Tunneling construction method for penetrating operating tunnel under shield in water-rich silt stratum

A construction method and shield technology, applied in tunnels, tunnel linings, underground chambers, etc., can solve the problems of small injection volume, ineffective water stop, and inability to meet the requirements of strength, so that the injection volume is full and sufficient to ensure Construction safety, ensure the effect of earth pressure balance

Inactive Publication Date: 2017-05-31
CHINA RAILWAY NO 2 ENG GRP CO LTD
View PDF5 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to: when excavating tunnels under the shield tunnel under the water-rich powdery soil layer, due to the small amount of grout injected and the inability to solidify quickly, the water can not be effectively stopped, and the strength cannot meet the requirements at the same time, and the construction soil is prone to Settlement caused huge safety hazards to the tunnels already in operation, and it was impossible to ensure safe and smooth construction. A tunneling construction method for shield tunnels passing through operational tunnels under water-rich powdery soil strata is provided. This method uses a double-fluid grouting system , and after the grout is fully mixed by the set mixer, the mixed grout is poured into the back of the segment synchronously, so that the grout can quickly solidify and quickly reach the required strength, effectively forming a water-stop effect, thereby preventing the soil from occurring during the construction process. Settlement affects tunnels already in operation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tunneling construction method for penetrating operating tunnel under shield in water-rich silt stratum
  • Tunneling construction method for penetrating operating tunnel under shield in water-rich silt stratum
  • Tunneling construction method for penetrating operating tunnel under shield in water-rich silt stratum

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0051] Such as figure 1 As shown, the excavation construction method for the shield to pass through the operational tunnel in the water-rich powder soil stratum includes the following steps:

[0052] a. Use the shield machine to test the excavation in the test section, and obtain the construction parameters;

[0053] b. Configure a double-fluid grouting system, a cleaning system and a mixer on the shield machine, and the mixer is used to mix the double-fluid slurry delivered by the dual-fluid grouting system, and the dual-fluid grouting system includes Two kinds of grout stored separately, and a grouting system that can solidify quickly after the two kinds of grout are mixed;

[0054] c. Determine the mixing ratio of the double liquid slurry;

[0055] d. Carry out formal shield construction according to the construction parameters obtained in step a;

[0056] e. Use the process of adding water or foam to improve the dregs and carry out double-liquid grouting construction si...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of tunnel construction, in particular to a tunneling construction method for penetrating an operating tunnel under a shield in a water-rich silt stratum. The method comprises the steps of a, conducting test tunneling to obtain construction parameters; b, configuring a double-grout grouting system, a rinsing system and a mixer on the shield, wherein the mixer is used for mixing double-grout conveyed by the double-grout grouting system; c, determining the matching ratio of the double-grout; d, according to the construction parameters obtained in the step a, conducting formal shield construction; e, adopting a technology that water is added or bubbles are grouted to conduct muck conditioning, and synchronously conducting double-grout grouting construction; f, conducting solidification treatment on a soil mass outside a segment in a tunnel. According to the tunneling construction method for penetrating the operating tunnel under the shield in the water-rich silt stratum, by arranging the double-grout grouting system, after the grout is sufficiently mixed through the arranged mixer, and after the mixed grout is grouted to the back of the segment synchronously, the grout quickly solidifies and reaches the demanded strength, the water stop effect is effectively formed, and thus the occurrence of sedimentation in the constructing process of the soil mass is avoided.

Description

technical field [0001] The invention relates to the technical field of tunnel construction, in particular to a tunneling construction method for a shield tunnel to pass through an operating tunnel in a water-rich powder soil stratum. Background technique [0002] In recent years, my country's urban rail transit has developed rapidly. In the process of urban tunnel construction, shield machines are usually used for tunnel excavation. Due to the influence of urban environment and subway lines under construction in the planning of shield tunnels, new construction The subway lines will inevitably intersect with the existing tunnels for construction, which will easily cause damage to the existing tunnels, and major safety accidents such as collapse and subsidence will occur. In the prior art, there is no construction method for this kind of underpass operation tunnel, and the accumulation of experience in construction methods is mainly concentrated in the construction process of o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/06E21D11/10
CPCE21D9/0607E21D11/10
Inventor 陈勇光陈强陈卓
Owner CHINA RAILWAY NO 2 ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products