Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

52results about How to "Improve safety and economy" patented technology

Hub-type robot and detecting method for system for autonomously detecting road surfaces

The invention discloses a hub-type robot system for autonomously detecting road surfaces. The hub-type robot system comprises a robot body and a remote-monitoring auxiliary system, wherein information is transmitted between the robot body and the remote-monitoring auxiliary system by a wireless communication mode; the robot body is provided with a control system, a non-destructive detection system and an operation mechanism; the operation mechanism is arranged on the robot body; the non-destructive detection system is connected with the operation mechanism; the control mechanism is electrically connected with the operation mechanism and the non-destructive detection system; the non-destructive detection system comprises a resistivity instrument; the operation mechanism comprises a telescopic mechanism; the resistivity instrument is connected with the telescopic mechanism; an independently driven steering device is arranged at the bottom part of the robot body. The invention also discloses a road-surface detecting method. By adoption of the hub-type robot system disclosed by the invention, intelligent detection can be realized; due to no need of manual driving, the detection safety and the accuracy of data detection are improved; multiple non-destructive detection sensors are integrated into one, comprehensive evaluation on the road surfaces and the internal conditions can be realized, the detection efficiency is greatly improved, and the influence on the road trafficability is also reduced.
Owner:桂仲成

Pre-reinforced composite structure for tunnel longitudinally penetrating through slope and implementation method thereof

InactiveCN102392649ARealize scientific prevention and controlPre-reinforced composite structure is safe and effectiveUnderground chambersTunnel liningEarth surfaceRebar
The invention relates to pre-reinforcement projects for a tunnel-slope system, and provides a pre-reinforced composite structure for a tunnel longitudinally penetrating through slope and an implementation method thereof. The pre-reinforced composite structure comprises surface grouting, a surface anchor cable frame, a tunnel lining, grouting in tunnel and lining anchor cables. The implementation method of the pre-reinforced composite structure comprises the following steps of: based on engineering geology investigation results and geomechanical model recognition of the tunnel-slope system, determining the space layout form of the pre-reinforced composite structure, arranging surface grouting and the surface anchor cable frame firstly on the surface of the tunnel-slope system, arranging grouting in the tunnel as required, arranging bearing steel bars on the tunnel lining and pre-forming anchor cable holes for arranging the lining anchor cables. The implementation of the pre-reinforced composite structure provided by the invention can effectively reinforce the tunnel-slope system, thereby improving the stability of the slope and the self-bearing capacity of the tunnel surrounding rock, and ensuring the safe transport operation of the tunnel.
Owner:NORTHWEST RES INST CO LTD OF C R E C

Method for improving measuring precision of thermal resistance thermometer

The invention relates to and particularly discloses a method for improving measuring precision of a thermal resistance thermometer. The method comprises the following steps that 1, m points are selected within the measuring range of one thermal resistance thermometer as temperature correction datum points, and the output temperature value of the nth datum point is Yn; 2, the resistance value Rn of the nth temperature correction datum point is collected according to the data table of the thermal resistance thermometer; 3, an input temperature value Xn corresponding to the nth temperature correction datum point is acquired; 4, m-1 temperature intervals are formed by the m temperature correction datum points, and when a temperature value Ti measured by the thermal resistance thermometer is within the ith temperature interval, the gain Ai and polarization Bi of the ith temperature interval are obtained according to the step 3; 5, the temperature value Ti measured by the thermal resistance thermometer is calibrated and corrected, and a calibrated and corrected temperature value Ti' is obtained. According to the method, the measuring precision of the thermal resistance thermometer of a nuclear power plant is improved, the error of a whole temperature measuring channel is lowered, and the safety and economical efficiency of the power plant are improved.
Owner:NUCLEAR POWER INSTITUTE OF CHINA

Method and device for identifying output feasible region of virtual power plant based on constraint aggregation

The invention discloses a method and a device for identifying the output feasible region of a virtual power plant based on constraint aggregation, and relates to the technical field of power system dispatching and operation. The method comprises the following steps: acquiring basic operation data of the internal power distribution system of the virtual power plant; a static safety constraint modelof the virtual power plant based on an AC power flow equation is constructed according to the basic operation data of the internal distribution system of the virtual power plant; the output feasibleregion model of the virtual power plant is constructed according to the static safety constraint model of the virtual power plant; and the feasible region model of the virtual power plant output is calculated according to the basic data of the internal distribution system of the virtual power plant and the enumeration algorithm of the feasible region vertex so as to obtain the output feasible region of the virtual power plant. The method can characterize the output feasible region of the virtual power plant allowed for safe operation so that the virtual power plant can participate in the optimal dispatching operation of the power system and the clearing of the spot power market, the dispatching and clearing results are ensured not to violate the internal safe operation constraints of the virtual power plant and thus the safety and economy of the system can be improved.
Owner:TSINGHUA UNIV

Steam turbine low-pressure through-flow area safety monitoring and prewarning system and working method

ActiveCN109899120AImprove the safety and stability of the low pressure final stageImprove safety and economyMachines/enginesSafety/regulatory devicesWorking setEngineering
The invention discloses a steam turbine low-pressure through-flow area safety monitoring and prewarning system and a working method. Data is acquired through a flow area air blowing monitoring module,a long blade vibration monitoring module, a blade water erosion water brush prewarning module and an optimal operation boundary adjusting module; and after intercommunication, target unit safety boundary data and optimal safety operation boundary are generated in a safety estimating module and the optimal operation boundary adjusting module to prompt safe and economical adjustment of an unit. Themethod is suitable for steam turbine low-pressure through-flow area safety monitoring and prewarning in operation of a deep peak adjusting unit under part-load working condition, can accurately, comprehensively and effectively predict the low-pressure through-flow area long blade air blowing critical steam inlet flow and the air blowing high-temperature area position in deep peak adjustment, canfinely monitor the long blade vibration stress peak magnitude, can prospect and prewarn the water erosion state of final-stage blades, and achieves further optimization to give the safety operation boundary to the unit.
Owner:XIAN THERMAL POWER RES INST CO LTD +1

Wind power-thermal power cutter strategy coordination optimization method

The invention provides a wind power-thermal power cutter strategy coordination optimization method. The method comprises the following steps that: step one, when a fault occurrence of the system is monitored, calculation is started to obtain a transient energy function of a wind power-thermal-power bundling system after the fault so as to determine whether the system is unstable; if so, the step two is executed; and if not, the cutter measure is not taken; step two, according to transient energy functions of thermal power generating units, whether any thermal power generating unit itself is unstable is determined; if so, the thermal power generating unit that is unstable is cut off and then the step one is executed; and if not, the step three is executed; step three, on the basis of the delivery power scale of the wind power-thermal-power bundling system before the fault and the delivery capacity limit of the power transmission channel after the fault, the thermal power generating unit capacity needing to be cut off is calculated; and after the cutter operation is completed and operation returns to the step one. According to the method provided by the invention, secure and stable operation of the wind power-thermal-power bundling delivery energy base station after the fault can be effectively guaranteed; the cutter capacities of the wind power and the thermal power are distributed reasonably; the effect of lost power generation capacity minimization is realized; the favorable conditions are created for system recovery after the fault; and the security and economy of the system are improved.
Owner:STATE GRID CORP OF CHINA +2

Method for establishing air pre-heater clean factor calculation model by using smoke pressure difference, and application

InactiveCN105069185AImprove safety and economyMeet the precision requirements of engineering applicationsSpecial data processing applicationsSoot blowerCondition monitoring
The present invention discloses a method for establishing an air pre-heater clean factor calculation model by using smoke pressure difference, and the method includes: converting an actual measuring pressure difference under conditions of different loads and an excess air coefficient into calculated values under conditions of rated loads, and further establishing the air pre-heater clean factor calculation model. The present invention also discloses an application of the above calculation model to monitoring of fouling conditions of the air pre-heater of a coal-fired boiler SCR denitrification system. According to a formation principle of fouling of the air pre-heater of the SCR denitrification system and a growth form, a fouling monitoring model of the air pre-heater of the denitration boiler is established, wherein the fouling monitoring model integrates data collection, fouling condition monitoring, and diagnosis. The method provided by the present invention can accurately predict fouling conditions of the air pre-heater, meet accuracy requirement of engineering application, guide a soot blower to blow soot timely, eventually achieve demand soot blowing of tail heating surface, improve economy and safety of generator operation, and can provide a technical reference for domestic same-type generators.
Owner:SOUTHEAST UNIV

Nuclear power plant radioactive fluid waste online sampling device and method

The invention discloses a nuclear power plant radioactive fluid waste online sampling device which comprises a sampling part sealedly connected to a fluid pipeline, a movable rod sealedly accommodated in an accommodating space, and a driving device sealedly mounted on the sampling part; the sampling part is provided with the accommodating space and a sample discharge port communicating with the accommodating space; the movable rod is provided with a concave sampling space and can perform reciprocating motion between a sample discharge position and a sampling position; the driving device drives the movable rod to perform reciprocating motion between the sample discharge position and the sampling position in the accommodating space; when the movable rod is located at the sampling position, the movable rod enters the fluid pipeline, and a fluid sample enters the concave sampling space; when the movable rod is located at the sample discharge position, the concave sampling space corresponds to the sample discharge port, and the fluid sample carried in the concave sampling space flows into a shield sampling bottle sealed connected on the sample discharge port from the sample discharge port. In addition, the invention also discloses a nuclear power plant radioactive fluid waste online sampling method.
Owner:中广核工程有限公司 +1

Intermittent energy mass data processing method

The invention relates to an intermittent energy mass data processing method. The method includes the following steps that (1) an intermittent energy mass data processing platform is established, wherein the processing platform comprises a main cloud central server, an auxiliary cloud central server, a first load server, a second load server, a third load server, a fourth load server, a fifth load server, a sixth load server, a seventh load server, an eighth load server, a ninth load server, a tenth load server, an eleventh load server, a terminal data bus, a load bus and a data interface bus; (2) data are acquired, wherein original data stored in a terminal data computer are acquired by the main cloud central server and the auxiliary cloud central server through data acquisition interfaces C of the servers; (3) data are stored, wherein the acquired mass data are stored in an HDFS; (4) the data are processed, wherein concurrent processing is conducted on the data through a MapReduce model, the main cloud central server only uniformly dispatches storage and processing of the data, and the specific data storage and processing steps are conducted through the first load server, the second load server, the third load server, the fourth load server, the fifth load server, the sixth load server, the seventh load server, the eighth load server, the ninth load server, the tenth load server and the eleventh load server. The method has the advantages that the processing speed is high and safety and reliability are achieved.
Owner:NORTH CHINA ELECTRIC POWER UNIV (BAODING)

Pricking-prevention low-hysteresis tire

The invention discloses a safe and energy-saving pricking-prevention low-hysteresis tire. The tire is mainly composed of an inner ring, a bent beam support object and an outer rubber tire, wherein the inner ring is positioned at the innermost side, is round, and plays the role of connecting a rim and the bent beam support object; the bent beam support object is formed by the rotational and symmetrical arrangement of a plurality of bent beam components which are same in shape and are made of low-elastic-hysteresis materials between the inner ring and the outer rubber tire by taking a wheel shaft as the center, can play the role of supporting as well as can replace the rubber side wall of an inflated tire to transmit power, and also reduces the energy and power loss due to elastic hysteresis as far as possible; while the outer rubber tire is braced to the outer side of the bent beam support object, and can play roles of buffering, damping and reducing the abrasion of the bent beam, and can wrap the integral or partial of the tire in necessity so as to insulate dustiness. The safe and energy-saving pricking-prevention low-hysteresis tire can be used for solving the problems that the traditional inflation type tire is easy to prick and explode, is high in elastic hysteresis and the like, and the vehicle driving safety and energy conservation are improved effectively.
Owner:郭劭琰 +2

A wheel hub motor distributed time-sharing four-wheel drive electric vehicle chassis configuration, a four-wheel drive electric vehicle and a control method

The invention discloses a wheel hub motor distributed time-sharing four-wheel drive electric vehicle chassis configuration, a four-wheel drive electric vehicle and a control method. The wheel hub motor distributed time-sharing four-wheel drive electric vehicle chassis configuration comprises a frame assembly, wherein the frame assembly is provided with a first tire rim assembly, a second tire rimassembly, a centralized motor, a power battery pack, a vehicle controller, a high voltage power distribution box, hub motors and a radiator assembly. The first tire rim assembly is in transmission connection to the centralized motor through a drive shaft and a transmission, and the hub motors are mounted on the second tire rim assembly. A charging machine is electrically connected with the high-voltage power distribution box, and the high-voltage power distribution box is electrically connected with input ends of the vehicle controller and the power battery pack. The vehicle controller is electrically connected with the hub motors, and an output end of the power battery pack is separately connected to the centralized motor and the hub motors through an inverter. The inverter is electrically connected to the high voltage power distribution box. According to the invention, power demands by different driving conditions can be met, and the transmission efficiency is high.
Owner:DONGFENG MOTOR CORP HUBEI

Dynamic feedback analysis and optimization design method for fissure rock slope based on monitoring information

The invention relates to a dynamic feedback analysis and optimization design method for a fissure rock slope based on monitoring information. According to the dynamic feedback analysis and optimization design method for the fissure rock slope based on the monitoring information, quantitative analysis, optimization design and risk prediction of the engineering stability of the fissure rock slope are achieved, and engineering safety and economical efficiency are improved. According to the technical scheme, the dynamic feedback analysis and optimization design method for the fissure rock slope based on the monitoring information is characterized by comprising the steps that the slope is divided into a plurality of excavation construction steps conducted along the slope from top to bottom, andeach construction step comprises slope excavation construction and supporting structure construction; deformation of each construction step during slope excavation is monitored in real time; and aiming at the n construction step, wherein n is greater than or equal to 1, a fissure rock numerical analysis model is established based on the survey result of the site rock mass structure characteristics. The dynamic feedback analysis and optimization design method is suitable for fissure rock slope treatment in the fields of water conservancy and hydropower, traffic and the like.
Owner:ZHEJIANG ZHONGKE ITASCA ROCK ENG RESDEV +1

Overall process quantitative evaluating method for hydraulic energy utilization evaluation of water-turbine generator set

The invention relates to an overall process quantitative evaluating method for hydraulic energy utilization evaluation of a water-turbine generator set. A hydraulic energy utilization evaluating method for the water-turbine generator set needs to be researched currently. The method comprises the following steps: firstly, reading measured data of a hydropower station computer supervisory control system, a reservoir operation automatic system, and a generator set ultrasonic flowmeter, to obtain a running state and real-time running data of the water-turbine generator set; secondly, based on therunning state of the generator set, performing the conversion process decomposition of the generator set from a generator set passing hydraulic energy to an electric energy, and determining the conversion composition of the generator set passing hydraulic energy; thirdly, establishing a calculating model of each part of the energies of the generator set passing hydraulic energy conversion, and calculating the energy in real time; and fourthly, based on a real-time calculating result, counting and calculating each part of the energies of the generator set passing hydraulic energy conversion ina specific time interval, and performing the quantitative evaluation on the generator set hydraulic energy utilization conversion. The method is capable of realizing the instant evaluation and the ex-post evaluation of the generator set energy efficiency performance, and guiding the safe and economic operation of a power station.
Owner:HUADIAN ELECTRIC POWER SCI INST CO LTD

SCR denitration device for controlling escape rate of ammonia, and working method thereof

The invention discloses an SCR denitration device for controlling the escape rate of ammonia. The device comprises a denitration system, one side of the denitration system is fixedly connected with afirst pipeline, a second pipeline and a third pipeline, one ends of the first pipeline, the second pipeline and the third pipeline extend into the denitration system, and the one ends of the first pipeline, the second pipeline and the third pipeline are sequentially arranged in the denitration system from top to bottom; and outside the denitration system, the other ends of the first pipeline, thesecond pipeline and the third pipeline are fixedly connected with a flue gas analyzer. The SCR denitration device for controlling the escape rate of ammonia extracts flue gas in the denitration systemfrom different pipelines to make the flue gas analyzer realize the purpose of multipoint measurement, and utilizes a controller to control a plurality of solenoid valves in order to accurately adjustthe ammonia spraying amount and treat SO3 in the flue gas, so the problems of large size of the cross section of a flue and inaccurate result of single-point test are solved, and escape caused by excess ammonia spray amount is avoided.
Owner:HUADIAN ELECTRIC POWER SCI INST CO LTD

Nuclear power plant protection system-based safety accident protection method

The invention discloses a safety accident protection method based on a nuclear power plant protection system. The reactor protection system generates two paths of automatic safety injection instruction signals at the same time, wherein the first path of automatic safety injection instruction signal is sent to an RS trigger of safety level software, and meanwhile the second path of automatic safetyinjection instruction signal is transmitted to an RS trigger of an ECP relay circuit; after the first path of automatic safety injection instruction signal is sent to an RS trigger of safety level software, the RS trigger of the safety level software is triggered to automatically carry out safety injection, preset delay is triggered to allow reset timing; and after the preset delay is finished, an operator is allowed to stop safety injection; and the second path of automatic safety injection instruction signal is transmitted to an RS trigger of the ECP relay circuit and then is subjected to logic OR processing with a manual safety injection instruction based on a relay, then safety injection is carried out after the RS trigger of the ECP relay circuit is triggered, and preset time delay is triggered to allow reset timing; finally, an operator is allowed to stop safety injection after the preset time delay is ended. The safety and economy of the nuclear power plant are improved.
Owner:NUCLEAR POWER INSTITUTE OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products