tower 4 recools the precooled circulating water.
[0030] The cooling water inlet pipe 7 is connected to the spare gravity water pipeline 9. The connection between the spare gravity water pipeline 9 and the cooling water inlet pipe 7 is arranged close to the smelting furnace 1. Two valves are installed in parallel on the spare gravity water pipeline 9, one is a normally open solenoid valve 5, and the other is a manual gate valve 6.
[0031] When the smelting furnace 1 is in normal operation, the water pump 3 is started, the normally open solenoid valve 5 is powered on and closed, the manual gate valve 6 is closed, and the water cooling system operates normally to ensure the cooling effect of the furnace body. When an emergency power outage occurs during the operation of the smelting furnace 1, the water pump 3 cannot be started normally. At this time, the normally open solenoid valve 5 is powered off and automatically opened, and the emergency water can enter the water cooling system in time to continue to supply water. The water cooling system still operates normally to ensure the cooling effect of the furnace body, and timely and effectively ensure the safety of the overall smelting system. If the normally open solenoid valve 5 fails and cannot be opened normally, manually open the manual gate valve 6 to ensure the emergency water supply.
[0032] An upper cavity 102 and a lower cavity 101 are symmetrically arranged inside the precooling box 10 in the vertical direction. The cavity walls at both ends of the upper cavity 102 and the lower cavity 101 along the length direction adopt an elliptical structure to improve pressure resistance.
[0033] There is a partition plate 103 between the upper cavity 102 and the lower cavity 101, and a plurality of vacuum heat pipes 104 are evenly distributed on the partition plate 103. The heating section of the vacuum heat pipe 104 is located in the lower cavity 101, and the cooling section of the vacuum heat pipe 104 is located in the upper cavity 102. The vacuum heat pipe 104 can quickly transfer the heat of the lower cavity 101 to the upper cavity 102.
[0034] A plurality of guide plates 105 arranged in a staggered manner are respectively installed inside the upper cavity 102 and the lower cavity 101 . The plurality of guide plates 105 implement serpentine guidance of water to ensure sufficient heat exchange.
[0035] Both ends of the lower cavity 101 along the length direction are connected to the cooling water return pipe 8 .
[0036] One end of the upper cavity 102 along the length direction is connected to the external water inlet pipe 106, and the other end is connected to the external water outlet pipe 107. The external water absorbs heat in the upper cavity 102 and cools down the circulating cooling water in the lower cavity 101. The heated external water can be used as domestic water, reducing the waste of circulating water heat and reducing losses.
[0037] The specific working principle of this utility model:
[0038] The circulating water flowing out of the smelting furnace 1 is first precooled by the precooling box 10, then recooled by the cooling tower 4, and then refluxed into the smelting furnace 1 to ensure a good cooling effect of the furnace body.
[0039] When the circulating water flows into the precooling box 10 for precooling, it fully exchanges heat with the external water. The external water heated by heat exchange can be used as domestic water, which reduces the waste of circulating water heat and reduces losses.
[0040] If an emergency power failure occurs during the operation of the smelting furnace 1, the normally open solenoid valve 5 is automatically opened after power failure, and the emergency water can enter the water cooling system in time to continue to supply water. The water cooling system still operates normally to ensure the cooling effect of the furnace body, and timely and effectively ensure the safety of the overall smelting system.
[0041] The above is an example of the best implementation of the utility model, and the parts not described in detail are common knowledge of ordinary technicians in this field. The protection scope of the utility model is based on the content of the claims, and any equivalent transformation based on the technical inspiration of the utility model is also within the protection scope of the utility model.
Claims
1. A metal smelting cooling water system, characterized in that: It comprises a cooling tower (4) and a smelting furnace (1), wherein the cooling tower (4) and the smelting furnace (1) are both provided with a circulating water inlet and a circulating water outlet, the circulating water outlet of the cooling tower (4) is connected to the circulating water inlet of the smelting furnace (1) via a cooling water inlet pipe (7), and the circulating water outlet of the smelting furnace (1) is connected to the circulating water inlet of the cooling tower (4) via a cooling water return pipe (8); A water tank (2), a precooling box (10) and a water pump (3) are sequentially installed on the cooling water return pipe (8); the cooling water inlet pipe (7) is connected to a spare gravity water pipe (9); and a normally open solenoid valve (5) and a manual gate valve (6) are installed in parallel on the spare gravity water pipe (9); An upper cavity (102) and a lower cavity (101) are symmetrically arranged in the vertical direction inside the precooling box (10), a partition plate (103) is provided between the upper cavity (102) and the lower cavity (101), and a plurality of vacuum heat conduction pipes (104) are evenly distributed on the partition plate (103).
2. A metal smelting cooling water system according to claim 1, characterized in that: The connection point between the standby gravity water pipeline (9) and the cooling water inlet pipe (7) is arranged close to the smelting furnace (1).
3. A metal smelting cooling water system according to claim 1, characterized in that: The water pump (3) is arranged close to the cooling tower (4).
4. A metal smelting cooling water system according to claim 1, characterized in that: The cavity walls at both ends of the upper cavity (102) and the lower cavity (101) along the length direction adopt an elliptical structure.
5. A metal smelting cooling water system according to claim 1, characterized in that: The heating section of the vacuum heat conducting pipe (104) is located in the lower cavity (101), and the cooling section of the vacuum heat conducting pipe (104) is located in the upper cavity (102).
6. A metal smelting cooling water system according to claim 1, characterized in that: A plurality of guide plates (105) arranged in a staggered manner are respectively installed inside the upper cavity (102) and the lower cavity (101).
7. A metal smelting cooling water system according to claim 1, characterized in that: Both ends of the lower cavity (101) along the length direction are connected to the cooling water return pipe (8).
8. A metal smelting cooling water system according to claim 1, characterized in that: One end of the upper cavity (102) along the length direction is connected to an external water inlet pipe (106), and the other end is connected to an external water outlet pipe (107).
