An inspection well, an integral technology, applied in the field of inspection wells, can solve the problems of poor sealing of connection and combination parts, trunk roads that are not suitable for heavy loads, insufficient rigidity of plastic inspection wells, etc., to facilitate on-site construction and installation , Conducive to transportation, fast and efficient production and on-site construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] Embodiment 1: see Figure 1 to Figure 6 , in an embodiment of the present invention, a large-scale integrated inspection well is provided, including a cylindrical plastic outer wall, a cylindrical plastic inner wall located inside the cylindrical plastic outer wall, an integrally cast cement concrete wall core 11, and a receiving branch pipe 10 ,
[0044] The cement concrete wall core 11 is located between the plastic outer wall and the plastic inner wall;
[0045] The plastic outer wall includes a plastic shut-off outer wall 1, a plastic well outer wall 5 and a plastic well seat outer wall 8 with a bottom arranged in sequence from top to bottom. The lower opening, the diameter of the upper opening of the outer wall 1 of the plastic closure is smaller than the diameter of the lower opening;
[0046] The plastic inner wall includes the plastic shut-off inner wall 2, the plastic well inner wall 6 and the plastic well base inner wall 9 with a bottom that are supported an...
Embodiment 2
[0068] Embodiment 2: as Figure 7 As shown, a large integral inspection well, the self-tapping screw 3 between the outer wall 8 of the plastic well base and the inner wall 9 of the plastic well base in this embodiment adopts two layers;
[0069] The number of plastic well chambers is 2, and the lower end of the plastic well outer wall 5 of the upper plastic well chamber between adjacent plastic well chambers fits in the receiving ring-4 of the plastic well outer wall 5 of the plastic well chamber below. ;
[0070] The inspection well height is 2600mm.
[0071] In step d of a large-scale integrated inspection well and its preparation method, it is necessary to increase the upper plastic well chamber between the adjacent plastic well chambers to cooperate with the lower plastic well chamber. Cement concrete needs to be filled, and earth and rocks should be filled externally.
[0072] All the other structures and methods are the same as in Example 1.
PUM
| Property | Measurement | Unit |
|---|---|---|
| height | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
| length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 