This invention relates to the field of municipal
engineering construction technology and discloses a high-precision construction method for split-type ultra-long-distance
pipe jacking in narrow spaces. The method includes the following steps: determining the design
route of the jacking pipeline; installing a
pipe jacking cylinder in the receiving shaft, installing the jacking main unit in the working shaft, arranging a hydraulic
power module outside the working shaft, and connecting the hydraulic
power module to the jacking main unit via
hydraulic connection pipelines; connecting the guide
drill rod to the guide
drill bit and the jacking main unit, installing a probe and a dual-frequency
receiver at the end of the guide
drill rod, and establishing a
data link between the dual-frequency
receiver and a ground-based handheld
receiver. This invention, by installing the jacking main unit inside the working shaft, arranging the hydraulic
power module outside the working shaft, and connecting the hydraulic power module to the jacking main unit via
hydraulic connection pipelines, can reduce the
space requirements of the working shaft. The minimum size of the working shaft can be compressed, reducing
space requirements and making it suitable for narrow space conditions such as dense urban areas, residential areas, and under overpasses.