Dynamic description method for high-water-consumption strip of water-drive reservoir
A water-flooding and water-consuming technology, which is used in earth-moving drilling, fluid production, measurement, etc., can solve the problem of inability to fully consider the particularity of high-water-consuming strips, the lack of effective description methods for high-water-consuming strips, and the difficulty of interpretation. and other problems to achieve the effect of improving the development effect
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2020-11-10
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of oil and gas field development, in particular to the technical field of high water consumption strips in water drive reservoirs. Background technique
[0002] The high water consumption strip refers to the connected area formed during the long-term water flooding process with low oil saturation, the displacement factor is much larger than other areas, and does not have the potential for continuous water flooding. Oilfield development enters the late stage of ultra-high water cut. Affected by reservoir heterogeneity, high water consumption bands generally develop, resulting in inefficient and ineffective circulation of a large amount of injected water. Identifying and describing the high water consumption zone is the prerequisite for its effective treatment, and it is also of great significance for improving the development effect of ultra-high water-cut reservoirs and reducing production costs.
[0003] A...
Examples
Embodiment Construction
[0029] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, so that those skilled in the art can better understand the present invention and implement it, but the examples given are not intended to limit the present invention.
[0030] Such as figure 1 As shown, a dynamic description method for high water consumption strips in water flooding reservoirs includes the following steps:
[0031] Step 1. Collect and sort out the geological data and development data of the target reservoir, and use the streamline simulator to construct the streamline simulation model of the target reservoir.
[0032] The geological data include reservoir structure parameters, reservoir physical parameters and fluid physical parameters; the reservoir structure parameters include top structure and fault data; the reservoir physical parameters include formation pressure, formation temperature, oil layer thickness, oil saturation d...