A multi-objective scheduling method for steelworks considering the supply conditions of molten iron
A dispatch plan and technology for steelmaking plants, applied in the field of multi-objective dispatch plan preparation, can solve the problem of not considering the supply time of molten iron and the utilization of iron water resources, and achieve the effect of improving the execution degree and reducing the cost of smelting
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] Embodiments of the present invention are described in detail below, examples of which are shown in the drawings, wherein the same or similar reference numerals designate the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the figures are exemplary only for explaining the present invention and should not be construed as limiting the present invention.
[0031] The existing steelmaking-continuous casting process mainly includes four production links: hot metal pretreatment, steelmaking, refining and continuous casting. The steelmaking link and the continuous casting link generally each include a parallel unit, while the hot metal pretreatment link and refining link generally include multiple parallel units to meet different process requirements. The general steelworks production process such as figure 1 Shown: The high-temperature molten iron transported from the blast furnace (measured...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


