Provided is a method for preventing and controlling limestone water in a
coal seam exploitation floor, and the method can solve the technical problems that limestone
water damage of the floor is proneto occur in the mining process of the Carboniferous Permian
coal resources in China. The method includes the following steps: S100, comprehensively exploring hydrogeological conditions of limestone of a
coal seam floor; S200, dividing the positions of a limestone
karst water-containing layer and water-
blocking layer in the coal seam floor, so as to determine the specific layer position to be transformed; S300, performing grouting transformation and drainage
pressure reduction according to the specific layer position; S400, detecting a vertical
water channel of the coal seam floor by using geophysical exploration, and then conducting grouting and sealing; and S500, synthetically evaluating the grouting and
treatment effect based on a combination of detecting
verification of the grouted transformation layer and drilling core analysis, so as to determine feasibility of safe mining. According to the present invention, the coal seam floor is divided into the limestone
karst water-containing and water-
blocking layer on the basis of the comprehensive exploration of the limestone hydrogeological conditions of the coal seam floor, and the specific layer position to be transformed is determined, grouting transformation and drainage
pressure reduction are performed, geophysical exploration is used to detect the channel, and then grouting and sealing are performed. Finally, comprehensiveevaluation is conducted through various methods such as a water
bursting coefficient, numerical
simulation, geophysical exploration and drilling detection to determine the feasibility of safe mining.