Anchor cable construction method under condition of water-rich sand layer

A construction method and anchor cable technology, which are applied in excavation, infrastructure engineering, sheet pile walls, etc., can solve the problems of increasing the difficulty of construction by forming anchor cable holes, drilling edge collapse holes, increasing construction risks, etc., so as to reduce the surge The risk of sand gushing, the effect of slowing the rate of water flow, and improving construction safety

Active Publication Date: 2018-11-06
深圳市蛇口招商港湾工程有限公司
View PDF6 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Before installing the anchor cable, it is generally necessary to drill a hole to form the anchor cable hole. At the same time, the shape of the anchor cable hole increases the difficulty of construction, especially for the sand layer rich in groundwater. During the hole forming process, the hole collapses while drilling. And with the increase of the anchor cable opening depth, the groundwater content is increasing, and the pressure of the confined water is also increasing, so the risk of water gushing and sand gushing is also increasing, thus greatly increasing the construction cost. risk

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Anchor cable construction method under condition of water-rich sand layer
  • Anchor cable construction method under condition of water-rich sand layer
  • Anchor cable construction method under condition of water-rich sand layer

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0028] Such as figure 1 Shown, a kind of anchor cable construction method under the condition of rich water sand layer, comprises the following steps:

[0029] S1, earthwork excavation, positioning anchor hole 3.

[0030] Excavate layer by layer to 40cm below the anchor cable 8 level to form a foundation pit 1, and leave a construction platform.

[0031] combine figure 2 As shown, at the same time, a plurality of well points 2 are set on the periphery of the reserved site of the foundation pit 1, and the well points 2 are dewatered. The depth of the well points 2 is lower than 8m of the final depth of the foundation pit 1. Use the pump to continuously pump water, so as to ensure that the water level in the well point 2 is always kept lower than the 2m depth requirement of the foundation pit 1, reduce the content of groundwater around the foundation pit 1,...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an anchor cable construction method under the condition of a water-rich sand layer, relates to the technical field of building construction, and solves the problems that due tothe fact that a sand layer in the prior art is too high in water content, the high risk phenomenon of water gushing and sand gushing is caused, and consequently the construction risk is increased. According to the technical scheme, the anchor cable construction method under the condition of the water-rich sand layer is characterized by comprising the steps that S1, earth excavation is performed,and an anchor cable hole is positioned; S2, a casing pipe is installed, and the casing pipe is refrigerated before the casing pipe is installed and inserted; S3, rotary drilling of a lead hole is performed, meanwhile, filling of liquid nitrogen for heat absorbing is performed, and nitrogen is sucked out; S4, an anchor cable is installed, and primary grouting is performed; S5, anchor pile construction is performed, and secondary grouting is performed; and S6, the anchor cable is tensioned and locked, and the purposes of decreasing the flowing speed of underground water, lowering the risk of water gushing and sand gushing caused by flowing of the underground water in the construction process and improving the construction safety are achieved.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to an anchor cable construction method under the condition of water-rich sand layer. Background technique [0002] With the acceleration of urbanization, the available space in cities is getting less and less, more and more buildings are developing underground, and underground space technology has been widely used. The excavation of deep foundation pits will also increase accordingly. The wide application of anchor cables brings more choices to the design of foundation pit support. Compared with internal support, the type of pile-anchor support provides convenience for subsequent construction. construction conditions. During the construction process, the reliability of the performance of the anchor cable determines the safety of the foundation pit support. [0003] Before installing the anchor cable, it is generally necessary to drill a hole to form the anchor cable ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/76E02D17/04
CPCE02D5/76E02D17/04
Inventor 宋维星
Owner 深圳市蛇口招商港湾工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products