Embodiment 1
[0089] Step (1) reservoir basic data collection.
[0090] Collect reservoir characteristic parameters, reservoir scheduling mode, reservoir water level and storage capacity curve, reservoir area and downstream main sections
[0091] Step (2) calculates the node period that needs to make risk decision-making according to the flood control compensation and flood regulation of the reservoir.
[0094]
[0100]
[0101] Do this until all calculation periods are complete.
[0102] The flood control process of the reservoir under the two scheduling decisions is shown in Figure 4 below, including the water level process and the flow process. It can be seen from Figure 4 that
[0103] Step (4) the optimal output of the decision-making scheme.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com