Dam slope drain hole structure for geomembrane anti-seepage dam

By setting through-type drainage holes and reverse filter geotextiles on the concrete slope of the geomembrane anti-seepage dam, combined with mesh steel bar fixings, the problems of construction difficulties, easy damage to geomembrane and invasion of aquatic animals are solved, and the dam is realized Safety and stability and anti-seepage protection.

CN222083474UActive Publication Date: 2024-11-29NORTHWEST ENGINEERING CORPORATION LIMITED
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420731011.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-10
Publication Date
2024-11-29
Estimated Expiration
2034-04-10

AI Technical Summary

Technical Problem

The drainage hole structure of the existing geomembrane anti-seepage dam has problems with construction difficulties, geomembrane is prone to damage, aquatic animals invade and dam seepage to take away soil particles, which affects the construction speed and safety of the dam.

Method used

A dam slope drainage hole structure was designed. By setting through-type drainage holes on the concrete slope protection, the upper and lower PVC drainage pipes and mesh steel bar fixtures were installed inside, and the lower drainage pipe was filled with reverse filter geotextile to prevent soil particles from being taken away. and aquatic animals invade, simplifying the construction process.

Benefits of technology

It effectively prevents the seepage of water from taking away soil particles and aquatic animals, simplifies the construction process, ensures the anti-seepage performance and safety of the dam, and avoids the formation of cavities inside the dam body.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222083474U_ABST
    Figure CN222083474U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of hydraulic engineering in hydraulic engineering, and particularly provides a dam slope drain hole structure for a geomembrane anti-seepage dam, a drain hole penetrates through a concrete protection slope, and an upper layer drain pipe, a connecting fixing piece and a lower layer drain pipe are sequentially arranged and connected in the drain hole from top to bottom. The lower-layer drainage pipe is filled with inverted filter geotechnical cloth; according to the utility model, the influence of slope protection drainage hole construction on the engineering construction progress is reduced; the problem that a geomembrane is damaged due to construction of a dam slope drainage hole soil inverted filter layer is avoided; the problem that dam body soil particles are brought out by dam body seepage water and the stability and safety of the dam are affected is solved; and the problem that aquatic animals enter the drainage holes to damage the seepage-proof geomembrane of the dam body is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of hydraulic engineering in water conservancy projects, and specifically relates to a dam slope drainage hole structure used for a geomembrane anti-seepage dam. Background Art

[0002] As a type of earth-rock dam, geomembrane anti-seepage dam mainly uses geomembrane as the anti-seepage body of the dam. It has been widely used in the upper and lower reservoirs of pumped storage power stations and plain reservoirs for full basin anti-seepage. The main advantages of using geomembrane as the anti-seepage body of the dam are: low investment, strong anti-seepage performance, light and easy construction, etc. However, there are also many problems with geomembrane as the anti-seepage body of the dam. As the anti-seepage body of the dam, geomembrane is a flexible material of a polymer compound with a relatively thin thickness, so it is easily damaged by external influences. Therefore, concrete slope protection is usually set upstream of the anti-seepage geomembrane of the dam to protect the geomembrane. However, since the water level often drops suddenly in reservoir projects, when the water level of the reservoir drops suddenly, the water pressure upstream of the slope protection decreases rapidly, and the water pressure downstream of the slope protection changes slowly, so it is particularly easy to lift the slope protection. Therefore, it is necessary to set drainage holes on the slope protection to dissipate the internal water pressure downstream of the slope protection when the water level drops suddenly.

[0003] There are three common forms of drainage holes in water conservancy projects. The first is to set a filter bag at the inlet of the drainage hole to filter the soil particles in the seepage water to prevent the soil particles in the dam body from being taken away and forming cavities inside the dam body, affecting the safety of the dam body; the second is to set a soil filter layer upstream of the geomembrane at the inlet of the drainage hole to prevent the soil particles in the dam body from being taken away and affecting the safety of the dam body; the third is to set drainage holes directly on the slope without setting a filter. For the first type of drainage hole, due to the need to set a filter bag, the anti-seepage geomembrane of the dam body needs to be concave inward at the filter bag, which brings difficulties to the laying of the geomembrane and the filling of the dam body, affecting the speed of engineering construction. For the second type of drainage hole, in order to ensure the stability of the dam slope, the soil filter layer upstream of the geomembrane needs to be compacted, but during the rolling process, the geomembrane is easily damaged, affecting the anti-seepage performance of the dam body, thereby affecting the safety of the dam. The third type of drainage hole is the simplest, but since there is no filter layer, it is very easy to carry away the soil particles inside the dam body when the dam body seeps and drains. Over time, cavities will form inside the dam body, affecting the safety of the dam body. At the same time, the diameter of the above three types of drainage holes is usually 10cm. Aquatic animals will drill into the drainage holes, damage the internal geomembrane and affect the anti-seepage performance of the dam.

[0004] Therefore, for geomembrane anti-seepage dams, choosing a suitable slope protection drainage hole structure is the key to ensuring the construction speed and safe operation of the project.

[0005] The Chinese patent document with the announcement number CN204023497U discloses a gravel dam slope protection device, including multiple concrete blocks laid on the gravel dam slope, each concrete block is provided with a drainage hole in the middle, a PVC pipe is embedded in the drainage hole, and the PVC pipe is filled with stones; by providing drainage holes, PVC pipes and stones in the concrete blocks, the water in the dam body can be discharged in time to prevent the damage to the dam slope caused by reverse osmosis. Geotextile is coated on the outer surface of the PVC pipe 3 to prevent the fine particles in the gravel from being taken away during drainage, causing damage to the dam slope; the stones in the PVC pipe in the document are not fixed and are easy to run out of the PVC pipe, and the PVC pipe is not easy to locate during construction. Utility Model Content

[0006] The utility model provides a dam slope drainage hole structure for a geomembrane anti-seepage dam. The first purpose is to overcome the problem in the prior art that an anti-filter bag is set at the inlet of the drainage hole, and the dam body anti-seepage geomembrane needs to be concave inward at the anti-filter bag, which brings difficulties to the geomembrane laying construction and the dam body filling construction, affecting the construction speed of the project; the second purpose is to overcome the problem in the prior art that the construction of the soil anti-filter layer in the dam slope drainage hole causes damage to the geomembrane; the third purpose is to overcome the problem in the prior art that water seepage from the dam body brings out soil particles from the dam body and affects the stability and safety of the dam; the fourth purpose is to overcome the problem in the prior art that aquatic animals enter the drainage hole and damage the dam body anti-seepage geomembrane.

[0007] To this end, the utility model provides a dam slope drainage hole structure for a geomembrane anti-seepage dam, in which the dam body, the dam slope anti-seepage geomembrane and the concrete slope protection are connected in sequence from bottom to top, and a plurality of drainage holes are opened on the concrete slope protection, and the drainage holes penetrate the concrete slope protection, and an upper drainage pipe, a connecting fixture and a lower drainage pipe are sequentially arranged in the drainage holes from top to bottom, and the interior of the lower drainage pipe is filled with an anti-filter geotextile.

[0008] Preferably, the upper drainage pipe and the lower drainage pipe are both PVC drainage pipes.

[0009] Preferably, the connecting fixing member comprises mesh steel bars, the mesh steel bars are arranged in a slope direction, and the mesh steel bars are connected to the concrete slope protection.

[0010] Preferably, the connecting fixture also includes positioning steel bars, the positioning steel bars are vertically connected to the mesh steel bars, and the upper portion of the positioning steel bars is located in the upper drainage pipe, and the lower portion of the positioning steel bars is located in the lower drainage pipe.

[0011] Preferably, the mesh steel bars are welded from steel bars with a diameter of 8 mm to 10 mm into a steel mesh, and the net spacing of the holes of the steel mesh is 2 to 3 cm.

[0012] Preferably, the anchoring length of the mesh steel bars in the concrete slope protection is 3 cm-5 cm.

[0013] Preferably, the number of positioning steel bars in each drainage hole is 2-4.

[0014] Preferably, the upper portion of the positioning steel bar contacts and is connected to the interior of the upper drainage pipe, and the lower portion of the positioning steel bar contacts and is connected to the interior of the lower drainage pipe.

[0015] Preferably, the positioning steel bars are vertically welded to the mesh steel bars.

[0016] Preferably, the plurality of drainage holes are spaced apart and distributed in the exact center of the concrete slope protection.

[0017] Beneficial effects of the utility model:

[0018] 1. The utility model provides a dam slope drainage hole structure for geomembrane anti-seepage dam, wherein the drainage hole penetrates the concrete slope protection, and an upper drainage pipe, a connecting fixture and a lower drainage pipe are sequentially arranged in the drainage hole from top to bottom. By filling the lower drainage pipe with an anti-filter geotextile, the problem of the dam forming an internal cavity and affecting the safety of the dam after the seepage water carries away the soil particles is avoided, and at the same time, aquatic animals can be prevented from entering the drainage pipe and damaging the anti-seepage geomembrane of the dam slope; the connecting fixture is convenient for fixing the anti-filter geotextile inside the lower drainage pipe to prevent it from running out of the upper drainage pipe and the lower drainage pipe; at the same time, the connecting fixture is convenient for fixing the upper drainage pipe and the lower drainage pipe during construction; the seepage water downstream of the slope protection is discharged through the upper drainage pipe and the lower drainage pipe; the structure is simple, easy to construct, and no rolling is required. The geomembrane will not be damaged during construction, and the anti-seepage performance of the dam body will not be affected, thereby ensuring the safety of the dam.

[0019] 2. The dam slope drainage hole structure for geomembrane anti-seepage dam provided by the utility model fixes the anti-filtration geotextile inside the lower drainage pipe by mesh steel bars. The structure is simple and can prevent aquatic animals from entering the drainage hole to damage the geomembrane and affect the anti-seepage performance of the dam.

[0020] 3. The dam slope drainage hole structure for geomembrane anti-seepage dam provided by the utility model can prevent the upper drainage pipe and the lower drainage pipe from moving along the concrete slope protection direction after being inserted into the positioning steel bars, thereby facilitating construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0022] Figure 1 It is a top view of the drainage hole distribution;

[0023] Figure 2 This is the front view of the drainage hole structure on the dam slope used for the geomembrane anti-seepage dam;

[0024] Figure 3It is a top view of the structure connecting the fixing parts;

[0025] Figure 4 yes Figure 2 A is an enlarged structural diagram.

[0026] Explanation of the accompanying reference numerals: 1. Drainage hole; 2. Concrete slope protection; 3. Anti-filtration geotextile; 4. Dam slope anti-seepage geomembrane; 5. Dam body; 6. Connecting fixtures; 7. Mesh steel bars; 8. Positioning steel bars; 9. Upper drainage pipe; 10. Lower drainage pipe. DETAILED DESCRIPTION

[0027] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.

[0028] Embodiment 1:

[0029] like Figure 1 and Figure 2 As shown, a dam slope drainage hole structure for a geomembrane anti-seepage dam, the dam body 5, the dam slope anti-seepage geomembrane 4 and the concrete slope protection 2 are connected in sequence from bottom to top, a plurality of drainage holes 1 are opened on the concrete slope protection 2, the drainage holes 1 penetrate the concrete slope protection 2, and the upper drainage pipe 9, the connecting fixing part 6 and the lower drainage pipe 10 are sequentially arranged in the drainage holes 1 from top to bottom, and the lower drainage pipe 10 is filled with an anti-filtration geotextile 3.

[0030] Specifically: the drainage hole 1 is perpendicular to the concrete slope protection 2 and penetrates the concrete slope protection 2. The seepage water downstream of the slope protection is filtered by the anti-filter geotextile 3 and discharged from the lower drainage pipe 10, the connecting fixture 6 and the upper drainage pipe 9 in sequence. The anti-filter geotextile 3 is filled inside the lower drainage pipe 10 to avoid the problem of the formation of internal cavities in the dam and affecting the safety of the dam after the seepage takes away the soil particles. At the same time, it can also prevent aquatic animals from entering the drainage pipe and damaging the anti-seepage geomembrane of the dam slope; the anti-filter geotextile 3 inside the lower drainage pipe 10 is conveniently fixed by the connecting fixture 6 to prevent it from running out of the upper drainage pipe 9 and the lower drainage pipe 10; at the same time, the connecting fixture 6 is convenient for fixing the upper drainage pipe 9 and the lower drainage pipe 10 during construction; the structure is simple, easy to construct, and no rolling is required. The geomembrane will not be damaged during construction, and the anti-seepage performance of the dam body will not be affected, thereby ensuring the safety of the dam.

[0031] Embodiment 2:

[0032] Based on Example 1, the upper drainage pipe 9 and the lower drainage pipe 10 are both PVC drainage pipes.

[0033] Specifically, PVC drainage pipes have good surface hardness and tensile strength, high pipe safety factor, good aging resistance, corrosion resistance, small pipe friction coefficient, smooth water flow, not easy to clog, less maintenance workload, convenient and simple construction, easy operation, and high installation efficiency.

[0034] Preferably, the inner diameter of the PVC drainage pipe is 10 cm, which has a good drainage effect.

[0035] Preferably, Figure 3 and Figure 4 As shown, the connecting fixture 6 includes mesh steel bars 7, the mesh steel bars 7 are arranged in a slope direction, and the mesh steel bars 7 are connected to the concrete slope protection 2. The structure is simple and stable connection is convenient.

[0036] Preferably, the mesh steel bar 7 is welded from steel bars with a diameter of 8mm-10mm into a steel mesh, and the net spacing of the holes of the steel mesh is 2-3cm. It has a simple structure, good stability, does not affect drainage, prevents aquatic animals from entering the drainage pipe and damaging the anti-seepage geomembrane of the dam slope, and prevents the anti-filter geotextile 3 from running out.

[0037] Preferably, the anchoring length of the mesh steel bar 7 in the concrete slope protection 2 is 3 cm to 5 cm, which is easy to operate and has a good anchoring effect.

[0038] Preferably, the connecting fixture 6 also includes positioning steel bars 8, which are vertically connected to the mesh steel bars 7, and the upper portion of the positioning steel bars 8 is located in the upper drainage pipe 9, and the lower portion of the positioning steel bars 8 is located in the lower drainage pipe 10.

[0039] Specifically, the positioning steel bars 8 are composed of steel bars with a diameter of 8mm-10mm and a length of 5-10cm. The positioning steel bars are arranged vertically to the mesh steel bars. The positioning steel bars are arranged so that the PVC drainage pipe does not move along the slope protection direction after being inserted into the positioning steel bars. The main function of the positioning steel bars is to fix the relative position of the PVC drainage pipe and the mesh steel bars during construction.

[0040] Preferably, the number of positioning steel bars 8 in each drainage hole 1 is 2-4. 2-4 ensures that the effect of stable positioning is achieved under the premise of minimizing the number, and has good economic and practicality.

[0041] Preferably, the upper part of the positioning steel bar 8 contacts and connects to the inside of the upper drainage pipe 9, and the lower part of the positioning steel bar 8 contacts and connects to the inside of the lower drainage pipe 10. This connection is simple and can achieve a stable positioning effect.

[0042] Preferably, the positioning steel bar 8 is vertically welded to the mesh steel bar 7. The connection method is simple, easy to operate, has a good stabilizing effect after welding, and reduces spare parts.

[0043] Preferably, the plurality of drainage holes 1 are spaced apart and distributed in the center of the concrete slope protection 2, so as to facilitate the drainage of water seepage downstream of the concrete slope protection 2.

[0044] Preferably, the lower drainage pipe 10 is filled with anti-filtration geotextile 3. Its main function is to filter soil particles in the seepage water, so as to prevent the formation of internal cavities in the dam after the seepage water carries away the soil particles, thereby affecting the safety of the dam. It has a good filtering effect and can also prevent aquatic animals from entering the drainage pipe and damaging the anti-seepage geomembrane of the dam slope.

[0045] Preferably, the concrete slope protection 2 has a thickness of 15 cm-30 cm, a seam width of 2.5 m-3 m, and a seam length of 4 m-5 m; the main function of the concrete slope protection 2 is to protect the geomembrane.

[0046] The working principle of the utility model is:

[0047] After being filtered by the anti-filtration geotextile 3, the seepage water downstream of the slope protection is discharged from the lower drainage pipe 10, the mesh holes of the mesh steel bars 7, and the upper drainage pipe 9 in sequence.

[0048] In the description of the present invention, it is necessary to understand that if there are terms such as "upper", "inner", "lower", etc., indicating an orientation or positional relationship, it is based on the orientation or positional relationship shown in the drawings, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as a limitation on the present invention.

[0049] The above examples are merely illustrative of the present invention and do not constitute a limitation on the protection scope of the present invention. All designs that are identical or similar to the present invention fall within the protection scope of the present invention.

Claims

1. A dam slope drainage hole structure for a geomembrane anti-seepage dam, wherein a dam body (5), a dam slope anti-seepage geomembrane (4) and a concrete slope protection (2) are connected in sequence from bottom to top, and a plurality of drainage holes (1) are opened on the concrete slope protection (2), characterized in that: The drainage hole (1) penetrates the concrete slope protection (2), and an upper drainage pipe (9), a connecting fixture (6), and a lower drainage pipe (10) are sequentially arranged in the drainage hole (1) from top to bottom, and the lower drainage pipe (10) is filled with a filter geotextile (3).

2. The dam slope drainage hole structure for geomembrane anti-seepage dam according to claim 1, characterized in that: The upper drainage pipe (9) and the lower drainage pipe (10) are both PVC drainage pipes.

3. The dam slope drainage hole structure for geomembrane anti-seepage dam according to claim 1, characterized in that: The connecting fixing member (6) comprises mesh steel bars (7), the mesh steel bars (7) are arranged in a slope direction, and the mesh steel bars (7) are connected to the concrete slope protection (2).

4. The dam slope drainage hole structure for geomembrane anti-seepage dam according to claim 3, characterized in that: The connecting fixture (6) further comprises a positioning steel bar (8), wherein the positioning steel bar (8) is vertically connected to the mesh steel bar (7), and the upper portion of the positioning steel bar (8) is located in the upper drainage pipe (9), and the lower portion of the positioning steel bar (8) is located in the lower drainage pipe (10).

5. The dam slope drainage hole structure for geomembrane anti-seepage dam according to claim 3, characterized in that: The mesh steel bars (7) are welded from steel bars with a diameter of 8 mm to 10 mm to form a steel mesh, and the net spacing of the holes in the steel mesh is 2 to 3 cm.

6. The dam slope drainage hole structure for geomembrane anti-seepage dam according to claim 5, characterized in that: The anchoring length of the mesh steel bars (7) in the concrete slope protection (2) is 3 cm to 5 cm.

7. The dam slope drainage hole structure for geomembrane anti-seepage dam according to claim 4, characterized in that: The number of positioning steel bars (8) in each drainage hole (1) is 2-4.

8. The dam slope drainage hole structure for geomembrane anti-seepage dam according to claim 7, characterized in that: The upper portion of the positioning steel bar (8) contacts and connects to the interior of the upper drainage pipe (9), and the lower portion of the positioning steel bar (8) contacts and connects to the interior of the lower drainage pipe (10).

9. The dam slope drainage hole structure for geomembrane anti-seepage dam according to claim 4, characterized in that: The positioning steel bars (8) are vertically welded to the mesh steel bars (7).

10. The dam slope drainage hole structure for geomembrane anti-seepage dam according to claim 1, characterized in that: The plurality of drainage holes (1) are distributed at intervals in the exact center of the concrete slope protection (2).