Support method by using waste tower crane standard knot as protection shed
A support method and standard section technology, which are applied in the processing of pillars, building materials, and on-site preparation of building components to reduce resource consumption, improve stability, and facilitate disassembly and assembly.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Such as figure 1 As shown in Fig. 1, a support method using the standard section of the waste tower crane as the protective shed, using the standard section 1 of the waste tower crane as the supporting part of the protective shed, the support position is set according to actual needs, and after the standard section 1 is loaded, it can be reinforced by an adjustable The structure is reinforced.
[0038] By adopting the above technical scheme: using the waste and old tower crane standard section 1 as the support method of the protective shed can effectively utilize the remaining bearing capacity of the waste and old tower crane standard section 1 by using the waste and old tower crane standard section 1 as the support of the protective shed, reduce resource consumption, and protect environment.
[0039] Such as figure 1 As shown, the bottom standard section 1 needs to be buried in the ground to a certain depth, and the standard section 1 and the standard section 1 are r...