On-line Management Method of Project Progress Plan

A technology of schedule planning and engineering, applied in the direction of calculation, data processing application, electrical digital data processing, etc., can solve the problem of failure to achieve the combination of goals and responsibilities in schedule management, difficulties in achieving schedule goals, delays in progress goals, processing goal changes, and lack of adjustments Strict supervision and other issues to achieve the effect of ensuring timely update and sharing, business follow-up in real time, and real-time performance

Active Publication Date: 2015-11-18
SICHUAN CHUANGUO BOILER
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Although it is already an Internet-based schedule management method, it only realizes the synchronous display of the schedule plan and completion status on the Internet, and the schedule management does not realize the combination of goals and responsibilities. At the same time, the delay processing of schedule goals and the change and adjustment of goals lack strict regulations. Supervision, making it difficult to achieve progress targets

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • On-line Management Method of Project Progress Plan
  • On-line Management Method of Project Progress Plan
  • On-line Management Method of Project Progress Plan

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0042] see figure 1 , the online management method of engineering progress plan of the present invention, described method comprises three parts of plan preparation, plan execution information collection and plan execution tracking process;

[0043] The plan preparation: the third-party plug-in gantt.js is integrated to display the progress plan, the WEB page file jap or jspx loads the gantt.js file, and javaScript is used to trigger the plug-in to update data. When the operator updates the progress task bar on gantt.js After performing operations such as dragging, upgrading and downgrading, and establishing associations, when you click Save, the page data is formed into XML and transmitted to the logic layer through AJAX. The logic is parsed into a usable form according to the XML format, and the AM logic is called to save the data to the database. Plan The compilation has strict auditing and locking functions. When the plan is prepared, the person in charge shall submit it ...

Embodiment 2

[0101] see figure 2 , in the present embodiment, an online management method of a project progress plan, the interactive personnel exchange information based on a remote interactive platform, and the remote interactive platform includes a server-side computer system, a microcomputer device for review, and a microcomputer device for audit ; The server-side computer system, the audit-end microcomputer device, and the audit-end microcomputer device are in a wide area network environment and realize network connection, and the described wide area network environment is a network domain environment based on INTERNET, and the server-side computer system includes a database The server, the webpage application server, and the software matched with the computer system at the server end; the microcomputer device at the review end and the microcomputer device at the audit end are respectively matched with corresponding management software.

[0102] In this embodiment, a preferred config...

Embodiment 3

[0148] This embodiment will describe the online management steps in the second embodiment in more detail.

[0149] Ⅰ. Drafting the project progress plan

[0150] see Image 6 , in this embodiment, the person in charge of the project enters the operation interface of drawing up the project schedule through the microcomputer device of the submitting terminal, selects the company where the project is located and the name of the project from the drop-down list, and then clicks the query button to query the schedule data of the project .

[0151] In this embodiment, the person in charge of the project invokes the gantt.js plug-in through the microcomputer device at the review end, and clicks the "Add Job" button to add a row of blank records in the data table below. Double-click the mouse in the newly added project code column, and the project codes of the project divisions that have been submitted for approval will pop up, and select the project codes for which the horizontal ba...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an on-line management method for a project progress plan. According to the method, based on a remote interaction platform, on-line making of the project progress plan, tracking of project progress completion conditions, and response and management of project progress abnormal conditions are achieved through interaction and data conversion between a submission end microcomputer device, a checking end microcomputer device and a server end computer system. The server end computer system issues an object-oriented operation interface, and data is stored in a database server to be shared by all operators using the platform; and operating permissions are controlled through locking and authorization, real-time performance of the data can be guaranteed, and meanwhile, the data can not be randomly changed. According to the on-line management method for the project progress plan, on-line management for the project progress plan is achieved, business expediting can be timely and convenient, and user data can be uniform and accurate.

Description

technical field [0001] The invention relates to an online management method of a project progress plan. The method is based on a remote interactive platform, and through the interaction and data conversion between the microcomputer device at the audit end, the microcomputer device at the audit end, and the computer system at the server end, the online planning of the project progress is realized. Tracking of completion of plans and project progress, reflection and handling of abnormal project progress. Background technique [0002] In the existing technology, most of the most widely used project schedule preparation software are stand-alone versions, the completion of the actual progress of the project cannot be provided to the project management personnel at all levels in time, and the information of the progress delay cannot be notified in time. Chinese patent 01121134.2 discloses a method for managing the progress of a project. The method for managing the progress of a pr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/06G06Q50/08G06F17/30
Inventor 李建国胡翊华白洁李中原
Owner SICHUAN CHUANGUO BOILER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products