Steel making factory multi-target scheduling plan compiling method considering molten iron supply condition

A dispatch plan, a technology for steelmaking plants, which is applied in the field of multi-objective dispatch plan preparation, and can solve the problems of not considering the supply time of molten iron and the utilization of iron water resources.

Active Publication Date: 2016-06-01
CHONGQING UNIV
View PDF5 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This method solves the problem that the supply time of molten iron and the utilization of molten iron resources are not considered in the preparation of the multi-objective scheduling plan of the steelmaking plant in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Steel making factory multi-target scheduling plan compiling method considering molten iron supply condition
  • Steel making factory multi-target scheduling plan compiling method considering molten iron supply condition
  • Steel making factory multi-target scheduling plan compiling method considering molten iron supply condition

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030]Embodiments of the present invention are described in detail below, examples of which are shown in the drawings, wherein the same or similar reference numerals designate the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the figures are exemplary only for explaining the present invention and should not be construed as limiting the present invention.

[0031] The existing steelmaking-continuous casting process mainly includes four production links: hot metal pretreatment, steelmaking, refining and continuous casting. The steelmaking link and the continuous casting link generally each include a parallel unit, while the hot metal pretreatment link and refining link generally include multiple parallel units to meet different process requirements. The general steelworks production process such as figure 1 Shown: The high-temperature molten iron transported from the blast furnace (measured ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a steel making factory multi-target scheduling plan compiling method considering molten iron supply time and molten iron resource utilization. The method comprises the following steps that a multi-target function and constraint conditions considering the molten iron supply condition are established, multiple Pareto optimal solutions about a decision variable are acquired by utilizing a multi-target genetic algorithm based on Pareto for iterative operation, and one concrete iterative process is that a matching scheme between charge and molten iron bottles is adopted to indicate chromosomes, and feasible solutions of all the chromosomes in the current population are acquired by utilizing a decoding heuristic method; a non-dominated solution construction method is designed to calculate non-dominated solutions of the feasible solutions; non-dominated hierarchical ranking is performed on the chromosomes corresponding to all the solutions and crowding distance between the solutions is calculated, and a parent population is selected; and selection, intersection and mutation are performed on the chromosomes in the parent population so that progeny populations are obtained. The problem of scheduling plan compiling considering the molten iron supply condition can be solved, and multiple Pareto optimal solutions are acquired so that decision makers are enabled to select more appropriate solutions to be applied to actual production.

Description

technical field [0001] The invention relates to the technical field of metallurgical control, in particular to a method for preparing a multi-objective scheduling plan for a steelworks considering the supply time of molten iron and the utilization of molten iron resources. Background technique [0002] Steel has become the most important industrial raw material due to its abundant resources, relatively low cost, superior material performance, easy processing and easy recycling. The steel industry is the basis of many industries such as the automobile industry, the construction industry, the shipbuilding industry, and many others. [0003] Production scheduling is an important decision-making process in many manufacturing systems. As a bottleneck process in the iron and steel manufacturing process, the steelmaking plant's scheduling is to determine when and in what order the furnaces will be processed on which equipment in the production process. The optimized dispatching p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/04
CPCY02P90/30G06Q50/04
Inventor 郑忠龙建宇高小强徐兆俊呼万哲黄世鹏
Owner CHONGQING UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products