Automatic judgment method of construction time sequence of urban rail transit line
An urban rail transit and rail transit technology, which is applied in the field of automatic determination of the construction timing of urban rail transit lines, can solve problems such as no construction timing of urban rail transit lines, inability to seek fast convergence solution algorithms, and many model constraints.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0034] Embodiment: the automatic judgment method of a kind of urban rail transit line construction time sequence of the present invention, its flow chart is as follows figure 1 As shown, proceed as follows:
[0035] (1) Determine the impact indicators of the construction timing of urban rail transit lines, and collect the impact index data of urban rail transit lines.
[0036] The determined and collected impact index data are line passenger flow load intensity C1, rail transit daily passenger flow C2, urban development direction matching index C3, location coefficient C4, line network layout importance index C5, and land development benefits along the line C6. Line passenger flow load intensity C1 refers to the ratio of the daily passenger traffic undertaken by the line to the length of the line; the daily passenger flow of rail transit C2 refers to the product of the daily passenger traffic undertaken by the line and the line; the urban development direction matching index C...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com