Information transmission and reception method and device, base station and user equipment
A technology of information transmission and user equipment, applied in the field of communication, can solve the problems of limited scheduling flexibility, large scheduling delay, business congestion, etc., to achieve the effect of avoiding business congestion and improving flexibility
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0189] image 3 is a signaling flowchart of an information receiving method shown in an exemplary embodiment of the present application, as shown in image 3 As shown, the method includes:
[0190] In step S301, the base station determines the set of PRBs used to transmit the scheduled PDSCH of the current PDCCH.
[0191] The set of PRBs used to transmit the scheduled PDSCH of the current PDCCH may be determined according to the generated second configuration information, or the set of PRBs may be determined according to a preset rule.
[0192] In addition, optionally, after the PRB set is determined according to the generated second configuration information, the second configuration information may be sent to the UE through high layer signaling.
[0193] In step S302, the base station sends the current PDCCH to the UE through the current PRB, and indicates the PRB used to transmit the scheduled PDSCH in the PRB set through downlink control information (DCI) in the current ...
Embodiment 2
[0211] Figure 4 is a signaling flow chart of another information receiving method shown in an exemplary embodiment of the present application, such as Figure 4 As shown, the method includes:
[0212] In step S401, the base station determines a PRB set for transmitting a PDCCH and its scheduled PDSCH starting from the time point corresponding to the current PDCCH that exceeds a preset duration.
[0213] Wherein, the PRB set used to transmit the PDCCH and its scheduled PDSCH longer than the preset duration starting from the time point corresponding to the current PDCCH can be determined according to the generated third configuration information, or can be determined according to the preset rule. The time point corresponding to the PDCCH is the PDCCH whose starting point exceeds the preset duration and the PRB set for scheduling the PDSCH.
[0214] In addition, optionally, after the PRB set is determined according to the generated third configuration information, the third conf...
Embodiment 3
[0230] Figure 5 is a signaling flow chart of another information receiving method shown in an exemplary embodiment of the present application, such as Figure 5 As shown, the method includes:
[0231] In step S501, the base station determines, based on the generated first configuration information, for repeated transmission of the PDCCH whose time point corresponding to the current PDCCH exceeds a preset duration and the PRB for scheduling the PDSCH and the repeated transmission of the corresponding channel on each PRB frequency.
[0232] Wherein, the base station may determine the PRB used for repeated transmission of the corresponding channel according to the generated first configuration information, the first configuration information includes one of the interval between the PRB to be determined and the current PRB, the PRB index to be determined and the corresponding channel The number of repeated transmissions on each PRB, the corresponding channel includes the PDCCH ...