Site selection method for power grid energy saving and consumption reduction in industrial park residential area

A technology for residential areas and industrial parks, applied in the field of site selection method for energy-saving and consumption-reducing power stations in industrial park residential area grids, can solve the problems of lack of applied mathematical means, large power grid operation loss in parks, etc., and achieve scientific and accurate site selection The effect of small loss and easy iterative program

Active Publication Date: 2018-04-03
SHANXI GUOKE ENERGY SAVING
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Site selection is based on power factors. Although it is already known that the power station should be built in the load center of the load surface (industrial park residential area), due to the lack of applied mathematical means in today's "big data era", the geographical center of the park is often used instead of the load center, resulting in The power grid in the park has a large road loss

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Site selection method for power grid energy saving and consumption reduction in industrial park residential area

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] When determining the point load group, the latest version of the map with complete content should be selected, and the point load envelope should occupy the entire map and be close to the edge of the map.

[0030] When point loads are connected in pairs, connect adjacent odd and even points with straight lines in order, such as figure 1 1-2 load pairs, 3-4 load pairs. In case of an odd-numbered point load, the last point load shall be treated as the virtual load center.

[0031] When measuring the load-to-spacing, use millimeters as the unit, which is suitable for drawing on the map and has sufficient accuracy.

[0032] Steps to solve the virtual load center of the load pair: ① Calculate the ratio of the power consumption of the load pair. Such as figure 1 The ratio of power consumption at points 1 and 2 is: 10MKwh: 2MKwh=5:1. ② Find the sum of the power consumption ratio. Such as figure 1 The sum of the ratio of load power consumption at points 1 and 2 is 5+1=6. ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an energy-saving and consumption-reducing power station site selecting method for a power grid in a residential district of an industrial park and belongs to the technical field of power transmission and distribution engineering. The energy-saving and consumption-reducing power station site selecting method for the power grid in the residential district of the industrial park comprises the steps that the virtual load centers of two point loads are obtained in pair according to the annual power consumption of all point loads in the industrial park, and convergence is conducted step by step till the load center of the industrial park is approached; then, the site of a power station is selected compressively according to an urban construction plan and social production and development by avoiding geographical limitation. By the adoption of the energy-saving and consumption-reducing power station site selecting method for the power grid in the residential district of the industrial park, the overall wire diameter of the power grid in the industrial park can be smallest, power grid construction investment is lowest, and operating line loss is smallest; the virtual load centers are obtained based on a selected conductor cross section computational formula and accord with the power scientific law. The method is used for selecting the site of the power station in the residential district of the industrial park and can also be used for selecting the site of a step-down substation of a power distribution network in a social power grid.

Description

technical field [0001] Transmission and distribution engineering. Background technique [0002] The power supply from the social grid to the residential area of ​​the industrial park is supplied to the power station in the residential area of ​​the industrial park with the rated distribution network voltage. The power station in the residential area of ​​the industrial park is reduced to a line voltage of 380V and a phase voltage of 220V, and then passed through the residential area of ​​the industrial park. The power grid in the park is sent to each point load in the park. Power grid line transmission must have road loss, which accounts for 5-10% of the total power supply. The scientific allocation of power stations in the residential area of ​​the industrial park can firstly save the investment in the construction of the power grid lines in the park, and more importantly, the power loss of the power grid in the park can be significantly saved, and the reduction of the roa...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06F17/15
CPCG06Q10/047G06Q50/06
Inventor 徐光第刘强白建俊
Owner SHANXI GUOKE ENERGY SAVING
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products