Pre-reinforced composite structure for tunnel longitudinally penetrating through slope and implementation method thereof

A combined structure and pre-reinforcement technology, which is applied in tunnels, tunnel linings, earthwork drilling and mining, etc., to achieve the effect of scientific prevention and control
CN102392649AInactive Publication Date: 2012-03-28NORTHWEST RES INST CO LTD OF C R E C

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
NORTHWEST RES INST CO LTD OF C R E C
Publication Date
2012-03-28
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention relates to pre-reinforcement projects for a tunnel-slope system, and provides a pre-reinforced composite structure for a tunnel longitudinally penetrating through slope and an implementation method thereof. The pre-reinforced composite structure comprises surface grouting, a surface anchor cable frame, a tunnel lining, grouting in tunnel and lining anchor cables. The implementation method of the pre-reinforced composite structure comprises the following steps of: based on engineering geology investigation results and geomechanical model recognition of the tunnel-slope system, determining the space layout form of the pre-reinforced composite structure, arranging surface grouting and the surface anchor cable frame firstly on the surface of the tunnel-slope system, arranging grouting in the tunnel as required, arranging bearing steel bars on the tunnel lining and pre-forming anchor cable holes for arranging the lining anchor cables. The implementation of the pre-reinforced composite structure provided by the invention can effectively reinforce the tunnel-slope system, thereby improving the stability of the slope and the self-bearing capacity of the tunnel surrounding rock, and ensuring the safe transport operation of the tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The present invention relates to a kind of pre-reinforcement project of tunnel-landslide system, especially in the aspect of pre-reinforcement project of tunnel crossing landslide longitudinally, proposes a kind of pre-reinforcement composite structure and implementation method of tunnel longitudinally crossing landslide, this composite structure can effectively Strengthen the tunnel-landslide system, improve the stability of the landslide and the self-bearing capacity of the tunnel surrounding rock, and ensure the safe operation of the tunnel. Background technique

[0002] At present, my country is ushering in a new round of large-scale engineering construction peak period, more and more energy, transportation, mining, water conservancy and national defense tunnel projects are built in the central and western mountainous areas. The terrain and geology in these areas are complex, and roads, railways and hydraulic tunnels often pass through areas with p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine