Discharging device of spray drying tower

By designing the discharge and screening mechanism in the spray drying tower, using spiral blade stirring and filter plate automatic screening, the problems of discharge port blockage and different particle sizes are solved, automatic screening and resource recovery are realized, and working efficiency is improved.

CN222173094UActive Publication Date: 2024-12-17JILIN CHANGLING COUNTY TIANLUN GAS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420329330.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-22
Publication Date
2024-12-17
Estimated Expiration
2034-02-22

AI Technical Summary

Technical Problem

The discharge port of the spray drying tower is prone to clogging, and the particle size does not require manual screening, resulting in waste of resources and low work efficiency.

Method used

The design includes a discharge mechanism and a screening mechanism. The discharge mechanism is stirred by spiral blades to avoid clogging. The screening mechanism uses filter plates and stirring leaves to automatically screen particles. Excessive particles are broken through the air pipe and recovered.

Benefits of technology

It effectively avoids blockage of the discharge port, realizes automatic screening, improves work efficiency and reduces resource waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222173094U_ABST
    Figure CN222173094U_ABST
Patent Text Reader

Abstract

The utility model provides a discharging device of a spray drying tower, and belongs to the technical field of discharging of spray drying towers. The discharging device of the spray drying tower comprises a tower body, a cavity is formed in the tower body, a discharging mechanism comprises a first rotating rod, a connecting rod and a spiral blade, the first rotating rod is rotationally installed at the top of the inner wall of the tower body, and the top of the first rotating rod penetrates to the top of the tower body; the connecting rod is fixedly installed on the surface of the first rotating rod, and the spiral blade is fixedly installed on the side, away from the first rotating rod, of the connecting rod. The discharging mechanism is arranged, a worker starts a motor to drive a first rotating rod to rotate, a spiral blade rotates at the same time through fixed connection of a connecting rod, and due to the fact that the spiral blade is arranged to be spiral and tends to descend, the spiral blade stirs granular materials at a discharging port; and therefore, the phenomenon that the discharge port is blocked by the materials is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of spray drying tower discharging, in particular to a spray drying tower discharging device. Background Art

[0002] Spray drying tower is a common drying equipment, usually used to convert liquid materials into powder or granular state. The working principle of the spray drying tower is to atomize the liquid material into tiny droplets through a nozzle or atomizer, and then contact these droplets with hot air flow. In this process, the water or solvent in the droplets will evaporate, leaving solid particles or powder.

[0003] In order to facilitate discharging, the discharge port of the equipment is usually funnel-shaped. Since the material is generally granular, while the material has fluidity, it also makes it easy for the material to be blocked at the discharge port. When the material is dried into granules, the sizes of the particles are different. Particles that are too large do not meet the requirements. The staff also need to manually screen them, which causes a waste of resources. Utility Model Content

[0004] In order to make up for the above deficiencies, the utility model provides a spray drying tower discharging device which overcomes the above technical problems or at least partially solves the above problems.

[0005] The utility model is achieved in this way:

[0006] The utility model provides a spray drying tower discharging device, comprising a tower body, wherein a cavity is provided inside the tower body.

[0007] A discharging mechanism, wherein the discharging mechanism comprises:

[0008] A first rotating rod, the first rotating rod is rotatably mounted on the top of the inner wall of the tower body, and the top of the first rotating rod penetrates to the top of the tower body;

[0009] A connecting rod, the connecting rod is fixedly mounted on the surface of the first rotating rod;

[0010] A spiral blade, wherein the spiral blade is fixedly mounted on a side of the connecting rod away from the first rotating rod, and the spiral blade is sleeved on a surface of the first rotating rod;

[0011] A hot air blower, wherein the hot air blower is arranged on the right side of the tower body;

[0012] The screening mechanism is arranged inside the tower body.

[0013] In a preferred embodiment, the screening mechanism comprises:

[0014] A filter plate, wherein the filter plate is fixedly mounted on the inner wall of the tower body;

[0015] A stirring blade, wherein the stirring blade is fixedly mounted on the surface of the first rotating rod;

[0016] A screening port is provided on the inner wall of the tower body.

[0017] In a preferred solution, a first air pipe and a support block are fixedly installed on the left side of the tower body, the inner cavity of the first air pipe is connected to the inner cavity of the screening port, the support block is sleeved on the surface of the first air pipe and fixedly connected to the first air pipe, and a valve is installed at the bottom of the first air pipe.

[0018] In a preferred solution, an air pump is installed at the other end of the first air pipe, a second air pipe is fixedly installed on the right side of the air pump, and the other end of the second air pipe passes through the cavity.

[0019] In a preferred solution, a second rotating rod is rotatably mounted on the bottom of the support platform, the second rotating rod is sleeved inside the first air pipe, and crushing leaves are fixedly mounted on the surface of the second rotating rod.

[0020] In a preferred solution, rotating wheels are installed on the surfaces of the first rotating rod and the second rotating rod, and a transmission belt is arranged between the first rotating rod and the second rotating rod via a rotating wheel sleeve.

[0021] In a preferred solution, a motor is fixedly installed inside the support platform, and an output end of the motor is fixedly connected to the top of the first rotating rod.

[0022] The utility model provides a spray drying tower discharging device, and its beneficial effects include:

[0023] 1. By setting up the discharging mechanism, the staff starts the motor to drive the first rotating rod to rotate, and through the fixed connection of the connecting rod, the spiral blades rotate at the same time. Since the shape of the spiral blades is set to be spiral and has a downward trend, the spiral blades stir the granular materials at the discharging port, thereby avoiding the phenomenon of material blocking the discharging port.

[0024] 2. By setting up the screening mechanism, when the material becomes granular and falls, the filter holes are opened on the surface of the filter plate, so that the material that meets the requirements continues to fall, and the oversized material is intercepted on the top of the filter plate. The first rotating rod rotates while driving the stirring blade to rotate. The oversized material enters the first air pipe from the screening port through the cooperation of the stirring blade, so there is no need for manual screening. The screening work can be completed while the equipment is running, thereby improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to more clearly illustrate the technical solution of the implementation mode of the utility model, the drawings required for use in the implementation mode will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0026] Figure 1 It is a schematic diagram of the overall structure provided by the implementation method of the utility model;

[0027] Figure 2 A partial cross-sectional view of the tower body is provided for the implementation mode of the utility model;

[0028] Figure 3 A partial cross-sectional view of the tower body and the first air pipe is provided for the embodiment of the utility model;

[0029] Figure 4 A partial cross-sectional view of an embodiment of the present utility model.

[0030] In the figure: 1. tower body; 2. cavity; 3. discharging mechanism; 301. first rotating rod; 302. connecting rod; 303. spiral blade; 4. hot air blower; 5. screening mechanism; 501. filter plate; 502. stirring blade; 503. screening port; 6. first air pipe; 7. support block; 8. valve; 9. vacuum pump; 10. second air pipe; 11. support plate; 12. support platform; 13. second rotating rod; 14. breaking blade; 15. transmission belt; 16. motor. DETAILED DESCRIPTION

[0031] In order to make the purpose, technical solution and advantages of the implementation of the utility model clearer, the technical solution in the implementation of the utility model will be clearly and completely described below in conjunction with the drawings in the implementation of the utility model. Obviously, the described implementation is a part of the implementation of the utility model, not all of the implementations. Based on the implementation of the utility model, all other implementations obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0032] Example

[0033] Reference Figure 1-4The utility model provides a technical solution: a spray drying tower discharging device, including a tower body 1, a cavity 2 is opened inside the tower body 1, a discharging mechanism 3 includes a first rotating rod 301, a connecting rod 302 and a spiral blade 303, the first rotating rod 301 is rotatably installed on the top of the inner wall of the tower body 1, the top of the first rotating rod 301 penetrates to the top of the tower body 1, the connecting rod 302 is fixedly installed on the surface of the first rotating rod 301, the spiral blade 303 is fixedly installed on the side of the connecting rod 302 away from the first rotating rod 301, the spiral blade 303 is sleeved on the surface of the first rotating rod 301, and a hot air blower 4 is provided. It is placed on the right side of the tower body 1, the screening mechanism 5 is arranged inside the tower body 1, and a motor 16 is fixedly installed inside the support platform 12. The output end of the motor 16 is fixedly connected to the top of the first rotating rod 301. By setting the discharging mechanism 3, the staff starts the motor 16 to drive the first rotating rod 301 to rotate, and the spiral blade 303 is rotated at the same time through the fixed connection of the connecting rod 302. Since the shape of the spiral blade 303 is set to be spiral and has a downward trend, the spiral blade 303 stirs the granular material at the discharging port, thereby avoiding the phenomenon of material blocking the discharging port;

[0034] Reference Figure 1-4 The screening mechanism 5 includes a filter plate 501, a stirring blade 502 and a screening port 503. The filter plate 501 is fixedly mounted on the inner wall of the tower body 1, the stirring blade 502 is fixedly mounted on the surface of the first rotating rod 301, and the screening port 503 is opened on the inner wall of the tower body 1. By setting the screening mechanism 5, the material is intercepted by the filter plate 501 during the process of falling into granular form. Since the filter plate 501 has filter holes on its surface, the material that meets the requirements continues to fall, and the oversized material is intercepted at the top of the filter plate 501. The first rotating rod 301 rotates while driving the stirring blade 502 to rotate. The first rotating rod 301 is sleeved inside the filter plate 501 and is rotatably connected to the filter plate 501. After the valve 8 is opened, the oversized material enters the first air pipe 6 from the screening port 503 through the cooperation of the stirring blade 502, so that there is no need for manual screening. The screening work can be completed while the equipment is running, thereby improving work efficiency.

[0035] Reference Figure 1-4The left side of the tower body 1 is fixedly installed with a first air pipe 6 and a support block 7, the inner cavity of the first air pipe 6 is connected with the inner cavity of the screening port 503, the support block 7 is sleeved on the surface of the first air pipe 6, and is fixedly connected to the first air pipe 6, a valve 8 is installed at the bottom of the first air pipe 6, an air pump 9 is installed at the other end of the first air pipe 6, a second air pipe 10 is fixedly installed on the right side of the air pump 9, and the other end of the second air pipe 10 passes through the cavity 2, and a second rotating rod 13 is rotatably installed at the bottom of the support platform 12, the second rotating rod 13 is sleeved inside the first air pipe 6, and a valve 8 is fixedly installed on the surface of the second rotating rod 13. The surfaces of the first rotating rod 301 and the second rotating rod 13 are both equipped with rotating wheels, and a transmission belt 15 is provided between the first rotating rod 301 and the second rotating rod 13 through a rotating wheel sleeve. By setting the second rotating rod 13 and starting the vacuum pump 9, the material in the first air pipe 6 moves upward. Through the cooperation of the transmission belt 15, the first rotating rod 301 rotates and drives the second rotating rod 13 to rotate, so that the breaking leaves 14 rotate at the same time, so that the material is broken into smaller particles in the process of moving upward, and then enters the tower body 1 again through the vacuum pump 9 and the second air pipe 10, so that the oversized particles can be recycled and reused.

[0036] Specifically, the working process or working principle of the spray drying tower discharge device is as follows: when in use, the staff starts the motor 16 to drive the first rotating rod 301 to rotate, and the spiral blade 303 is rotated at the same time through the fixed connection of the connecting rod 302. Since the shape of the spiral blade 303 is set to be spiral and has a downward trend, the spiral blade 303 stirs the granular material at the discharge port. In the process of the material becoming granular and falling, it is intercepted by the filter plate 501. Since the surface of the filter plate 501 is provided with filter holes, the material that meets the requirements continues to fall, and the excessively large material is blocked. The material is intercepted at the top of the filter plate 501, and the first rotating rod 301 rotates while driving the stirring blade 502 to rotate. After the valve 8 is opened, the oversized material enters the first air pipe 6 from the screening port 503 through the cooperation of the stirring blade 502, and the vacuum pump 9 is started. The material in the first air pipe 6 moves upward. Through the cooperation of the transmission belt 15, the first rotating rod 301 rotates while driving the second rotating rod 13 to rotate, and the breaking blade 14 rotates at the same time, so that the material is broken into smaller particles in the process of moving upward, and then enters the tower body 1 again through the vacuum pump 9 and the second air pipe 10.

[0037] It should be noted that the motor 16 and the vacuum pump 9 are devices or equipment existing in the prior art, or are devices or equipment that can be realized in the prior art. Their power supply, specific composition and principles are clear to those skilled in the art, so they are not described in detail.

Claims

1. A spray drying tower discharge device, comprising a tower body (1), wherein a cavity (2) is provided inside the tower body (1), characterized in that: A discharging mechanism (3), wherein the discharging mechanism (3) comprises: A first rotating rod (301), the first rotating rod (301) being rotatably mounted on the top of the inner wall of the tower body (1), and the top of the first rotating rod (301) passing through the top of the tower body (1); A connecting rod (302), wherein the connecting rod (302) is fixedly mounted on the surface of the first rotating rod (301); A spiral blade (303), wherein the spiral blade (303) is fixedly mounted on a side of the connecting rod (302) away from the first rotating rod (301), and the spiral blade (303) is sleeved on a surface of the first rotating rod (301); A hot air blower (4), wherein the hot air blower (4) is arranged on the right side of the tower body (1); A screening mechanism (5), wherein the screening mechanism (5) is arranged inside the tower body (1).

2. A spray drying tower discharging device according to claim 1, characterized in that: The screening mechanism (5) comprises: A filter plate (501), wherein the filter plate (501) is fixedly mounted on the inner wall of the tower body (1); A stirring blade (502), wherein the stirring blade (502) is fixedly mounted on the surface of the first rotating rod (301); A screening port (503), wherein the screening port (503) is provided on the inner wall of the tower body (1).

3. A spray drying tower discharging device according to claim 2, characterized in that: A first air pipe (6) and a support block (7) are fixedly installed on the left side of the tower body (1); the inner cavity of the first air pipe (6) is connected to the inner cavity of the screening port (503); the support block (7) is sleeved on the surface of the first air pipe (6) and is fixedly connected to the first air pipe (6); and a valve (8) is installed at the bottom of the first air pipe (6).

4. A spray drying tower discharging device according to claim 3, characterized in that: An air pump (9) is installed at the other end of the first air pipe (6), a second air pipe (10) is fixedly installed on the right side of the air pump (9), and the other end of the second air pipe (10) passes through the cavity (2).

5. A spray drying tower discharging device according to claim 3, characterized in that: A second rotating rod (13) is rotatably mounted at the bottom of the support platform (12); the second rotating rod (13) is sleeved inside the first air pipe (6); and a crushing blade (14) is fixedly mounted on the surface of the second rotating rod (13).

6. A spray drying tower discharging device according to claim 5, characterized in that: Rotating wheels are installed on the surfaces of the first rotating rod (301) and the second rotating rod (13), and a transmission belt (15) is arranged between the first rotating rod (301) and the second rotating rod (13) via a rotating wheel sleeve.

7. A spray drying tower discharging device according to claim 6, characterized in that: A motor (16) is fixedly installed inside the support platform (12), and an output end of the motor (16) is fixedly connected to the top of the first rotating rod (301).