Reservoir flood control scheduling calculation method based on reservoir area and downstream risk decision feedback

A technology for flood control scheduling and risk decision-making, which is applied in computing, instruments, and climate change adaptation, and can solve problems such as dilemmas, backwater submersion of downstream excess floods in reservoir areas, etc.

Active Publication Date: 2020-01-17
CHANGJIANG SURVEY PLANNING DESIGN & RES
View PDF5 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In fact, in the face of major floods, in the practice of real-time flood control dispatching of reservoirs, there will often be an embarrassing situation in which the backwater in the reservoir area is submerged and the excess flood in the downstream is difficult to deal with. The submergence risk of flood diversion in the downstream reaches, how to make dispatching decisions has become an important problem for flood control personnel

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Reservoir flood control scheduling calculation method based on reservoir area and downstream risk decision feedback
  • Reservoir flood control scheduling calculation method based on reservoir area and downstream risk decision feedback
  • Reservoir flood control scheduling calculation method based on reservoir area and downstream risk decision feedback

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0089] Taking a reservoir in the upper reaches of the Yangtze River in my country as an example, for a major flood that actually occurred and caused relatively large flood losses, the calculation of flood control scheduling based on the reservoir area and downstream risk decision-making feedback includes the following steps:

[0090] Step (1) Collection of reservoir basic data.

[0091] Collect information such as reservoir characteristic parameters, reservoir scheduling mode, reservoir water level storage capacity curve, reservoir area and downstream main section basic data, downstream flood control station safety discharge, reservoir area and downstream loss relationship curve, etc., and use it as the basis for reservoir flood control scheduling constraint. There were 31 periods of flood in this field, and each period was 24 hours; there were 70 backwater sections in the reservoir area, which were used to calculate the backwater surface line of the reservoir area, and obtain...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a reservoir flood control scheduling calculation method based on reservoir area and downstream risk decision feedback. The method comprises the following steps: (1) collectingreservoir flood control scheduling information; (2) calculating a node time period needing risk decision making according to reservoir flood control compensation flood regulation calculation; (3) starting from the node time period, counting reservoir area return water inundation loss E according to a downstream flood prevention safety decision, and counting downstream inundation loss E 'accordingto the reservoir area flood prevention safety decision; and (4) comparing E with E ', and selecting a flood control compensation scheduling mode. According to the method, the flood loss of the reservoir area or the downstream can be quickly identified, and a decision scheme with acceptable loss is provided for a management department as an optimal scheme.

Description

technical field [0001] The invention belongs to the technical field of water conservancy and hydropower, in particular to a calculation method for reservoir flood control scheduling based on reservoir area and downstream risk decision-making feedback. Background technique [0002] Reservoir flood control dispatching is a multi-stage, multi-level, multi-objective complex decision-making process, which not only needs to take into account the contradiction between reservoir flood control and profit dispatching, but also takes into account the flood control requirements of cascade reservoir areas and downstream. Due to the real-time, urgency and irreversibility of the reservoir flood control system, it is necessary to make early flood control risk decisions in case of major floods to minimize flood losses. [0003] Most of the current reservoir flood control dispatching is based on the established flood control conditions of the reservoir, and the corresponding outflow flow proc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/06312G06Q10/0635G06Q50/06Y02A10/40
Inventor 胡向阳邹强丁毅喻杉何小聪张先平王学敏李肖男
Owner CHANGJIANG SURVEY PLANNING DESIGN & RES
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products