High rock-fill dam medium-term food season water retaining risk rate detection method
A technology for retaining water during flood season and high rockfill dam, applied in special data processing applications, instruments, electrical and digital data processing, etc. Uncertain water retaining elevation, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0097] Take the implementation of the present invention in a certain high rockfill dam project on the Dadu River as an example. The dam adopts a gravel soil core rockfill dam with a height of 240m. This project is a first-class large-scale project. The permanent main buildings such as water retaining, flood discharge, water diversion and power generation are Grade 1 buildings, the permanent secondary buildings are Grade 3 buildings, and temporary buildings are Grade 3 buildings. The diversion cofferdam is combined with the rockfill dam body. If the project fails, it will not only cause huge losses, but also affect the safety of downstream projects under construction and the region. According to relevant regulations, combined with the dam type and storage capacity of the project, the upper limit of the design standard for temporary flood relief during the dam construction period is 100 years. But at present, the filling elevation of the hydropower dam is H 0It is 1496m, which ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com