A mining method, step-type technology, applied in the field of mechanized step-type room-and-pillar mining method, can solve the problems of low level of mechanization in stope production operations, high labor intensity of workers, and small effective rake distance of electric rakes, so as to reduce pedestrian ventilation The amount of climbing and cutting works, the labor intensity of workers is reduced, and the effect of reducing the cutting works
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] From figure 1 and figure 2 As can be seen, this mechanized stepped room-and-pillar mining method of the present invention comprises the following steps:
[0038] (1) Stope layout: The stope is arranged along the ore body trend, the height of the middle section is 20-30m, the length of the stope along the strike is 100-120m, the oblique length of the stope is not more than 80m, and the width of the stope is 4-6m along the inclination The middle column 1 is arranged between the upper and lower adjacent middle sections, and the middle transportation lane 3 is arranged, and the top column 4 and the bottom column 2 are reserved. The width of the bottom column is 4-6m, and the width of the top column is 4-6m; The ore body is divided into subsections 5 along the strike for mining, the width of the subsections is 6-8m, and point columns 6 are set between the subsections 5. 10m, the distance between point columns along the slope is 6-8m;
[0039] (2) Mining and cutting works: ...
Embodiment 2
[0045] From image 3 and Figure 4 As can be seen, this mechanized stepped room-and-pillar mining method of the present invention comprises the following steps:
[0046] (1) Stope layout: The stope is arranged along the ore body trend, the height of the middle section is 20-30m, the length of the stope along the strike is 100-120m, the oblique length of the stope is greater than 80m, and 4-6m wide pits are set between the stopes along the inclination Inter-column 1, mid-section transportation roadway 3 is arranged between the upper and lower adjacent middle sections, and top column 4 and bottom column 2 are reserved. The width of the bottom column is 4-6m, and the width of the top column is 4-6m. , and the next two subsections, between which a continuous column 12 with a width of 4 to 6 m is left; during stope mining, the ore body is divided into subsections 5 along the strike for mining, the subsection width is 6 to 8 m, and the subsection 5 6 point columns are left between...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com