The invention belongs to the technical field of tunnels, and particularly relates to a treatment method for a building door tunnel penetrating a
karst underground river reach, which comprises the following steps: step 1, multi-source
geophysical prospecting fusion investigation: aiming at the tunnel
karst underground river reach and the range of 500m around the tunnel
karst underground river reach; the method comprises the following steps of: delineating a karst abnormal area by adopting semi-
aviation transient
electromagnetism; screening a strong
corrosion area by adopting a depression
analysis method; verifying parameters of the abnormal area through surface drilling and
coring; identifying surface
hydrology,
lithology and seepage data characteristics through unmanned aerial vehicle-mounted high-resolution multispectral and
thermal infrared cooperative
remote sensing;
karst water dynamic conditions including underground
water flow velocity, flow direction and
permeability coefficient,
corrosion evolution characteristics including cavern forming time and
expansion rate, and key physical and mechanical parameters including cavern filler
porosity,
permeability coefficient, surrounding rock integrity coefficient, uniaxial
compressive strength,
elastic modulus and Poisson's ratio are obtained. According to the treatment method for the building door tunnel to penetrate through the karst underground
river section, the karst space characteristics are clearly presented through the arrangement of the treatment method for the building door tunnel to penetrate through the karst underground
river section.