Just-in-time-based parallel forward calculation programing method for steel-making production planned time

The invention discloses a just-in-time-based parallel forward calculation programing method for steel-making production planned time. The method comprises the following steps of: on the basis that a steel-making production process flow network bottom layer object model takes a working position, a working procedure and a transport line as basic elements and the normal distribution rules of the operation time and transportation time of various steel grades are considered, regarding the pouring start time of each heat of sequential casting constraint calculation as a delivery date; taking the operation start time of each heat in the aspect of working procedure based on working procedure backward calculation as the planned reference target time; after the start and end operation time of each heat are calculated by time parallel forward calculation, distributing an appropriate processing working position for each heat by a working position selection rule; and adjusting and determining the start and end operation time on a corresponding working position of each heat by a heat operation time adjusting strategy in reference to the reference target time. An executable operation planning and dispatching scheme for realizing sequential casting production can be programmed rapidly and the method has high generality and wide applicability to the optimization of steel-making production operation planning and dispatching.
Owner:KUNMING UNIV OF SCI & TECH

Operating temperature control device for SCR (semiconductor control rectifier) denitration reactor of thermal power plant and control method of operating temperature control device

The invention relates to an operating temperature control device for an SCR (semiconductor control rectifier) denitration reactor of a thermal power plant and a control method of the operating temperature control device. At present, no convenient, flexible and effective control device and method for guaranteeing operating temperature of the SCR denitration reactor exists when exhaust gas temperature of the thermal power plant changes fiercely. The operating temperature control device comprises a coal economizer, a flue, the SCR denitraton reactor, a boiler, an evaporator, a water feed pump and a low-pressure steam pumping pipe, and is characterized by further comprising a high-pressure heater bypass, a high-pressure heater bypass stop valve, a coal economizer bypass, a coal economizer bypass stop valve, a coal economizer bypass electric adjusting valve, a high-pressure heater bypass control circuit, a coal economizer bypass control circuit, an SCR denitration reactor inlet smoke temperature measuring circuit and a controller. A temperature sensor is arranged at an inlet of the SCR denitration reactor, and the controller is connected to the temperature sensor through the SCR denitration reactor inlet smoke temperature measuring circuit. The operating temperature control device is simple in structural design, and convenient and flexible to use.
Owner:HUADIAN ELECTRIC POWER SCI INST CO LTD

Steel making factory multi-target scheduling plan compiling method considering molten iron supply condition

The invention provides a steel making factory multi-target scheduling plan compiling method considering molten iron supply time and molten iron resource utilization. The method comprises the following steps that a multi-target function and constraint conditions considering the molten iron supply condition are established, multiple Pareto optimal solutions about a decision variable are acquired by utilizing a multi-target genetic algorithm based on Pareto for iterative operation, and one concrete iterative process is that a matching scheme between charge and molten iron bottles is adopted to indicate chromosomes, and feasible solutions of all the chromosomes in the current population are acquired by utilizing a decoding heuristic method; a non-dominated solution construction method is designed to calculate non-dominated solutions of the feasible solutions; non-dominated hierarchical ranking is performed on the chromosomes corresponding to all the solutions and crowding distance between the solutions is calculated, and a parent population is selected; and selection, intersection and mutation are performed on the chromosomes in the parent population so that progeny populations are obtained. The problem of scheduling plan compiling considering the molten iron supply condition can be solved, and multiple Pareto optimal solutions are acquired so that decision makers are enabled to select more appropriate solutions to be applied to actual production.
Owner:CHONGQING UNIV

Hydropower station deterministic optimal operation method based on reference line

The invention discloses a hydropower station deterministic optimal operation method based on a reference line and belongs to the technical field of hydropower. The hydropower station deterministic optimal operation method comprises the following steps that (1) a scheduling period is determined, and constraint conditions in the scheduling period are set; (2) a reservoir deterministic long-term optimal operation maximum generating capacity model is established; (3) based on the principle of reducing abandoned water energy and the loss of entering energy, an anti-abandoned-water line and a minimum decision boundary line are obtained; (4) the anti-abandoned-water line is correspondingly adjusted, and the optimal operation reference line is determined; (5) according to the optimal operation reference line, an optimal decision is obtained and used for guiding operation of a hydropower station. According to the hydropower station deterministic optimal operation method, experience of an expert and a reservoir operation rule are fused, and the method can be easily understood and grasped by operation personnel; a corresponding decision can be made at any moment according to the current water storage state of the hydropower station, and the hydropower station deterministic optimal operation method has a higher executable performance and a greater guiding significance.
Owner:HUAZHONG UNIV OF SCI & TECH

Method for realizing insulation coordination of basic functional units of voltage source converter (VSC) based on half bridge circuit

The invention relates to a method for realizing the insulation coordination of basic functional units of a voltage source converter (VSC) based on a half bridge circuit, which comprises the following steps of: 1) determining the insulation strength and properties of each component according to the steady-state over-voltage level, transient-state over-voltage level and transient over-voltage level of a sub-module under various operation conditions; 2) making equal the ground potential of a metal shell and a secondary control protection board of primary equipment and the potential of the cathode of the sub-module according to the potential distribution characteristics of the sub-module, and connecting the secondary control protection board and a primary circuit by using an isolation transformer to isolate the influence of the high voltage of the primary circuit on a secondary circuit; 3) shielding the electromagnetic interference of an insulated gate bipolar translator (IGBT) high speed switch in the secondary control protection board by using a metal shielding box according to the electromagnetic field distribution of the sub-module; 4) making equipotential an operating mechanism of a bypass switch and the cathode of the sub-module; and 5) selecting a high voltage wire as a wire crossing a high potential and a low potential to reduce the local discharge capacity of the sub-module. By the insulation coordination method, the insulation requirements of a system can be met, and high security and high economy are achieved.
Owner:CHINA ELECTRIC POWER RES INST +1

Karst surface collapse analysis method

The invention relates to the technical field of geological disaster prevention and control, and discloses a karst surface collapse analysis method, which comprises the following steps of obtaining a geological structure, a hydrological structure and a construction collapse condition of a target area; dividing the collapse process of the target area into an engineering construction penetration stage and a sudden collapse stage; in the engineering construction penetration stage, judging the penetration mode of the karst cave or the soil cave in the construction process according to the construction collapse condition; and in the sudden-change collapse stage, obtaining the change condition of the geological structure and the change condition of the hydrological structure, and judging the collapse type of the karst cave or the soil cave so as to determine the surface collapse forming mechanism of the target area. According to the method, the penetration effect analysis of engineering construction is introduced, and the surface collapse formation mechanism of the target area is obtained by combining the change conditions of the geological structure and the hydrological structure, so that the karst surface collapse formation mechanism caused by the penetration effect of engineering construction can be accurately determined, and effective basis and guidance are provided for urban related disaster prevention and reduction work.
Owner:GUANGZHOU URBAN PLANNING & DESIGN SURVEY RES INST +1

Mobile terminal and low-electrical-quantity notification method and device

InactiveCN102883060AAutomatically interrupt the communication stateEasy to useSubstation equipmentState of chargeComputer module
The invention belongs to the technical field of mobile communication and discloses a low-electrical-quantity notification method for a mobile terminal. The method comprises the following steps: detecting whether the mobile terminal is in a communication state or not when the mobile terminal is in a low electrical quantity state, if yes, notifying the other party of the low-electrical-quantity state of the mobile terminal, and if no, setting the color ring of the mobile terminal as notification information for prompting the low-electrical-quantity state of the mobile terminal. According to the method provided by the invention, when the mobile terminal is in a communication state, the other party can be notified in time that the mobile terminal is in a low-electrical-quantity state; when the mobile terminal is not in a communication state, the color ring can be set in a way that the electrical quantity state of the mobile terminal can be known when any follow-up incoming call is dialed, so as to allow the follow-up caller to select the connection way when knowing the electrical quantity state of the mobile terminal. According to the notification method and device provided by the invention, the using effect of the key electrical quantity before a communicating module is closed is enhanced, and the performability is strong. The mobile terminal provided by the invention enhances the user's experience.
Owner:DONGGUAN YULONG COMM TECH +1

Cover beam construction auxiliary device and method

The invention relates to a capping beam construction auxiliary device which at least comprises two triangular support units which are used for being arranged on the two sides of a pier column in the length direction of a to-be-poured capping beam and can be assembled to form an integrated triangular bracket capable of synchronously moving in the length direction of the pier column; a steel supporting frame which surrounds the pier column to form a non-contact space used for containing the pier column, and the two ends of the steel supporting frame are connected to a bottom end frame body of the triangular bracket and a bearing platform located below the pier column correspondingly, so that external force borne by the triangular bracket is transmitted to the bearing platform through the steel supporting frame; and the triangular bracket is hoisted to the steel supporting frame in the mode that a gap is reserved between the triangular bracket and the pier column. The advanced modular solution thought of modern standardization is applied to the technical field of capping beam construction, and the capping beam construction process which is numerous and complicated in original construction system and tedious in on-site assembly steps is simplified to obtain the modular capping beam construction auxiliary system which is high in executability and high in stability.
Owner:北京住总集团有限责任公司

Pillarless sublevel caving mining plan optimization method based on target planning

ActiveCN106384173AAvoid problems that are difficult to connect reasonablyHighly executableUnderground miningForecastingSpelunkingMathematical model
The invention discloses a pillarless sublevel caving mining plan optimization method based on target planning, and a problem that the working procedures of a mining plan are difficult to be reasonably connected in an implementation process can be effectively avoided. The method comprises a step of carrying out working procedure dividing of underground mining and counting the remaining workload of each working procedure in each section at the end of a year and the ore grade of a stope, a step of defining the mutual connection relation between the working procedures in the time, a step of obtaining the restriction relationship between adjacent stope backstopping according to the position relation of stopes in the space, and defining the equipment scheduling relationship of the same type of working procedures, a step of carrying out segmentation of a system project according to the production capacity of tunneling equipment and carrying out numbering, defining the logic relation of each segment of system project in a propulsion direction, associating the segmented system project and the stopes, and finding the system workload which is needed to be completed of any stope before backstopping, a step of establishing a pillarless sublevel caving mining plan optimization mathematical model based on target planning, and a step of solving the mathematical model and obtaining a mining plan optimization plan.
Owner:CHANGSHA DIGITAL MINE

The invention relates to a classification management method for reactor internal components of a pressurized water reactor nuclear power plant

The invention provides a classification management method of reactor internal components of a pressurized water reactor nuclear power plant, comprising the following steps: 1) determining an aging mechanism of reactor internal components; 2) determining screening criteria of components; 3) classifying that components in the reactor into A-type component and non-A-type components; 4) carrying out FMECA analysis on non-A-type components, further classify into A, B and C-type components; 5) carrying out functional evaluation on that C-type components, and confirm whether the C-type components aremaintained in the C-type component or are adjusted to the B-type components; 6) dividing that class B and the clas C parts into main inspection parts, enlarging the inspection part, existing outlineparts, and classifying the clas A parts as inspection parts without additional measures; 7) for that main inspection component, the enlarged inspection component and the existing outline component, the classification management method of the invention overcomes the problems of lacking theoretical basis in the management of the conventional reactor inner component components and lacking quantitative analysis in the analysis and evaluation process, and has the advantages of strong executability, high applicability and definite supplementary inspection requirements.
Owner:SUZHOU NUCLEAR POWER RES INST +4

Single-tower desulfurization ultra-clean treatment system and desulfurization process

The invention relates to the technical field of flue gas desulfurization, and discloses a single-tower desulfurization ultra-clean treatment system and a desulfurization process, the single-tower desulfurization ultra-clean treatment system comprises a pre-absorption device and a desulfurization tower, and the pre-absorption device adopts spraying to pre-absorb flue gas; an absorption tower, a turbulent flow synergistic plate, a spraying layer, a slurry circulating pump, a synergistic dust removal device and a demister are sequentially arranged in the desulfurization tower from bottom to top; and the pre-absorbed flue gas enters the desulfurization tower through an absorption tower to finally finish desulfurization ultra-clean treatment. According to the invention, 20-30% of SO2 is captured after the flue gas is pre-absorbed and washed, and the reduction of the temperature and the concentration is more beneficial to the absorption of the subsequent absorption tower; and in addition, due to the design of the turbulent flow synergistic plate and the synergistic dust removal device, the desulfurization efficiency and desulfurization capacity are further improved. The system can meet the emission requirements that the SO2 concentration value at the outlet of the absorption tower is lower than 35mg/Nm < 3 > and the particulate matter concentration value is lower than 5mg/Nm < 3 > under the condition that the SO2 concentration at the inlet of the single-tower absorption tower is less than or equal to 6200mg/Nm < 3 >.
Owner:武汉立为工程技术有限公司

Direct-current bus voltage control method suitable for low-wind-speed distributed wind power generation

The invention discloses a direct-current bus voltage control method suitable for low-wind-speed distributed wind power generation. The low-wind-speed distributed wind power generation system adopted by the control method comprises a wind turbine, a generator, a machine-side converter, a voltage-stabilizing capacitor C, a grid-side converter and a direct-current bus. The low-wind-speed distributedwind power generation system can be directly connected to an alternating-current power distribution network. The low-wind-speed distributed wind power generation system further comprises a super capacitor. The super capacitor is connected in parallel with a bidirectional DC/DC converter and then is connected to a DC bus on the rear side of a machine-side converter. The DC/DC converter controls charging and discharging of the super capacitor in any control period T to maintain power stability of the DC bus injected into the wind power generation system. According to the method, the power stability of the direct current bus can be maintained, so that the delay between the actual value and the reference value of the d-axis current output by the PI regulator in the voltage outer loop control of the grid-side converter is reduced. The voltage stability of the direct-current bus is realized.
Owner:NANJING INST OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products