Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Scheduling method and system based on multiple dependent processes

A scheduling method and technology of a scheduling system, applied in the field of scheduling methods and systems based on multi-dependent processes, can solve problems such as the inability to achieve fast analysis and statistics, and achieve the effect of reducing manual checks

Pending Publication Date: 2020-10-30
北京思特奇信息技术股份有限公司
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In a complex data environment, when performing statistical analysis of multiple data sources, due to the difference in data arrival time, there are more interdependencies between the data. Missing relational data leads to statistical analysis anomalies

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Scheduling method and system based on multiple dependent processes
  • Scheduling method and system based on multiple dependent processes

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] The principles and features of the present invention will be described below in conjunction with the accompanying drawings, and the examples given are only used to explain the present invention, and are not intended to limit the scope of the present invention.

[0041] Such as figure 1 As shown, it is a scheduling method based on multiple dependent processes provided by the embodiment of the present invention. The method includes: S1, configuring the dependencies of multiple script files into the entry program; wherein the entry program is used to control the flow cycle, and judge Whether there is an error in the log and start the next sub-process cycle, etc. The dependencies may include: relationships between scripts and corresponding script names.

[0042] In some examples, obtaining the dependencies may include: establishing multiple corresponding script files according to the multiple application programs to be uniformly scheduled, and establishing the dependency r...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a scheduling method and system based on multiple dependent processes, and relates to the field of process scheduling. The method comprises the following steps: configuring thedependency relationship of the plurality of script files into an entry program; entering a sub-process for obtaining target data through an entry program, calling a sub-process script to combine a dependency relationship to generate the target data, and integrating data acquisition and data statistics by adopting a unified entry mode, thereby solving the problem that numerous acquisition programsand statistical programs are abnormal due to the problems of data dependency relationship, data arrival time and the like.

Description

technical field [0001] The invention relates to the field of process scheduling, in particular to a scheduling method and system based on multiple dependent processes. Background technique [0002] In a complex data environment, when performing statistical analysis of multiple data sources, due to the difference in data arrival time, there are more interdependencies between the data. Missing relational data lead to anomalies in statistical analysis. Contents of the invention [0003] The technical problem to be solved by the present invention is to provide a scheduling method and system based on multiple dependent processes in view of the deficiencies in the prior art. [0004] The technical scheme that the present invention solves the problems of the technologies described above is as follows: [0005] A scheduling method based on multiple dependent processes, comprising: [0006] S1, configuring the dependencies of multiple script files into the entry program; [000...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F9/455G06F11/30G06F11/07
CPCG06F9/45512G06F9/45529G06F11/302G06F11/3065G06F11/079G06F2201/865
Inventor 许智凯
Owner 北京思特奇信息技术股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products