System and process of screen pipe completion and cross oil layer cementing for steam injection heavy oil well
A technology of screen tube completion and steam injection, applied in wellbore/well components, flushing wellbore, producing fluid, etc., can solve problems such as blockage, and achieve the effect of expanding the scope of application, short construction time, and high pump efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0060] The present invention will be further described below in conjunction with accompanying drawing:
[0061] For example, in a thermal recovery wellbore with a diameter of 215.9 mm, a cementing and completion pipe string spanning oil layers with a thermal screen 6 with a diameter of 177.8 mm is run, as shown in figure 1 As shown, the steam injection heavy oil well screen completion cross-reservoir cementing system includes a completion string and a cementing string arranged inside the completion string, and the completion string includes sequentially from bottom to top Connected floating shoe 10, sand settling pipe 9, pressure limiting sliding sleeve 8, high temperature resistant packer at the lower end of the screen pipe 7, heat sensitive screen pipe 6, boss positioning seat 5, high temperature resistant packer at the upper end of the screen pipe 4, cement Injection device 3 and sleeve pipe 2; the cementing pipe string includes an insert joint 24, a one-way valve 23, a cem...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com