Box frame device for rapidly constructing gabion

By designing the combination of support rods, reinforcements and limit nuts, the problem of deformation and damage of steel wire mesh due to stone pulling during construction is solved, and the effective support of the steel wire mesh and efficient removal of stone filling is achieved, which has improved the Construction efficiency and progress of Gibbin gabion.

CN222065331UActive Publication Date: 2024-11-26WUHAN ENGINEERING CO LTD OF CHINA RAILWAY SEVENTH GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420236767.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-31
Publication Date
2024-11-26
Estimated Expiration
2034-01-31

AI Technical Summary

Technical Problem

When placing stones in existing rapid construction of gabion gabion, the wire mesh is easily deformed and damaged by pulling forces, affecting the construction progress.

Method used

A box rack device including a base plate, a support mechanism and a hoisting assembly is designed to support and fix the wire mesh through a combination of support rods, reinforcements and limit nuts to avoid damage when the stone is pulled, and to utilize wear resistance The rubber buffer plate reduces impact force and enhances the practicality of the device.

Benefits of technology

It effectively avoids deformation and damage caused by stone pulling during the construction process, improves the construction efficiency and progress of the Gibbin gabion, and simplifies the stone filling and removal operations through the use of hoisting equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065331U_ABST
    Figure CN222065331U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of engineering construction gabion construction, in particular to a box frame device for quickly constructing gabion gabions, which comprises a bottom plate, a box frame and a box frame, wherein the supporting mechanism comprises four supporting rods which are fixedly connected to the four corners of the top of the bottom plate respectively, the four corners of the top of the bottom plate are fixedly connected with fixing plates, and a baffle is arranged between every two fixing plates; the four baffles are sequentially installed above the clamping grooves through the inserting plates, the baffles can block stones, the gabion is further prevented from being damaged, the four corners of the gabion are sleeved with the four supporting rods from the top ends of the four supporting rods, at the moment, the gabion is tightened and supported through the four corners of the gabion, and the gabion is prevented from being damaged. Therefore, the gabion can be limited without using objects such as a hook, and the gabion cannot be damaged under the pulling of the hook when the gabion is pulled by the stone.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering construction gabion cage construction, in particular to a box frame device for quickly constructing gabion cages. Background Art

[0002] Gabion gabion is a hexahedral wire mesh cage filled with stones. It is mostly used for slope protection and roadbed reinforcement. It has the advantages of good durability and low price. During construction, the wire mesh is first made into a hexahedral structure, and then the top cover is opened to load the stones, and then the top cover is sealed. Since the wire mesh is woven with galvanized steel wire and has a soft texture, it is easy to deform or even break when placing stones, resulting in low efficiency of gabion gabion construction and affecting the overall construction progress.

[0003] After searching, it is found that the Chinese publicly authorized patent "Box frame device for rapid construction of gabion cages" has a publication number of "CN216475107U". This patent uses steel formwork as a support surface to shape and reinforce the wire mesh, which can avoid deformation of the mesh box when placing stones. Since there is no need to consider the above factors, whether it is manual loading or mechanical loading, it can greatly increase the stone loading speed and accelerate the construction of gabion cages.

[0004] However, the device in the above case requires the wire mesh to be hung on a hook when in use. When placing stones, the wire mesh is easily deformed and damaged by the pulling force of the falling stones.

[0005] Therefore, a box frame device for quickly constructing gabion cages is proposed to solve the above problems. Utility Model Content

[0006] The purpose of the utility model is to provide a box frame device for quickly constructing gabion stone cages in order to solve the above problems, thereby improving the problem that the wire mesh in the above case is easily deformed and damaged by the pulling force when the stones fall.

[0007] The utility model achieves the above-mentioned purpose through the following technical scheme: a box frame device for quickly constructing gabion stone cages, comprising: a bottom plate, a supporting mechanism is arranged on the top of the bottom plate; wherein the supporting mechanism comprises four supporting rods which are respectively fixedly connected to the four corners of the top of the bottom plate, the four corners of the top of the bottom plate are fixedly connected to a fixing plate, a baffle is arranged between every two of the fixing plates, a rectangular block is fixedly connected to the top of the fixing plate, a reinforcing piece is sleeved on the surface of the supporting rod, a rectangular hole is opened on the top of the reinforcing piece, the top of the rectangular block passes through the inside of the rectangular hole, a lifting assembly is arranged on the top of the bottom plate, a bolt is fixedly connected to the top of the rectangular block, the top of the bolt passes through the rectangular hole and is threadedly connected to a limiting nut, and both sides of the baffle are fixed A plug-in plate is connected, and a slot is provided on one side of the fixing plate close to the baffle plate, and the plug-in plate is plugged into the slot, and the four baffle plates are installed from the top of the slot through the plug-in plate in sequence. The baffle plate can block the stones, further preventing the gabion stone cage from being damaged, and the four corners of the gabion stone cage are inserted from the top ends of the four support rods. At this time, the four support rods will tighten and support the gabion stone cage through the four corners, so that there is no need to use hooks or the like to limit the gabion stone cage, and the gabion stone cage will not be damaged by the pull of the hooks when it is pulled by the stones, and then the reinforcement piece is put on the surface of the support rod, and as the reinforcement piece moves downward, the reinforcement piece will be put on the surface of the bolt and the rectangular block through the rectangular hole, and then the reinforcement piece is locked with a limit nut, so that the support rod can be reinforced.

[0008] Preferably, the lifting assembly includes two lifting plates, two mounting grooves are provided at the bottom of the base plate, the bottom end of the lifting plate passes through the interior of the mounting groove, and a double-headed screw is provided at the top of the lifting plate, both ends of the double-headed screw pass through the lifting plate and are threadedly connected with locking nuts. The lifting plate is U-shaped, and through holes are provided on both sides of the lifting plate. The ends of the double-headed screw pass through the outside of the through holes. After the filling of the gabion cage is completed, the double-headed screw is passed through the through holes on the lifting plate, and then the locking nuts are used to fix the double-headed screws. Then, the lifting equipment is used to hook up the two double-headed screws to drive the lifting plate to move. The lifting plate drives the filled gabion cage out of the device, and then a new gabion cage is put back in for filling.

[0009] Preferably, a buffer plate is provided on one side of the baffle plate close to the support rod, and the buffer plate is made of wear-resistant rubber material. The buffer plate made of wear-resistant rubber material can reduce the impact force generated by the falling stone, thereby improving the practicality of the device.

[0010] Preferably, two hooks are fixedly connected to the top of the baffle, and the hooks facilitate the use of lifting equipment to install the baffle on the top of the base plate.

[0011] Preferably, a corner of the fixing plate close to the support rod is set as an arc chamfer, which can avoid the fixing plate from obstructing the four corners of the gabion stone cage.

[0012] The beneficial effects of the utility model are:

[0013] 1. Install the four baffles from the top of the slot through the plug-in board in sequence. The baffles can block the stones to further prevent the gabion cage from being damaged. Insert the four corners of the gabion cage from the top of the four support rods. At this time, the four support rods will tighten and support the gabion cage through the four corners, so that there is no need to use hooks or other objects to limit the gabion cage. The gabion cage will not be damaged by the pull of the hooks when it is pulled by the stones. Then put the reinforcement piece on the surface of the support rod. As the reinforcement piece moves downward, the reinforcement piece will be put on the surface of the bolt and the rectangular block through the rectangular hole. Then use the limit nut to lock the reinforcement piece, so that the support rod can be reinforced;

[0014] 2. After the filling of the gabion cage is completed, pass the double-headed screw through the through hole on the lifting plate, and then use the locking nut to fix the double-headed screw. Then use the lifting equipment to hook up the two double-headed screws to drive the lifting plate to move. The lifting plate drives the filled gabion cage out of this device, and then put the new gabion cage back in for filling operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of the utility model;

[0016] Figure 2 It is a schematic diagram of the connection between the lifting assembly and the base plate of the utility model;

[0017] Figure 3 It is a schematic diagram of the connection between the reinforcement member and the fixing plate of the utility model;

[0018] Figure 4 for Figure 1 A is an enlarged view of the middle image.

[0019] In the figure: 1. base plate; 2. supporting mechanism; 21. supporting rod; 22. fixing plate; 23. baffle; 24. plug-in board; 25. slot; 26. buffer plate; 27. hook ring; 28. reinforcement; 29. ​​lifting assembly; 2901. lifting plate; 2902. mounting groove; 2903. double-headed screw; 2904. locking nut; 210. rectangular hole; 211. rectangular block; 212. bolt; 213. limit nut. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] When implementing: Figure 1-4 As shown, a box frame device for rapid construction of gabion stone cages comprises: a bottom plate 1, a support mechanism 2 is arranged on the top of the bottom plate 1; wherein the support mechanism 2 comprises four support rods 21 which are respectively fixedly connected to the four corners of the top of the bottom plate 1, the four corners of the top of the bottom plate 1 are fixedly connected to fixing plates 22, a baffle 23 is arranged between every two fixing plates 22, a rectangular block 211 is fixedly connected to the top of the fixing plate 22, a reinforcing member 28 is sleeved on the surface of the support rod 21, a rectangular hole 210 is opened on the top of the reinforcing member 28, the top of the rectangular block 211 passes through the inside of the rectangular hole 210, a hanging assembly 29 is arranged on the top of the bottom plate 1, a bolt 212 is fixedly connected to the top of the rectangular block 211, the top of the bolt 212 passes through the rectangular hole 210 and is threadedly connected to a limiting nut 213, plug-in plates 24 are fixedly connected to both sides of the baffle 23, and the fixing plate 22 is close to the baffle A card slot 25 is provided on one side of 23, and the plug-in plate 24 is plugged into the card slot 25. When in use, the lifting assembly 29 is first installed on the top of the base plate 1, and the four baffles 23 are installed from the top of the card slot 25 through the plug-in plate 24 in turn, and then the four corners of the gabion stone cage are inserted from the top of the four support rods 21. At this time, the four support rods 21 will tighten and support the gabion stone cage through the four corners, and then the reinforcement piece 28 is sleeved on the surface of the support rod 21. As the reinforcement piece 28 moves downward, the reinforcement piece 28 will be sleeved on the surface of the bolt 212 and the rectangular block 211 through the rectangular hole 210, and then the reinforcement piece 28 is locked with the limit nut 213, and then the stones are placed into the interior of the gabion stone cage manually or mechanically, and the top cover is closed after it is filled, and then the reinforcement piece 28 is removed, and finally the filled gabion stone cage is lifted out by the lifting equipment through the lifting assembly 29.

[0022] like Figure 1 and Figure 2As shown, the hanging assembly 29 includes two hanging plates 2901, two placement grooves 2902 are opened at the bottom of the bottom plate 1, the bottom end of the hanging plate 2901 penetrates into the interior of the placement groove 2902, and the top of the hanging plate 2901 is provided with a double-headed screw 2903, both ends of the double-headed screw 2903 penetrate the hanging plate 2901 and are threadedly connected with a locking nut 2904. The shape of the hanging plate 2901 is U-shaped, and both sides of the hanging plate 2901 are opened. There is a through hole, and the end of the double-headed screw 2903 passes through the outside of the through hole. After the filling of the gabion cage is completed, the double-headed screw 2903 is passed through the through hole on the lifting plate 2901, and then the double-headed screw 2903 is fixed with the locking nut 2904, and then the two double-headed screws 2903 are hooked up with the lifting equipment to drive the lifting plate 2901 to move, and the lifting plate 2901 drives the filled gabion cage to move out of this device, and then the new gabion cage is put back in for filling operation.

[0023] like Figure 1 and Figure 4 As shown, a buffer plate 26 is provided on one side of the baffle plate 23 close to the support rod 21. The buffer plate 26 is made of wear-resistant rubber material. The buffer plate 26 made of wear-resistant rubber material can reduce the impact force generated by the falling stone.

[0024] like Figure 1 and Figure 4 As shown, two hooks 27 are fixedly connected to the top of the baffle 23 .

[0025] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, a corner of the fixing plate 22 close to the supporting rod 21 is configured as an arc chamfer.

[0026] When the utility model is used, the hoisting assembly 29 is first installed on the top of the bottom plate 1, and the four baffles 23 are installed from the top of the card slot 25 through the plug-in plate 24 in sequence, and then the four corners of the gabion stone cage are inserted from the top of the four support rods 21. At this time, the four support rods 21 will tighten and support the gabion stone cage through the four corners, and then the reinforcement member 28 is sleeved on the surface of the support rod 21. As the reinforcement member 28 moves downward, the reinforcement member 28 will be sleeved on the surface of the bolt 212 and the rectangular block 211 through the rectangular hole 210, and then the limit The nut 213 locks the reinforcement 28, and then the stones are placed into the gabion cage manually or mechanically. After it is filled, the top cover is closed, and then the reinforcement 28 is removed, and the double-headed screw 2903 is passed through the through hole on the lifting plate 2901. Then, the double-headed screw 2903 is fixed with the locking nut 2904, and then the two double-headed screws 2903 are hooked up with the lifting equipment to drive the lifting plate 2901 to move. The lifting plate 2901 drives the filled gabion cage out of the device, and then a new gabion cage is put in to carry out the filling operation.

[0027] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A box frame device for rapid construction of gabion cages, characterized in that: include: A bottom plate (1), wherein a support mechanism (2) is provided on the top of the bottom plate (1); The support mechanism (2) comprises four support rods (21) which are respectively fixedly connected to the four corners of the top of the base plate (1); the four corners of the top of the base plate (1) are fixedly connected to fixed plates (22); a baffle (23) is provided between every two fixed plates (22); a rectangular block (211) is fixedly connected to the top of the fixed plate (22); a reinforcing member (28) is sleeved on the surface of the support rod (21); a rectangular hole (210) is provided on the top of the reinforcing member (28); the top of the rectangular block (211) passes through the inside of the rectangular hole (210); and a lifting assembly (29) is provided on the top of the base plate (1).

2. A box frame device for rapid construction of gabion cages according to claim 1, characterized in that: The hoisting assembly (29) comprises two hoisting plates (2901), the bottom of the base plate (1) is provided with two placement grooves (2902), the bottom end of the hoisting plate (2901) penetrates into the interior of the placement groove (2902), the top end of the hoisting plate (2901) is provided with a double-headed screw (2903), both ends of the double-headed screw (2903) penetrate the hoisting plate (2901) and are threadedly connected with locking nuts (2904).

3. A box frame device for rapid construction of gabion stone cage according to claim 1, characterized in that: A bolt (212) is fixedly connected to the top of the rectangular block (211), and the top end of the bolt (212) passes through the rectangular hole (210) and is threadedly connected to a limiting nut (213).

4. A box frame device for rapid construction of gabion stone cage according to claim 1, characterized in that: Both sides of the baffle (23) are fixedly connected with plug-in boards (24); a clamping slot (25) is provided on one side of the fixed plate (22) close to the baffle (23); and the plug-in board (24) is clamped with the clamping slot (25).

5. A box frame device for rapid construction of gabion cages according to claim 1, characterized in that: A buffer plate (26) is provided on one side of the baffle plate (23) close to the support rod (21), and the buffer plate (26) is made of a wear-resistant rubber material.

6. A box frame device for rapid construction of gabion stone cage according to claim 1, characterized in that: Two hook rings (27) are fixedly connected to the top of the baffle (23).

7. A box frame device for rapid construction of gabion stone cage according to claim 1, characterized in that: A corner of the fixing plate (22) close to the support rod (21) is arranged as an arc-shaped chamfer.

8. A box frame device for rapid construction of gabion cages according to claim 2, characterized in that: The shape of the hanging plate (2901) is U-shaped, and through holes are opened on both sides of the hanging plate (2901), and the ends of the double-headed screw (2903) penetrate to the outside of the through holes.